Abdul-Aziz, A-R (2001) Foreign workers and labour segmentation in Malaysia's construction industry. Construction Management and Economics, 19(08), 789-98.

Abu Dabous, S and Alkass, S (2008) Decision support method for multi-criteria selection of bridge rehabilitation strategy. Construction Management and Economics, 26(08), 883–93.

Acar, E and Göç, Y (2011) Prediction of risk perception by owners’ psychological traits in small building contractors. Construction Management and Economics, 29(08), 841–52.

Agapiou, A (2002) Perceptions of gender roles and attitudes toward work among male and female operatives in the Scottish construction industry. Construction Management and Economics, 20(08), 697-705.

Alananga, S, Lucian, C and Kusiluka, M M (2015) Significant cost-push factors in owner-built incremental housing construction in Tanzania. Construction Management and Economics, 33(08), 671-88.

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(08), 715–25.

Andersen, L P, Karlsen, I L, Kines, P, Joensson, T and Nielsen, K J (2015) Social identity in the construction industry: implications for safety perception and behaviour. Construction Management and Economics, 33(08), 640-52.

Arditi, D and Chotibhongs, R (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(08), 721–32.

Aye, L, Bamford, N, Charters, B and Robinson, J (2000) Environmentally sustainable development: a life-cycle costing approach for a commercial office building in Melbourne, Australia. Construction Management and Economics, 18(08), 927-34.

Benjaoran, V and Peansupap, V (2020) Grid-based construction site layout planning with Particle Swarm Optimisation and Travel Path Distance. Construction Management and Economics, 38(08), 673–88.

Bergström, M and Stehn, L (2005) Benefits and disadvantages of ERP in industrialised timber frame housing in Sweden. Construction Management and Economics, 23(08), 831-8.

Bogus, S M, Molenaar, K R and Diekmann, J E (2006) Strategies for overlapping dependent design activities. Construction Management and Economics, 24(08), 829-37.

Bonnal, P, Gourc, D, Hameri, A-p and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(08), 797-814.

Boonstra, C and Knapen, M (2000) Knowledge infrastructure for sustainable building in The Netherlands. Construction Management and Economics, 18(08), 885-91.

Bowen, P, Dorrington, R, Distiller, G, Lake, H and Besesar, S (2008) HIV/AIDS in the South African construction industry: an empirical study. Construction Management and Economics, 26(08), 827–39.

Bröchner, J, Josephson, P-e and Alte, J (2005) Identifying management research priorities. Construction Management and Economics, 23(08), 793-6.

Bridge, A J and Tisdell, C (2004) The determinants of the vertical boundaries of the construction firm. Construction Management and Economics, 22(08), 807-25.

Cameron, I and Duff, R (2007) Use of performance measurement and goal setting to improve construction managers' focus on health and safety. Construction Management and Economics, 25(08), 869–81.

Caven, V and Astor, E N (2013) The potential for gender equality in architecture: an Anglo-Spanish comparison. Construction Management and Economics, 31(08), 874-82.

Chan, P W (2013) Queer eye on a ‘straight’ life: deconstructing masculinities in construction. Construction Management and Economics, 31(08), 816-31.

Chang, C-Y and Ive, G (2007) Reversal of bargaining power in construction projects: meaning, existence and implications. Construction Management and Economics, 25(08), 845–55.

Chao, L-C and Liou, C-N (2007) Risk-minimizing approach to bid-cutting limit determination. Construction Management and Economics, 25(08), 835–43.

Chau, C K, Lee, W L, Yik, F W H and Burnett, J (2000) Towards a successful voluntary building environmental assessment scheme. Construction Management and Economics, 18(08), 959-68.

Chen, J-H, Yang, L-R, Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(08), 805–14.

Chen, Y, Chen, Y, Smyth, H and Fu, Y (2021) Enforcement against contract violation in Chinese construction projects: impacts of trust and perceived intentionality. Construction Management and Economics, 39(08), 687–703.

Chen, Y, Wang, W, Zhang, S and You, J (2018) Understanding the multiple functions of construction contracts: the anatomy of FIDIC model contracts. Construction Management and Economics, 36(08), 472–85.

Choi, K, Lee, E-B, Ibbs, C W and Kim, Y W (2009) Multifaceted public outreach and cost–benefit analysis for its effectiveness validation. Construction Management and Economics, 27(08), 771–82.

