Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 107 results ...

Abdal Noor, B and Yi, S (2018) Review of BIM literature in construction industry and transportation: meta-analysis. Construction Innovation, 18(04), 433–52.

Akadiri, P O and Fadiya, O O (2013) Empirical analysis of the determinants of environmentally sustainable practices in the UK construction industry. Construction Innovation, 13(04), 352-73.

Akbari, S, Pour Rahimian, F, Sheikhkhoshkar, M, Banihashemi, S and Khanzadi, M (2020) Dynamic sustainable success prediction model for infrastructure projects: a rough set based fuzzy inference system. Construction Innovation , 20(04), 545–67.

Al Ahbabi, M and Alshawi, M (2015) BIM for client organisations: A continuous improvement approach. Construction Innovation, 15(04), 402-8.

Anike, E E, Saidani, M, Ganjian, E, Tyrer, M and Olubanwo, A O (2019) The potency of recycled aggregate in new concrete: a review. Construction Innovation , 19(04), 594–613.

Anumba, C, Dainty, A R J, Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(04), 219–30.

Bansal, V K and Pal, M (2009) Extended GIS for construction engineering by adding direct sunlight visualisations on buildings. Construction Innovation, 9(04), 406–19.

Bibby, L, Bouchlaghem, D and Austin, S (2003) Design management in practice: testing a training initiative to deliver tools and learning. Construction Innovation, 3(04), 217–29.

Blyth, K, Lewis, J and Kaka, A (2004) Developing a framework for a standardized works programme for building projects. Construction Innovation, 4(04), 193–210.

Bossink, B A G (2004) Effectiveness of innovation leadership styles: a manager’s influence on ecological innovation in construction projects. Construction Innovation, 4(04), 211–28.

Brian, D, Stuart, G and Simon, A (2010) Understanding construction competitiveness: the contribution of system dynamics. Construction Innovation, 10(04), 408–20.

Bridge, C and Carnemolla, P (2014) An enabling BIM block library: An online repository to facilitate social inclusion in Australia. Construction Innovation, 14(04), 477-92.

Bröchner, J (2013) Construction patents and university-industry research interaction: An analysis of Nordic region data. Construction Innovation, 13(04), 410-23.

Chan, A P C, Yang, Y, Wong, F K W, Chan, D W M and Lam, E W M (2015) Wearing comfort of two construction work uniforms. Construction Innovation, 15(04), 473-92.

Charoenngam, C, Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(04), 197–215.

Cheng, E W L and Li, H (2003) Utility of consistency measure in the analytic hierarchy process. Construction Innovation, 3(04), 231–47.

Cheng, E W L, Li, H, Fang, D P and Xie, F (2004) Construction safety management: an exploratory study from China. Construction Innovation, 4(04), 229–41.

Chritamara, S, Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(04), 269–95.

Dansoh, A, Oteng, D and Frimpong, S (2017) Innovation development and adoption in small construction firms in Ghana. Construction Innovation, 17(04), 511-35.

Davidson, C (2013) Innovation in construction – before the curtain goes up. Construction Innovation, 13(04), 344-51.

Din, Z U and Bernold, L E (2017) Experimental study of signal behavior for wireless communication in construction. Construction Innovation, 17(04), 475-91.

Edwards, D J, Yang, J, Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: an examination of plant operators. Construction Innovation, 5(04), 243–54.

El-Sawalhi, N, Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(04), 280–98.

Emilia, L C v E-d W d L and Masi, M (2011) Innovations in domotics: fulfilling potential or hampered by prevailing technological regime?. Construction Innovation, 11(04), 470–92.

Engström, S and Hedgren, E (2012) Sustaining inertia? Construction clients' decision-making and information-processing approach to industrialized building innovations. Construction Innovation, 12(04), 393-413.

Eriksson, P E and Szentes, H (2017) Managing the tensions between exploration and exploitation in large construction projects. Construction Innovation, 17(04), 492-510.

Forsman, S, Bj_rngrim, N, Bystedt, A, Laitila, L, Bomark, P and (2012) Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden. Construction Innovation, 12(04), 464-91.

Fred, R and Peter, F (2010) UK construction industry site health and safety management: An examination of promotional web material as an indicator of current direction. Construction Innovation, 10(04), 435–46.

Ghassan, A, Beliz, O and Carl, A (2010) Facilitating innovation in construction: Directions and implications for research and policy. Construction Innovation, 10(04), 374–94.

