Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Amirtash, P, Majid Parchami, J and Jelodar, M B (2021) Integration of project management services for International Engineering, Procurement and Construction projects. Built Environment Project and Asset Management, 11(2), 330-49.

Bhagwat, K and Venkata Santosh Kumar, D (2022) A systematic review of construction safety research: quantitative and qualitative content analysis approach. Built Environment Project and Asset Management, 12(2), 243-61.

Bhattacharya, S, Momaya, K S and Iyer, K C (2021) Bridging the gaps for business growth among Indian construction companies. Built Environment Project and Asset Management, 11(2), 231-50.

Cevikcan, E and Kose, Y (2021) Optimization of profitability and liquidity for residential projects under debt and equity financing. Built Environment Project and Asset Management, 11(2), 369-91.

Chipozya Kosta, T, Muleya, F and Phiri, E (2022) Demystifying performance difference between local and foreign contractors through organisational culture. Built Environment Project and Asset Management, 12(2), 325-44.

  • Type: Journal Article
  • Keywords: local contractors; foreign contractors; organisational culture; Zambia; innovations; corporate culture; questionnaires; leadership; knowledge sharing; cultural differences; clients; market share
  • ISBN/ISSN:
  • URL: http://dx.doi.org/10.1108/BEPAM-02-2021-0029
  • Abstract:
    This research aimed to investigate the extent to which organisational culture is practised in local and foreign contractors in grade one and two categories and how it affects their performance. The approach for this research was positivist in nature adopting a mono-method of data collection through a survey using self-administered questionnaires. A total of 138 questionnaires were distributed among public clients and large-scale contractors registered in the stated grades, and 112 questionnaires were returned for analysis representing an overall response rate of 81% for contractors and clients. revealed that in organisational culture, significant differences were found for management style and dominant characteristics of the organisation between local and foreign contractors. Differences were not found for leadership styles, measures of success and organisational glue. Results suggest that for local contractors to perform better, significant changes are needed to their management style and dominant characteristics of their organisations. Foreign contractors in the Zambian construction industry are reportedly outperforming local contractors making them preferred contractors on larger public projects accounting for 85% of construction projects by value of works. This study presents the differences in organisational culture between foreign and local firms. It further demonstrates that organisational culture plays a key role in determining performance of a contracting firm. The study presents areas that local contractors can improve in organisational culture in order to remain competitive.

Henry Duncan John, M, Amoah, C and Ayesu-Koranteng, E (2022) Causes of road projects' delays: a case of Blantyre, Malawi. Built Environment Project and Asset Management, 12(2), 293-308.

Heravi, G, Taherkhani, A H, Sobhkhiz, S, Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), 180-204.

Isuri Anuradha, A, Soorige, D and Geekiyanage, D (2021) Comparative study on life cycle assessment of buildings in developed countries and Sri Lanka. Built Environment Project and Asset Management, 11(2), 304-29.

Jayantha Wadu, M and Maqsood, T (2022) Transport infrastructure, accessibility and residential property values: evidence from Hong Kong. Built Environment Project and Asset Management, 12(2), 163-79.

Kaluarachchi, M, Waidyasekara, K and Rameezdeen, R (2022) Antecedents of noise pollution control behaviour of employees of construction companies. Built Environment Project and Asset Management, 12(2), 277-92.

Kamardeen, I (2022) Work stress related cardiovascular diseases among construction professionals. Built Environment Project and Asset Management, 12(2), 223-42.

Martek, I, Edwards, D J, Seaton, S and Jones, D (2022) An appraisal of Australia's approach to promoting urban sustainability. Built Environment Project and Asset Management, 12(2), 262-76.

Moyo, T, Crafford, G and Emuze, F (2021) People-centred management for improving construction workers' productivity in Zimbabwe. Built Environment Project and Asset Management, 11(2), 350-68.

Nguyen Van, D, Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: evidence from Vietnam. Built Environment Project and Asset Management, 12(2), 309-24.

Nyamagere Gladys, S, Rwelamila, P D and Gimbi, J J (2022) A conceptual framework for managing post-disaster reconstruction projects in emerging economies: the case of Angola. Built Environment Project and Asset Management, 12(2), 205-22.

Ottou, J A, Baiden, B K, Nani, G and Martin Morgan, T (2021) Benefits of implementing Six Sigma in competitive tendering process. Built Environment Project and Asset Management, 11(2), 214-30.

Safapour, E, Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), 157-73.

Sekar, G, Sambasivan, M and Viswanathan, K (2021) Does size of construction firms matter? Impact of project-factors and organization-factors on project performance. Built Environment Project and Asset Management, 11(2), 174-94.

Stanitsas, M and Kirytopoulos, K (2022) Underlying factors for successful project management to construct sustainable built assets. Built Environment Project and Asset Management, 12(2), 129-46.

Sun, J, Balakrishnan, S and Zhang, Z (2021) A resource allocation framework for predisaster resilience management of interdependent infrastructure networks. Built Environment Project and Asset Management, 11(2), 284-303.

Tuffaha, F M, Assaf, S, Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), 195-213.

Verma, S, Mandal, S N, Robinson, S, Bajaj, D and Saxena, A (2021) Investment appraisal and financial benefits of corporate green buildings: a developing economy case study. Built Environment Project and Asset Management, 11(2), 392-408.

Zarghami, S A and Gunawan, I (2021) The emergence and evolution of reliability theory for water distribution networks. Built Environment Project and Asset Management, 11(2), 251-65.

Zeb, J (2022) A level of service framework for service-centric asset management planning. Built Environment Project and Asset Management, 12(2), 147-62.