Choudhury, T (2013) Experiences of women as workers: a study of construction workers in Bangladesh. Construction Management and Economics, 31(08), 883-98.

Cole, R J (2000) Building environmental assessment methods: assessing construction practices. Construction Management and Economics, 18(08), 949-57.

Cuervo, J C and Low, S P (2004) Global performance measures for transnational construction corporations. Construction Management and Economics, 22(08), 851-60.

Dainty, A R J, Cheng, M-I and Moore, D R (2004) A competency-based performance model for construction project managers. Construction Management and Economics, 22(08), 877-86.

Dainty, A R, Briscoe, G H and Millett, S J (2001) Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(08), 841-8.

Dhanshyam, M and Srivastava, S K (2021) Governance structures for public infrastructure projects: Public–private management regimes, contractual forms and innovation. Construction Management and Economics, 39(08), 652–68.

Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(08), 841–54.

Dorée, A G and Holmen, E (2004) Achieving the unlikely: innovating in the loosely coupled construction system. Construction Management and Economics, 22(08), 827-38.

Duong, T B A, Pham, T, Truong, Q H, Nguyen, K, Pham, C H, Hoang, T and Pham, T H (2023) Risk in sustainable construction supply chains: construct development and measurement validation. Construction Management and Economics, 41(08), 634–50.

Eriksson, P E and Ossi (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(08), 893–901.

Fan, S C, Shen, Q P and Luo, X (2010) Group decision support systems in value management. Construction Management and Economics, 28(08), 38.

Fellows, R and Liu, A M M (2012) Managing organizational interfaces in engineering construction projects: addressing fragmentation and boundary issues across multiple interfaces. Construction Management and Economics, 30(08), 653-71.

Fellows, R F, Liu, A and Fong, C M (2003) Leadership style and power relations in quantity surveying in Hong Kong. Construction Management and Economics, 21(08), 809-18.

Fox, S, Marsh, L and Cockerham, G (2002) Constructability rules: guidelines for successful application to bespoke buildings. Construction Management and Economics, 20(08), 689-96.

Fraser, C and Zarkada-Frazer, A (2001) The philosophy, structure and objectives of research and development in Japan. Construction Management and Economics, 19(08), 831-40.

Fu, W K, Drew, D S and Lo, H P (2002) The effect of experience on contractors' competitiveness in recurrent bidding. Construction Management and Economics, 20(08), 655-66.

Fu, Y, Chen, Y, Zhang, S and Wang, W (2015) Promoting cooperation in construction projects: an integrated approach of contractual incentive and trust. Construction Management and Economics, 33(08), 653-70.

Gangwar, M and Goodrum, P M (2005) The effect of time on safety incentive programs in the US construction industry. Construction Management and Economics, 23(08), 851-9.

Geekiyanage, D and Ramachandra, T (2021) Running costs indices for commercial buildings using the hedonic price imputation approach: a case of Sri Lanka. Construction Management and Economics, 39(08), 704–21.

George, M and Loosemore, M (2019) Site operatives’ attitudes towards traditional masculinity ideology in the Australian construction industry. Construction Management and Economics, 37(08), 419–32.

Graham, P (2000) Building education for the next industrial revolution: teaching and learning environmental literacy for the building professions. Construction Management and Economics, 18(08), 917-25.

Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: reflections on a case study from Iran. Construction Management and Economics, 30(08), 687-95.

Griffith, A (2007) Key considerations for delivering best value in the small building works portfolio of large client organizations. Construction Management and Economics, 25(08), 903–9.

Griffith, A (2002) Key considerations for developing corporate and operational approaches for managing the small building works portfolio of large client organizations. Construction Management and Economics, 20(08), 679-87.

Grosskopf, K R and Kibert, C J (2006) Economic incentive framework for sustainable energy use in US residential construction. Construction Management and Economics, 24(08), 839-46.

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(08), 756–72.

Han, S H and Diekmann, J E (2001) Making a risk-based decision for overseas construction projects. Construction Management and Economics, 19(08), 765-76.

Haponava, T and Al-Jibouri, S (2010) Influence of process performance during the construction stage on achieving end-project goals. Construction Management and Economics, 28(08), 69.

