Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 146 results ...

Aalto, L, Sirola, P, Kalliomäki-Levanto, T, Lahtinen, M, Ruohomäki, V, Salonen, H and Reijula, K (2019) User-centric work environments in modular healthcare facilities. Engineering, Construction and Architectural Management, 26(06), 1047–62.

Acharya, N K, Lee, Y D and Im, H M (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(06), 543–66.

Akadiri, P O and Olomolaiye, P O (2012) Development of sustainable assessment criteria for building materials selection. Engineering, Construction and Architectural Management, 19(06), 666-87.

Akintoye, A and Chinyio, E (2005) Private Finance Initiative in the healthcare sector: trends and risk assessment. Engineering, Construction and Architectural Management, 12(06), 601–16.

Akintoye, A and Main, J (2007) Collaborative relationships in construction: the UK contractors' perception. Engineering, Construction and Architectural Management, 14(06), 597–617.

Amuda-Yusuf, G and Mohamed, S F (2015) Essential features of a building services standard method of measurement in Malaysia. Engineering, Construction and Architectural Management, 22(06), 749-70.

Anikeeff, M A and Sriram, V (2008) Construction management strategy and developer performance. Engineering, Construction and Architectural Management, 15(06), 504–13.

Anumba, C E H, Dainty, A, Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(06), 616–33.

Attoh-Okine, N O (2003) Rule induction in productivity analysis: a rough set approach. Engineering, Construction and Architectural Management, 10(06), 413–7.

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(06), 875-900.

Babatunde, S O, Perera, S, Zhou, L and Udeaja, C (2015) Barriers to public private partnership projects in developing countries: A case of Nigeria. Engineering, Construction and Architectural Management, 22(06), 669-91.

Bakry, I, Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(06), 782-800.

Ballesteros-Pérez, P, del Campo-Hitschfeld, M L, González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(06), 596-621.

Beitelmal, W, Molenaar, K R, Javernick-Will, A and Pellicer, E (2017) Challenges and barriers to establishing infrastructure asset management: A comparative study between Libya and the USA. Engineering, Construction and Architectural Management, 24(06), 1184-202.

Billy, H and Iain, C (2011) Site manager safety training. Engineering, Construction and Architectural Management, 18(06), 2–.

Bowen, P, Edwards, P and Lingard, H (2013) Workplace stress among construction professionals in South Africa: The role of harassment and discrimination. Engineering, Construction and Architectural Management, 20(06), 620-35.

Bråthen, K and Moum, A (2016) Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(06), 751-64.

Caldas, C and Gupta, A (2017) Critical factors impacting the performance of mega-projects. Engineering, Construction and Architectural Management, 24(06), 920-34.

Carley, L A, Haas, C T, Borcherding, J D and Goodrum, P M (2003) Experiences with multiskilling among non-union craft workers in US industrial construction projects. Engineering, Construction and Architectural Management, 10(06), 374–81.

Chan, A P C, Wong, F K W, Hon, C K H, Ali, J A and Lyu, S (2017) Construction safety and health problems of ethnic minority workers in Hong Kong. Engineering, Construction and Architectural Management, 24(06), 901-19.

Cheng, J, Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(06), 567–83.

Cheng, Z, Ke, Y, Yang, Z, Cai, J and Wang, H (2020) Diversification or convergence. Engineering, Construction and Architectural Management, 27(06), 1315–35.

Chuan, C and John, I M (2011) Characterizing entry modes for international construction markets: paving the way to a selection model. Engineering, Construction and Architectural Management, 18(06), 1–.

Cotton, A P, Sohail, M and Scott, R E (2005) Towards improved labour standards for construction of minor works in low income countries. Engineering, Construction and Architectural Management, 12(06), 617–32.

Cunha, L R M, Bastos, C D, Meijon, M N H and Araújo, D F (2016) Gamification technique for supporting transparency on construction sites: A case study. Engineering, Construction and Architectural Management, 23(06), 801-22.

