Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 158 results ...
Ökmen , Ö and ÖztaÅŸ, A (2015) Scenario-based evaluation of a cost risk model through sensitivity analysis. Engineering, Construction and Architectural Management, 22(04), 403-23.
Abdel-Wahab, M S, Dainty, A R J, Ison, S G, Bowen, P and Hazlehurst, G (2008) Trends of skills and productivity in the UK construction industry. Engineering, Construction and Architectural Management, 15(04), 372–82.
Acheamfour, V K, Kissi, E and Adjei-Kumi, T (2019) Ascertaining the impact of contractors pre-qualification criteria on project success criteria. Engineering, Construction and Architectural Management, 26(04), 618–32.
Afzal, F, Yunfei, S, Sajid, M and Afzal, F (2019) Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(04), 825–49.
Ahadzie, D K, Proverbs, D G, Olomolaiye, P O and Ankrah, N A (2009) Competencies required by project managers for housing construction in Ghana: Implications for CPD agenda. Engineering, Construction and Architectural Management, 16(04), 353–75.
Ahmadian, F F A, Rashidi, T H, Akbarnezhad, A and Waller, S T (2017) BIM-enabled sustainability assessment of material supply decisions. Engineering, Construction and Architectural Management, 24(04), 668-95.
Ajayi, S O, Oyedele, L O, Kadiri, K O, Akinade, O O, Bilal, M, Owolabi, H A and Alaka, H A (2016) Competency-based measures for designing out construction waste: Task and contextual attributes. Engineering, Construction and Architectural Management, 23(04), 464-90.
Akbari, S, Khanzadi, M and Gholamian, M R (2018) Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. Engineering, Construction and Architectural Management, 25(04), 534–58.
Al-Reshaid, K, Kartam, N, Tewari, N and Al-Bader, H (2005) A project control process in pre-construction phases: Focus on effective methodology. Engineering, Construction and Architectural Management, 12(04), 351–72.
Al-Sibaie, E Z, Alashwal, A M, Abdul-Rahman, H and Zolkafli, U K (2014) Determining the relationship between conflict factors and performance of international construction projects. Engineering, Construction and Architectural Management, 21(04), 369-82.
Al-Tabtabai, H, Kartam, N, Flood, I and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(04), 271–93.
Attar, A, Boudjakdji, M A, Bhuiyan, N, Grine, K, Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(04), 376–91.
Bai, Y, Kim, S H and Burkett, W R (2007) Enhancing the capability of rapid bridge replacement after extreme events. Engineering, Construction and Architectural Management, 14(04), 375–86.
Baird, A (1995) Pioneering the NEC system of documents. Engineering, Construction and Architectural Management, 2(04), 249–69.
Ballal, T M A and Sher, W D (2003) Artificial neural networks for the selection of buildable structural systems. Engineering, Construction and Architectural Management, 10(04), 263–71.
Bemelmans, J, Voordijk, H and Vos, B (2012) Supplier-contractor collaboration in the construction industry: A taxonomic approach to the literature of the 2000-2009 decade. Engineering, Construction and Architectural Management, 19(04), 342-68.
Benjaoran, V and Bhokha, S (2009) Enhancing visualization of 4D CAD model compared to conventional methods. Engineering, Construction and Architectural Management, 16(04), 392–408.
Bon-Gang, H and Zong Bao, Y (2011) Perception on benefits of construction waste management in the Singapore construction industry. Engineering, Construction and Architectural Management, 18(04), 394–406.
Bonanomi, M M, Hall, D M, Staub-French, S, Tucker, A and Talamo, C M L (2019) The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms. Engineering, Construction and Architectural Management, 27(04), 872–92.
Broome, J C and Perry, J G (1995) Experiences of the use of the New Engineering Contract. Engineering, Construction and Architectural Management, 2(04), 271–85.
Brown, J and Loosemore, M (2015) Behavioural factors influencing corrupt action in the Australian construction industry. Engineering, Construction and Architectural Management, 22(04), 372-89.
Budayan, C, Dikmen, I and Birgonul, M T (2013) Investigation of drivers and modes of differentiation in Turkish construction industry. Engineering, Construction and Architectural Management, 20(04), 345-64.
Cameron, I, Gillan, G and Duff, A R (2007) Issues in the selection of fall prevention and arrest equipment. Engineering, Construction and Architectural Management, 14(04), 363–74.
