Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 264 results ...

Agapiou, A, Price, A D F and McCaffer, R (1995) Forecasting the supply of construction skills in the UK. Construction Management and Economics, 13(04), 353-64.

Akintoye, A and Skitmore, M R (1991) Profitability of UK construction contractors. Construction Management and Economics, 9(04), 311-25.

Aksorn, T and Hadikusumo, B H W (2008) Measuring effectiveness of safety programmes in the Thai construction industry. Construction Management and Economics, 26(04), 21.

Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(04), 459-70.

Al-Momani, A H (1996) Construction cost prediction for public school buildings in Jordan. Construction Management and Economics, 14(04), 311-7.

Al-Sabah, R, Menassa, C C and Hanna, A (2014) Evaluating impact of construction risks in the Arabian Gulf Region from perspective of multinational architecture, engineering and construction firms. Construction Management and Economics, 32(04), 382-402.

Al-Sobiei, O S, Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(04), 423-30.

Alkass, S, Mazerolle, M, Tribaldos, E and Harris, F C (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(04), 335-52.

Amadi, A I and Higham, A (2019) Putting context to numbers: a geotechnical risk trajectory to cost overrun extremism. Construction Management and Economics, 37(04), 217–37.

Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(04), 323-30.

Arditi, D and Suh, K (1991) Estimating system selection expert. Construction Management and Economics, 9(04), 369-81.

Arditi, D, Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(04), 353-64.

Awakul, P and Ogunlana, S O (2002) The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study. Construction Management and Economics, 20(04), 365-77.

Badi, S (2017) Public sustainable-energy requirements and innovation in UK PFI school projects. Construction Management and Economics, 35(04), 218-38.

Bajaj, D, Oluwoye, J O and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(04), 363-9.

Balasubramani, M, Mahalingam, A and Scott, W R (2020) Imitation and adaptation: lessons from a case study of a metro rail project in India. Construction Management and Economics, 38(04), 364–82.

Ball, M and Wood, A (1995) How many jobs does construction expenditure generate?. Construction Management and Economics, 13(04), 307-18.

Ballesteros-Pérez, P, Skitmore, M, Pellicer, E and González-Cruz, M C (2015) Scoring rules and abnormally low bids criteria in construction tenders: a taxonomic review. Construction Management and Economics, 33(04), 259-78.

Barrett, P S (1992) Measuring the ability gap for construction professionals. Construction Management and Economics, 10(04), 321-42.

Best, R and Langston, C (2006) Evaluation of construction contractor performance: a critical analysis of some recent research. Construction Management and Economics, 24(04), 439-45.

Betts, M (1990) Methods and data used by large building contractors in preparing tenders. Construction Management and Economics, 8(04), 399-414.

Betts, M and Lansley, P R (1993) Construction Management and Economics: a review of the first ten years. Construction Management and Economics, 11(04), 221-45.

Bird, B (1987) Costs-in-use: principles in the context of building procurement. Construction Management and Economics, 5(04), S23-S30.

Bishop, D (1994) The professionals' view of the Health and Safety Commission's draft Construction (Design and Management) Regulations. Construction Management and Economics, 12(04), 365-72.

Blismas, N G, Sher, W, Thorpe, A and Baldwin, A (2004) A typology for clients' multi-project environments. Construction Management and Economics, 22(04), 357-71.

Bon, R and Luck, R (1999) Outsourcing of property-related management functions in Europe and North America, 1993-1998. Construction Management and Economics, 17(04), 409-12.

Bon, R and Yashiro, T (1996) Some new evidence of old trends: Japanese construction, 1960-1990. Construction Management and Economics, 14(04), 319-23.

Boussabaine, A H and Kaka, A P (1998) A neural networks approach for cost-flow forecasting. Construction Management and Economics, 16(04), 471-9.

Bowen, P, Allen, Y, Edwards, P, Cattell, K and Simbayi, L (2014) Guidelines for effective workplace HIV/AIDS intervention management by construction firms. Construction Management and Economics, 32(04), 362-81.

Bowen, P, Peihua Zhang, R and Edwards, P (2021) An investigation of work-related strain effects and coping mechanisms among South African construction professionals. Construction Management and Economics, 39(04), 298–322.

Bowles, G, Dagpunar, J S and Gow, H (1997) Financial management of planned maintenance for housing associations. Construction Management and Economics, 15(04), 315-26.

Bröchner, J, Rosander, S and Waara, F (2004) Cross-border post-acquisition knowledge transfer among construction consultants. Construction Management and Economics, 22(04), 421-7.

Bresnen, M J and Haslam, C O (1991) Construction industry clients: a survey of their attributes and project management practices. Construction Management and Economics, 9(04), 327-42.

Bromilow, F J and Pawsey, M R (1987) Life cycle cost of university buildings. Construction Management and Economics, 5(04), S3-S22.

