Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 138 results ...

Abu El-Maaty, A E, El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(05), 809-27.

Agyekum-Mensah, G and Knight, A D (2017) The professionals’ perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management, 24(05), 828-41.

Akanmu, A and Anumba, C J (2015) Cyber-physical systems integration of building information models and the physical construction. Engineering, Construction and Architectural Management, 22(05), 516-35.

Al-Ghassani, A M, Kamara, J M, Anumba, C J and Carrillo, P M (2004) An innovative approach to identifying knowledge management problems. Engineering, Construction and Architectural Management, 11(05), 349–57.

Al-Jibouri, S H and Mawdesley, M J (2001) Design and experience with a computer game for teaching construction project planning and control. Engineering, Construction and Architectural Management, 8(05), 418–27.

Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(05), 493-515.

Alves, T d C L, Milberg, C and Walsh, K D (2012) Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management, 19(05), 512-25.

Arain, F M and Pheng, L S (2007) Modeling for management of variations in building projects. Engineering, Construction and Architectural Management, 14(05), 420–33.

Arditi, D, Ayrancioglu, M and Shi, J J (2005) Worker safety issues in night-time highway construction. Engineering, Construction and Architectural Management, 12(05), 487–501.

Bosher, L, Dainty, A, Carrillo, P and Glass, J (2007) Built-in resilience to disasters: a pre-emptive approach. Engineering, Construction and Architectural Management, 14(05), 434–46.

Bresnen, M and Marshall, N (2001) Understanding the diffusion and application of new management ideas in construction. Engineering, Construction and Architectural Management, 8(05), 335–45.

Cameron, I, Hare, B and Duff, R (2013) An analysis of safety advisor roles and site safety performance. Engineering, Construction and Architectural Management, 20(05), 505-21.

Chan, A P C and Oppong, G D (2017) Managing the expectations of external stakeholders in construction projects. Engineering, Construction and Architectural Management, 24(05), 736-56.

Chan, C T W and Sher, W (2014) Exploring AEC education through collaborative learning. Engineering, Construction and Architectural Management, 21(05), 532-50.

Chang, R-D, Zuo, J, Soebarto, V, Zhao, Z-Y and Zillante, G (2017) Dynamic interactions between sustainability and competitiveness in construction firms: A transition perspective. Engineering, Construction and Architectural Management, 24(05), 842-59.

Chang, Y, Wilkinson, S, Potangaroa, R and Seville, E (2012) Managing resources in disaster recovery projects. Engineering, Construction and Architectural Management, 19(05), 557-80.

Charoenngam, C and Sriprasert, E (2001) Assessment of cost control systems: a case study of Thai construction organizations. Engineering, Construction and Architectural Management, 8(05), 368–80.

Che Ibrahim, C K I, Costello, S B and Wilkinson, S (2018) Making sense of team integration practice through the “lived experience” of alliance project teams. Engineering, Construction and Architectural Management, 25(05), 598–622.

Chong, H-Y and Oon, C K (2016) A practical approach in clarifying legal drafting: Delphi and case study in Malaysia. Engineering, Construction and Architectural Management, 23(05), 610-21.

Christabel Man-Fong, H (2011) Ethics management for the construction industry: A review of ethical decision-making literature. Engineering, Construction and Architectural Management, 18(05), 516–37.

Chritamara, S, Ogunlana, S O and Bach, N L (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(05), 381–92.

Cox, A and Ireland, P (2002) Managing construction supply chains: the common sense approach. Engineering, Construction and Architectural Management, 9(05), 409–18.

Cuervo, J C and Pheng, L S (2003) Significance of location factors for Singapore transnational construction corporations. Engineering, Construction and Architectural Management, 10(05), 342–53.

Das, M, Cheng, J C P and Law, K H (2015) An ontology-based web service framework for construction supply chain collaboration and management. Engineering, Construction and Architectural Management, 22(05), 551-72.

David, J E and Gary, D H (2010) Case study analysis of construction excavator H&S overturn incidents. Engineering, Construction and Architectural Management, 17(05), 493–511.

Davis, P R and Walker, D H T (2009) Building capability in construction projects: a relationship-based approach. Engineering, Construction and Architectural Management, 16(05), 475–89.

Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(05), 438–58.

de Valence, G (2019) Reframing construction within the built environment sector. Engineering, Construction and Architectural Management, 26(05), 740–5.

Denny-Smith, G and Loosemore, M (2017) Integrating indigenous enterprises into the Australian construction industry. Engineering, Construction and Architectural Management, 24(05), 788-808.

