Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 187 results ...

Abdul-Aziz, A-R and Wong, S-S (2011) Business networks and internationalisation of contractors from developing countries: an explorative study. Engineering, Construction and Architectural Management, 18(03), 282–96.

Abeid, J and Arditi, D (2003) Photo-net: an integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(03), 162–71.

Abidel-Razek, R H (1998) Factors affecting construction quality in Egypt: identification and relative importance. Engineering, Construction and Architectural Management, 5(03), 220–7.

Adam, A, Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(03), 393-406.

Adesi, M, Owusu-Manu, D and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(03), 458–74.

Ahmed, S M, Ahmad, R and Saram, D D D (1999) Risk management trends in the Hong Kong construction industry: a comparison of contractors and owners perceptions. Engineering, Construction and Architectural Management, 6(03), 225–34.

Aka, A, Isah, A D, Eze, C J and Timileyin, O (2019) Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process. Engineering, Construction and Architectural Management, 27(03), 658–79.

Al-Hussein, M, Kumar, J, Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(03), 290–306.

Alkoc, E and Erbatur, F (1998) Site expert: a prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(03), 238–51.

Andary, E G, Abi Shdid, C, Chowdhury, A and Ahmad, I (2019) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(03), 609–33.

Arboleda, C A and Abraham, D M (2006) Evaluation of flexibility in capital investments of infrastructure systems. Engineering, Construction and Architectural Management, 13(03), 254–74.

Augenbroe, G, Verheij, H and Schwarzmuller, G (2002) Project web sites with design management extensions. Engineering, Construction and Architectural Management, 9(03), 259–71.

Austin, S A, Baldwin, A N and Steele, J L (2002) Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9(03), 249–58.

Ballard, G (2002) Managing work flow on design projects: a case study. Engineering, Construction and Architectural Management, 9(03), 284–91.

Barrett, J, Goulding, J and Qualter, P (2013) The social life of the novel idea: what did social psychologists ever do for us?. Engineering, Construction and Architectural Management, 20(03), 250-66.

Beran, V and Dlask, P (2007) Nonlinear optimisation and rational cash flow. Engineering, Construction and Architectural Management, 14(03), 277–92.

Bevan, E A M and Yung, P (2015) Implementation of corporate social responsibility in Australian construction SMEs. Engineering, Construction and Architectural Management, 22(03), 295-311.

Boussabaine, A H, Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(03), 213–24.

Bowen, P and Cattell, K (2008) Job satisfaction of South African quantity surveyors. Engineering, Construction and Architectural Management, 15(03), 260–9.

Brewer, G and Strahorn, S (2012) Trust and the Project Management Body of Knowledge. Engineering, Construction and Architectural Management, 19(03), 286-305.

Carrillo, P (2005) Lessons learned practices in the engineering, procurement and construction sector. Engineering, Construction and Architectural Management, 12(03), 236–50.

Carrillo, P and Heavey, I (2000) UK contractors’ acquisitions strategy for Central and Eastern Europe. Engineering, Construction and Architectural Management, 7(03), 322–8.

Carrillo, P M (1998) Mergers and acquisitions: the impact on information systems and information technology. Engineering, Construction and Architectural Management, 5(03), 276–84.

Chand, A M and Loosemore, M (2016) Hospital disaster management’s understanding of built environment impacts on healthcare services during extreme weather events. Engineering, Construction and Architectural Management, 23(03), 385-402.

Cheah, C Y J and Garvin, M J (2004) An open framework for corporate strategy in construction. Engineering, Construction and Architectural Management, 11(03), 176–88.

Chen, L and Mohamed, S (2007) Empirical study of interactions between knowledge management activities. Engineering, Construction and Architectural Management, 14(03), 242–60.

Cheung, E, Chan, A P C and Kajewski, S (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(03), 292–308.

Chileshe, N and Kikwasi, G J (2014) Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry. Engineering, Construction and Architectural Management, 21(03), 291-319.

Chinowsky, P S, Molenaar, K and Bastias, A (2007) Measuring achievement of learning organizations in construction. Engineering, Construction and Architectural Management, 14(03), 215–27.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

Dabous, S A and Alkass, S (2010) A multi-attribute ranking method for bridge management. Engineering, Construction and Architectural Management, 17(03), 282–91.