Buyukyoran, F and Gundes, S (2018) Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(04), 203–16.

Cannon, J (1994) Lies and construction statistics. Construction Management and Economics, 12(04), 307-13.

Carbonara, N, Costantino, N and Pellegrino, R (2014) Revenue guarantee in public-private partnerships: a fair risk allocation model. Construction Management and Economics, 32(04), 403-15.

Carter, K and Fortune, C (2007) Sustainable development policy perceptions and practice in the UK social housing sector. Construction Management and Economics, 25(04), 399–408.

Cattell, D W, Bowen, P A and Kaka, A P (2010) The risks of unbalanced bidding. Construction Management and Economics, 28(04), 333–44.

Chan, D W M and Kumaraswamy, M M (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13(04), 319-33.

Chan, M (2011) Fatigue: the most critical accident risk in oil and gas construction. Construction Management and Economics, 29(04), 341–53.

Chan, P W and Dainty, A R J (2007) Resolving the UK construction skills crisis: a critical perspective on the research and policy agenda. Construction Management and Economics, 25(04), 375–86.

Chan, S L (2001) Empirical tests to discern linkages between construction and other economic sectors in Singapore. Construction Management and Economics, 19(04), 355-63.

Chau, K W (1997) Note - The ranking of construction management journals. Construction Management and Economics, 15(04), 387-98.

Chau, K W (1999) On the issue of plan shape complexity: plan shape indices revisited. Construction Management and Economics, 17(04), 473-82.

Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(04), 391-405.

Cheung, F K T, Kurul, E and Oti, A H (2016) A case study of hybrid strategies to create value for a contracting business in the education sector in England and Wales. Construction Management and Economics, 34(04), 335-52.

Cheung, F K T, Wong, M and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(04), 349–62.

Cheung, S-O, Lam, T, Lueng, M and Wan, Y (2001) An analytical hierarchy process based procurement selection method. Construction Management and Economics, 19(04), 427-37.

Chew, M Y L and Tan, S S (2004) A multivariate approach to maintenance prediction of wet areas. Construction Management and Economics, 22(04), 395-407.

Chinowsky, P S and Javernick-Will, A (2020) High-value, collaborative networks. Construction Management and Economics, 38(04), 398–408.

Chinyio, E A and Olomolaiye, P O (1999) A needs based methodology for classifying construction clients and selecting contractors-a rejoinder. Construction Management and Economics, 17(04), 413-7.

Claver, E, Molina, J F and Tari, J J (2003) Strategic groups and form performance: the case of Spanish house-building firms. Construction Management and Economics, 21(04), 369-77.

Comet, C (2009) Social capital and profits of small firms in the French construction industry. Construction Management and Economics, 27(04), 411–8.

Costantino, N, Pietroforte, R and Harnill, P (2001) Subcontracting in commercial and residential construction: an emperical investigation. Construction Management and Economics, 19(04), 439-47.

Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(04), 355-64.

Cox, I D, Morris, J P, Rogerson, J H and Jared, G E (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17(04), 427-39.

Crosthwaite, D (1998) Note - The internationalization of British construction companies 1990-1996: an empirical analysis. Construction Management and Economics, 16(04), 389-95.

Cui, Q, Hastak, M and Halpin, D (2010) Systems analysis of project cash flow management strategies. Construction Management and Economics, 28(04), 361–76.

Dainty, A R J, Ison, S G and Briscoe, G H (2005) The construction labour market skills crisis: the perspective of small-medium-sized firms. Construction Management and Economics, 23(04), 387-98.

Davenport, P (1993) Extensions of time: time for change. Construction Management and Economics, 11(04), 305-7.

Dawood, N N and Neale, R H (1990) A survey of current production planning practices in the precast concrete industry. Construction Management and Economics, 8(04), 365-83.

Demirel, H Ç, Leendertse, W, Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(04), 196-206.

Dewulf, G and Garvin, M J (2020) Responsive governance in PPP projects to manage uncertainty. Construction Management and Economics, 38(04), 383–97.

Djebarni, R (1996) The impact of stress in site management effectiveness. Construction Management and Economics, 14(04), 281-93.

Dodd, J and Langford, D A (1990) Construction management on one large project in London: a case study. Construction Management and Economics, 8(04), 385-99.

Dulaimi, M F, Alhashemi, M, Ling, F Y Y and Kumaraswamy, M (2010) The execution of public-private partnership projects in the UAE. Construction Management and Economics, 28(04), 393–402.

Dzeng, R-J and Wu, J-S (2013) Efficiency measurement of the construction industry in Taiwan: a stochastic frontier cost function approach. Construction Management and Economics, 31(04), 335-44.

