Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 210 results ...

Çevikbaş, M, Okudan, O and Işık, Z (2022) New Delay-Analysis Method Using Modified Schedule and Modified Updated Schedule for Construction Projects. Journal of Construction Engineering and Management, 148(11).

Abd El-Razek, M E, Bassioni, H A and Mobarak, A M (2008) Causes of Delay in Building Construction Projects in Egypt. Journal of Construction Engineering and Management, 134(11), 831–41.

Abouhamad, M and Zayed, T (2019) Risk-Based Asset Management Framework for Subway Systems. Journal of Construction Engineering and Management, 145(11).

Abuwarda, Z and Hegazy, T (2016) Flexible Activity Relations to Support Optimum Schedule Acceleration. Journal of Construction Engineering and Management, 142(11).

Agapaki, E and Brilakis, I (2021) CLOI: An Automated Benchmark Framework for Generating Geometric Digital Twins of Industrial Facilities. Journal of Construction Engineering and Management, 147(11).

Ahmed, M O, Abdul Nabi, M, El-adaway, I H, Caranci, D, Eberle, J, Hawkins, Z and Sparrow, R (2021) Contractual Guidelines for Promoting Integrated Project Delivery. Journal of Construction Engineering and Management, 147(11).

Ahn, C R, Lee, S, Sun, C, Jebelli, H, Yang, K and Choi, B (2019) Wearable Sensing Technology Applications in Construction Safety and Health. Journal of Construction Engineering and Management, 145(11).

Akhavian, R and Behzadan, A H (2013) Knowledge-Based Simulation Modeling of Construction Fleet Operations Using Multimodal-Process Data Mining. Journal of Construction Engineering and Management, 139(11).

Akinci, B, Kiziltas, S, Ergen, E, Karaesmen, I Z and Keceli, F (2006) Modeling and Analyzing the Impact of Technology on Data Capture and Transfer Processes at Construction Sites: A Case Study. Journal of Construction Engineering and Management, 132(11), 1148–57.

Alroomi, A, Jeong, D H S and Oberlender, G D (2012) Analysis of Cost-Estimating Competencies Using Criticality Matrix and Factor Analysis. Journal of Construction Engineering and Management, 138(11), 1270–80.

Alruwaythi, O and Goodrum, P (2019) A Difference in Perspective: Impact of Different Formats of Engineering Information and Spatial Cognition on Craft-Worker Eye-Gaze Patterns. Journal of Construction Engineering and Management, 145(11).

An, X, Li, H, Zuo, J, Ojuri, O, Wang, Z and Ding, J (2018) Identification and Prevention of Unbalanced Bids Using the Unascertained Model. Journal of Construction Engineering and Management, 144(11).

Apipattanavis, S, Sabol, K, Molenaar, K R, Rajagopalan, B, Xi, Y, Blackard, B and Patil, S (2010) Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays. Journal of Construction Engineering and Management, 136(11), 1160–8.

Arditi, D and Balci, G (2009) Managerial Competencies of Female and Male Construction Managers. Journal of Construction Engineering and Management, 135(11), 1275–8.

Asghari, V, Wang, Y, Biglari, A J, Hsu, S and Tang, P (2022) Reinforcement Learning in Construction Engineering and Management: A Review. Journal of Construction Engineering and Management, 148(11).

Ashuri, B and Lu, J (2010) Time Series Analysis of ENR Construction Cost Index. Journal of Construction Engineering and Management, 136(11), 1227–37.

Asmar, M E, Hanna, A S and Whited, G C (2011) New Approach to Developing Conceptual Cost Estimates for Highway Projects. Journal of Construction Engineering and Management, 137(11), 942–9.

Bagheri-Zadeh, S, Kim, H, Hounsell, S, Wood, C R, Soleymani, H and King, M (2007) Field Study of Concrete Maturity Methodology in Cold Weather. Journal of Construction Engineering and Management, 133(11), 827–35.

Bai, Y and Burkett, W R (2006) Rapid Bridge Replacement: Processes, Techniques, and Needs for Improvements. Journal of Construction Engineering and Management, 132(11), 1139–47.

Batselier, J and Vanhoucke, M (2015) . Journal of Construction Engineering and Management, 141(11).

Bayram, S and Al-Jibouri, S (2016) Efficacy of Estimation Methods in Forecasting Building Projects’ Costs. Journal of Construction Engineering and Management, 142(11).

Bernold, L E (2007) Quantitative Assessment of Backhoe Operator Skill. Journal of Construction Engineering and Management, 133(11), 889–99.

Bhargava, A, Anastasopoulos, P C, Labi, S, Sinha, K C and Mannering, F L (2010) Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts. Journal of Construction Engineering and Management, 136(11), 1207–18.

Blackman, I Q and Picken, D H (2010) Height and Construction Costs of Residential High-Rise Buildings in Shanghai. Journal of Construction Engineering and Management, 136(11), 1169–80.

Bogus, S M, Diekmann, J E, Molenaar, K R, Harper, C, Patil, S and Lee, J S (2011) Simulation of Overlapping Design Activities in Concurrent Engineering. Journal of Construction Engineering and Management, 137(11), 950–7.

Bogus, S M, Molenaar, K R and Diekmann, J E (2005) Concurrent Engineering Approach to Reducing Design Delivery Time. Journal of Construction Engineering and Management, 131(11), 1179–85.

Brockmann, C, Brezinski, H and Erbe, A (2016) Innovation in Construction Megaprojects. Journal of Construction Engineering and Management, 142(11).