Goulding, J S and Alshawi, M (2004) A process-driven IT training model for construction: core development issues. Construction Innovation, 4(04), 243–54.

Grisham, T and Walker, D H T (2006) Nurturing a knowledge environment for international construction organizations through communities of practice. Construction Innovation, 6(04), 217–31.

Hastie, J, Sutrisna, M and Egbu, C (2017) Modelling knowledge integration process in early contractor involvement procurement at tender stage: A Western Australian case study. Construction Innovation, 17(04), 429-56.

Hedborg Bengtsson, S, Karrbom Gustavsson, T and Eriksson, P E (2018) Users’ influence on inter-organizational innovation: mapping the receptive context. Construction Innovation, 18(04), 488–504.

Hilal, M, Maqsood, T and Abdekhodaee, A (2019) A hybrid conceptual model for BIM in FM. Construction Innovation , 19(04), 531–49.

Hooper, M (2015) Automated model progression scheduling using level of development. Construction Innovation, 15(04), 428-48.

Hosseini, M R, Chileshe, N, Baroudi, B, Zuo, J and Mills, A (2016) Factors affecting perceived level of virtuality in hybrid construction project teams: A qualitative study. Construction Innovation, 16(04), 460-82.

Huang, T, Li, H, Guo, H, Chan, N, Kong, S, Chan, G and Skitmore, M (2009) Construction virtual prototyping: a survey of use. Construction Innovation, 9(04), 420–33.

Ibrahim, M N, Thorpe, D and Mahmood, M N (2019) Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia. Construction Innovation , 19(04), 550–69.

Ibrahim, Y M, Kaka, A, Aouad, G and Kagioglou, M (2009) Framework for a generic work breakdown structure for building projects. Construction Innovation, 9(04), 388–405.

Imoudu, E W, Godwin, A U and Nita, A K (2014) Preliminary building information modelling adoption model in Malaysia: A strategic information technology perspective. Construction Innovation, 14(04), 408-32.

Isah, A D, Muhammad, I B and Katun, I (2018) Optimizing architects’ building materials’ specification strategy through knowledge management principles. Construction Innovation, 18(04), 394–411.

Kong, S C W, Li, H and Shen, L Y (2001) An Internet-based electronic product catalogue of construction materials. Construction Innovation, 1(04), 245–57.

Koskela, L and Dave, B (2008) Process and IT. Construction Innovation, 8(04), 244–9.

Kushan, K, Udayangani, K, Dilanthi, A and Richard, H (2011) Client's championing characteristics that promote construction innovation. Construction Innovation, 11(04), 380–98.

Lai, K S, Yusof, N A and Kamal, E M (2016) Innovation orientation in architectural firms. Construction Innovation, 16(04), 425-45.

Lavikka, R , Seppänen, O, Peltokorpi, A and Lehtovaara, J (2020) Fostering process innovations in construction through industry–university consortium. Construction Innovation , 20(04), 569–86.

Lemos, T d, Almeida, L, Betts, M and Eaton, D (2003) An examination on the sustainable competitive advantage of private finance initiative projects. Construction Innovation, 3(04), 249–59.

Lessing, J and Brege, S (2015) Business models for product-oriented house-building companies: experience from two Swedish case studies. Construction Innovation, 15(04), 449-72.

Li, H, Chan, N K Y and Skitmore, M (2012) The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(04), 429-46.

Li, H, Yu, L and Cheng, E W L (2005) A GIS-based site selection system for real estate projects. Construction Innovation, 5(04), 231–41.

Love, P E D (2009) Communities and champions of practice: catalysts for learning and knowing. Construction Innovation, 9(04), 365–71.

Love, P E D and Smith, J (2016) Error management: Implications for construction. Construction Innovation, 16(04), 418-24.

Lundberg, M, Engström, S and Lidelöw, H (2019) Diffusion of innovation in a contractor company. Construction Innovation , 19(04), 629–52.

Ma, X, Chan, A P, Wu, H, Xiong, F and Dong, N (2018) Achieving leanness with BIM-based integrated data management in a built environment project. Construction Innovation, 18(04), 469–87.

Martina, M, George, H and Srinath, P (2011) A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA. Construction Innovation, 11(04), 416–40.