Ding, Z, Zuo, J, Wang, J and Zillante, G (2016) Searching for niche market for engineering consultants: Case of regional supervision systems in China. Engineering, Construction and Architectural Management, 23(05), 622-37.

Edum-Fotwe, F T, Gibb, A G F and Benford-Miller, M (2004) Reconciling construction innovation and standardisation on major projects. Engineering, Construction and Architectural Management, 11(05), 366–72.

Egbu, C O (2004) Managing knowledge and intellectual capital for improved organizational innovations in the construction industry: an examination of critical success factors. Engineering, Construction and Architectural Management, 11(05), 301–15.

El-Omari, S and Moselhi, O (2009) Data acquisition from construction sites for tracking purposes. Engineering, Construction and Architectural Management, 16(05), 490–503.

El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(05), 639–53.

Ellis, R C T, Wood, G D and Thorpe, T (2004) Technology-based learning and the project manager. Engineering, Construction and Architectural Management, 11(05), 358–65.

Emmanuel, K C and Steven, G (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(05), 446–60.

Fernie, S, Green, S D and Weller, S J (2003) Dilettantes, discipline and discourse: requirements management for construction. Engineering, Construction and Architectural Management, 10(05), 354–67.

Fo, S, Marsh, x and Cockerham, G (2002) How building design imperatives constrain construction productivity and quality. Engineering, Construction and Architectural Management, 9(05), 378–87.

Formoso, C T, Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(05), 419–32.

Forsythe, P (2008) Modelling customer perceived service quality in housing construction. Engineering, Construction and Architectural Management, 15(05), 485–96.

Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(05), 446–57.

Fulford, R G (2019) The implications of the construction industry to national wealth. Engineering, Construction and Architectural Management, 26(05), 779–93.

Gambo, N, Said, I and Ismail, R (2016) Comparing the levels of performance of small scale local government contractors in northern Nigeria with international practice. Engineering, Construction and Architectural Management, 23(05), 588-609.

Gil, N, Tommelein, I D, Kirkendall, R L and Ballard, G (2001) Leveraging speciality-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(05), 355–67.

Gonzalez-Ruiz, J D, Arboleda, A, Botero, S and Rojo, J (2019) Investment valuation model for sustainable infrastructure systems. Engineering, Construction and Architectural Management, 26(05), 850–84.

Haji Karimian, S, Mbachu, J, Egbelakin, T and Shahzad, W (2019) Improving efficiency in roading projects: a New Zealand study. Engineering, Construction and Architectural Management, 26(05), 827–49.

Hare, B, Cameron, I and Duff, A R (2006) Exploring the integration of health and safety with pre-construction planning. Engineering, Construction and Architectural Management, 13(05), 438–50.

Harris, R A and Scott, S (2001) UK practice in dealing with claims for delay. Engineering, Construction and Architectural Management, 8(05), 317–24.

Hartmann, A and Girmscheid, G (2004) The innovation potential of integrated services and its utilisation through co-operation. Engineering, Construction and Architectural Management, 11(05), 335–41.

Hassanein, A A G and Khalifa, R A (2007) Financial and operational performance indicators applied to public and private water and wastewater utilities. Engineering, Construction and Architectural Management, 14(05), 479–92.

Hassanein, A A G and Khalil, B N L (2006) Building Egypt 1 � a general indicator cost index for the Egyptian construction industry. Engineering, Construction and Architectural Management, 13(05), 463–80.

Hassanein, A A G and Nemr, W E (2008) Claims management in the Egyptian industrial construction sector: a contractor's perspective. Engineering, Construction and Architectural Management, 15(05), 456–69.

Haugbølle, K, Larsen, J N and Nielsen, J (2019) Construction productivity revisited: towards measuring performance of construction output. Engineering, Construction and Architectural Management, 26(05), 794–813.

Heng, H K S and Loosemore, M (2013) Structural holes in hospital organisations: Facilities managers as intrapreneurial brokers in the tertiary health sector. Engineering, Construction and Architectural Management, 20(05), 474-87.

Heravi, G and Ilbeigi, M (2012) Development of a comprehensive model for construction project success evaluation by contractors. Engineering, Construction and Architectural Management, 19(05), 526-42.

Hsieh, H-Y and Forster, J (2006) Residential construction quality and production levels in Taiwan. Engineering, Construction and Architectural Management, 13(05), 502–20.