Cable, J K, Jaselskis, E J, Walters, R C, Li, L and Bauer, C R (2009) Stringless Portland Cement Concrete Paving. Journal of Construction Engineering and Management, 135(11), 1253–60.

Caerteling, J S, Halman, J I M, Song, M and Dorée, A G (2009) Impact of Government and Corporate Strategy on the Performance of Technology Projects in Road Construction. Journal of Construction Engineering and Management, 135(11), 1211–21.

Carr, P G (2005) Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of Bidders. Journal of Construction Engineering and Management, 131(11), 1165–72.

Carretero-Ayuso, M J, García-Sanz-Calcedo, J and Reyes-Rodríguez, A M (2016) Qualitative and Quantitative Analyses on Project Deficiencies in Flat-Roof Design in Extremadura, Spain. Journal of Construction Engineering and Management, 142(11).

Cass, D and Mukherjee, A (2011) Calculation of Greenhouse Gas Emissions for Highway Construction Operations by Using a Hybrid Life-Cycle Assessment Approach: Case Study for Pavement Operations. Journal of Construction Engineering and Management, 137(11), 1015–25.

Chan, A P C, Chan, D W M and Yeung, J F Y (2009) Overview of the Application of “Fuzzy Techniques” in Construction Management Research. Journal of Construction Engineering and Management, 135(11), 1241–52.

Chan, A P C, Lam, P T I, Chan, D W M, Cheung, E and Ke, Y (2009) Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), 1115–24.

Chancellor, W and Lu, W (2016) A Regional and Provincial Productivity Analysis of the Chinese Construction Industry: 1995 to 2012. Journal of Construction Engineering and Management, 142(11).

Charkhakan, M H and Heravi, G (2018) Risk Manageability Assessment to Improve Risk Response Plan: Case Study of Construction Projects in Iran. Journal of Construction Engineering and Management, 144(11).

Chen, C and Orr, R J (2009) Chinese Contractors in Africa: Home Government Support, Coordination Mechanisms, and Market Entry Strategies. Journal of Construction Engineering and Management, 135(11), 1201–10.

Chen, H L (2009) Model for Predicting Financial Performance of Development and Construction Corporations. Journal of Construction Engineering and Management, 135(11), 1190–200.

Chen, J, Su, M and Huang, D (2010) Application of a SOM-Based Optimization Algorithm in Minimizing Construction Time for Secant Pile Wall. Journal of Construction Engineering and Management, 136(11), 1189–95.

Cheng, M, Chang, Y and Korir, D (2019) Novel Approach to Estimating Schedule to Completion in Construction Projects Using Sequence and Nonsequence Learning. Journal of Construction Engineering and Management, 145(11).

Cheng, Y, Yu, C and Wang, H (2011) . Journal of Construction Engineering and Management, 137(11), 933–41.

Choi, H and Mahadevan, S (2008) Construction Project Risk Assessment Using Existing Database and Project-Specific Information. Journal of Construction Engineering and Management, 134(11), 894–903.

Chotibhongs, R and Arditi, D (2012) Detection of Collusive Behavior. Journal of Construction Engineering and Management, 138(11), 1251–8.

Chou, J, Irawan, N and Pham, A (2013) Project Management Knowledge of Construction Professionals: Cross-Country Study of Effects on Project Success. Journal of Construction Engineering and Management, 139(11).

Col Debella, D and Ries, R (2006) Construction Delivery Systems: A Comparative Analysis of Their Performance within School Districts. Journal of Construction Engineering and Management, 132(11), 1131–8.

Dang, C N, Chih, Y, Le-Hoai, L and Nguyen, L D (2020) Project-Based A/E/C Firms’ Knowledge Management Capability and Market Development Performance: Does Firm Size Matter. Journal of Construction Engineering and Management, 146(11).

De Jarnette, V, McCarthy, L M, Bennert, T and Guercio, M C (2013) Use of Mechanistic-Empirical Pavement Design Principles to Assign Asphalt Pavement Pay Factor Adjustments. Journal of Construction Engineering and Management, 139(11).

de la Garza, J M, Prateapusanond, A and Ambani, N (2007) Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract. Journal of Construction Engineering and Management, 133(11), 836–45.

De Marco, A, Mangano, G, Corinna Cagliano, A and Grimaldi, S (2012) Public Financing into Build-Operate-Transfer Hospital Projects in Italy. Journal of Construction Engineering and Management, 138(11), 1294–302.

Demirel, H &, Volker, L, Leendertse, W and Hertogh, M (2019) Dealing with Contract Variations in PPPs: Social Mechanisms and Contract Management in Infrastructure Projects. Journal of Construction Engineering and Management, 145(11).

Devine, R D, Barbachyn, S M, Thrall, A P and Kurama, Y C (2018) Effect of Tripping Prefabricated Rebar Assemblies on Bar Spacing. Journal of Construction Engineering and Management, 144(11).

Du, J, Liu, R and Issa, R R A (2014) BIM Cloud Score: Benchmarking BIM Performance. Journal of Construction Engineering and Management, 140(11).

Ekanayake, E M A C, Shen, G Q P, Kumaraswamy, M M, Owusu, E K and Saka, A B (2021) Modeling Supply Chain Resilience in Industrialized Construction: A Hong Kong Case. Journal of Construction Engineering and Management, 147(11).

El Asmar, M, Hanna, A S and Loh, W (2013) Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems. Journal of Construction Engineering and Management, 139(11).