Capper, P N (1995) The Adjudicator under NEC 2nd Edition: a new approach to disputes. Engineering, Construction and Architectural Management, 2(04), 317–26.
Carbonara, N, Costantino, N and Pellegrino, R (2016) A transaction costs-based model to choose PPP procurement procedures. Engineering, Construction and Architectural Management, 23(04), 491-510.
Cheng, E W L and Li, H (2001) Development of a conceptual model of construction partnering. Engineering, Construction and Architectural Management, 8(04), 292–303.
Chong, H-Y and Zin, R M (2012) Selection of dispute resolution methods: factor analysis approach. Engineering, Construction and Architectural Management, 19(04), 428-43.
Christodoulou, S (2010) Bid mark-up selection using artificial neural networks and an entropy metric. Engineering, Construction and Architectural Management, 17(04), 424–39.
Collins, F (2013) 2nd generation concrete construction: carbon footprint accounting. Engineering, Construction and Architectural Management, 20(04), 330-44.
Cooke, T, Lingard, H, Blismas, N and Stranieri, A (2008) ToolSHeDUPTM/UP: The development and evaluation of a decision support tool for health and safety in construction design. Engineering, Construction and Architectural Management, 15(04), 336–51.
Dainty, A R J, Ison, S G and Root, D S (2004) Bridging the skills gap: a regionally driven strategy for resolving the construction labour market crisis. Engineering, Construction and Architectural Management, 11(04), 275–83.
Davey, C L, Powell, J A, Cooper, I and Powell, J E (2004) Innovation, construction SMEs and action learning. Engineering, Construction and Architectural Management, 11(04), 230–7.
Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(04), 330–46.
Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(04), 347–61.
Dikmen, I, Birgonul, M T, Ozorhon, B and Sapci, N E (2010) Using analytic network process to assess business failure risks of construction firms. Engineering, Construction and Architectural Management, 17(04), 369–86.
Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(04), 444-68.
Edwards, D J and Holt, G D (2008) Health and safety issues relating to construction excavators and their attachments. Engineering, Construction and Architectural Management, 15(04), 321–35.
Edwards, D J and Holt, G D (2009) New stability field tests for construction excavators. Engineering, Construction and Architectural Management, 16(04), 337–52.
Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: a review and future directions for research. Engineering, Construction and Architectural Management, 5(04), 339–49.
Ejohwomu, O A, Oshodi, O S and Lam, K C (2017) Nigeria’s construction industry: Barriers to effective communication. Engineering, Construction and Architectural Management, 24(04), 652-67.
Eriksson, P E and Laan, A (2007) Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, 14(04), 387–99.
Fan, C N L, Ho, M H C and Ng, V (2001) Effect of professional socialization on quantity surveyors’ ethical perceptions in Hong Kong. Engineering, Construction and Architectural Management, 8(04), 304–12.
Feghaly, J, El Asmar, M, Ariaratnam, S and Bearup, W (2019) Selecting project delivery methods for water treatment plants. Engineering, Construction and Architectural Management, 27(04), 936–51.
Fellows, R and Liu, A M M (2000) Human dimensions in modelling prices of building projects. Engineering, Construction and Architectural Management, 7(04), 362–72.
Fernie, S and Thorpe, A (2007) Exploring change in construction: supply chain management. Engineering, Construction and Architectural Management, 14(04), 319–33.
Forsythe, P J and Sepasgozar, S M (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(04), 578–98.
Franck, T, Gérard, S and Régis, B (2011) Method and tools for building maintenance plan arbitration. Engineering, Construction and Architectural Management, 18(04), 343–62.
GhaffarianHoseini, A, Tien, D D, Naismith, N, Tookey, J and GhaffarianHoseini, A (2017) Amplifying the practicality of contemporary building information modelling implementations for New Zealand green building certification (green star). Engineering, Construction and Architectural Management, 24(04), 696-714.
Gorse, C A and Emmitt, S (2003) Investigating interpersonal communication during construction progress meetings: challenges and opportunities. Engineering, Construction and Architectural Management, 10(04), 234–44.
Green, S D (1998) The technocratic totalitarianism of construction process improvement: a critical perspective. Engineering, Construction and Architectural Management, 5(04), 376–86.