Dada, J O (2017) An appraisal of paradigm shifts required of competence of the Nigerian quantity surveyors. Engineering, Construction and Architectural Management, 24(06), 1269-80.

Damci, A, Arditi, D and Polat, G (2017) Civil engineers’ personal values/demographics linkage in project team building. Engineering, Construction and Architectural Management, 24(06), 1337-49.

Daniel, E I and Pasquire, C (2019) Creating social value within the delivery of construction projects: the role of lean approach. Engineering, Construction and Architectural Management, 26(06), 1105–28.

de Paula, N, Arditi, D and Melhado, S (2017) Managing sustainability efforts in building design, construction, consulting, and facility management firms. Engineering, Construction and Architectural Management, 24(06), 1040-50.

Ding, Z, Ng, F F and Wang, J (2013) The mediation role of trust in knowledge sharing: A cognitive perspective in Chinese architectural design teams. Engineering, Construction and Architectural Management, 20(06), 604-19.

Ding, Z, Zuo, J, Wu, J and Wang, J Y (2015) Key factors for the BIM adoption by architects: A China study. Engineering, Construction and Architectural Management, 22(06), 732-48.

Du, J, Wang, Q and Shi, Q (2019) Description–experience gap under imperfect information. Engineering, Construction and Architectural Management, 26(06), 1151–70.

Dulaimi, M F (2007) Case studies on knowledge sharing across cultural boundaries. Engineering, Construction and Architectural Management, 14(06), 550–67.

Edirisinghe, R, London, K A, Kalutara, P and Aranda-Mena, G (2017) Building information modelling for facility management: Are we there yet?. Engineering, Construction and Architectural Management, 24(06), 1119-54.

Edwards, P and Bowen, P (2019) Language and communication issues in HIV/AIDS intervention management in the South African construction industry. Engineering, Construction and Architectural Management, 26(06), 962–88.

El-Hamrawy, S A-K, Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(06), 988-1003.

Eriksson, P E, Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(06), 598–611.

Eriksson, P E, Nilsson, T, rn and Atkin, B (2008) Client perceptions of barriers to partnering. Engineering, Construction and Architectural Management, 15(06), 527–39.

Erman Surya, B, Muhd Zaimi Bin Abdul, M, Rosli Mohamad, Z and Bambang, T (2011) Constructability improvement in sea water intake structure. Engineering, Construction and Architectural Management, 18(06), 4–.

Essa, R and Fortune, C (2008) Pre-construction evaluation practices of sustainable housing projects in the UK. Engineering, Construction and Architectural Management, 15(06), 514–26.

Florence Yean Yng, L and Asanga, G (2011) Strategies for potential owners in Singapore to own environmentally sustainable homes. Engineering, Construction and Architectural Management, 18(06), 3–.

Florence, L and Siew Huay, L (2010) Improving export performance of contractors from China. Engineering, Construction and Architectural Management, 17(06), 581–97.

Forsythe, P J (2012) Profiling customer perceived service quality expectations in made-to-order housing construction in Australia. Engineering, Construction and Architectural Management, 19(06), 587-609.

Gajendran, T and Brewer, G (2007) Integration of information and communication technology: Influence of the cultural environment. Engineering, Construction and Architectural Management, 14(06), 532–49.

Gledson, B J and Greenwood, D (2017) The adoption of 4D BIM in the UK construction industry: An innovation diffusion approach. Engineering, Construction and Architectural Management, 24(06), 950-67.

Gunduz, M and Elsherbeny, H A (2020) Critical assessment of construction contract administration using fuzzy structural equation modeling. Engineering, Construction and Architectural Management, 27(06), 1233–55.

Gurgun, A P and Koc, K (2020) Contractor prequalification for green buildings—evidence from Turkey. Engineering, Construction and Architectural Management, 27(06), 1377–400.

Hamzeh, F, Abdul, G O, Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(06), 935-49.

