Abstracts – Search Results

Search or browse again, or refine search.

Click on the titles below to expand the information about each abstract.
Viewing 141 results ...

Abdalall, S (2017) Concurrent delay analysis in public works construction disputes: a cross-jurisdictional study of Egypt, Scotland and England, Unpublished PhD Thesis, Law School, University of Strathclyde.

  • Type: Thesis
  • Keywords: construction law; construction project; contracts; differentiation; dispute; Egypt; land
  • ISBN/ISSN:
  • URL: http://digitool.lib.strath.ac.uk:80/R/?func=dbin-jump-full&object_id=28663
  • Abstract:
    For “Concurrent Delay” dispute in construction projects, within what is called the Malmaison approach, English court allow the contractor to gain time but no monetary compensation. Following the issue of the judgment of the City Inn case in 2007 in Scotland which departed from the English approach to the apportionment approach for the monetary consequences, an argument on “Concurrent Delay” in construction projects has started. Few writers have commented giving their opinion based on common law grounds. The question can be: should we have different remedies for the same situation in a cross jurisdiction industry like construction industry which has nearly the same characteristics anywhere. When we take the matter to a larger comparative study, the civilian law logic should be brought to the argument on how to deal with “Concurrent Delay”. There is a notion of differentiation between private contracts and public contracts in most of the civil law countries. Egypt is a developed example of this. When we examine this notion of differentiation with the possible approaches of the “Concurrent Delay” we may add other philosophical and practical perspective to the matter of “Concurrent Delay”. In view of that issue, the author identifies the notion of the differentiation between the private contracts and the public contracts within the context of public works construction disputes. The author also aims to explore the matter of concurrent delay from its two angles which are the legal perspective and the construction management perspective to identify the concurrent delay issue. The research aims to identify the related matters to the issue of concurrent delay and to test an appropriate regulatory framework for concurrent delay within the civilian law context and in common law context. The main findings of the research can be summarized that, within modern construction industry, a unified fair and reasonable advocated resolution or remedy can be developed to be applicable in different jurisdictions as long as the characteristics and the nature of the dispute are nearly the same. These findings will help to support the process of developing a theoretical regulatory framework that will be used as a guide to develop the way we theoretically and practically deal with concurrent delay dispute. One of the aims of this research is to develop the research area of construction law in Egypt.

Abdulrahman, A (2010) The development of a performance measurement framework for FE/HE co-location construction projects, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Abo Kanon, H (2017) The motivations, possibilities and constrains of flexible housing practices in the UK and Turkey, Unpublished PhD Thesis, , Heriot-Watt University.

Abukhder, J S A (2004) A study of the management process on construction projects, and the development of a new notation system, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Agapiou, A and Clark, B (2014) Construction mediation in Scotland: A comparison of the views and experiences of lawyers and end-users. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 583–91.

Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 307–16.

Ahiaga-Dagbui, D D and Smith, S D (2014) Exploring escalation of commitment in construction project management: Case study of the scottish parliament project. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 753–62.

Akintoye, A, Beck, M, Hardcastle, C, Chinyio, E A and Asenova, D (2001) Risk identification practices under PFI environment. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 875–83.

Akintoye, A, Renukappa, S and Lal, H (2012) The abolition of the "contracts in writing" rule in the 2009 Construction Act: Potential implications for UK adjudication. International Journal of Law in the Built Environment, 4(02), 140-56.

Allan, C, Sommerville, J, Kennedy, P and Robertson, H (2000) A business unit approach to construction process re-engineering. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 335–42.

Andrew, A and Bryan, C (2011) Scottish construction lawyers and mediation: an investigation into attitudes and experiences. International Journal of Law in the Built Environment, 3(02), 159–81.

Andrew, A, Murning, I, Pitt, M and Tucker, M (2008) Investment in the Scottish further education estate 1999-2006. Journal of Financial Management of Property and Construction, 13(03), 209–16.

Ayus, A M B N (1992) Building contract claims: a comparative study (Scotland, England and Malaysia), Unpublished PhD Thesis, Faculty of Law, University of Aberdeen.