El-Diraby, T E and Wang, B (2005) E-Society Portal: Integrating Urban Highway Construction Projects into the Knowledge City. Journal of Construction Engineering and Management, 131(11), 1196–211.

El-Rayes, K and Jun, D H (2009) Optimizing Resource Leveling in Construction Projects. Journal of Construction Engineering and Management, 135(11), 1172–80.

El-Rayes, K and Khalafallah, A (2005) Trade-off between Safety and Cost in Planning Construction Site Layouts. Journal of Construction Engineering and Management, 131(11), 1186–95.

ElMousalami, H H, Elyamany, A H and Ibrahim, A H (2018) Predicting Conceptual Cost for Field Canal Improvement Projects. Journal of Construction Engineering and Management, 144(11).

Eom, C S, Yun, S H and Paek, J H (2008) Subcontractor Evaluation and Management Framework for Strategic Partnering. Journal of Construction Engineering and Management, 134(11), 842–51.

Ershadi, M, Jefferies, M, Davis, P and Mojtahedi, M (2021) Comparative Analysis of PMO Functions between the Public and Private Sectors: Survey of High-Performing Construction Organizations. Journal of Construction Engineering and Management, 147(11).

Esmaeeli, A N and Heravi, G (2019) Real Options Approach versus Conventional Approaches to Valuing Highway Projects under Uncertainty. Journal of Construction Engineering and Management, 145(11).

Fathi, M and Shrestha, P P (2022) Public–Private Partnership Project Performance Analysis Compared to Design-Build in Highway Projects. Journal of Construction Engineering and Management, 148(11).

Feng, H, Song, Q, Yin, C and Cao, D (2022) Adaptive Impedance Control Method for Dynamic Contact Force Tracking of Robotic Excavators. Journal of Construction Engineering and Management, 148(11).

Feng, Y and Trinh, M T (2019) Developing Resilient Safety Culture for Construction Projects. Journal of Construction Engineering and Management, 145(11).

Franco-Duran, D M and Garza, J M d l (2019) Review of Resource-Constrained Scheduling Algorithms. Journal of Construction Engineering and Management, 145(11).

Fredericks, T K, Abudayyeh, O, Choi, S D, Wiersma, M and Charles, M (2005) Occupational Injuries and Fatalities in the Roofing Contracting Industry. Journal of Construction Engineering and Management, 131(11), 1233–40.

Gao, Z, Walters, R C, Jaselskis, E J and Wipf, T J (2006) Approaches to Improving the Quality of Construction Drawings from Owner’s Perspective. Journal of Construction Engineering and Management, 132(11), 1187–92.

Gardner, B J, Gransberg, D D and Jeong, H D (2016) Reducing Data-Collection Efforts for Conceptual Cost Estimating at a Highway Agency. Journal of Construction Engineering and Management, 142(11).

Gibson, G E, Sanboskani, H, El Asmar, M and Aramali, V (2022) Employing Technology to Enable Remote Research Charrettes as a Method for Engaging Industry and Uncovering Best Practices: A Novel Approach for a Post-COVID-19 World. Journal of Construction Engineering and Management, 148(11).

Goedert, J D and Sekpe, V D (2013) Decision Support System–Enhanced Scheduling in Matrix Organizations Using the Analytic Hierarchy Process. Journal of Construction Engineering and Management, 139(11).

Goh, Y M and Chua, D K H (2009) Case-Based Reasoning for Construction Hazard Identification: Case Representation and Retrieval. Journal of Construction Engineering and Management, 135(11), 1181–9.

González-Cruz, M, Ballesteros-Pérez, P, Lucko, G and Zhang, J (2022) Critical Duration Index: Anticipating Project Delays from Deterministic Schedule Information. Journal of Construction Engineering and Management, 148(11).

Gosling, J, Pero, M, Schoenwitz, M, Towill, D and Cigolini, R (2016) Defining and Categorizing Modules in Building Projects: An International Perspective. Journal of Construction Engineering and Management, 142(11).

Gransberg, D D and Riemer, C (2009) Impact of Inaccurate Engineer’s Estimated Quantities on Unit Price Contracts. Journal of Construction Engineering and Management, 135(11), 1138–45.

Gupta, M, Hasan, A, Jain, A K and Jha, K N (2018) Site Amenities and Workers’ Welfare Factors Affecting Workforce Productivity in Indian Construction Projects. Journal of Construction Engineering and Management, 144(11).

Gurmu, A T (2021) Hybrid Model for Assessing the Influence of Safety Management Practices on Labor Productivity in Multistory Building Projects. Journal of Construction Engineering and Management, 147(11).

Hajarolasvadi, H and Shahhosseini, V (2022) A System-Dynamic Model for Evaluating the Effect of Person–Team Fit on Project Performance. Journal of Construction Engineering and Management, 148(11).

Hallowell, M R and Calhoun, M E (2011) Interrelationships among Highly Effective Construction Injury Prevention Strategies. Journal of Construction Engineering and Management, 137(11), 985–93.

Hamzeh, F R, El Samad, G and Emdanat, S (2019) Advanced Metrics for Construction Planning. Journal of Construction Engineering and Management, 145(11).

Han, F and Bogus, S M (2021) Resilience Criteria for Project Delivery Processes: An Exploratory Analysis for Highway Project Development. Journal of Construction Engineering and Management, 147(11).

Han, Y, He, T, Chang, R and Xue, R (2020) Development Trend and Segmentation of the US Green Building Market: Corporate Perspective on Green Contractors and Design Firms. Journal of Construction Engineering and Management, 146(11).