Henjewele, C, Sun, M and Fewings, P (2011) Critical parameters influencing value for money variations in PFI projects in the healthcare and transport sectors. Construction Management and Economics, 29(08), 825–39.

Hessami, A R, Faghihi, V, Kim, A and Ford, D N (2020) Evaluating planning strategies for prioritizing projects in sustainability improvement programs. Construction Management and Economics, 38(08), 726–38.

Huang, Y and Lin, T (2023) Compound deferrable options for the valuation of multi-stage infrastructure investment projects. Construction Management and Economics, 41(08), 670–86.

Hudak, D and Maxwell, M (2007) A macro approach to estimating correlated random variables in engineering production projects. Construction Management and Economics, 25(08), 883–92.

Hui, E C-M, Ng, I and Lau, O M-F (2011) Speculative bubbles in mass and luxury properties: an investigation of the Hong Kong residential market. Construction Management and Economics, 29(08), 781–93.

Hyari, K H, El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(08), 749–61.

Ilozor, B D (2009) Differential management of waste by construction sectors: a case study in Michigan, USA. Construction Management and Economics, 27(08), 763–70.

Ivory, C (2005) The cult of customer responsiveness: is design innovation the price of a client-focused construction industry?. Construction Management and Economics, 23(08), 861-70.

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(08), 771–9.

Jarkas, A M and Horner, R M W (2015) Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(08), 625-39.

Javernick-Will, A N (2009) Organizational learning during internationalization: acquiring local institutional knowledge. Construction Management and Economics, 27(08), 783–97.

Kadefors, A (2005) Fairness in interorganizational project relations: norms and strategies. Construction Management and Economics, 23(08), 871–8.

Kenley, R (2001) The predictive ability of Bromilow's time-cost model: a comment. Construction Management and Economics, 19(08), 759-64.

Kibert, C J, Sendzimir, J and Guy, B (2000) Construction ecology and metabolism: natural system analogues for a sustainable built environment. Construction Management and Economics, 18(08), 903-16.

Kim, A and Arditi, D (2010) Performance of minority firms providing construction management services in the US transportation sector. Construction Management and Economics, 28(08), 51.

Knauseder, I, Josephson, P-E and Styhre, A (2007) Learning approaches for housing, service and infrastructure project organizations. Construction Management and Economics, 25(08), 857–67.

Koch, C (2012) Contested overruns and performance of offshore wind power plants. Construction Management and Economics, 30(08), 609-22.

Kremers, J, Rietjens, B, Voordijk, H and De Boer, S J (2010) Construction contracting and civil-military interaction. Construction Management and Economics, 28(08), 83.

Langford, D A and Robson, P (2003) The representation of the professions in the cinema: the case of construction engineers and lawyers. Construction Management and Economics, 21(08), 799-807.

Langford, D A, Kennedy, P, Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(08), 831-40.

Larsen, G D (2005) Horses for courses: relating innovation diffusion concepts to the stages of the diffusion process. Construction Management and Economics, 23(08), 787-92.

Lavers, A P and Shiers, D E (2000) Construction law and environmental harm: the liability interface. Construction Management and Economics, 18(08), 893-902.

Lewis, T M and Hosein, R (2006) An estimation of the size of the hidden labour force in construction in Trinidad and Tobago. Construction Management and Economics, 24(08), 805-15.

Lingard, H C, Cooke, T and Blismas, N (2010) Safety climate in conditions of construction subcontracting: a multi-level analysis. Construction Management and Economics, 28(08), 25.

Lingard, H, Gilbert, G and Graham, P (2001) Improving solid waste reduction and recycling performance using goal setting and feedback. Construction Management and Economics, 19(08), 809-17.

Liu, A M-M, Fellows, R and Fang, Z (2003) The power paradigm of project leadership. Construction Management and Economics, 21(08), 819-29.

Locatelli, G and Mancini, M (2012) Looking back to see the future: building nuclear power plants in Europe. Construction Management and Economics, 30(08), 623-37.

London, K A and Kenley, R (2001) An industrial organization economic supply chain approach for the construction industry: a review. Construction Management and Economics, 19(08), 777-88.

Low, S P and Min, W (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(08), 815-29.

Low, S P and Tan, G S L (2002) Relationship marketing: a survey of QS firms in Singapore. Construction Management and Economics, 20(08), 707-21.