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the pr, Unpublished PhD Thesis, School of the Built Environment, University of Salford.

Barot, B (2002) Growth and business cycles for the Swedish economy. Journal of Construction Research, 3(02), 217–53.

Bell, T (2018) A detailed investigation into the engineering properties and challenges affecting the potential introduction of a UK grown dowel-laminated timber floor panel into the domestic construction market, Unpublished PhD Thesis, Department of Architecture, University of Strathclyde.

Billy, H and Iain, C (2011) Site manager safety training. Engineering, Construction and Architectural Management, 18(06), 2–.

Boateng, P (2014) A dynamic systems approach to risk assessment in megaprojects, Unpublished PhD Thesis, , Heriot-Watt University.

Boateng, P, Ahiaga-Dagbui, D, Chen, Z and Ogunlana, S (2015) Modelling economic risks in megaproject construction: A systemic approach. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 115–124.

Bornstein, L, Lizarralde, G, Gould, K A and Davidson, C (2013) Framing responses to post-earthquake Haiti: How representations of disasters, reconstruction and human settlements shape resilience. International Journal of Disaster Resilience in the Built Environment, 4(01), 43-57.

Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(01), 60-74.

Boyd, N J P (2016) From bicycles to buildings: a SCOT analysis of project level adoption of BIPV, Unpublished PhD Thesis, School of Construction Management and Engineering, University of Reading.

Boyd, P and Schweber, L (2018) Unintended consequences: institutional artefacts, closure mechanisms and the performance gap. Building Research & Information, 46(01), 10–22.

Boyd, P, Larsen, G D and Schweber, L (2014) Perspectives on the specification of Building Integrated Photovoltaic (BIPV) technology in construction projects. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 153–62.

Boyd, P, Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: incorporating building integrated photovoltaics. Construction Management and Economics, 33(05), 349-60.

Boyle F and Thomson C (2013) Housing an ageing population: implications for managing the social housing stock. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 1185–1195.

BuHamdan, S, Duncheva, T and Alwisy, A (2021) Developing a BIM and Simulation-Based Hazard Assessment and Visualization Framework for CLT Construction Design. Journal of Construction Engineering and Management, 147(03).

Burdge, J A (2023) Building a New University: a study of the buildings and related interiors at the University of St Andrews, c.1890-1914, Unpublished PhD Thesis, , University of St Andrews.

Carter, K and Fortune, C (2003) Procuring sustainable projects: a grounded approach. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 755–64.

Casady, C B and Baxter, D (2020) Pandemics, public-private partnerships (PPPs), and force majeure | COVID-19 expectations and implications. Construction Management and Economics, 38(12), 1077–85.

Charles, A (2012) Factors affecting the transformation of existing (no-fines concrete) dwellings to low carbon homes, Unpublished PhD Thesis, , Glasgow Caledonian University.

Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK, Unpublished PhD Thesis, , University of Manchester.

Clarke, K (2021) A critical analysis of the gap between collaborative risk management policies and practice in construction projects in the Scottish Highlands, Unpublished PhD Thesis, , University of Salford.

Clarke, L and Herrmann, G (2004) Cost vs. production: labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), 1057-66.

Craig, R W (2000) Controversial aspects of Commonwealth construction and engineering procurement law , Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.

Crawley, J, Biddulph, P, Wingfield, J, Ashdown, M, Lowe, R and Elwell, C (2020) Inferring the as-built air permeability of new UK dwellings. International Journal of Building Pathology and Adaptation, 38(01), 3–19.

Czarnocki, V and Murray, M (2004) The new scottish parliament project: a content analysis of two broadsheet newspapers. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 401–8.

Dammann, S and Elle, M (2006) Environmental indicators: establishing a common language for green building. Building Research & Information, 34(04), 387–404.

Daniel, E I, Oshodi, O, Dabara, D and Dimka, N (2024) Towards closing the housing gap in the UK: exploration of the influencing factors and the way forward. Construction Innovation, 24(04), 965-85.

Dao, M A (2008) Determinants of firm compliance with environmental laws : A case study of Vietnam, Unpublished PhD Thesis, Building, National University of Singapore.