Hanna, A S, Menches, C L, Sullivan, K T and Sargent, J R (2005) Factors Affecting Absenteeism in Electrical Construction. Journal of Construction Engineering and Management, 131(11), 1212–8.

Hasanzadeh, S and de la Garza, J M (2020) Productivity-Safety Model: Debunking the Myth of the Productivity-Safety Divide through a Mixed-Reality Residential Roofing Task. Journal of Construction Engineering and Management, 146(11).

Hebiba, A M, Bouferguene, A, Moon, S and Han, S (2022) Wind-Wise Automated Stability Analysis for Selection of Tower Crane and Location. Journal of Construction Engineering and Management, 148(11).

Hindman, D P, Timko, P D and Nussbaum, M A (2013) Mechanical Response of Unbraced Wood Composite I-Joist to Walking Loads. Journal of Construction Engineering and Management, 139(11).

Hu, J, Ren, Z and Shen, L (2008) Impacts of Overseas Management Structures on Project Buyout Management: Case Studies of Chinese International Contractors. Journal of Construction Engineering and Management, 134(11), 864–75.

Hughes, J O, Pallin, S, Aldykiewicz, A J and Clark, C J (2021) Installation Quality Framework: Investment Return Approach for Energy Savings on Building Product Installation. Journal of Construction Engineering and Management, 147(11).

Hwang, B and Soh, C K (2013) Trade-Level Productivity Measurement: Critical Challenges and Solutions. Journal of Construction Engineering and Management, 139(11).

Hwang, S, Park, M, Lee, H and Kim, H (2012) Automated Time-Series Cost Forecasting System for Construction Materials. Journal of Construction Engineering and Management, 138(11), 1259–69.

Ibbs, W (2005) Impact of Change’s Timing on Labor Productivity. Journal of Construction Engineering and Management, 131(11), 1219–23.

Jang, Y, Jeong, I, Cho, Y K and Ahn, Y (2019) Predicting Business Failure of Construction Contractors Using Long Short-Term Memory Recurrent Neural Network. Journal of Construction Engineering and Management, 145(11).

  • Type: Journal Article
  • Keywords: Business failure; Construction contractors; Prediction model; Long short-term memory (LSTM); Recurrent neural network (RNN);
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001709
  • Abstract:
    Predicting business failure of construction contractors is critical for both contractors and other stakeholders such as project owners, surety underwriters, investors, and government entities. To identify a new model with better prediction of business failure of the construction contractors, this study utilized long short-term memory (LSTM) recurrent neural network (RNN). The financial ratios of the construction contractors in the United States were collected, and synthetic minority oversampling technique (SMOTE) and Tomek links were employed to obtain a balanced data set. The proposed LSTM RNN model was evaluated by comparing its accuracy and F1-score with feedforward neural network (FNN) and support vector machine (SVM) models for the optimized parameters selected from a grid search with five-fold cross-validation. The results successfully demonstrate that the prediction performance of the proposed LSTM RNN model outperforms FNN and SVM models for both test and original data set. Therefore, the proposed LSTM RNN model is a promising alternative to assist managers, investors, auditors, and government entities in predicting business failure of construction contractors, and can also be adapted to other industry cases.

Jiang, H, Xu, Y and Liu, C (2013) Construction Price Prediction Using Vector Error Correction Models. Journal of Construction Engineering and Management, 139(11).

Jin, X (2011) Model for Efficient Risk Allocation in Privately Financed Public Infrastructure Projects Using Neuro-Fuzzy Techniques. Journal of Construction Engineering and Management, 137(11), 1003–14.

Jin, X and Yng Ling, F Y (2005) Model for Fostering Trust and Building Relationships in China’s Construction Industry. Journal of Construction Engineering and Management, 131(11), 1224–32.

Jones, S H and Armanios, D E (2020) Methodological Framework and Feasibility Study to Assess Social Equity Impacts of the Built Environment. Journal of Construction Engineering and Management, 146(11).

Kang, Y, Kim, C, Son, H, Lee, S and Limsawasd, C (2013) Comparison of Preproject Planning for Green and Conventional Buildings. Journal of Construction Engineering and Management, 139(11).

Kang, Y, O’Brien, W J, Thomas, S and Chapman, R E (2008) Impact of Information Technologies on Performance: Cross Study Comparison. Journal of Construction Engineering and Management, 134(11), 852–63.

Khalafallah, A and Shalaby, Y (2019) Change Orders: Automating Comparative Data Analysis and Controlling Impacts in Public Projects. Journal of Construction Engineering and Management, 145(11).

Kim, B and Reinschmidt, K F (2011) Combination of Project Cost Forecasts in Earned Value Management. Journal of Construction Engineering and Management, 137(11), 958–66.

Kim, B, Lee, H, Park, H and Kim, H (2012) Framework for Estimating Greenhouse Gas Emissions Due to Asphalt Pavement Construction. Journal of Construction Engineering and Management, 138(11), 1312–21.

Kim, J and Ellis, R D (2008) Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling. Journal of Construction Engineering and Management, 134(11), 904–13.

Kim, N, Anderson, B A and Ahn, C R (2021) Reducing Risk Habituation to Struck-By Hazards in a Road Construction Environment Using Virtual Reality Behavioral Intervention. Journal of Construction Engineering and Management, 147(11).

Kim, Y, Kim, K and Shin, D (2005) Delay Analysis Method Using Delay Section. Journal of Construction Engineering and Management, 131(11), 1155–64.