Edwards, D J, Holt, G D and Harris, F C (2000) Estimating life cycle plant maintenance costs. Construction Management and Economics, 18(04), 427-35.

El-adaway, I H, Ali, G G, Eissa, R, Abdul Nabi, M, Ahmed, M O, Elbashbishy, T and Khalef, R (2023) Construction Management and Economics 40th anniversary: investigating knowledge structure and evolution of research trends. Construction Management and Economics, 41(04), 338–60.

El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(04), 443-6.

El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(04), 385–98.

Elazouni, A and Salem, O A (2011) Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics, 29(04), 355–70.

Ershadi, M, Davis, P and Newaz, M T (2021) Important academic interventions for promoting resilience: The perception of construction management undergraduates. Construction Management and Economics, 39(04), 340–55.

Eyiah, A K and Cook, P (2003) Financing small and medium-scale contractors in developing countries: a Ghana case study. Construction Management and Economics, 21(04), 357-67.

Feige, A, McAllister, P and Wallbaum, H (2013) Rental price and sustainability ratings: which sustainability criteria are really paying back?. Construction Management and Economics, 31(04), 322-34.

Fenn, P (1997) Note - Rigour in research and peer review. Construction Management and Economics, 15(04), 383-5.

Fisher, N G (1990) The use of structured data analysis as a construction management research tool. Construction Management and Economics, 8(04), 341-63.

Fisher, T and Ranasinghe, M (2001) Culture and foreign companies' choice of entry mode: the case of the Singapore building and construction industry. Construction Management and Economics, 19(04), 343-53.

Flanagan, R, Kendell, A, Norman, G and Robinson, G D (1987) Life cycle costing and risk management. Construction Management and Economics, 5(04), S53-S71.

Ford, D N, Lander, D M and Voyer, J J (2002) A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(04), 343-51.

Frimpong, S, Sunindijo, R Y, Wang, C C, Boadu, E F, Dansoh, A, Hon, C K H and Yiu, T W (2024) Promoting positive mental health among young construction workers: the role of theory. Construction Management and Economics, 42(04), 366–85.

Galardo, L and Trottier, M (2022) How supervisor, co-worker, and spousal social support influences the experience of workload and work-family conflict: results from a survey of construction workers in Québec. Construction Management and Economics, 40(04), 331–42.

Gale, A W and Fellows, R F (1990) Challenge and innovation: the challenge to the construction industry. Construction Management and Economics, 8(04), 431-6.

Ganesan, S (1994) Employment maximization in construction in developing countries. Construction Management and Economics, 12(04), 323-35.

Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructure investment decisions. Construction Management and Economics, 22(04), 373-83.

Gilleard, J (1989) Computerized reference sources in the construction industry. Construction Management and Economics, 7(04), 321-30.

Giritli, H, Sözen, Z, Flanagan, R and Lansley, P R (1990) International contracting: a Turkish perspective. Construction Management and Economics, 8(04), 415-30.

Gowda, R, Singh, A and Connolly, M (1998) Holistic enhancement of the production analysis of bituminous paving operations. Construction Management and Economics, 16(04), 417-32.

Greenwood, D and Wu, S (2012) Establishing the association between collaborative working and construction project performance based on client and contractor perceptions. Construction Management and Economics, 30(04), 299-308.

Grenzfurtner, W, Rudberg, M, Mayrhofer, R, Loike, K and Gronalt, M (2022) Performance measurement and management practices of on-site activities in industrialized housebuilding. Construction Management and Economics, 40(04), 239–53.

Griffith, A and Headley, J D (1995) Developing an effective approach to the procurement and management of small building works within large client organizations. Construction Management and Economics, 13(04), 279-89.

Griffith, A and Headley, J D (1997) Using a weighted score model as an aid to selecting procurement methods for small building works. Construction Management and Economics, 15(04), 341-8.

Groák, S (1994) Is construction an industry? Notes towards a greater analytic emphasis on external linkages. Construction Management and Economics, 12(04), 287-93.

Gruneberg, S and Folwell, K (2013) The use of gross fixed capital formation as a measure of construction output. Construction Management and Economics, 31(04), 359-68.

Hall, D M, Whyte, J K and Lessing, J (2020) Mirror-breaking strategies to enable digital manufacturing in Silicon Valley construction firms: a comparative case study. Construction Management and Economics, 38(04), 322–39.

Hallowell, M (2010) Safety risk perception in construction companies in the Pacific Northwest of the USA. Construction Management and Economics, 28(04), 403–13.

Hallowell, M R, Bhandari, S and Alruqi, W (2020) Methods of safety prediction: analysis and integration of risk assessment, leading indicators, precursor analysis, and safety climate. Construction Management and Economics, 38(04), 308–21.

Hallowell, M, Esmaeili, B and Chinowsky, P (2011) Safety risk interactions among highway construction work tasks. Construction Management and Economics, 29(04), 417–29.