Griffith, A and Sidwell, A C (1997) Development of constructability concepts, principles and practices. Engineering, Construction and Architectural Management, 4(04), 295–310.
Halliday, J (1995) Use of the New Engineering Contract in Hong Kong. Engineering, Construction and Architectural Management, 2(04), 307–15.
Hans, V (2011) Construction management research at the interface of design and explanatory science. Engineering, Construction and Architectural Management, 18(04), 334–42.
Ho, P H K (2016) Labour and skill shortages in Hong Kong’s construction industry. Engineering, Construction and Architectural Management, 23(04), 533-50.
Hosny, O, Nassar, K and Esmail, Y (2013) Prequalification of Egyptian construction contractors using fuzzy-AHP models. Engineering, Construction and Architectural Management, 20(04), 381-405.
Howes, R (2000) Improving the performance of Earned Value Analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(04), 399–411.
Hu, X and Liu, C (2017) Total factor productivity measurement with carbon reduction. Engineering, Construction and Architectural Management, 24(04), 575-92.
- Type: Journal Article
- Keywords: Australia; data analysis; productivity rate; construction industry; carbon reduction; malmquist-luenberger index
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-06-2015-0097
- Abstract:
This paper suggests that total factor productivity (TFP) measurement should consider carbon reduction, which is beneficial for policymakers to promote sustainable productivity development in Australian construction industry.
Hughes, W (2001) Evaluating plans of work. Engineering, Construction and Architectural Management, 8(04), 272–83.
Ilozor, B D and Ilozor, D B (2006) Open-planning concepts and effective facilities management of commercial buildings. Engineering, Construction and Architectural Management, 13(04), 396–412.
Ismail, Z B (2018) Improving contractor social networking on IBS infrastructure maintenance projects: a review. Engineering, Construction and Architectural Management, 25(04), 479–96.
Jayasinghe, R S, Rameezdeen, R and Chileshe, N (2019) Exploring sustainable post-end-of-life of building operations. Engineering, Construction and Architectural Management, 26(04), 689–722.
Jefferies, M, Gameson, R and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study. Engineering, Construction and Architectural Management, 9(04), 352–61.
John, G A, Clements-Croome, D J, Fairey, V and Loy, H M (2005) Contextual prerequisites for the application of ILS principles to the building services industry. Engineering, Construction and Architectural Management, 12(04), 307–28.
Jones, K and Kaluarachchi, Y (2007) Operational factors affecting strategic partnering in UK social housing. Engineering, Construction and Architectural Management, 14(04), 334–45.
Kannimuthu, M, Raphael, B, Ekambaram, P and Kuppuswamy, A (2019) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(04), 893–916.
Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(04), 272–82.
Karunasena, G and Amaratunga, D (2015) Capacity gaps in post disaster construction and demolition waste management. Engineering, Construction and Architectural Management, 22(04), 446-66.
Kazemi, R M, Riley, D, Asadi, S and Delgoshaei, P (2017) Improving the performance profile of energy conservation measures at the Penn State University Park campus. Engineering, Construction and Architectural Management, 24(04), 610-28.
Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(04), 249–69.
Konno, Y (2015) Analysing Japanese contractor activity on the basis of panel data. Engineering, Construction and Architectural Management, 22(04), 390-402.
Kululanga, G and Kuotcha, W (2010) Measuring project risk management process for construction contractors with statement indicators linked to numerical scores. Engineering, Construction and Architectural Management, 17(04), 336–51.
Kululanga, G K (2009) Construction process improvement through cognitive power under team generative learning. Engineering, Construction and Architectural Management, 16(04), 307–24.
Kumaraswamy, M M (1996) The pursuit of quality in Hong Kong construction. Engineering, Construction and Architectural Management, 3(04), 289–306.
Kyrö, R, Peltokorpi, A and Luoma-Halkola, L (2019) Connecting adaptability strategies to building system lifecycles in hospital retrofits. Engineering, Construction and Architectural Management, 26(04), 633–47.
Lai, A W Y and Lai, W M (2013) Users’ satisfaction survey on building maintenance in public housing. Engineering, Construction and Architectural Management, 20(04), 420-40.
Lam, K C, Runeson, G, Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(04), 359–75.
Lansley, P R (1999) Determinants of performance of UK universities in Built Environment and Town and Country Planning research. Engineering, Construction and Architectural Management, 6(04), 391–402.