King-Lewis, A, Shan, Y and Ivey, M (2021) Gender Bias and Its Impact on Self-Concept in Undergraduate and Graduate Construction Education Programs in the United States. Journal of Construction Engineering and Management, 147(11).

Ko, T, Jeong, H D and Lee, G (2021) Natural Language Processing–Driven Model to Extract Contract Change Reasons and Altered Work Items for Advanced Retrieval of Change Orders. Journal of Construction Engineering and Management, 147(11).

Kong, D, Tiong, R L, Cheah, C Y, Permana, A and Ehrlich, M (2008) Assessment of Credit Risk in Project Finance. Journal of Construction Engineering and Management, 134(11), 876–84.

Lee, G and Kim, S (2012) Case Study of Mass Customization of Double-Curved Metal Façade Panels Using a New Hybrid Sheet Metal Processing Technique. Journal of Construction Engineering and Management, 138(11), 1322–30.

Lee, H, Ryu, H, Yu, J and Kim, J (2005) Method for Calculating Schedule Delay Considering Lost Productivity. Journal of Construction Engineering and Management, 131(11), 1147–54.

Lee, H, Seo, J, Park, M, Ryu, H and Kwon, S (2009) Transaction-Cost-Based Selection of Appropriate General Contractor-Subcontractor Relationship Type. Journal of Construction Engineering and Management, 135(11), 1232–40.

Lee, J (2016) Estimating Cumulative Damages due to Disruptions in Repetitive Construction. Journal of Construction Engineering and Management, 142(11).

Lee, Y, Kim, J and Lee, T S (2016) Topological Competiveness Based on Social Relationships in the Korean Construction-Management Industry. Journal of Construction Engineering and Management, 142(11).

Lerche, J, Neve, H H, Ballard, G, Teizer, J, Wandahl, S and Gross, A (2020) Application of Last Planner System to Modular Offshore Wind Construction. Journal of Construction Engineering and Management, 146(11).

Leung, M, Yu, J and Liang, Q (2013) Improving Public Engagement in Construction Development Projects from a Stakeholder’s Perspective. Journal of Construction Engineering and Management, 139(11).

Li, J, Moselhi, O and Alkass, S (2006) Forecasting Project Status by Using Fuzzy Logic. Journal of Construction Engineering and Management, 132(11), 1193–202.

Li, K and Cheung, S O (2019) Unveiling Cognitive Biases in Construction Project Dispute Resolution through the Lenses of Third-Party Neutrals. Journal of Construction Engineering and Management, 145(11).

Li, L, Luan, H, Yin, X, Dou, Y, Yuan, M and Li, Z (2022) Understanding Sustainability in Off-Site Construction Management: State of the Art and Future Directions. Journal of Construction Engineering and Management, 148(11).

Li, Y, Cao, L, Zhang, J, Jiang, Y, Han, Y and Wei, J (2021) Energy Benchmarking in Healthcare Facilities: A Comparative Study. Journal of Construction Engineering and Management, 147(11).

Li, Y, Wang, G and Zuo, J (2021) Assessing Green-Building Policies with Structural Consistency and Behavioral Coherence: A Framework of Effectiveness and Efficiency. Journal of Construction Engineering and Management, 147(11).

Liang, C, Lu, W, Rowlinson, S and Zhang, X (2016) Development of a Multifunctional BIM Maturity Model. Journal of Construction Engineering and Management, 142(11).

Lin, K and Soibelman, L (2007) Knowledge-Assisted Retrieval of Online Product Information in Architectural/Engineering/Construction. Journal of Construction Engineering and Management, 133(11), 871–9.

Lindhard, S (2014) Understanding the Effect of Variation in a Production System. Journal of Construction Engineering and Management, 140(11).

Lingard, H, Francis, V and Turner, M (2010) Work-Family Conflict in Construction: Case for a Finer-Grained Analysis. Journal of Construction Engineering and Management, 136(11), 1196–206.

Liu, J, Wang, Y and Wang, Z (2022) Effect of Pressure on Construction Company Compliance Attitudes: Moderating Role of Organizational Ethical Climate. Journal of Construction Engineering and Management, 148(11).

Liu, K and Golparvar-Fard, M (2015) Crowdsourcing Construction Activity Analysis from Jobsite Video Streams. Journal of Construction Engineering and Management, 141(11).

Liu, W, Zhang, J and Liu, W (2021) Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem. Journal of Construction Engineering and Management, 147(11).

Love, P E D and Smith, J (2016) Toward Error Management in Construction: Moving beyond a Zero Vision. Journal of Construction Engineering and Management, 142(11).

Love, P E D, Ackermann, F, Teo, P and Morrison, J (2015) From Individual to Collective Learning: A Conceptual Learning Framework for Enacting Rework Prevention. Journal of Construction Engineering and Management, 141(11).

Lu, M, Poon, C and Wong, L (2006) Application Framework for Mapping and Simulation of Waste Handling Processes in Construction. Journal of Construction Engineering and Management, 132(11), 1212–21.

Luo, Y, Shen, Y and Xu, X (2007) Construction Method for Cylindrical Latticed Shells Based on Expandable Mechanisms. Journal of Construction Engineering and Management, 133(11), 912–5.

Lv, X and El-Gohary, N M (2016) Discovering Context-Specific Integration Practices for Integrating NEPA into Statewide and Metropolitan Project Planning Processes. Journal of Construction Engineering and Management, 142(11).