Hamerski, D C, Saurin, T A, Formoso, C T and Isatto, E L (2024) The contributions of the Last Planner System to resilient performance in construction projects. Construction Management and Economics, 42(04), 328–45.

Hamzeh, F R, Zankoul, E and Rouhana, C (2015) How can 'tasks made ready' during look-ahead planning impact reliable workflow and project duration?. Construction Management and Economics, 33(04), 243-58.

Handa, V K and Adas, A (1996) Predicting the level of organizational effectiveness: a methodology for the construction firm. Construction Management and Economics, 14(04), 341-452.

Hanioglu, M N and Arditi, D (2013) Teaming/timing sequences in hotel development projects. Construction Management and Economics, 31(04), 369-85.

Hartmann, A and Hietbrink, M (2013) An exploratory study on the relationship between stakeholder expectations, experiences and satisfaction in road maintenance. Construction Management and Economics, 31(04), 345-58.

Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(04), 377-85.

Hatush, Z and Skitmore, M R (1997) Assessment and evaluation of contractor data against client goals using PERT approach. Construction Management and Economics, 15(04), 327-40.

Hellström, M, Wikström, R, Gustafsson, M and Luotola, H (2016) The value of project execution services: A problem and uncertainty perspective. Construction Management and Economics, 34(04), 272-85.

Hemström, K, Gustavsson, L and Mahapatra, K (2017) The sociotechnical regime and Swedish contractor perceptions of structural frames. Construction Management and Economics, 35(04), 184-95.

Herazo, B and Lizarralde, G (2015) The influence of green building certifications in collaboration and innovation processes. Construction Management and Economics, 33(04), 279-98.

Hickey, P J and Cui, Q (2024) Tracing the career trajectories of architecture, engineering and construction (AEC) women leaders. Construction Management and Economics, 42(04), 289–306.

Hiete, M, Kühlen, A and Schultmann, F (2011) Analysing the interdependencies between the criteria of sustainable building rating systems. Construction Management and Economics, 29(04), 323–8.

Horsley, A, France, C and Quatermass, B (2003) Delivering energy efficient buildings: a design procedure to demonstrate environmental and economic benefits. Construction Management and Economics, 21(04), 345-56.

Hu, K, Rahmandad, H, Smith‐Jackson, T and Winchester, W (2011) Factors influencing the risk of falls in the construction industry: a review of the evidence. Construction Management and Economics, 29(04), 397–416.

Huang, C-F and Lien, H-C (2012) An empirical analysis of the influences of corporate social responsibility on organizational performance of Taiwan's construction industry: using corporate image as a mediator. Construction Management and Economics, 30(04), 263-75.

Huang, Y-L and Chou, S-P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(04), 379-89.

Isidore, L J, Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(04), 417-26.

Issa, M H, Attalla, M, Rankin, J H and Christian, A J (2011) Energy consumption in conventional, energy‐retrofitted and green LEED Toronto schools. Construction Management and Economics, 29(04), 383–95.

Ive, G (1994) A theory of ownership types applied to the construction majors. Construction Management and Economics, 12(04), 349-64.

Javed, A A, Lam, P T I and Chan, A P C (2014) Change negotiation in public-private partnership projects through output specifications: an experimental approach based on game theory. Construction Management and Economics, 32(04), 323-48.

Jha, K N and Devaya, M N (2008) Modelling the risks faced by Indian construction companies assessing international projects. Construction Management and Economics, 26(04), 337–48.

Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(04), 409–21.

Johnson, C, Lizarralde, G and Davidson, C H (2006) A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(04), 367-78.

Johnson, R E, Sherif, A and Becker, F D (1987) Economics of university research laboratories: policy considerations. Construction Management and Economics, 5(04), S31-S42.

Kabasakal, H E and Sözen, Z (1989) Organizational context, structural attributes and management systems in construction firms. Construction Management and Economics, 7(04), 347-56.

Kaka, A P and Price, A D F (1993) Modelling standard cost commitment curves for contractors' cash-flow forecasting. Construction Management and Economics, 11(04), 271-83.

Kaka, A P and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(04), 383-400.

Kale, S and Arditi, D (1999) Age-dependent business failures in the US construction industry. Construction Management and Economics, 17(04), 493-503.

Kaminsky, J (2015) The fourth pillar of infrastructure sustainability: tailoring civil infrastructure to social context. Construction Management and Economics, 33(04), 299-309.

Kapliński, O and Thiel, T (1995) Evaluation of multi-family housing systems in Poland. Construction Management and Economics, 13(04), 291-8.

Kein, A T T, Ofori, G and Briffett, C (1999) ISO 14000: its relevance to the construction industry of Singapore and its potential as the next industry milestone. Construction Management and Economics, 17(04), 449-61.

