Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 33 results ...

Aghimien, D O, Aghimien, E I, Fadiyimu, A O and Adegbembo, T F (2018) Survival strategies of built environment organisations in a challenging economy. Engineering, Construction and Architectural Management, 25(07), 861–76.

Aghimien, D O, Oke, A E and Aigbavboa, C O (2018) Barriers to the adoption of value management in developing countries. Engineering, Construction and Architectural Management, 25(07), 818–34.

Bao, F, Chen, C, Chan, A P, Martek, I and Shrestha, A (2019) Dynamic framework transfer model for public–private partnerships. Engineering, Construction and Architectural Management, 26(07), 1218–39.

Chen, C, Tang, L, Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(07), 1367–86.

Chen, K and Lu, W (2019) Bridging BIM and building (BBB) for information management in construction. Engineering, Construction and Architectural Management, 26(07), 1518–32.

Chia, F C, Skitmore, M, Gray, J and Bridge, A (2018) International comparisons of nominal and real construction labour productivity. Engineering, Construction and Architectural Management, 25(07), 896–915.

Cui, Z, Liu, J, Xia, B and Cheng, Y (2019) Beyond national culture difference. Engineering, Construction and Architectural Management, 26(07), 1476–97.

Dang, C N and Le-Hoai, L (2018) Revisiting storey enclosure method for early estimation of structural building construction cost. Engineering, Construction and Architectural Management, 25(07), 877–95.

Goel, A, Ganesh, L and Kaur, A (2020) Social sustainability considerations in construction project feasibility study: a stakeholder salience perspective. Engineering, Construction and Architectural Management, 27(07), 1429–59.

Hasan, A, Baroudi, B, Elmualim, A and Rameezdeen, R (2018) Factors affecting construction productivity: a 30 year systematic review. Engineering, Construction and Architectural Management, 25(07), 916–37.

Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(07), 1579–94.

Khattak, M S and Mustafa, U (2019) Management competencies, complexities and performance in engineering infrastructure projects of Pakistan. Engineering, Construction and Architectural Management, 26(07), 1321–47.

Leung, M, Famakin, I O and Wang, C (2019) Developing an integrated indoor built environment–quality of life model for the elderly in public and subsidized housing. Engineering, Construction and Architectural Management, 26(07), 1498–517.

Lew, Y, Hassim, S, Muniandy, R and Hua, L T (2018) Structural equation modelling for subcontracting practice: Malaysia chapter. Engineering, Construction and Architectural Management, 25(07), 835–60.

Li, G, Chen, C, Zhang, G and Martek, I (2019) Bid/no-bid decision factors for Chinese international contractors in international construction projects. Engineering, Construction and Architectural Management, 27(07), 1619–43.

Liu, N, Ruan, L, Jin, R, Chen, Y, Deng, X and Yang, T (2019) Investigation of individual perceptions towards BIM implementation-a Chongqing case study. Engineering, Construction and Architectural Management, 26(07), 1455–75.

Moussavi Nadoushani, Z S, Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(07), 938–57.

Nasirzadeh, F, Carmichael, D G, Jarban, M J and Rostamnezhad, M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Engineering, Construction and Architectural Management, 26(07), 1261–76.

Oechler, E, Molenaar, K R, Hallowell, M and Scott, S (2018) State-of-practice for risk-based quality assurance in state departments of transportation. Engineering, Construction and Architectural Management, 25(07), 958–70.

Olatunji, O A (2019) Promoting student commitment to BIM in construction education. Engineering, Construction and Architectural Management, 26(07), 1240–60.

Pablo, Z and London, K A (2020) Stable relationality and dynamic innovation: two models of collaboration in SME-driven offsite manufacturing supply chains in housing construction. Engineering, Construction and Architectural Management, 27(07), 1553–77.