Lapp, J A D, Ford, D N, Bryant, J A and Horlen, J (2004) Impacts of CAD on design realization. Engineering, Construction and Architectural Management, 11(04), 284–91.
Li, H, Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(04), 444-58.
Li, J, Yu, M and Wang, H (2018) A taxonomy of performance shaping factors for shield tunnel construction. Engineering, Construction and Architectural Management, 25(04), 574–96.
Lim, B T H, Oo, B L and Ling, F (2010) The survival strategies of Singapore contractors in prolonged recession. Engineering, Construction and Architectural Management, 17(04), 387–403.
Ling, F and Lim, H L (2007) Foreign firms' financial and economic risk in China. Engineering, Construction and Architectural Management, 14(04), 346–62.
Ling, F Y-Y, Ofori, G and Low, S P (2000) Importance of design consultants’ soft skills in design-build projects. Engineering, Construction and Architectural Management, 7(04), 389–98.
Lingard, H, Cooke, T and Gharaie, E (2013) The how and why of plant-related fatalities in the Australian construction industry. Engineering, Construction and Architectural Management, 20(04), 365-80.
Lingard, H, Warmerdam, A and Shooshtarian, S (2019) Getting the balance right. Engineering, Construction and Architectural Management, 26(04), 599–617.
Liu, A M M, Zhang, S and Leung, M (2006) A framework for assessing organisational culture of Chinese construction enterprises. Engineering, Construction and Architectural Management, 13(04), 327–42.
Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(04), 406-27.
Loosemore, M (1998) Social network analysis: using a quantitative tool within an interpretative context to explore the management of construction crises. Engineering, Construction and Architectural Management, 5(04), 315–26.
Loosemore, M and Lim, B T-H (2016) Intra-organisational injustice in the construction industry. Engineering, Construction and Architectural Management, 23(04), 428-47.
Love, P E D and Edwards, D J (2004) Determinants of rework in building construction projects. Engineering, Construction and Architectural Management, 11(04), 259–74.
Love, P E D, Holt, G D and Li, H (2002) Triangulation in construction management research. Engineering, Construction and Architectural Management, 9(04), 294–303.
Love, P, Davis, P, Ellis, J and Cheung, S O (2010) Dispute causation: identification of pathogenic influences in construction. Engineering, Construction and Architectural Management, 17(04), 404–23.
Lu, W, Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(04), 448-63.
Luo, M, Fan, H and Liu, G (2019) Measuring regional differences of construction productive efficiency in China. Engineering, Construction and Architectural Management, 27(04), 952–74.
Ma, H, Liu, Z, Zeng, S, Lin, H and Tam, V W (2019) Does megaproject social responsibility improve the sustainability of the construction industry?. Engineering, Construction and Architectural Management, 27(04), 975–96.
Mahdi, I M, Al-Reshaid, K and Fereig, S M (2006) Optimum house delivery decision model from the Government's and recipients' point-of-view. Engineering, Construction and Architectural Management, 13(04), 413–30.
Mahjoubpour, B, Nasirzadeh, F, Mohammad Hosein Zadeh Golabchi, M, Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers’ learning behavior in construction projects using agent-based approach. Engineering, Construction and Architectural Management, 25(04), 559–73.
Mallasi, Z (2019) Designing with pixels: parametric thinking for patterning dynamic building facades. Engineering, Construction and Architectural Management, 26(04), 668–88.
Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(04), 511-32.
Manowong, E and Ogunlana, S O (2006) Public hearings in Thailand's infrastructure projects: effective participations?. Engineering, Construction and Architectural Management, 13(04), 343–63.
Marsh, L and Flanagan, R (2000) Measuring the costs and benefits of information technology in construction. Engineering, Construction and Architectural Management, 7(04), 423–35.
Martin, L, Florence, T T P, Kevin, D and Umut, O (2011) The politics of sameness in the Australian construction industry: Comparing operative and manager attitudes towards cultural diversity. Engineering, Construction and Architectural Management, 18(04), 363–80.
Matthews, J and Rowlinson, S (1999) Partnering: incorporating safety management. Engineering, Construction and Architectural Management, 6(04), 347–57.
May, D, Wilson, O and Skitmore, M (2001) Bid cutting: an empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(04), 250–6.