Kelly, J (2007) Making client values explicit in value management workshops. Construction Management and Economics, 25(04), 435–42.

Khalef, R, Ali, G G, El-adaway, I H and Gad, G M (2022) Managing construction projects impacted by the COVID-19 pandemic: a contractual perspective. Construction Management and Economics, 40(04), 313–30.

Kishk, M (2004) Combining various facets of uncertainty in whole-life cost modelling. Construction Management and Economics, 22(04), 429-35.

Kodikara, G W, Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(04), 261-9.

Koraltan, S B and Dikbas, A (2002) An assessment of the applicability of partnering in the Turkish construction sector. Construction Management and Economics, 20(04), 315-21.

Kunz, J and Fischer, M (2020) Virtual design and construction. Construction Management and Economics, 38(04), 355–63.

Lai, I K W and Lam, F K S (2010) Perception of various performance criteria by stakeholders in the construction sector in Hong Kong. Construction Management and Economics, 28(04), 377–91.

Lai, J H K (2010) Operation and maintenance budgeting for commercial buildings in Hong Kong. Construction Management and Economics, 28(04), 415–27.

Lam, K-C, Ning, X and Ng, T (2007) The application of the ant colony optimization algorithm to the construction site layout planning problem. Construction Management and Economics, 25(04), 359–74.

Lam, Y T and Chen, Z (2004) The development of the construction legal system in China. Construction Management and Economics, 22(04), 347-56.

Lansley, P R (1994) Analysing construction organizations. Construction Management and Economics, 12(04), 337-48.

Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(04), 339-55.

Lehtovaara, J, Seppänen, O and Peltokorpi, A (2022) Improving construction management with decentralised production planning and control: exploring the production crew and manager perspectives through a multi-method approach. Construction Management and Economics, 40(04), 254–77.

Leiringer, R and Dainty, A (2018) Plugging into the big debates of the day. Construction Management and Economics, 36(04), 181.

Li, H, Lu, W and Huang, T (2009) Rethinking project management and exploring virtual design and construction as a potential solution. Construction Management and Economics, 27(04), 363–71.

Ling, F Y Y and Li, S (2016) Business models for foreign firms offering construction-related consultancy services in China. Construction Management and Economics, 34(04), 218-35.

Lingard, H and Lin, J (2004) Career, family and work environment determinants of organizational commitment among women in the Australian construction industry. Construction Management and Economics, 22(04), 409-420.

Lingard, H and Rowlinson, S M (1998) Behaviour-based safety management in Hong Kong's construction industry: the results of a field study. Construction Management and Economics, 16(04), 481-8.

Lingard, H C, Cooke, T and Blismas, N (2009) Group-level safety climate in the Australian construction industry: within-group homogeneity and between-group differences in road construction and maintenance. Construction Management and Economics, 27(04), 419–32.

Lingard, H C, Yip, B, Rowlinson, S and Kvan, T (2007) The experience of burnout among future construction professionals: a cross-national study. Construction Management and Economics, 25(04), 345–57.

Lingard, H, Graham, P and Smithers, G (2000) Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation. Construction Management and Economics, 18(04), 383-93.

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(04), 331–42.

Liu, S L, Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(04), 347-53.

Loosemore, M and Lam, A S Y (2004) The locus of control: a determinant of opportunistic behaviour in construction health and safety. Construction Management and Economics, 22(04), 385-94.

Loosemore, M and Lim, B (2015) Inter-organizational unfairness in the construction industry. Construction Management and Economics, 33(04), 310-26.

Loosemore, M and Reid, S (2019) The social procurement practices of tier-one construction contractors in Australia. Construction Management and Economics, 37(04), 183–200.

Loosemore, M, Nguyen, B T and Denis, N (2000) An investigation into the merits of encouraging conflict in the construction industry. Construction Management and Economics, 18(04), 447-56.

Love, P E D and Li, H (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(04), 479-90.

Love, P E D, Mandal, P and Li, H (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(04), 505-17.

Low S P (1993) The rationalization of quality in the construction industry: some empirical findings. Construction Management and Economics, 11(04), 247-59.

Low, S P and Tan, W (1996) Public policies for managing construction quality: the grand strategy of Singapore. Construction Management and Economics, 14(04), 295-309.

Luu, T-V, Kim, S-Y, Cao, H-L and Park, Y-M (2008) Performance measurement of construction firms in developing countries. Construction Management and Economics, 26(04), 373–86.

Mak, S W and Raftery, J (1992) Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(04), 303-20.

Manavazhi, M R (2000) Hybrid modelling framework for synthesizing virtual structures. Construction Management and Economics, 18(04), 415-26.

Manavazhi, M R and Xunzhi, Z (2001) Productivity oriented analysis of design revisions. Construction Management and Economics, 19(04), 379-91.