Ma, H, Lv, K, Zeng, S, Lin, H and Shi, J J (2022) Climbing the Pyramid of Megaproject Social Responsibility: Impacts of External Stakeholders and Project Complexity. Journal of Construction Engineering and Management, 148(11).

Marques, R C and Berg, S (2011) Risks, Contracts, and Private-Sector Participation in Infrastructure. Journal of Construction Engineering and Management, 137(11), 925–32.

Marsh, K and Fayek, A R (2010) SuretyAssist: Fuzzy Expert System to Assist Surety Underwriters in Evaluating Construction Contractors for Bonding. Journal of Construction Engineering and Management, 136(11), 1219–26.

Mohajeri, M, Ardeshir, A, Malekitabar, H and Rowlinson, S (2021) Structural Model of Internal Factors Influencing the Safety Behavior of Construction Workers. Journal of Construction Engineering and Management, 147(11).

Moharrami, S, Bayat, A and AbouRizk, S (2022) Modeling Microtunnel Boring Machine Penetration Rate Using a Mechanistic Approach. Journal of Construction Engineering and Management, 148(11).

Morgado, J and Neves, J (2014) Work Zone Planning in Pavement Rehabilitation: Integrating Cost, Duration, and User Effects. Journal of Construction Engineering and Management, 140(11).

Mousaei, A, Taghaddos, H, Marzieh Bagheri, S and Hermann, U (2021) Optimizing Heavy Lift Plans for Industrial Construction Sites Using Dijkstra’s Algorithm. Journal of Construction Engineering and Management, 147(11).

Nassar, K M, Nassar, W M and Hegab, M Y (2005) Evaluating Cost Overruns of Asphalt Paving Project Using Statistical Process Control Methods. Journal of Construction Engineering and Management, 131(11), 1173–8.

Nauman, S, Zheng, C and Ahmad, R (2021) Employee Career Outlook and Turnover: Unleashing the Roles of Career Adaptability and Career Satisfaction in International Construction Projects. Journal of Construction Engineering and Management, 147(11).

Nawaz Khan, A, Khan, N A and Soomro, M A (2020) Influence of Ethical Leadership in Managing Human Resources in Construction Companies. Journal of Construction Engineering and Management, 146(11).

Neuman, Y, Alves, T d C L, Walsh, K D and Needy, K L (2015) Quantitative Analysis of Supplier Quality Surveillance Practices in EPC Projects. Journal of Construction Engineering and Management, 141(11).

Ning, Y and Ling, F Y Y (2013) Reducing Hindrances to Adoption of Relational Behaviors in Public Construction Projects. Journal of Construction Engineering and Management, 139(11).

O’Connor, J T, Choi, J O and Winkler, M (2016) Critical Success Factors for Commissioning and Start-Up of Capital Projects. Journal of Construction Engineering and Management, 142(11).

Olatunji, S O, Olawumi, T O and Aje, I O (2017) Rethinking Partnering among Quantity-Surveying Firms in Nigeria. Journal of Construction Engineering and Management, 143(11).

Omatule Onubi, H, Yusof, N and Sanusi Hassan, A (2021) Perceived COVID-19 Safety Risk and Safety Behavior on Construction Sites: Role of Safety Climate and Firm Size. Journal of Construction Engineering and Management, 147(11).

Oppong, G D, Chan, A P C, Ameyaw, E E, Frimpong, S and Dansoh, A (2021) Fuzzy Evaluation of the Factors Contributing to the Success of External Stakeholder Management in Construction. Journal of Construction Engineering and Management, 147(11).

Orgut, R E, Zhu, J, Batouli, M, Mostafavi, A and Jaselskis, E J (2018) Metrics That Matter: Core Predictive and Diagnostic Metrics for Improved Project Controls and Analytics. Journal of Construction Engineering and Management, 144(11).

Ozorovskaja, R, Voordijk, J T and Wilderom, C P M (2007) Leadership and Cultures of Lithuanian and Dutch Construction Firms. Journal of Construction Engineering and Management, 133(11), 900–11.

Pan, W, Dainty, A R J and Gibb, A G F (2012) Establishing and Weighting Decision Criteria for Building System Selection in Housing Construction. Journal of Construction Engineering and Management, 138(11), 1239–50.

Pan, W, Gibb, A G F and Dainty, A R J (2012) Strategies for Integrating the Use of Off-Site Production Technologies in House Building. Journal of Construction Engineering and Management, 138(11), 1331–40.

Park, M, Ji, S, Lee, H and Kim, W (2009) Strategies for Design-Build in Korea Using System Dynamics Modeling. Journal of Construction Engineering and Management, 135(11), 1125–37.

Park, S H (2009) Whole Life Performance Assessment: Critical Success Factors. Journal of Construction Engineering and Management, 135(11), 1146–61.

Park, T, Kim, M K, Kim, C and Kim, H (2009) Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction. Journal of Construction Engineering and Management, 135(11), 1261–70.

Pheng, L S and Tan, J H (2005) Integrating {[}ISO 9001{]} Quality Management System and {[}ISO 14001{]} Environmental Management System for Contractors. Journal of Construction Engineering and Management, 131(11), 1241–4.

Pikas, E, Sacks, R and Hazzan, O (2013) Building Information Modeling Education for Construction Engineering and Management. II: Procedures and Implementation Case Study. Journal of Construction Engineering and Management, 139(11).