Mejlænder-Larsen, & (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(04), 648–67.
Mikael, F (2011) Criteria for achieving efficient contractor-supplier relations. Engineering, Construction and Architectural Management, 18(04), 381–93.
Mills, A, Harris, D and Skitmore, M R (2003) The accuracy of housing forecasting in Australia. Engineering, Construction and Architectural Management, 10(04), 245–53.
Motawa, I and Kaka, A (2009) Modelling payment mechanisms for supply chain in construction. Engineering, Construction and Architectural Management, 16(04), 325–36.
Mrad, F, Abdul-Malak, M A, Sadek, S and Khudr, Z (2002) Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management, 9(04), 325–35.
Ndekugri, I and Russell, V (2006) Disputing the existence of a dispute as a strategy for avoiding construction adjudication. Engineering, Construction and Architectural Management, 13(04), 380–95.
Ng, S T, Skitmore, R M and Sharma, T (2001) Towards a human resource information system for Australian construction companies. Engineering, Construction and Architectural Management, 8(04), 238–49.
Ng, S T, Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(04), 352–68.
Obonyo, E, Anumba, C and Thorpe, T (2005) APRON: an agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(04), 329–50.
Ofori, G (1996) International contractors and structural changes in host country construction industries: case of Singapore. Engineering, Construction and Architectural Management, 3(04), 271–88.
Oluwatayo, A and Amole, D (2012) Characteristics of global architectural firms. Engineering, Construction and Architectural Management, 19(04), 393-405.
Othman, A A E, Hassan, T M and Pasquire, C L (2004) Drivers for dynamic brief development in construction. Engineering, Construction and Architectural Management, 11(04), 248–58.
Panahi, B, Moezzi, E, Preece, C N and Wan, Z W N (2017) Value conflicts and organizational commitment of internal construction stakeholders. Engineering, Construction and Architectural Management, 24(04), 554-74.
Parchami, J M and Shoar, S (2017) A hybrid SD-dematel approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(04), 629-51.
Peansupap, V and Walker, D H T (2006) Information communication technology (ICT) implementation constraints: A construction industry perspective. Engineering, Construction and Architectural Management, 13(04), 364–79.
Phillips, S, Martin, J, Dainty, A and Price, A (2008) Analysis of the quality attributes used in establishing best value tenders in the UK social housing sector. Engineering, Construction and Architectural Management, 15(04), 307–20.
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(04), 336–44.
Price, A D F (2003) The strategy process within large construction organizations. Engineering, Construction and Architectural Management, 10(04), 283–96.
Proverbs, D G and Faniran, O O (2001) International construction performance comparisons: a study of ‘European’ and Australian contractors. Engineering, Construction and Architectural Management, 8(04), 284–91.
Proverbs, D G, Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(04), 350–8.
Psilander, K (2002) Axiomatic design in the customizing home building industry. Engineering, Construction and Architectural Management, 9(04), 318–24.
Rahmani, F, Maqsood, T and Khalfan, M (2017) An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(04), 593-609.
rgensen, B and Emmitt, S (2008) Lost in transition: the transfer of lean manufacturing to construction. Engineering, Construction and Architectural Management, 15(04), 383–98.
Rogers, J, Chong, H-Y and Preece, C (2015) Adoption of building information modelling technology: Perspectives from Malaysian engineering consulting services firms. Engineering, Construction and Architectural Management, 22(04), 424-45.
Rooke, J D and Seymour, D E (1995) The NEC and the culture of the industry: some early findings regarding possible sources of resistance to change. Engineering, Construction and Architectural Management, 2(04), 287–305.
Rwelamila, P D, Talukhaba, A A and Ngowi, A B (1999) Tracing the African Project Failure Syndrome: the significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(04), 335–46.
Sangki, K, Sanghyo, L and Jaejun, K (2011) Relationship between the financial crisis of Korean construction firms and macroeconomic fluctuations. Engineering, Construction and Architectural Management, 18(04), 407–22.
Sarshar, M and Isikdag, U (2004) A survey of ICT use in the Turkish construction industry. Engineering, Construction and Architectural Management, 11(04), 238–47.
Shahsavand, P, Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(04), 497–533.