Manoliadis, O G, Pantouvakis, J-P and Christodoulou, S E (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(04), 373–84.

Marasini, R, Dawood, N and Hobbs, B (2001) Stockyard layout planning in precast concrete products industry: a case study and proposed framework. Construction Management and Economics, 19(04), 365-77.

Marsh, L and Finch, E (1998) Note - Attitudes towards auto-ID technologies within the UK construction industry. Construction Management and Economics, 16(04), 383-8.

Marshall, H E (1987) Building economics in the United States. Construction Management and Economics, 5(04), S43-S52.

Maslova, S and Burgess, G (2023) Delivering human-centred housing: understanding the role of post-occupancy evaluation and customer feedback in traditional and innovative social housebuilding in England. Construction Management and Economics, 41(04), 277–92.

McCabe, S, Rooke, J D, Seymour, D E and Brown, P (1998) Quality managers, authority and leadership. Construction Management and Economics, 16(04), 447-57.

Meikle, J L and Connaughton, J N (1994) How long should housing last? Some implications of the age and probable life of housing in England. Construction Management and Economics, 12(04), 315-21.

Mills, G R W and Razmdoost, K (2016) Managing value co-creation/destruction: A longitudinal education capital programme/project case study. Construction Management and Economics, 34(04), 286-301.

Min, W and Pheng, L S (2005) Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: an alternative analysis in the ready-mixed concrete industry. Construction Management and Economics, 23(04), 409-22.

Mochtar, K and Arditi, D (2001) Pricing strategy in the US construction industry. Construction Management and Economics, 19(04), 405-15.

Mohsini, R A and Davidson, C H (1992) Determinants of performance in the traditional building process. Construction Management and Economics, 10(04), 343-59.

Morgan, R E and Morgan, N A (1991) An appraisal of the marketing development in engineering consultancy firms. Construction Management and Economics, 9(04), 355-68.

Morland, K V and Breslin, D (2024) Resolving learning paradoxes within a UK new-build housebuilder. Construction Management and Economics, 42(04), 307–27.

Moselhi, O and Lorterapong, P (1993) Near optimal solution for resource-constrained scheduling problems. Construction Management and Economics, 11(04), 293-303.

Murtagh, N, Roberts, A and Hind, R (2016) The role of environmental sustainability in marketing of small architectural design practices. Construction Management and Economics, 34(04), 258-71.

Naderpajouh, N and Afshar, A (2008) A case-based reasoning approach to application of value engineering methodology in the construction industry. Construction Management and Economics, 26(04), 363–72.

Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(04), 399-408.

Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(04), 273-94.

Niskanen, T and Lauttalammi, J (1989) Accident risks during handling of materials at building construction sites. Construction Management and Economics, 7(04), 283-301.

Notman, D, Norman, G, Flanagan, R and Agapiou, A (1998) A time-series analysis of UK annual and quarterly construction output data (1955-1995). Construction Management and Economics, 16(04), 409-16.

Nyqvist, R, Peltokorpi, A and Seppänen, O (2024) Uncertainty network modeling method for construction risk management. Construction Management and Economics, 42(04), 346–65.

Ofori, G (1994) Establishing construction economics as an academic discipline. Construction Management and Economics, 12(04), 295-306.

Ofori, G (2003) Frameworks for analysing international construction. Construction Management and Economics, 21(04), 379-91.

Ofori, G and Debrah, Y A (1998) Flexible management of operatives in the Singapore construction industry. Construction Management and Economics, 16(04), 397-408.

Olsen, J, Lee, Z-H and Pong, W (2007) Optimal selection of concrete anchors for connection cost reduction. Construction Management and Economics, 25(04), 423–34.

Oo, B-L, Drew, D S and Lo, H P (2007) Applying a random coefficients logistic model to contractors' decision to bid. Construction Management and Economics, 25(04), 387–98.

Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: a study in use. Construction Management and Economics, 6(04), 307-37.

Phua, F T T (2017) Does the built-environment industry attract risk-taking individuals?. Construction Management and Economics, 35(04), 207-17.

Pietroforte, R and Tangerini, P (1999) From boom to bust: the case of Italian construction firms. Construction Management and Economics, 17(04), 419-25.

Pitt, M and Smith, A (2003) An assessment of waste management efficiency at BAA airports. Construction Management and Economics, 21(04), 421-31.

Preece, C N, Mat Isa, C M, Saman, H M and Che Ibrahim, C K (2016) Development of entry location, entry timing and entry mode decision model for construction firms in international markets. Construction Management and Economics, 34(04), 236-57.

Punwani, A (1997) A study of the growth-investment-financing nexus of the major UK construction groups. Construction Management and Economics, 15(04), 349-61.