Rostamnezhad, M, Nasirzadeh, F, Khanzadi, M, Jarban, M J and Ghayoumian, M (2020) Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: a case study of highway project. Engineering, Construction and Architectural Management, 27(07), 1595–618.

Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(07), 1294–320.

Sun, H, Wang, Y and Meng, J (2019) A trading and pricing method of expansion options for BOT freeway projects in China. Engineering, Construction and Architectural Management, 26(07), 1406–23.

Tayeh, B A, Hallaq, K A, Zahoor, H and Al Faqawi, A H (2019) Techniques and benefits of implementing the last planner system in the Gaza Strip construction industry. Engineering, Construction and Architectural Management, 26(07), 1424–36.

  • Type: Journal Article
  • Keywords: Tools/techniques; Benefits; Last planner system; Stakeholders; Construction industry; Gaza Strip;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-01-2018-0039
  • Abstract:
    The purpose of this paper is to prioritize the vital tools/techniques for the effective implementation of the last planner system (LPS) in the cross-cultural setting of a developing country, i.e. Gaza Strip. Besides, the potential benefits of implementing LPS are prioritized. Design/methodology/approach The significant techniques and likely benefits of LPS implementations were identified through comprehensive literature, followed by their verification through a pilot study. The quantitative data were collected using a questionnaire survey from 89 companies, operating in the Gaza Strip construction industry. The relative important index was calculated for prioritizing the significant tools/techniques (16) which support the effective LPS implementation, and highlighting the potential benefits (10) achieved through LPS implementation. Findings The results showed that the “use of visual devices to spread information in the construction site,” “attendance of key actors” and “look ahead plan” are the most important tools/techniques supporting LPS implementation. The top three potential benefits of implementing LPS include: “allows a better understanding of the program control,” “maximizes the co-operation and confidence among team members” and “allows the manager to better visualize the work program.” To prevent any waste in project time and to ensure the material supply and continuity of works, the study recommends advance supply and storage of demand materials, and early availability of the shop-drawings for acceptance by the superintendent. Practical implications The study’s findings are expected to guide the key construction stakeholders to prioritize their energies toward effective LPS implementation in the Gaza Strip. Originality/value Though this study pertains to Palestine, its methodology can be generalized in other countries and regions, having a similar work environment, after making necessary cultural adjustments.

Uusitalo, P, Seppänen, O, Peltokorpi, A and Olivieri, H (2019) Solving design management problems using lean design management: the role of trust. Engineering, Construction and Architectural Management, 26(07), 1387–405.

Wang, G, Xia, C and Cao, D (2020) State and determinants of inter-regional market entry practices in the Chinese construction industry: evidence from national quality award projects. Engineering, Construction and Architectural Management, 27(07), 1461–77.

Wang, Y and Jin, X (2019) Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, Construction and Architectural Management, 26(07), 1348–66.

Xue, J, Shen, G Q, Yang, R J, Zafar, I, Ekanayake, E, Lin, X and Darko, A (2020) Influence of formal and informal stakeholder relationship on megaproject performance: a case of China. Engineering, Construction and Architectural Management, 27(07), 1505–31.

Yap, J B H, Leong, W J and Skitmore, M (2020) Capitalising teamwork for enhancing project delivery and management in construction: empirical study in Malaysia. Engineering, Construction and Architectural Management, 27(07), 1479–503.

Yu, J, Ma, G and Cai, S (2019) Disparities in the provision of aging-friendly communities in old and new urban neighborhoods in China. Engineering, Construction and Architectural Management, 26(07), 1277–93.

Yuan, F, Tang, M and Hong, J (2020) Efficiency estimation and reduction potential of the Chinese construction industry via SE-DEA and artificial neural network. Engineering, Construction and Architectural Management, 27(07), 1533–52.

Zhang, J, Xie, H and Li, H (2019) Improvement of students problem-solving skills through project execution planning in civil engineering and construction management education. Engineering, Construction and Architectural Management, 26(07), 1437–54.