Pooladvand, S, Taghaddos, H, Eslami, A, Nekouvaght Tak, A and Hermann, U ( (2021) Evaluating Mobile Crane Lift Operations Using an Interactive Virtual Reality System. Journal of Construction Engineering and Management, 147(11).

Poshdar, M, González, V A, Raftery, G M and Orozco, F (2014) Characterization of Process Variability in Construction. Journal of Construction Engineering and Management, 140(11).

Prakash, A and Phadtare, M (2019) Exploration of Logic in Project Marketing Using Interpretive Structural Modeling. Journal of Construction Engineering and Management, 145(11).

Praticò, F G (2013) New Road Surfaces: Logical Bases for Simple Quality-Related Pay Adjustments. Journal of Construction Engineering and Management, 139(11).

Radujković, M, Sjekavica Klepo, M and Bosch-Rekveldt, M (2021) Breakdown of Engineering Projects’ Success Criteria. Journal of Construction Engineering and Management, 147(11).

Rodríguez-Garzón, I, Martínez-Fiestas, M, Delgado-Padial, A and Lucas-Ruiz, V (2016) An Exploratory Analysis of Perceived Risk among Construction Workers in Three Spanish-Speaking Countries. Journal of Construction Engineering and Management, 142(11).

Rudeli, N, Santilli, A, Puente, I and Viles, E (2017) Statistical Model for Schedule Prediction: Validation in a Housing-Cooperative Construction Database. Journal of Construction Engineering and Management, 143(11).

Sackey, S and Kim, B (2018) Environmental and Economic Performance of Asphalt Shingle and Clay Tile Roofing Sheets Using Life Cycle Assessment Approach and TOPSIS. Journal of Construction Engineering and Management, 144(11).

Sacks, R and Pikas, E (2013) Building Information Modeling Education for Construction Engineering and Management. I: Industry Requirements, State of the Art, and Gap Analysis. Journal of Construction Engineering and Management, 139(11).

San Cristóbal, J R (2009) Time, Cost, and Quality in a Road Building Project. Journal of Construction Engineering and Management, 135(11), 1271–4.

Schatteman, D, Herroelen, W, Van de Vonder, S and Boone, A (2008) Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects. Journal of Construction Engineering and Management, 134(11), 885–93.

Seo, J, Lee, S and Seo, J (2016) Simulation-Based Assessment of Workers’ Muscle Fatigue and Its Impact on Construction Operations. Journal of Construction Engineering and Management, 142(11).

Shamsai, M, Whitlatch, E and Sezen, H (2007) Economic Evaluation of Reinforced Concrete Structures with Columns Reinforced with Prefabricated Cage System. Journal of Construction Engineering and Management, 133(11), 864–70.

Shapira, A, Simcha, M and Goldenberg, M (2012) Integrative Model for Quantitative Evaluation of Safety on Construction Sites with Tower Cranes. Journal of Construction Engineering and Management, 138(11), 1281–93.

Sharif, M M, Chuo, S and Haas, C T (2022) Rapid 3D Quality Control in Prefabrication Using a 3D Digital-Templates Framework. Journal of Construction Engineering and Management, 148(11).

Sharrard, A L, Matthews, H S and Roth, M (2007) Environmental Implications of Construction Site Energy Use and Electricity Generation1. Journal of Construction Engineering and Management, 133(11), 846–54.

Shen, Y, Koh, T Y, Rowlinson, S and Bridge, A J (2015) Empirical Investigation of Factors Contributing to the Psychological Safety Climate on Construction Sites. Journal of Construction Engineering and Management, 141(11).

Shepherd, S and Woskie, S R (2010) Case Study to Identify Barriers and Incentives to Implementing an Engineering Control for Concrete Grinding Dust. Journal of Construction Engineering and Management, 136(11), 1238–48.

Sing, M C P, Edwards, D J, Liu, H J X and Love, P E D (2015) Forecasting Private-Sector Construction Works: VAR Model Using Economic Indicators. Journal of Construction Engineering and Management, 141(11).

Singh, J, Cheng, J C P and Anumba, C J (2021) BIM-Based Approach for Automatic Pipe Systems Installation Coordination and Schedule Optimization. Journal of Construction Engineering and Management, 147(11).

Skitmore, R M, Pettitt, A N and McVinish, R (2007) Gates’ Bidding Model. Journal of Construction Engineering and Management, 133(11), 855–63.

Song, Y and Chua, D K H (2011) Requirement and Availability Time-Window Analysis of Intermediate Function. Journal of Construction Engineering and Management, 137(11), 967–75.

Srour, I M, Haas, C T and Morton, D P (2006) Linear Programming Approach to Optimize Strategic Investment in the Construction Workforce. Journal of Construction Engineering and Management, 132(11), 1158–66.

Su, Y and Lucko, G (2015) Optimum Present Value Scheduling Based on Synthetic Cash Flow Model with Singularity Functions. Journal of Construction Engineering and Management, 141(11).

Sun, G, Sun, J and Li, F (2022) Influencing Factors of Early Termination for PPP Projects Based on Multicase Grounded Theory. Journal of Construction Engineering and Management, 148(11).

Tavakolan, M and Etemadinia, H (2017) Fuzzy Weighted Interpretive Structural Modeling: Improved Method for Identification of Risk Interactions in Construction Projects. Journal of Construction Engineering and Management, 143(11).

Teizer, J, Caldas, C H and Haas, C T (2007) Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources. Journal of Construction Engineering and Management, 133(11), 880–8.