Hu, L and Wu, H (2016) Exploratory study on risk management of state-owned construction enterprises in China. Engineering, Construction and Architectural Management, 23(05), 674-91.

Hughes, W (2003) A comparison of two editions of the RIBA Plan of Work. Engineering, Construction and Architectural Management, 10(05), 302–11.

Ibrahim, A D, Price, A D F and Dainty, A R J (2009) Evaluation of key practices under the Local Improvement Finance Trust (LIFT) initiative for UK healthcare facilities. Engineering, Construction and Architectural Management, 16(05), 504–18.

Ilhan, B and Yobas, B (2019) Measuring construction for social, economic and environmental assessment. Engineering, Construction and Architectural Management, 26(05), 746–65.

Ingirige, B and Sexton, M (2006) Alliances in construction: Investigating initiatives and barriers for long-term collaboration. Engineering, Construction and Architectural Management, 13(05), 521–35.

Jaeger, M and Adair, D (2013) Organisational culture of construction project managers in the GCC countries. Engineering, Construction and Architectural Management, 20(05), 461-73.

Jane, L J H, Vivian, W Y T, Yuan, H P, Wang, J Y and Li, J R (2010) Dynamic modeling of construction and demolition waste management processes: An empirical study in Shenzhen, China. Engineering, Construction and Architectural Management, 17(05), 476–92.

Jefferies, M (2006) Critical success factors of public private sector partnerships: A case study of the Sydney SuperDome. Engineering, Construction and Architectural Management, 13(05), 451–62.

Jefferies, M and McGeorge, W D (2009) Using public-private partnerships (PPPs) to procure social infrastructure in Australia. Engineering, Construction and Architectural Management, 16(05), 415–37.

Jefferies, M, Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(05), 465-80.

Karim, J A, Demian, P, Baldwin, A and Anumba, C (2014) An empirical study of the complexity of requirements management in construction projects. Engineering, Construction and Architectural Management, 21(05), 505-31.

Karimidorabati, S, Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(05), 554-70.

Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(05), 474-92.

Kristiansen, K, Emmitt, S and Bonke, S (2005) Changes in the Danish construction sector: the need for a new focus. Engineering, Construction and Architectural Management, 12(05), 502–11.

Kululanga, G K and McCaffer, R (2001) Measuring knowledge management for construction organizations. Engineering, Construction and Architectural Management, 8(05), 346–54.

Kumar, V and Lin, E T A (2020) Conceptualizing “COBieEvaluator”. Engineering, Construction and Architectural Management, 27(05), 1093–118.

Kumaraswamy, M and Dulaimi, M (2001) Empowering innovative improvements through creative construction procurement. Engineering, Construction and Architectural Management, 8(05), 325–34.

Kumaraswamy, M, Love, P E D, Dulaimi, M and Rahman, M (2004) Integrating procurement and operational innovations for construction industry development. Engineering, Construction and Architectural Management, 11(05), 323–34.

Kwofie, T E, Amos-Abanyie, S and Afram, S O (2016) Principal component analysis of professional competencies of architects in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 23(05), 571-87.

Lan, O B, Ling, F Y Y and Soo, A (2014) Information feedback and bidders’ competitiveness in construction bidding. Engineering, Construction and Architectural Management, 21(05), 571-85.

Leung, M-y, Dongyu, C and Liu, A, M.M. (2014) Impact of values on the learning approaches of Chinese construction students in Hong Kong. Engineering, Construction and Architectural Management, 21(05), 481-504.

Li, H, Chan, G, Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(05), 536-50.

Li, S and Ling, F Y Y (2012) Critical strategies for Chinese architectural, engineering and construction firms to achieve profitability. Engineering, Construction and Architectural Management, 19(05), 495-511.

Lim, E H and Ling, F Y Y (2002) Model for predicting clients' contribution to project success. Engineering, Construction and Architectural Management, 9(05), 388–95.

Lindhard, S and Larsen, J K (2016) Identifying the key process factors affecting project performance. Engineering, Construction and Architectural Management, 23(05), 657-73.

Ling, F Y Y and Chan, A H M (2008) Internationalizing quantity surveying services. Engineering, Construction and Architectural Management, 15(05), 440–55.

Ling, F Y Y, Ning, Y, Chang, Y H and Zhang, Z (2018) Human resource management practices to improve project managers’ job satisfaction. Engineering, Construction and Architectural Management, 25(05), 654–69.