Hari, S, Egbu, C and Kumar, B (2005) A knowledge capture awareness tool: An empirical study on small and medium enterprises in the construction industry. Engineering, Construction and Architectural Management, 12(06), 533–67.

Hoeber, H and Alsem, D (2016) Life-cycle information management using open-standard BIM. Engineering, Construction and Architectural Management, 23(06), 696-708.

Holt, G D, Goulding, J and Akintoye, A (2014) Interrelationships between theory and research impact: Views from a survey of UK academics. Engineering, Construction and Architectural Management, 21(06), 674-96.

Hong, X and David, B (2010) Learning from cross-cultural problems in international projects: a Chinese case. Engineering, Construction and Architectural Management, 17(06), 549–62.

Hu, X and Liu, C (2018) Measuring efficiency, effectiveness and overall performance in the Chinese construction industry. Engineering, Construction and Architectural Management, 25(06), 780–97.

Huan, Y, Chan, A P C and Qiming, L (2010) Density dependence in the Chinese construction industry: focus on mortality of Jiangsu Province (1989-2007). Engineering, Construction and Architectural Management, 17(06), 563–80.

Ibrahim, A K M (2011) Risk matrix for factors affecting time delay in road construction projects: owners’ perspective. Engineering, Construction and Architectural Management, 18(06), 5–.

Ikediashi, D I and Ogunlana, S O (2015) Significant risk factors associated with facilities management outsourcing: A study on Nigeria’s public hospitals. Engineering, Construction and Architectural Management, 22(06), 771-96.

Ison, S, Dainty, A and Wall, S (2004) The construction sector, congestion charging and exemptions. Engineering, Construction and Architectural Management, 11(06), 386–94.

Jaeger, M, Yu, G and Adair, D (2017) Organisational culture of Chinese construction organisations in Kuwait. Engineering, Construction and Architectural Management, 24(06), 1051-66.

Josephson, P-E and Björkman, L (2013) Why do work sampling studies in construction? The case of plumbing work in Scandinavia. Engineering, Construction and Architectural Management, 20(06), 589-603.

Karam, A H (2003) Marketing and architects in South Africa. Engineering, Construction and Architectural Management, 10(06), 402–12.

Kehinde, J O and Mosaku, T O (2006) An empirical study of assets structure of building construction contractors in Nigeria. Engineering, Construction and Architectural Management, 13(06), 634–44.

Khanh, H D and Kim, S Y (2015) Development of waste occurrence level indicator in Vietnam construction industry. Engineering, Construction and Architectural Management, 22(06), 715-31.

Khosrowshahi, F and Arayici, Y (2012) Roadmap for implementation of BIM in the UK construction industry. Engineering, Construction and Architectural Management, 19(06), 610-35.

Koch, C (2003) Knowledge management in consulting engineering - joining IT and human resources to support the production of knowledge. Engineering, Construction and Architectural Management, 10(06), 391–401.

Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(06), 709-26.

Koops, L, van Loenhout, C, Bosch-Rekveldt, M, Hertogh, M and Bakker, H (2017) Different perspectives of public project managers on project success. Engineering, Construction and Architectural Management, 24(06), 1294-318.

Kululanga, G K and Kuotcha, W S (2008) Measuring organisational learning through project reviews. Engineering, Construction and Architectural Management, 15(06), 580–95.

Kumaraswamy, M M, Ling, F Y Y, Anvuur, A M and Rahman, M M (2007) Targeting relationally integrated teams for sustainable PPPS. Engineering, Construction and Architectural Management, 14(06), 581–96.

Löwstedt, M and Sandberg, R (2020) Standardizing the free and independent professional. Engineering, Construction and Architectural Management, 27(06), 1337–55.

Laryea, S and Hughes, W (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(06), 558–72.

Le, P T, Chileshe, N, Kirytopoulos, K and Rameezdeen, R (2020) Investigating the significance of risks in BOT transportation projects in Vietnam. Engineering, Construction and Architectural Management, 27(06), 1401–25.