Martinez, E, Reid, C K and Tommelein, I D (2019) Lean construction for affordable housing: a case study in Latin America. Construction Innovation , 19(04), 570–93.

Marzouk, M (2008) A superiority and inferiority ranking model for contractor selection. Construction Innovation, 8(04), 250–68.

Marzouk, M and Hassouna, M (2019) Quality analysis using three-dimensional modelling and image processing techniques. Construction Innovation , 19(04), 614–28.

Marzouk, M and Zaher, M (2020) Artificial intelligence exploitation in facility management using deep learning. Construction Innovation , 20(04), 609–24.

Mawdesley, M J, A-Jibouri, S H, Askew, W H and Patterson, D E (2002) A model for the automated generation of earthwork planning activities. Construction Innovation, 2(04), 249–68.

Mike, M and Ryan, S (2010) A programme of testing to evaluate a passive approach to whole-house ventilation. Construction Innovation, 10(04), 395–407.

Mock, B and O'Connor, J T (2019) High-value, low-effort industrial plant commissioning solution strategies. Construction Innovation , 19(04), 653–71.

Mohamed, S F and J.Anumba, C (2006) Potential for improving site management practices through knowledge management. Construction Innovation, 6(04), 232–49.

Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: a multi-objective methodology. Construction Innovation, 13(04), 374-93.

Mostafa, S, Chileshe, N and Abdelhamid, T (2016) Lean and agile integration within offsite construction using discrete event simulation: A systematic literature review. Construction Innovation, 16(04), 483-525.

Murphy, M E (2014) Implementing innovation: A stakeholder competency-based approach for BIM. Construction Innovation, 14(04), 433-52.

Nageim, H A and Pountney, D (2007) A non-linear optimisation technique based on the complex method: The optimal design of a concrete trough supporting a new lightweight rail track system, LR55. Construction Innovation, 7(04), 320–39.

Nahyan, M T A, Sohal, A S, Fildes, B N and Hawas, Y E (2012) Transportation infrastructure development in the UAE: Stakeholder perspectives on management practice. Construction Innovation, 12(04), 492-514.

Ngowtanasuwan, G and Hadikusumo, B H W (2017) System dynamics modelling for BIM adoption in Thai architectural and engineering design industry. Construction Innovation, 17(04), 457-74.

Noriega, M S, Valles, C A, Torres-Argüelles, V, Martínez, G E and Hernández, G A (2016) Six sigma improvement project in a concrete block plant. Construction Innovation, 16(04), 526-44.

O'Connor, J T and Mock, B (2020) Responsibilities and accountabilities for industrial facility commissioning and startup activities. Construction Innovation , 20(04), 625–45.

P.Duarte, J and Correia, R (2006) Implementing a description grammar:generating housing programs online. Construction Innovation, 6(04), 203–16.

Palmer, S and Udawatta, N (2019) Characterising “Green Building” as a topic in Twitter. Construction Innovation , 19(04), 513–30.

Panuwatwanich, K, Stewart, R A and Mohamed, S (2009) Validation of an empirical model for innovation diffusion in Australian design firms. Construction Innovation, 9(04), 449–67.

Polat, G and Bingol, B N (2013) A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. Construction Innovation, 13(04), 445-62.

Pulkka, L and Junnila, S (2015) Gravitational slingshot analogy of discontinuous sustainability innovation in the construction industry. Construction Innovation, 15(04), 409-27.

Robert, J-M, Moulet, L, Lizarralde, G, H.Davidson, C, Nie, J-Y and Sylva, L d (2006) Finding out: a system for providing rapid and reliable answers to questions in the construction sector. Construction Innovation, 6(04), 250–61.

Robinson, H S, Carrillo, P M, Anumba, C J and A-Ghassani, A M (2005) Review and implementation of performance management models in construction engineering organizations. Construction Innovation, 5(04), 203–17.

Roy, M (2011) Colleges as agents for construction innovation. Construction Innovation, 11(04), 441–51.

Ruikar, K, Koskela, L and Sexton, M (2009) Communities of practice in construction case study organisations: Questions and insights. Construction Innovation, 9(04), 434–48.

Sebastian, R, Claeson-Jonsson, C and Giulio, R D (2013) Performance-based procurement for low-disturbance bridge construction projects. Construction Innovation, 13(04), 394-409.

Setya, W, Alan, G and Paul, S (2010) Reducing earthquake risk to non-engineered buildings in Indonesia. Construction Innovation, 10(04), 421–34.