Darren Graham, L, Smith, S D and Dunlop, P (2005) Lognormal Distribution Provides an Optimum Representation of the Concrete Delivery and Placement Process. Journal of Construction Engineering and Management, 131(02), 230–8.

Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria, Unpublished PhD Thesis, School of Management , University of Stirling.

Edwards, D J, Cabahug, R R and Nicholas, J (2003) The Impact of Training and Education Characteristics Upon Plant Operator Maintenance Proficiency. Journal of Engineering, Design and Technology, 1(02), 119–34.

Foster, J A and Poston, A (2024) Occupant experience of domestic kitchen environments in low-energy social and affordable housing in Scotland. Building Research & Information, 52(07), 799-816.

Foster, J A and Poston, A (2024) Occupant experience of domestic kitchen environments in low-energy social and affordable housing in Scotland. Building Research & Information, 52(07), 799–816.

Giarchi, G G (1981) Between McAlpine and Polaris: A social inscape study, Unpublished PhD Thesis, , University of Glasgow.

Gilmour, D, Blackwood, D, Falconer, R, Isaacs, J and Simpson, E (2015) The role of sustainability assessment in sustainability management for urban redevelopment. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 377–386.

Gilmour, D, Simpson, E, Blackwood, D, McCallum, C and Logan, G (2016) Vocational Training and Knowledge Development: A Deeper Understanding. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 393–402.

Giupponi, N and Thomson, C (2020) The Implication of Advances in Community Mapping Through Spatial Information Technologies for Urban Regeneration Projects. In: Scott, L and Neilson, C J (Eds.), Proceedings 36th Annual ARCOM Conference, 7-8 September 2020, UK, Association of Researchers in Construction Management, 735-744.

Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: a case study of new build in Scotland. Journal of Construction Procurement, 6(01), 20–32.

Griffith, A (1984) A critical investigation of factors influencing buildability and productivity, Unpublished PhD Thesis, , Heriot-Watt University.

Hairstans, R and Smith, R E (2018) Offsite HUB (Scotland): establishing a collaborative regional framework for knowledge exchange in the UK. Architectural Engineering and Design Management, 14(01–02), 60–77.

Hampton, G, Baldwin, A N and Holt, G (2012) Project delays and cost: stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(01), 73-91.

Hashim, R (2018) Green innovation adoption in the construction sector : the role of absorptive capacity and the effect of environmental requirements, Unpublished PhD Thesis, Business School, University of Edinburgh.

Hassan, P F (2005) A best practice framework for training UK construction site managers, Unpublished PhD Thesis, Department of Environment and Development, Sheffield Hallam University.

Hofman, P, Wade, F, Webb, J and Groenleer, M (2021) Retrofitting at scale: comparing transition experiments in Scotland and the Netherlands. Buildings and Cities, 2(01), 637–54.

Howard, M A (2022) Integration strategies for mergers and acquisitions in the United Kingdom housing sector, Unpublished PhD Thesis, , Walden University.

Hughes, J (2020) Global claims in engineering and construction contracts, Unpublished PhD Thesis, Law School , University of Strathclyde.

Hulls, P M (2022) The epidemiology of health and wellbeing in the workplace: managing and measuring occupational stress and behavioural factors in a male-dominated industry, Unpublished PhD Thesis, , University of Bristol.

Hunter, K and Kelly, J (2004) The case for value management in the UK public service sector. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 1031–41.

Javernick Will, A N (2009) Mobilizing institutional knowledge for international projects: The relative importance, acquisition and transfer of institutional knowledge for international firms, Unpublished PhD Thesis, , Stanford University.

Kasˌpar, H M P (2022) Robert Adam and networks for building in eighteenth-century Britain, Unpublished PhD Thesis, , University of Leeds.

Kennedy, P, Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and sub-contractors. Construction Management and Economics, 15(06), 527-37.

Koo, D H (2007) Development of sustainability assessment model for underground infrastructure, Unpublished PhD Thesis, , Arizona State University.