Madter, N, Brookes, N J, Bower, D A and Hagan, G (2012) Exploring project management continuing professional development in engineering construction. Construction Management and Economics, 30(08), 639-51.

Manley, S and Graft-Johnson, A D (2013) Towards inclusion: rethinking architectural education. Construction Management and Economics, 31(08), 914-27.

Marchant, T (2013) Keep going: career perspectives on ageing and masculinity of self-employed tradesmen in Australia. Construction Management and Economics, 31(08), 845-60.

Matar, M, Osman, H, Georgy, M, Abou-Zeid, A and Elsaid, M (2020) Evaluating the environmental performance of pipeline construction using systems modelling. Construction Management and Economics, 38(08), 689–714.

Mattar, M H and Cheah, C Y J (2006) Valuing large engineering projects under uncertainty: private risk effects and real options. Construction Management and Economics, 24(08), 847-60.

Menches, C L, Hanna, A S, Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(08), 855–69.

Moradi, S and Sormunen, P (2023) Revisiting the concept of waste and its causes in construction from analytical and conceptual perspectives. Construction Management and Economics, 41(08), 621–33.

Myers, D (2005) A review of construction companies' attitudes to sustainability. Construction Management and Economics, 23(08), 781-5.

Newcombe, R (2003) From client to project stakeholders: a stakeholder mapping approach. Construction Management and Economics, 21(08), 841-8.

Nguyen, T H D, Chileshe, N and Rameezdeen, R (2018) External stakeholder strategic actions in construction projects: a Vietnamese study. Construction Management and Economics, 36(08), 443–58.

Nima, M A, Abdul-Kadir, M R, Jaafar, M S and Alghulami, R G (2001) Constructability implementation: a survey in the Malaysian construction industry. Construction Management and Economics, 19(08), 819-29.

Ofori, G, Briffett, C, Gang, G and Ranasinghe, M (2000) Impact of ISO 14000 on construction enterprises in Singapore. Construction Management and Economics, 18(08), 935-47.

Ormerod, M and Newton, R (2013) Construction as a career choice for young disabled people: dispelling the myths. Construction Management and Economics, 31(08), 928-38.

Pasquire, C (2012) Positioning Lean within an exploration of engineering construction. Construction Management and Economics, 30(08), 673-85.

Poh, Y P and Tah, J H M (2006) Integrated duration-cost influence network for modelling risk impacts on construction tasks. Construction Management and Economics, 24(08), 861-8.

Poon, C S, Yu, A T W, See, S C and Cheung, E (2004) Minimizing demolition wastes in Hong Kong public housing projects. Construction Management and Economics, 22(08), 799-805.

Pryke, S D (2004) Analysing construction project coalitions: exploring the application of social network analysis. Construction Management and Economics, 22(08), 787-97.

Pryke, S, Lunic, D and Badi, S (2015) The effect of leader emotional intelligence on leader–follower chemistry: a study of construction project managers. Construction Management and Economics, 33(08), 603-24.

Raidén, A B, Dainty, A R J and Neale, R H (2006) Balancing employee needs, project requirements and organisational priorities in team deployment. Construction Management and Economics, 24(08), 883-95.

Raiden, A B and Räisänen, C (2013) Striving to achieve it all: men and work-family-life balance in Sweden and the UK. Construction Management and Economics, 31(08), 899-913.

Rajala, P, Ylä-Kujala, A, Sinkkonen, T and Kärri, T (2023) Building renovation business: the effects of specialization on profitability. Construction Management and Economics, 41(08), 687–702.

Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: the influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(08), 651–69.

Rowlinson, S M and Yates, D (2003) nDCAD: a virtual change agent for professions and procurement systems?. Construction Management and Economics, 21(08), 849-57.

Rumens, N (2013) Queering men and masculinities in construction: towards a research agenda. Construction Management and Economics, 31(08), 802-15.

Sacks, R and Harel, M (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24(08), 869-81.

Sage, D, Vitry, C, Dainty, A and Barnard, S (2021) Towards a new theory of construction innovation: a socio-material analysis of classification work. Construction Management and Economics, 39(08), 637–51.

Sha, K (2019) Incentive strategies for construction project manager: a common agency perspective. Construction Management and Economics, 37(08), 461–71.

Skitmore, M (2008) First and second price independent values sealed bid procurement auctions: some scalar equilibrium results. Construction Management and Economics, 26(08), 787–803.