Li, J, Zuo, J, Jiang, W, Zhong, X, Li, J and Pan, Y (2020) Policy instrument choice for construction and demolition waste management: the case study of Shenzhen, China. Engineering, Construction and Architectural Management, 27(06), 1283–97.

Li, L, Li, Z, Li, X and Wu, G (2019) A review of global lean construction during the past two decades: analysis and visualization. Engineering, Construction and Architectural Management, 26(06), 1192–216.

Ling, F Y Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(06), 576-88.

Ling, F Y Y, Ang, A M H and Lim, S S Y (2007) Encounters between foreigners and Chinese: Perception and management of cultural differences. Engineering, Construction and Architectural Management, 14(06), 501–18.

Lingard, H and Francis, V (2008) An exploration of the adaptive strategies of working families in the Australian construction industry. Engineering, Construction and Architectural Management, 15(06), 562–79.

Lingard, H, Francis, V and Turner, M (2012) Work time demands, work time control and supervisor support in the Australian construction industry: An analysis of work-family interaction. Engineering, Construction and Architectural Management, 19(06), 647-65.

Lingard, H, Zhang, R P and Oswald, D (2019) Effect of leadership and communication practices on the safety climate and behaviour of construction workgroups. Engineering, Construction and Architectural Management, 26(06), 886–906.

Liu, A M M, Chiu, W M and Fellows, R (2007) Enhancing commitment through work empowerment. Engineering, Construction and Architectural Management, 14(06), 568–80.

Liu, A M M, Fellows, R and Ng, J (2004) Surveyors' perspectives on ethics in organisational culture. Engineering, Construction and Architectural Management, 11(06), 438–49.

Luo, L-z, Mao, C, Shen, L-y and Li, Z-d (2015) Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China. Engineering, Construction and Architectural Management, 22(06), 622-43.

Madson, K M, Franz, B, Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(06), 1299–314.

Mary, H and Graeme, N (2011) Factors influencing technical innovation in SME construction firms. Engineering, Construction and Architectural Management, 18(06), 6–.

Meldrum, A, Hare, B and Cameron, I (2009) Road testing a health and safety worker engagement tool-kit in the construction industry. Engineering, Construction and Architectural Management, 16(06), 612–32.

Meng, J, Xue, B, Liu, B and Fang, N (2015) Relationships between top managers’ leadership and infrastructure sustainability: A Chinese urbanization perspective. Engineering, Construction and Architectural Management, 22(06), 692-714.

Mohammed, A and Charles, E (2010) Making a case for offsite construction in China. Engineering, Construction and Architectural Management, 17(06), 536–48.

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(06), 1004-17.

Munir, M, Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(06), 1171–91.

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2018) Developing a safety climate factor model in construction research and practice. Engineering, Construction and Architectural Management, 25(06), 738–57.

Ng, S T (2005) Performance of engineering consultants in ISO 9000-based quality management systems implementation. Engineering, Construction and Architectural Management, 12(06), 519–32.

Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity: A case of structural work. Engineering, Construction and Architectural Management, 20(06), 563-75.

Nguyen, L D, Ogunlana, S O and Lan, D T X (2004) A study on project success factors in large construction projects in Vietnam. Engineering, Construction and Architectural Management, 11(06), 404–13.

Nikmehr, B, Hosseini, M R, Rameezdeen, R, Chileshe, N, Ghoddousi, P and Arashpour, M (2017) An integrated model for factors affecting construction and demolition waste management in Iran. Engineering, Construction and Architectural Management, 24(06), 1246-68.

Ochieng, E G and Price, A D (2009) Framework for managing multicultural project teams. Engineering, Construction and Architectural Management, 16(06), 527–43.

Oke, A E (2018) Bonding capability of Nigerian contracting firms. Engineering, Construction and Architectural Management, 25(06), 707–20.

Olawumi, T O and Chan, D W (2020) Key drivers for smart and sustainable practices in the built environment. Engineering, Construction and Architectural Management, 27(06), 1257–81.