Langford, D A, Abukhder, J, Murray, M, Hardcastle, C and Vernea, E (2004) Rethinking construction: what about the SMEs?. Journal of Construction Procurement, 10(01).

Lawani, K, McKenzie-Govan, S, Hare, B, Sherratt, F and Cameron, I (2022) Skill shortage of bricklayers in Scotland. Journal of Engineering, Design and Technology, 20(01), 321-38.

Leblanc, H (2012) Knowledge mapping and process modelling to develop a sustainability-related knowledge management strategy for Scottish housing association planned works, Unpublished PhD Thesis, , Glasgow Caledonian University.

Leblanc, H, Thomson, C and Nitithamyong, P (2011) Mapping sustainability related knowledge of construction planned works: A social housing case study. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 563–72.

Littlefair, P, Ortiz, J and Bhaumik, C D (2010) A simulation of solar shading control on UK office energy use. Building Research & Information, 38(06), 46.

Liyanage, C L and Egbu, C O (2004) Development of a performance management framework for facilities management in the control of infections: an outline of methodology. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 321–31.

Love, N E (2009) Leading indicators of failure: a study of SMES in the construction sector in Wales and Scotland, Unpublished PhD Thesis, Business School , University of the West of England, Bristol.

Lowe, J G (2010) Edinburgh trams: a case study of a complex project. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1289–98.

Lowe, J G and Moroke, E (2010) Insolvency in the UK construction sector. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 93–100.

Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Maver, T W (2020) The architectural and engineering design of buildings aided by computer: A personal memoir with selected publications, Unpublished PhD Thesis, , University of Glasgow.

McCall, V (2022) Inclusive Living: ageing, adaptations and future-proofing homes. Buildings and Cities, 3(01), 250–64.

McElroy, L B (2009) Embedding integrated building performance assessment in design practice, Unpublished PhD Thesis, Department of Architecture and Building Science , University of Strathclyde.

McLean, J and Murray, M (2003) The construction of the new Scottish parliament in Edinburgh: an opinion poll of the Scottish public and construction industry professionals. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 725–34.

McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods, Unpublished PhD Thesis, , Aston University.

Menzies, B, Emmanuel, R, Thomson, C and Walton, J (2010) Creating the conditions that facilitate the development of equitable, low carbon communities in Scotland. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1467–76.

Morgan, C, Foster, J A, Poston, A and Sharpe, T R (2017) Overheating in Scotland: Contributing factors in occupied homes. Building Research & Information, 45(01), 143-56.

Morrison, S and Trushell, I (2016) Payment for offsite goods and materials: The Scottish perspective. Construction Management and Economics, 34(10), 679-87.

Murray, M and Langford, D (2009) Collegiality in the Scottish Construction Industry: Are Jock Tamson's Bairns held together by surface tension?. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 1327–37.

Murray, M D, Tookey, J E and Chan, A P (2001) Respect for people: looking at KPIs through 'younger eyes'!. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 671–80.

Murray, M D, Tookey, J E, Langford, D A and Hardcastle, C (2000) Project communication variables: a comparative study of US and UK construction industry perceptions. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 813–22.

Myers, H, Wade, F and Webb, J (2019) Mapping Emerging Subcontracting Networks for the Energy Efficiency Retrofit of Hard-to-Treat Buildings. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 852-861.

Nakhi, A E (1995) Adaptive construction modelling within whole building dynamic simulation, Unpublished PhD Thesis, , University of Strathclyde.

Nigra, M and Dimitrijevic, B (2018) Is radical innovation in architecture crucial to sustainability? Lessons from three Scottish contemporary buildings. Architectural Engineering and Design Management, 14(04), 272–91.

Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria, Unpublished PhD Thesis, , University of Newcastle (Australia).

Oliver, A K (2020) Perceptions of sustainability and their influence in the design and delivery of Scottish housing, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Oti-Sarpong, K (2019) Examining international technology transfer on construction projects in developing countries through a social construction of technology lens, Unpublished PhD Thesis, Department of Real Estate and Construction , University of Hong Kong.