Telem, D, Laufer, A and Shapira, A (2006) Only Dynamics Can Absorb Dynamics. Journal of Construction Engineering and Management, 132(11), 1167–77.

Thabet, W and Lucas, J (2017) Asset Data Handover for a Large Educational Institution: Case-Study Approach. Journal of Construction Engineering and Management, 143(11).

Thal, A E, Cook, J J and White, E D (2010) Estimation of Cost Contingency for Air Force Construction Projects. Journal of Construction Engineering and Management, 136(11), 1181–8.

Thomas, A, Davis, B, Dadi, G B and Goodrum, P M (2013) Case Study on the Effect of 690 mpa (100 ksi) Steel Reinforcement on Concrete Productivity in Buildings. Journal of Construction Engineering and Management, 139(11).

Tixier, A J, Hallowell, M R, Albert, A, van Boven, L and Kleiner, B M (2014) Psychological Antecedents of Risk-Taking Behavior in Construction. Journal of Construction Engineering and Management, 140(11).

Tummalapudi, M, Killingsworth, J, Harper, C and Mehaney, M (2021) US Construction Industry Managerial Strategies for Economic Recession and Recovery: A Delphi Study. Journal of Construction Engineering and Management, 147(11).

Unsal, H I and Taylor, J E (2011) Absorptive Capacity of Project Networks. Journal of Construction Engineering and Management, 137(11), 994–1002.

van den Berg, M, Voordijk, H, Adriaanse, A and Hartmann, T (2017) Experiencing Supply Chain Optimizations: A Serious Gaming Approach. Journal of Construction Engineering and Management, 143(11).

Wanberg, J, Javernick-Will, A and Taylor, J E (2017) Mechanisms to Initiate Knowledge-Sharing Connections in Communities of Practice. Journal of Construction Engineering and Management, 143(11).

Wang, X, Qiao, Y, Wang, D, Sheng, Z and Newaz, M T (2021) Psychological Contract of Safety and Construction Worker Behavior: Felt Safety Responsibility and Safety-Specific Trust as Mediators. Journal of Construction Engineering and Management, 147(11).

Wang, Z, Hu, H and Gong, J (2018) Modeling Worker Competence to Advance Precast Production Scheduling Optimization. Journal of Construction Engineering and Management, 144(11).

Wethyavivorn, P, Charoenngam, C and Teerajetgul, W (2009) Strategic Assets Driving Organizational Capabilities of Thai Construction Firms. Journal of Construction Engineering and Management, 135(11), 1222–31.

Won, J, Lee, G, Dossick, C and Messner, J (2013) Where to Focus for Successful Adoption of Building Information Modeling within Organization. Journal of Construction Engineering and Management, 139(11).

Xiang, P, Zhou, J, Zhou, X and Ye, K (2012) Construction Project Risk Management Based on the View of Asymmetric Information. Journal of Construction Engineering and Management, 138(11), 1303–11.

Xu, J, Jin, R, Piroozfar, P, Wang, Y, Kang, B, Ma, L, Wanatowski, D and Yang, T (2018) Constructing a BIM Climate–Based Framework: Regional Case Study in China. Journal of Construction Engineering and Management, 144(11).

Yang, F, Li, X, Song, Z, Li, Y and Zhu, Y (2018) Job Burnout of Construction Project Managers: Considering the Role of Organizational Justice. Journal of Construction Engineering and Management, 144(11).

Young, D A, Haas, C T, Goodrum, P and Caldas, C (2011) Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology. Journal of Construction Engineering and Management, 137(11), 976–84.

Yu, A T W, Shen, Q, Kelly, J and Hunter, K (2006) Investigation of Critical Success Factors in Construction Project Briefing by Way of Content Analysis. Journal of Construction Engineering and Management, 132(11), 1178–86.

Yu, W, Chang, H, Hsu, Y, Cheng, S and Wang, K (2020) Pretendering Decision Model for Contractor Selection of Public Procurement Projects. Journal of Construction Engineering and Management, 146(11).

Zahraie, B and Tavakolan, M (2009) Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets. Journal of Construction Engineering and Management, 135(11), 1162–71.

Zhang, L and El-Gohary, N M (2021) Axiology-Based Valuation Modeling for Human-Centered Decision Making in Building Planning and Design. Journal of Construction Engineering and Management, 147(11).

Zhang, L and Qi, J (2012) Controlling Path and Controlling Segment Analysis in Repetitive Scheduling Method. Journal of Construction Engineering and Management, 138(11), 1341–5.

Zhang, L, Zou, X and Kan, Z (2014) Improved Strategy for Resource Allocation in Repetitive Projects Considering the Learning Effect. Journal of Construction Engineering and Management, 140(11).

Zhang, X (2006) Markov-Based Optimization Model for Building Facilities Management. Journal of Construction Engineering and Management, 132(11), 1203–11.

Zhang, Y, Chen, Y, Wang, Y and Li, H (2021) Dual-Attribution Model of Trust Development between Contracting Parties in Construction Projects: Psychological Perspective. Journal of Construction Engineering and Management, 147(11).

Zhou, H W, Zhou, Y H and Zhao, C J (2016) Fault-Response Mechanism of Production System in Concrete-Dam-Construction Simulation. Journal of Construction Engineering and Management, 142(11).

Zhu, L and Cheung, S O (2021) Toward an Equity-Based Analysis of Construction Incentivization. Journal of Construction Engineering and Management, 147(11).

Zuo, F, Zio, E and Yuan, Y (2022) Risk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling. Journal of Construction Engineering and Management, 148(11).