Sharp, M and Jones, K (2012) Perceived inefficiency in social housing maintenance. Construction Innovation, 12(04), 414-28.

Shelbourn, M, Bouchlaghem, N M, Anumba, C and Carrillo, P (2007) Planning and implementation of effective collaboration in construction projects. Construction Innovation, 7(04), 357–77.

Søren, W, Alexia, J, Astrid Heidemann, L, Søren Bolvig, P and Henrik, S (2011) User-driven innovation in a construction material supply network. Construction Innovation, 11(04), 399–415.

Spillane, J P and Oyedele, L O (2017) Effective material logistics in urban construction sites: A structural equation model. Construction Innovation, 17(04), 406-28.

  • Type: Journal Article
  • Keywords: structural equation modelling,management,construction management,planning and management,confined site construction
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-11-2015-0063
  • Abstract:
    This paper identifies strategies to implement site safety management plans and proactive spatial monitoring and control for effective logistical management of materials in urban construction sites.

Suresh, M and Arun Ram Nathan, R (2020) Readiness for lean procurement in construction projects. Construction Innovation , 20(04), 587–608.

Sweis, G J, Hiyassat, M and Al-Hroub, F F (2016) Assessing lean conformance by first-grade contractors in the Jordanian construction industry. Construction Innovation, 16(04), 446-59.

Tatari, O, Castro-Lacouture, D and Skibniewski, M J (2007) Current state of construction enterprise information systems: survey research. Construction Innovation, 7(04), 310–9.

Teller, J (2001) An on-line glossary as a way to foster the construction of a common culture among urban experts, stakeholders and decision-makers. Construction Innovation, 1(04), 259–71.

Teräväinen, V J and Junnonen, J (2019) The promoters and the barriers for organizational culture change in a Finnish construction company. Construction Innovation , 19(04), 672–88.

Tingting, L and Suzanne, W (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(04), 452–69.

Tunçer, B, Stouffs, R and Sariyildiz, S (2002) Document decomposition by content as a means for structuring building project information. Construction Innovation, 2(04), 229–48.

van den Berg, M, Voordijk, H and Adriaanse, A (2020) Information processing for end-of-life coordination: a multiple-case study. Construction Innovation , 20(04), 647–71.

Vegad, K, Madurwar, M and Ralegaonkar, R (2014) Application of AV-ERP system for on-site project monitoring. Construction Innovation, 14(04), 518-31.

Visscher, H, Suddle, S and Meijer, F (2008) Quantitative risk analysis as a supporting tool for safety protocols at multi-functional urban locations. Construction Innovation, 8(04), 269–79.

Vojinovic, Z and Kecman, V (2001) Modelling empirical data to support project cost estimating: neural networks versus traditional methods. Construction Innovation, 1(04), 227–43.

Walker, D H T, Peters, R J, Hampson, K D and Thompson, M J (2001) Achieving a responsive industrial relations environment for construction industry workers: a project alliancing case study. Construction Innovation, 1(04), 211–25.

Wang, J, Wang, X, Shou, W and Xu, B (2014) Integrating BIM and augmented reality for interactive architectural visualisation. Construction Innovation, 14(04), 453-76.

Waroonkun, T and Stewart, R A (2008) Pathways to enhanced value creation from the international technology transfer process in Thai construction projects. Construction Innovation, 8(04), 299–317.

Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(04), 340–56.

Windapo, A O and Goulding, J (2013) Value-based perspectives of stakeholders' building requirements in low cost and government subsidised housing projects in South Africa. Construction Innovation, 13(04), 424-44.

Yunus, R and Yang, J (2012) Critical sustainability factors in industrialised building systems. Construction Innovation, 12(04), 447-63.

Zainal Abidin, N A and Ingirige, B (2018) The dynamics of vulnerabilities and capabilities in improving resilience within Malaysian construction supply chain. Construction Innovation, 18(04), 412–32.

Zhou, S and Gheisari, M (2018) Unmanned aerial system applications in construction: a systematic review. Construction Innovation, 18(04), 453–68.

Zhou, W, Heesom, D, Georgakis, P and Tah, J H M (2014) User-centred design for collaborative 4D modelling. Construction Innovation, 14(04), 493-517.

Zwikael, O (2009) Critical planning processes in construction projects. Construction Innovation, 9(04), 372–87.