Puolitaival, T, Kähkönen, K and Kestle, L (2023) The framing of construction management responsibilities in job advertisements in the UK and the USA. Construction Management and Economics, 41(04), 307–21.

Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(04), 365-75.

Raisbeck, P, Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(04), 345–59.

Ranasinghe, M (2000) Impact of correlation and induced correlation on the estimation of project cost of buildings. Construction Management and Economics, 18(04), 395-406.

Razmdoost, K and Mills, G (2016) Towards a service-led relationship in project-based firms. Construction Management and Economics, 34(04), 317-34.

Rose, T M and Manley, K (2012) Adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 30(04), 277-98.

Roumboutsos, A and Saussier, S (2014) Public-private partnerships and investments in innovation: the influence of the contractual arrangement. Construction Management and Economics, 32(04), 349-61.

Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(04), 357-70.

Runeson, G and Loosemore, M (1999) Gate-keepers or judges: peer reviews in construction management. Construction Management and Economics, 17(04), 529-36.

Russell, A D and Ranasinghe, M (1992) Analytical approach for economic risk quantification of large engineering projects. Construction Management and Economics, 10(04), 277-301.

Salminen, S (1995) Serious occupational accidents in the construction industry. Construction Management and Economics, 13(04), 299-306.

Schade, J, Olofsson, T and Schreyer, M (2011) Decision‐making in a model‐based design process. Construction Management and Economics, 29(04), 371–82.

Sebestyén, G (1994) A bulletin of statistics: some considerations. Construction Management and Economics, 12(04), 373-5.

Shadid, W K (2018) A framework for managing organizations in complex environments. Construction Management and Economics, 36(04), 182–202.

Shammas-Toma, M, Seymour, D E and Clark, L (1996) The effectiveness of formal quality management systems in achieving the required cover in reinforced concrete. Construction Management and Economics, 14(04), 353-64.

Shapira, A and Goldfinger, D (2000) Work-input model for assembly and disassembly of high shoring towers. Construction Management and Economics, 18(04), 467-77.

Shapira, A and Schexnayder, C J (1999) Selection of mobile cranes for building construction projects. Construction Management and Economics, 17(04), 519-27.

Shi, J and AbouRizk, S M (1998) Continuous and combined event-process models for simulating pipeline construction. Construction Management and Economics, 16(04), 489-98.

Shi, J J (1999) A neural network-based system for predicting earthmoving production. Construction Management and Economics, 17(04), 463-71.

Shields, R and West, K (2003) Innovation in clean-room construction: a case study of co-operation between firms. Construction Management and Economics, 21(04), 337-44.

Shohet, I M, Puterman, M and Gilboa, E (2002) Deterioration patterns of building cladding components for maintenance management. Construction Management and Economics, 20(04), 305-14.

Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(04), 261-72.

Skibniewski, M J and Molinski, J (1989) Modelling of building production activities for multi-facility projects. Construction Management and Economics, 7(04), 357-65.

Smith, S D (2019) Safety first? Production pressures and the implications on safety and health. Construction Management and Economics, 37(04), 238–42.

Smyth, H and Fitch, T (2009) Application of relationship marketing and management: a large contractor case study. Construction Management and Economics, 27(04), 399–410.

Sommerville, J, Kennedy, P and Orr, L (1993) Women in the UK construction industry. Construction Management and Economics, 11(04), 285-91.

Songer, A D, Diekmann, J E and Pecsok, R (1997) Note - Risk analysis for revenue dependent infrastructure projects. Construction Management and Economics, 15(04), 377-82.

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: a case study. Construction Management and Economics, 24(04), 339-48.

Swaffield, L M and Pasquire, C L (1999) Examination of relationships between building form and function, and the cost of mechanical and electrical services. Construction Management and Economics, 17(04), 483-92.

Swarts, K M, Lehman, K and Lewis, G K (2016) The use of social customer relationship management by building contractors: Evidence from Tasmania. Construction Management and Economics, 34(04), 302-16.

Tah, J H M and Carr, V (2000) A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics, 18(04), 491-500.

Tam, C M, Deng, Z M, Zeng, S X and Ho, C S (2000) Quest for continuous quality improvement for public housing construction in Hong Kong. Construction Management and Economics, 18(04), 437-46.

Tam, C M, Fung, I W H and Chan, A P C (2001) Study of attitude changes in people after the implementation of a new safety management system: the supervision plan. Construction Management and Economics, 19(04), 393-403.

Tang, C M, Wong, C W Y, Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: a Hong Kong case study. Construction Management and Economics, 24(04), 349-65.

Tansey, P, Spillane, J P and Brooks, T (2018) Creating opportunities in the face of an environmental jolt: exploring turnaround strategizing practices within large Irish construction contractors. Construction Management and Economics, 36(04), 217–41.