Shang, H, Anumba, C J, Bouchlaghem, D M, Miles, J C, Cen, M and Taylor, M (2005) An intelligent risk assessment system for distributed construction teams. Engineering, Construction and Architectural Management, 12(04), 391–409.
Silva, N D and Wimalaratne, P L I (2012) OSH management framework for workers at construction sites in Sri Lanka. Engineering, Construction and Architectural Management, 19(04), 369-92.
Smith, J M, Kenley, R and Wyatt, R (1998) Evaluating the client briefing problem: an exploratory study. Engineering, Construction and Architectural Management, 5(04), 387–98.
Tah, J H M, V, C and Howes, R (1998) An application of case-based reasoning to the planning of highway bridge construction. Engineering, Construction and Architectural Management, 5(04), 327–38.
Tam, V W Y and Zeng, S X (2014) Employee job satisfaction in engineering firms. Engineering, Construction and Architectural Management, 21(04), 353-68.
Teo, E A L, Ling, F Y Y and Ong, D S Y (2005) Fostering safe work behaviour in workers at construction sites. Engineering, Construction and Architectural Management, 12(04), 410–22.
Toor, S-u-R and Ofori, G (2008) Taking leadership research into future: A review of empirical studies and new directions for research. Engineering, Construction and Architectural Management, 15(04), 352–71.
Trangkanont, S and Charoenngam, C (2014) Critical failure factors of public-private partnership low-cost housing program in Thailand. Engineering, Construction and Architectural Management, 21(04), 421-43.
Ugwu, O O and Tah, H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(04), 304–17.
Underwood, J, Alshawi, M A, Aouad, G F, Child, T and Faraj, I Z (2000) Enhancing building product libraries to enable the dynamic definition of design element specifications. Engineering, Construction and Architectural Management, 7(04), 373–88.
Upstill-Goddard, J, Glass, J, Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(04), 407-27.
Viles, E, Rudeli, N C and Santilli, A (2019) Causes of delay in construction projects: a quantitative analysis. Engineering, Construction and Architectural Management, 27(04), 917–35.
Wang, D, Fang, S and Li, K (2019) Dynamic changes of governance mechanisms in mega construction projects in China. Engineering, Construction and Architectural Management, 26(04), 723–35.
Wang, S, Tang, J, Zou, Y and Zhou, Q (2019) Research on production process optimization of precast concrete component factory based on value stream mapping. Engineering, Construction and Architectural Management, 27(04), 850–71.
Whyte, J, Bouchlaghem, N, Thorpe, A and Mccaffer, R (1999) A survey of CAD and virtual reality within the house building industry. Engineering, Construction and Architectural Management, 6(04), 371–9.
Wibowo, A and Alfen, H W (2013) Fine-tuning the value and cost of capital of risky PPP infrastructure projects. Engineering, Construction and Architectural Management, 20(04), 406-19.
Wibowo, A and Alfen, H W (2014) Identifying macro-environmental critical success factors and key areas for improvement to promote public-private partnerships in infrastructure: Indonesia's perspective. Engineering, Construction and Architectural Management, 21(04), 383-402.
Wild, A (2002) The unmanageability of construction and the theoretical psycho-social dynamics of projects. Engineering, Construction and Architectural Management, 9(04).
Wirba, E N, Tah, J H M and Howes, R (1996) Risk interdependencies and natural language computations. Engineering, Construction and Architectural Management, 3(04), 251–69.
Wong, C H, Holt, G D and Harris, P (2001) Multi-criteria selection or lowest price? Investigation of UK construction clients’ tender evaluation preferences. Engineering, Construction and Architectural Management, 8(04), 257–71.
Wong, J K W and Lin, A H Q (2014) Construction workplace discrimination: Experiences of ethnic minority operatives in Hong Kong construction sites. Engineering, Construction and Architectural Management, 21(04), 403-20.
Wood, G D and Ellis, R C T (2003) Risk management practices of leading UK cost consultants. Engineering, Construction and Architectural Management, 10(04), 254–62.
Ye, S and Tiong, R K L (2000) Government support and risk-return trade-off in China's BOT power projects. Engineering, Construction and Architectural Management, 7(04), 412–22.
Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(04), 373–90.
Zhang, W R, Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (1998) Risk management of Shanghai's privately financed Yan'an Donglu tunnels. Engineering, Construction and Architectural Management, 5(04), 399–410.