Lingard, H, Cooke, T and Gharaie, E (2013) A case study analysis of fatal incidents involving excavators in the Australian construction industry. Engineering, Construction and Architectural Management, 20(05), 488-504.

Liu, D, Wang, Y, Chen, J and Zhang, Y (2019) Intelligent compaction practice and development: a bibliometric analysis. Engineering, Construction and Architectural Management, 27(05), 1213–32.

Lopes, J P, Oliveira, R A and Abreu, M I (2019) Estimating the built environment stock in Cape Verde. Engineering, Construction and Architectural Management, 26(05), 814–26.

Love, P, Edwards, D J, Standing, C and Irani, Z (2009) Beyond the Red Queen syndrome: CRM technology and building material suppliers. Engineering, Construction and Architectural Management, 16(05), 459–74.

Lu, W, Tam, V W, Chen, H and Du, L (2020) A holistic review of research on carbon emissions of green building construction industry. Engineering, Construction and Architectural Management, 27(05), 1065–92.

Maghrebi, M, Sammut, C and Waller, S T (2015) Feasibility study of automatically performing the concrete delivery dispatching through machine learning techniques. Engineering, Construction and Architectural Management, 22(05), 573-90.

Mahamid, I (2013) Contractors perspective toward factors affecting labor productivity in building construction. Engineering, Construction and Architectural Management, 20(05), 446-60.

Mahdi, H S and Carmichael, D G (2014) An optimal target cost contract with a risk neutral owner. Engineering, Construction and Architectural Management, 21(05), 586-604.

Matsumoto, I T, Stapleton, J, Glass, J and Thorpe, T (2005) Use of process maps to develop a management briefing sheet for a design consultancy. Engineering, Construction and Architectural Management, 12(05), 458–69.

Mensah, I, Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(05), 638-56.

Messner, J I and Sanvido, V E (2001) An information model of project evaluation. Engineering, Construction and Architectural Management, 8(05), 393–402.

Moselhi, O, Alkass, S and Al-Hussein, M (2004) Innovative 3D-modelling for selecting and locating mobile cranes. Engineering, Construction and Architectural Management, 11(05), 373–80.

Murphy, M E and Nahod, M-M (2017) Stakeholder competency in evaluating the environmental impacts of infrastructure projects using BIM. Engineering, Construction and Architectural Management, 24(05), 718-35.

Na, L J (2014) The government as marketer of innovation. Engineering, Construction and Architectural Management, 21(05), 551-70.

Nitithamyong, P and Tan, Z (2007) Determinants for effective performance of external project management consultants in Malaysia. Engineering, Construction and Architectural Management, 14(05), 463–78.

Nourbakhsh, M, Zin, R M, Irizarry, J, Zolfagharian, S and Gheisari, M (2012) Mobile application prototype for on-site information management in construction industry. Engineering, Construction and Architectural Management, 19(05), 474-94.

Omran, E and Bingunath, I (2011) Privatisation and manpower capability development: Cases from the Libyan house building sector. Engineering, Construction and Architectural Management, 18(05), 497–515.

Oo, B L, Drew, D and Lo, H-P (2007) Modelling contractors' mark-up behaviour in different construction markets. Engineering, Construction and Architectural Management, 14(05), 447–62.

Othman, A A, Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(05), 481–501.

Otter, A d and Emmitt, S (2007) oring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams. Engineering, Construction and Architectural Management, 14(05), 408–19.

Oyegoke, A S (2001) UK and US construction management contracting procedures and practices: a comparative study. Engineering, Construction and Architectural Management, 8(05), 403–17.

Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(05), 461–75.

Panuwatwanich, K, Stewart, R A and Mohamed, S (2008) The role of climate for innovation in enhancing business performance: The case of design firms. Engineering, Construction and Architectural Management, 15(05), 407–22.

Peter, D and Peter, L (2011) Alliance contracting: adding value through relationship development. Engineering, Construction and Architectural Management, 18(05), 444–61.

Prakash, A and Phadtare, M (2018) Service quality for architects: scale development and validation. Engineering, Construction and Architectural Management, 25(05), 670–86.

Reini, D W and Krishna, S P (2011) Licensing construction workforce: Indonesia's effort on improving the quality of national construction industry. Engineering, Construction and Architectural Management, 18(05), 431–43.

Robinson, H S, Carrillo, P M, Anumba, C J and Al-Ghassani, A M (2005) Knowledge management practices in large construction organisations. Engineering, Construction and Architectural Management, 12(05), 431–45.