Oti-Sarpong, K and Leiringer, R (2016) The Role of Learning in Construction Technology Transfer: A 'SCOT' Perspective. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 699–708.

Oyemomi, B, Hare, B and Tong, M (2016) Exploring Human Resource Incentivisation for Public Sector Construction Project Delivery in Scotland. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 609–618.

Oyemomi, B, Hare, B and Tong, M (2018) Exploring Public-Private Partnership Challenges and the Effects on the Construction Workforce: A Scotland Study. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 403–412.

Pasquire, C L and King, J H J (2000) Project team performance within the Scottish water market based private finance initiative. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 251–60.

Payne, S L (2009) The institutional capacity of the UK speculative housebuilding industry: responding to the brownfield development policy agenda, Unpublished PhD Thesis, Department of Urban Studies, University of Glasgow.

Pearson, A D (2014) An investigation of climatically responsive ultra-low energy housing in rural Scotland: a case study, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Porteous, C D A, Sharpe, T R, Menon, R A, Shearer, D, Musa, H, Baker, P H, Sanders, C H, Strachan, P A, Kelly, N J and Markopoulos, A (2012) Energy and environmental appraisal of domestic laundering appliances. Building Research & Information, 40(06), 679-99.

Ren, Z (2002) A multi-agent systems approach to construction claims negotiation, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.

Rezaei, M, Mostafaeipour, A, Jafari, N, Naghdi-Khozani, N and Moftakharzadeh, A (2020) Wind and solar energy utilization for seawater desalination and hydrogen production in the coastal areas of southern Iran. Journal of Engineering, Design and Technology , 18(06), 1951–69.

Rodger, D, Callaghan, N and Thomson, C (2019) The Integration of Retrofit Practice within Social Housing. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 832-841.

Rodger, R G (1976) Scottish urban housebuilding, 1870-1914, Unpublished PhD Thesis, , University of Edinburgh.

Rodríguez-Labajos, L, Thomson, C S and O’Brien, G (2021) Applying constructivist grounded theory in co-production research: a case study exploring its potential and lessons for construction management research. Construction Management and Economics, 39(05), 369–82.

Rostami, A (2015) Risk management in small and medium enterprises in the UK construction industry, Unpublished PhD Thesis, School of Engineering and Built Environment, Glasgow Caledonian University.

Ruchinskaya, T (1996) The contribution of the Scottish architect Adam Menelaws to Moscow architecture in the early 19th century. Building Research & Information, 24(02), 75–80.

Salama, M, Keogh, W and Tabunshchikova, O (2007) Universities' role in enhancing generic competencies in multicultural students. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 1, 275–84.

Sanna, F (2018) Timber modern methods of construction: a comparative study, Unpublished PhD Thesis, Institute for Sustainable Construction, Edinburgh Napier University.

Saunders, A (1998) Aspects of funding for BOOT projects. Engineering, Construction and Architectural Management, 5(01), 22–30.

Scott, J R (2004) Optimising the relationship between passive solar design of new housing and the economics of construction and land value, Unpublished PhD Thesis, Scott Sutherland School of Architecture & Built Environment, Robert Gordon University.

Scott, J, Deveci, G, Edge, M and Martin, P (2004) Towards zero-heating: affordable models for environmentally friendly housing in Scotland. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 1349–58.

Sergeeva, N and Liu, N (2020) Social construction of innovation and the role of innovation brokers in the construction sector. Construction Innovation, 20(02), 247–59.

Shafik, M and Martin, P (2006) The impact of procurement methods on the Scottish housebuilding industry. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 81–90.

Shang, G, Sui Pheng, L and Jia Hui, W (2020) Drivers and barriers for multiskilling workers in the Singapore construction industry. International Journal of Construction Management, 20(04), 289-304.

Sidwell, N C (1957) A critical examination of new constructional techniques and their influence on productivity in the building industry with special reference to housing in south-east Scotland, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Sloan, B, McLeod, B N, Smith, R M and Goodall, W L (1996) A functional cost approach in the development and use of a project budget cost limit estimator (PBCLE) for capitol building works. Journal of Financial Management of Property and Construction, 1(01), 89–100.

Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site, Unpublished PhD Thesis, School of Geographical and Earth Sciences, University of Glasgow.

Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(02), 147-54.

Sommerville, J (2011) Ethical views of micro-enterprises delivering project and asset management services in west-central Scotland. Built Environment Project and Asset Management, 1(01), 91-103.

Sommerville, J and Thomas, W (2009) Factors affecting the management of micro-construction enterprises. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 1349–55.

Sommerville, J, Craig, N and Charles, A (2011) No-fines homes: the make or break question?. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 13–22.

Stephen, J S (1936) The history of roads in the highlands of Scotland in the eighteenth and nineteenth centuries - contrasting the military roads (i.e. Those of Wade and Caulfield) with the parliamentary roads (i.e. Those constructed by Telford), Unpublished PhD Thesis, , University of Aberdeen.

Sugar, K, Mose, T M, Nolden, C, Davis, M, Eyre, N, Sanchez-Graells, A and Van der Horst, D (2022) Local decarbonisation opportunities and barriers: UK public procurement legislation. Buildings and Cities, 3(01), 895–911.

Swan, W, Cooper, R, McDermott, P and Wood, G (2001) A review of social network analysis for the IMI trust in construction project. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 59–67.

Talhouni, B T K (1990) Measurement and analysis of construction labour productivity, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Tansey, P and Spillane, J (2018) Vistas of Strategy-Making within Northern Ireland Construction Firms: How SME's Differ from Large Firms. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 776–785.

Thomas, H R, Sanders, S R and Bilal, S (1992) Comparison of Labor Productivity. Journal of Construction Engineering and Management, 118(04), 635–50.

Thomson, C, Mickovski, S and Orr, C (2014) Promoting double loop learning in flood risk management in the Scottish context. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 1185–94.

Thomson, D S, Carter, K and Grant, F (2017) Unpacking cohort social ties: The appropriateness of perceived social capital to graduate early career performance in construction project teams. International Journal of Construction Education and Research, 13(04), 299-316.

Thomson, D, Kaka, A, Pronk, L and Alalouch, C (2012) The use of freelisting to elicit stakeholder understanding of the benefits sought from healthcare buildings. Construction Management and Economics, 30(04), 309-23.

Tierney, G and Tennant, S (2015) House building in Scotland: The sustainability performance gap . In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 317–326.

Tokede, O, Udawatta, N and Luther, M (2018) Retrofitting heritage office buildings in the UK: a case study. Built Environment Project and Asset Management, 8(01), 39–50.

Trushell, I and Morrison, S (2015) Ownership of materials: A Scottish/English dichotomy . In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 63–72.

Trushell, I, Clark, B and Agapiou, A (2014) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 593–602.

Trushell, I, Clark, B and Agapiou, A (2016) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. International Journal of Law in the Built Environment, 8(02), 101-22.

Trushell, J M (2010) A history of the quantity surveying profession in scotland to the late-twentieth century, with special reference to john dansken & purdie, chartered quantity surveyors, Unpublished PhD Thesis, , Glasgow Caledonian University.

Venter, I M, Blignaut, R J and Renaud, K (2014) Uniformity in the midst of diversity. Journal of Engineering, Design and Technology, 12(04), 550-62.

Wamuziri, S (2010) Alternative models for procurement of major infrastructure projects in Scotland. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1009–18.

Wamuziri, S C and Clearie, A G F (2005) Economic feasibility of the proposed Second Forth Road Bridge using public private partnership procurement. Journal of Financial Management of Property and Construction, 10(02), 95–106.

Watson, A and McInnes, S (1997) Small/medium scale construction logistics: a study into the factors affecting planning accuracy. In: Stephenson, P (Ed.), Proceedings 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK. Association of Researchers in Construction Management, Vol. 1, 223–32.

Whitehead, R C (1995) Factors influencing labour productivity on construction sites, Unpublished PhD Thesis, , University of Dundee.

Zhang, X, Austin, S A and Glass, J (2006) Linking individual and organisational values: a case study in UK construction. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 2, 833–42.