Oney-Yazici, E, Giritli, H, Topcu-Oraz, G and Acar, E (2007) Organizational culture: the case of Turkish construction industry. Engineering, Construction and Architectural Management, 14(06), 519–31.

Osei-Kyei, R and Chan, A P C (2017) Empirical comparison of critical success factors for public-private partnerships in developing and developed countries: A case of Ghana and Hong Kong. Engineering, Construction and Architectural Management, 24(06), 1222-45.

Othman, A A, Rahman, S A, Sundram, V P K and Bhatti, M A (2015) Modelling marketing resources, procurement process coordination and firm performance in the Malaysian building construction industry. Engineering, Construction and Architectural Management, 22(06), 644-68.

Palaneeswaran, E, Kumaraswamy, M M and Ng, S T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor. Engineering, Construction and Architectural Management, 10(06), 418–31.

Pellicer, T M, Pellicer, E and Eaton, D (2009) A macroeconomic regression analysis of the European construction industry. Engineering, Construction and Architectural Management, 16(06), 573–97.

Pewdum, W, Rujirayanyong, T and Sooksatra, V (2009) Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Management, 16(06), 544–57.

Prasertrungruang, T and Hadikusumo, B H W (2008) System dynamics modelling of machine downtime for small to medium highway contractors. Engineering, Construction and Architectural Management, 15(06), 540–61.

Ritson, N H, Wilson, M M J and Cohen, D A (2017) Managing engineering contractors in the UK petrochemicals industry. Engineering, Construction and Architectural Management, 24(06), 1067-80.

Sandhu, M and Helo, P (2006) A network approach to project business analysis. Engineering, Construction and Architectural Management, 13(06), 600–15.

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(06), 945–61.

Senaratne, S, Jin, X-H and Balasuriya, K (2017) Exploring the role of networks in disseminating construction project knowledge through case studies. Engineering, Construction and Architectural Management, 24(06), 1281-93.

Senaratne, S, Kagioglou, M, Amaratunga, D, Baldry, D, Aouad, G and Bowden, A (2005) Research knowledge transfer into teaching in the built environment. Engineering, Construction and Architectural Management, 12(06), 587–600.

Sepasgozar, S M E and Loosemore, M (2017) The role of customers and vendors in modern construction equipment technology diffusion. Engineering, Construction and Architectural Management, 24(06), 1203-21.

Sexton, M, Goulding, J, Zhang, X, Kagioglou, M, Aouad, G, Cooper, R and Barrett, P (2005) The role of the HyCon design-support tool in elevating hybrid concrete as a design option for structural frames. Engineering, Construction and Architectural Management, 12(06), 568–86.

Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(06), 1004–23.

Shanbari, H, Blinn, N and Issa, R R A (2016) Using augmented reality video in enhancing masonry and roof component comprehension for construction management students. Engineering, Construction and Architectural Management, 23(06), 765-81.

Shebob, A, Dawood, N, Shah, R K and Xu, Q (2012) Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(06), 688-712.

Shrestha, K, Shrestha, P P and Lidder, M (2019) Life-cycle cost comparison of chip seal and striping: in-house workers versus private contractors. Engineering, Construction and Architectural Management, 26(06), 927–44.

Shrestha, P P, Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(06), 1087–104.

Shurrab, J, Hussain, M and Khan, M (2019) Green and sustainable practices in the construction industry. Engineering, Construction and Architectural Management, 26(06), 1063–86.

Soetanto, R, Dainty, A R J, Glass, J and Price, A D F (2004) Criteria for assessing the potential performance of hybrid concrete structural frames. Engineering, Construction and Architectural Management, 11(06), 414–25.

Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(06), 968-87.

Teerajetgul, W and Charoenngam, C (2006) Factors inducing knowledge creation: empirical evidence from Thai construction projects. Engineering, Construction and Architectural Management, 13(06), 584–99.

Teo, A L E, Ofori, G, Tjandra, I and Kim, H (2017) Framework for productivity and safety enhancement system using BIM in Singapore. Engineering, Construction and Architectural Management, 24(06), 1350-71.

Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(06), 631-47.

Tran, D Q, Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(06), 1319-36.

Tran, T X M, Malano, H M and Thompson, R G (2003) Application of the analytic hierarchy process to prioritise irrigation asset renewals: the case of the La Khe irrigation scheme, Vietnam. Engineering, Construction and Architectural Management, 10(06), 382–90.

Trigunarsyah, B (2017) Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(06), 1155-69.

Tripathi, K K and Jha, K N (2018) Application of fuzzy preference relation for evaluating success factors of construction organisations. Engineering, Construction and Architectural Management, 25(06), 758–79.

Umeokafor, N (2018) An investigation into public and private clients’ attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(06), 798–815.

Venselaar, M and Wamelink, H (2017) The nature of qualitative construction partnering research: Literature review. Engineering, Construction and Architectural Management, 24(06), 1092-118.

Vieira, R, Carreira, P, Domingues, P and Costa, A A (2020) Supporting building automation systems in BIM/IFC: reviewing the existing information gap. Engineering, Construction and Architectural Management, 27(06), 1357–75.

Vu, H A, Cu, V H, Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(06), 1018-39.

Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(06), 648-73.

Wang, C, Li, B, Li, B and Baldwin, A (2017) Case study of “project controlling” on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(06), 862-74.

Wang, Q and Shi, Q (2019) The incentive mechanism of knowledge sharing in the industrial construction supply chain based on a supervisory mechanism. Engineering, Construction and Architectural Management, 26(06), 989–1003.

Weisheng, L, Liu, A M M, Hongdi, W and Zhongbing, W (2013) Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China. Engineering, Construction and Architectural Management, 20(06), 543-62.

Wibowo, A (2004) Valuing guarantees in a BOT infrastructure project. Engineering, Construction and Architectural Management, 11(06), 395–403.

Yalcinkaya, M and Singh, V (2019) Exploring the use of Gestalt’s principles in improving the visualization, user experience and comprehension of COBie data extension. Engineering, Construction and Architectural Management, 26(06), 1024–46.

Yan, X and Kim, Y (2018) A conceptual framework of ITSMCA for a building collapse accident. Engineering, Construction and Architectural Management, 25(06), 721–37.

Yang, R J, Jayasuriya, S, Gunarathna, C, Arashpour, M, Xue, X and Zhang, G (2018) The evolution of stakeholder management practices in Australian mega construction projects. Engineering, Construction and Architectural Management, 25(06), 690–706.

Yiu, T W and Chung, Y N (2014) Face-saving tactics as an aid to construction negotiation in Hong Kong. Engineering, Construction and Architectural Management, 21(06), 609-30.

Yong Qiang, C, Huanqing, L, Wenxue, L and Ning, Z (2010) Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA). Engineering, Construction and Architectural Management, 17(06), 598–614.

Yu, A T W (2017) Using jigsaw method to enhance the learning of research and consultancy techniques for postgraduate students. Engineering, Construction and Architectural Management, 24(06), 1081-91.

Yu, J, Ma, G and Jiang, X (2017) Impact of the built environment and care services within rural nursing homes in China on quality of life for elderly residents. Engineering, Construction and Architectural Management, 24(06), 1170-83.

Yung, P and Agyekum-Mensah, G (2012) Productivity losses in smoking breaks on construction sites: a case study. Engineering, Construction and Architectural Management, 19(06), 636-46.

Zhang, H, Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(06), 426–37.

Zhu, F, Sun, M, Wang, L, Sun, X and Yu, M (2019) Value conflicts between local government and private sector in stock public-private partnership projects. Engineering, Construction and Architectural Management, 26(06), 907–26.

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(06), 1129–50.

Zou, Y, Kiviniemi, A and Jones, S W (2016) Developing a tailored RBS linking to BIM for risk management of bridge projects. Engineering, Construction and Architectural Management, 23(06), 727-50.