Ruddock, L and Ruddock, S (2019) Wealth measurement and the role of built asset investment: an empirical comparison. Engineering, Construction and Architectural Management, 26(05), 766–78.

Ruthankoon, R and Ogunlana, S O (2003) Testing Hertzberg's two-factor theory in the Thai construction industry. Engineering, Construction and Architectural Management, 10(05), 333–41.

Sexton, M and Barrett, P (2004) The role of technology transfer in innovation within small construction firms. Engineering, Construction and Architectural Management, 11(05), 342–8.

Shakantu, W, Muya, M, Tookey, J and Bowen, P (2008) Flow modelling of construction site materials and waste logistics: A case study from Cape Town, South Africa. Engineering, Construction and Architectural Management, 15(05), 423–39.

Sinesilassie, E G, Tabish, S Z S and Jha, K N (2017) Critical factors affecting schedule performance: A case of Ethiopian public construction projects: engineers’ perspective. Engineering, Construction and Architectural Management, 24(05), 757-73.

Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(05), 312–21.

Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: the impact of client performance. Engineering, Construction and Architectural Management, 9(05), 453–65.

Steele, J and Murray, M (2004) Creating, supporting and sustaining a culture of innovation. Engineering, Construction and Architectural Management, 11(05), 316–22.

Stephenson, P, Morrey, I, Vacher, P and Ahmed, Z (2002) Acquisition and structuring of knowledge for defect prediction in brickwork mortar. Engineering, Construction and Architectural Management, 9(05), 396–408.

Swan, W, Ruddock, L and Smith, L (2013) Low carbon retrofit: attitudes and readiness within the social housing sector. Engineering, Construction and Architectural Management, 20(05), 522-35.

Tam, C M, Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(05).

Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(05), 623–38.

Tran, D Q, Molenaar, K R and Kolli, B (2017) Implementation of best-value procurement for highway design and construction in the USA. Engineering, Construction and Architectural Management, 24(05), 774-87.

Tzortzopoulos, P, Sexton, M and Cooper, R (2005) Process models implementation in the construction industry: a literature synthesis. Engineering, Construction and Architectural Management, 12(05), 470–86.

Uher, T E and Brand, M C (2008) Claimants' view of the performance of adjudication in new South Wales. Engineering, Construction and Architectural Management, 15(05), 470–84.

Viswanathan, S K and Jha, K N (2020) Critical risk factors in international construction projects. Engineering, Construction and Architectural Management, 27(05), 1169–90.

Whyte, J, Bouchlaghem, D and Thorpe, A (2002) IT implementation in the construction organization. Engineering, Construction and Architectural Management, 9(05), 371–7.

Xiao, H and Proverbs, D (2003) Factors influencing contractors performance: an international investigation. Engineering, Construction and Architectural Management, 10(05), 322–32.

Yasser, E, Simaan, M A, Siri, F and Yasser, M (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(05), 462–80.

Yong, Y C and Mustaffa, N E (2012) Analysis of factors critical to construction project success in Malaysia. Engineering, Construction and Architectural Management, 19(05), 543-56.

Yongjian, K, ShouQing, W, Albert, P C C and Esther, C (2011) Understanding the risks in China's PPP projects: ranking of their probability and consequence. Engineering, Construction and Architectural Management, 18(05), 481–96.

Yun, L, Wan, J, Wang, G, Bai, J and Zhang, B (2020) Exploring the missing link between top management team characteristics and megaproject performance. Engineering, Construction and Architectural Management, 27(05), 1039–64.

Zaman, U (2020) Examining the effect of xenophobia on “transnational” mega construction project (MCP) success. Engineering, Construction and Architectural Management, 27(05), 1119–43.

Zhang, H, Shi, J J and Tam, C-M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(05), 433–45.

Zhang, J, Li, H, Golizadeh, H, Zhao, C, Lyu, S and Jin, R (2020) Reliability evaluation index for the integrated supply chain utilising BIM and lean approaches. Engineering, Construction and Architectural Management, 27(05), 997–1038.

Zhu, D, Wen, H and Deng, Y (2020) Pro-active warning system for the crossroads at construction sites based on computer vision. Engineering, Construction and Architectural Management, 27(05), 1145–68.

Zhu, F, Wang, L, Yu, M and Yang, X (2020) Quality of conflict management in construction project context. Engineering, Construction and Architectural Management, 27(05), 1191–211.

Zongzhi, L (2010) Highway work zone safety audits for safety improvements. Engineering, Construction and Architectural Management, 17(05), 512–26.