Skitmore, M and Runeson, G (2006) Bidding models: testing the stationarity assumption. Construction Management and Economics, 24(08), 791-803.

Smith, L (2013) Trading in gender for women in trades: embodying hegemonic masculinity, femininity and being a gender hotrod. Construction Management and Economics, 31(08), 861-73.

Tabish, S Z S and Jha, K N (2011) Identification and evaluation of success factors for public construction projects. Construction Management and Economics, 29(08), 809–23.

Tam, C M, Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(08), 839-49.

  • Type: Journal Article
  • Keywords: Artificial neural networks; hook time; mobile crane
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/0144619042000202771
  • Abstract:

    The hook times of mobile cranes are processes that are of non-linear and discrete nature. Artificial neural network is a data processing technique that lends itself to this kind of problem. Three common artificial neural network architectures - multi-layer feed-forward (MLFF), group method of data handling (GMDH) and general regression neural network (GRNN) - are compared. The results show that the GRNN model aided with genetic algorithm (GA) is most promising in describing the non-linear and discrete nature of the hook times. The MLFF model can also give a moderate level of accuracy in the estimation of hook travelling times of mobile cranes and is ranked second. The GMDH model is outperformed by the former two due to a less promising R-square.

Taylor, M D (2010) A definition and valuation of the UK offsite construction sector. Construction Management and Economics, 28(08), 96.

Thomson, C S and El-Haram, M A (2019) Is the evolution of building sustainability assessment methods promoting the desired sharing of knowledge amongst project stakeholders?. Construction Management and Economics, 37(08), 433–60.

Thunberg, M and Fredriksson, A (2018) Bringing planning back into the picture – How can supply chain planning aid in dealing with supply chain-related problems in construction?. Construction Management and Economics, 36(08), 425–42.

Trigunarsyah, B (2004) Project owners' role in improving constructability of construction projects: an example analysis for Indonesia. Construction Management and Economics, 22(08), 861-76.

Tsolas, I E (2011) Modelling profitability and effectiveness of Greek-listed construction firms: an integrated DEA and ratio analysis. Construction Management and Economics, 29(08), 795–807.

Voordijk, H (2009) Construction management and economics: the epistemology of a multidisciplinary design science. Construction Management and Economics, 27(08), 713–20.

Williams, C C, Nadin, S J and Windebank, J (2011) Undeclared work in the European construction industry: evidence from a 2007 Eurobarometer survey. Construction Management and Economics, 29(08), 853–67.

Winch, G M (2001) Governing the project process: a conceptual framework. Construction Management and Economics, 19(08), 799-808.

Wong, J M W, Chiang, Y H and Ng, T S (2008) Construction and economic development: the case of Hong Kong. Construction Management and Economics, 26(08), 815–26.

Wright, T (2013) Uncovering sexuality and gender: an intersectional examination of women’s experience in UK construction. Construction Management and Economics, 31(08), 832-44.

Yeh, H H (2018) How the capital structure of firms is determined over business cycles: further evidence from the construction industry of Taiwan. Construction Management and Economics, 36(08), 459–71.

Yip, B, Rowlinson, S and Siu, O L (2008) Coping strategies as moderators in the relationship between role overload and burnout. Construction Management and Economics, 26(08), 871–82.

Yu, W-d, Chang, P-l, Yao, S-H and Liu, S-J (2009) KVAM: model for measuring knowledge management performance of engineering community of practice. Construction Management and Economics, 27(08), 733–47.

Zayed, T M, Halpin, D W and Basha, I M (2005) Productivity and delays assessment for concrete batch plant-truck mixer operations. Construction Management and Economics, 23(08), 839-50.

Zhang, H, Tam, C M and Shi, J J (2002) Simulation-based methodology for project scheduling. Construction Management and Economics, 20(08), 667-78.

Zhang, J, Chen, F and Yuan, X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: a Canadian study. Construction Management and Economics, 38(08), 739–55.

Zhang, R P, Holdsworth, S, Turner, M and Andamon, M M (2021) Does gender really matter? A closer look at early career women in construction. Construction Management and Economics, 39(08), 669–86.

Zhang, S B and Liu, A M M (2006) Organisational culture profiles of construction enterprises in China. Construction Management and Economics, 24(08), 817-28.