Tay, L and Morgan, N A (2002) Antecedents and consequences of market orientation in chartered surveying firms. Construction Management and Economics, 20(04), 331-41.

Thomas, A V, Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(04), 407-24.

Thomas, A V, Kalidndi, S N and Ananthanarayanan, K (2003) Risk perception analysis of BOT road project participants in India. Construction Management and Economics, 21(04), 393-407.

Thomson, D, Kaka, A, Pronk, L and Alalouch, C (2012) The use of freelisting to elicit stakeholder understanding of the benefits sought from healthcare buildings. Construction Management and Economics, 30(04), 309-23.

Tommelein, I D (2020) Design science research in construction management: multi-disciplinary collaboration on the SightPlan system. Construction Management and Economics, 38(04), 340–54.

Tone, K, Skitmore, M and Wong, J K W (2009) An investigation of the impact of cross-cultural communication on the management of construction projects in Samoa. Construction Management and Economics, 27(04), 343–61.

Toor, S-U-R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(04), 395–408.

Toppinen, A, Sauru, M, Pätäri, S, Lähtinen, K and Tuppura, A (2019) Internal and external factors of competitiveness shaping the future of wooden multistory construction in Finland and Sweden. Construction Management and Economics, 37(04), 201–16.

Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(04), 295-306.

Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(04), 325-40.

Tse, R Y C and Ganesan, S (1997) Note - Causal relationship between construction flows and output: evidence from Hong Kong. Construction Management and Economics, 15(04), 371-6.

Uusitalo, P, Lappalainen, E, Seppänen, O, Pikas, E, Peltokorpi, A, Menzhinskii, N and Piitulainen, M (2021) To trust or not to trust: is trust a prerequisite for solving design quality problems?. Construction Management and Economics, 39(04), 279–97.

Vahabi, A, Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: a fuzzy hybrid simulation approach. Construction Management and Economics, 40(04), 278–95.

van den Berg, M, Voordijk, H and Adriaanse, A (2021) BIM uses for deconstruction: an activity-theoretical perspective on reorganising end-of-life practices. Construction Management and Economics, 39(04), 323–39.

van der Meer, J, Hartmann, A, van der Horst, A and Dewulf, G (2022) Raising risk awareness in multi-criteria design decisions for integrated design and construction tenders. Construction Management and Economics, 40(04), 296–312.

Wallace, W A (1987) Capital costs versus costs-in-use: a content analysis of design team member communication patterns. Construction Management and Economics, 5(04), S73-S92.

Wang, Y, Yao, Y, Zhang, Y, Su, B and Wu, T (2023) Impact of industrial agglomeration on total factor productivity in the construction industry: evidence from China. Construction Management and Economics, 41(04), 322–37.

Wanous, M, Boussabaine, A H and Lewis, J (2000) To bid or not to bid: a parametric solution. Construction Management and Economics, 18(04), 457-66.

Ward, S C, Curtis, B and Chapman, C B (1991) Objectives and performance in construction projects. Construction Management and Economics, 9(04), 343-53.

Williams, C C and Kayaoglu, A (2021) Explaining the supply of home repair and renovation services in the undeclared economy: lessons from Europe. Construction Management and Economics, 39(04), 356–68.

Williams, T (1999) Allocation of contingency in activity duration networks. Construction Management and Economics, 17(04), 441-7.

Wilson, H A (1989) Organizational behaviour and safety management in the construction industry. Construction Management and Economics, 7(04), 303-19.

Winch, G (1989) The construction firm and the construction project: a transaction cost approach. Construction Management and Economics, 7(04), 331-45.

Wong, E T T, Norman, G and Flanagan, R (2000) A fuzzy stochastic technique for project selection. Construction Management and Economics, 18(04), 407-14.

Wong, J T Y and Hui, E C M (2006) Construction project risks: further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(04), 425-38.

Xenidis, Y and Angelides, D (2005) The financial risks in build-operate-transfer projects. Construction Management and Economics, 23(04), 431-41.

Yang, H and Lu, W (2013) Niche comparisons: toward a new approach for analysing competition and organizational performance in the international construction market. Construction Management and Economics, 31(04), 307-21.

Ye, S and Tiong, R L K (2003) Tariff adjustment frameworks for privately financed infrastructure projects. Construction Management and Economics, 21(04), 409-19.

Yeh, H-H H (2011) Adjustment behaviour of capital structure over the business cycles: evidence from the construction industry of Taiwan. Construction Management and Economics, 29(04), 329–40.

Yiu, C Y, Lu, X H, Leung, M Y and Jin, W X (2004) A longitudinal analysis on the relationship between construction output and GDP in Hong Kong. Construction Management and Economics, 22(04), 339-45.

Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(04), 293–306.

Zou, Y and Lee, S-H (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26(04), 387–93.