Daniel, E I, Pasquire, C, Dickens, G and Ballard, H G (2017) The relationship between the Last Planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(03), 407-25.

Deng, X, Low, S P, Zhao, X and Chang, T (2018) Identifying micro variables contributing to political risks in international construction projects. Engineering, Construction and Architectural Management, 25(03), 317–34.

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(03), 287–98.

Drew, D S, Tang, S L Y and Lui, C K (2004) Balancing fee and quality in two envelope fee bidding. Engineering, Construction and Architectural Management, 11(03), 159–75.

Duncan, K, Philips, P and Prus, M (2012) Using stochastic frontier regression to estimate the construction cost inefficiency of prevailing wage laws. Engineering, Construction and Architectural Management, 19(03), 320-34.

Duyshart, B, Walker, D, Mohamed, S and Hampson, K (2003) An example of developing a business model for information and communication technologies (ICT) adoption on construction projects - the National Museum of Australia project. Engineering, Construction and Architectural Management, 10(03), 179–92.

Edwards, D J and Holt, G D (2007) Perceptions of workplace vibration hazards among a small sample of UK construction professionals. Engineering, Construction and Architectural Management, 14(03), 261–76.

Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: a tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(03), 225–32.

Edwards, D J, Nicholas, J and Sharp, R (2001) Forecasting UK construction plant sales. Engineering, Construction and Architectural Management, 8(03), 171–6.

Edwards, D, Parn, E A, Sing, M C and Thwala, W D (2019) Risk of excavators overturning. Engineering, Construction and Architectural Management, 26(03), 479–98.

Ekanayake, E, Shen, G and Kumaraswamy, M M (2019) Mapping the knowledge domains of value management: a bibliometric approach. Engineering, Construction and Architectural Management, 26(03), 499–514.

Elbeltagi, E, Ammar, M, Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(03), 265-82.

Ezulike, E L, Perry, J G and Hawwash, K (1997) The barriers to entry into the PFI market. Engineering, Construction and Architectural Management, 4(03), 179–93.

Faruqi, S and Smith, N J (1997) Karachi light rail transit: a private finance proposal. Engineering, Construction and Architectural Management, 4(03), 233–46.

Fenis, S M, Diekmann, J E and Huang, P-Y (1995) A GIS-based pipeline planning system. Engineering, Construction and Architectural Management, 2(03), 227–38.

Ford, D N and Bhargav, S (2006) Project management quality and the value of flexible strategies. Engineering, Construction and Architectural Management, 13(03), 275–89.

Forsythe, P (2006) Consumer-perceived appearance tolerances in construction quality management. Engineering, Construction and Architectural Management, 13(03), 307–18.

Forsythe, P J (2016) Construction service quality and satisfaction for a targeted housing customer. Engineering, Construction and Architectural Management, 23(03), 323-48.

Gan, X, Chang, R, Langston, C and Wen, T (2019) Exploring the interactions among factors impeding the diffusion of prefabricated building technologies. Engineering, Construction and Architectural Management, 26(03), 535–53.

Goh, B-H (1998) Forecasting residential construction demand in Singapore: a comparative study of the accuracy of time series, regression and artificial neural network techniques. Engineering, Construction and Architectural Management, 5(03), 261–75.

Golizadeh, H, Hosseini, M R, Martek, I, Edwards, D, Gheisari, M, Banihashemi, S and Zhang, J (2019) Scientometric analysis of research on “remotely piloted aircraft”. Engineering, Construction and Architectural Management, 27(03), 634–57.

Gravina da Rocha, C, El Ghoz, H B and Jr Guadanhim, S (2019) A model for implementing product modularity in buildings design. Engineering, Construction and Architectural Management, 27(03), 680–99.

Griffith, A (2000) Integrated management systems: a single management system solution for project control?. Engineering, Construction and Architectural Management, 7(03), 232–40.

Griffith, A (1996) Review of environmental assessment in UK building construction: current awareness, concerns and issues. Engineering, Construction and Architectural Management, 3(03), 205–17.

Grimsey, D and Graham, R (1997) PFI in the NHS (Private finance initiative in the UK National Health Service). Engineering, Construction and Architectural Management, 4(03), 215–31.

Gunner, J and Skitmore, M R (1999) Pre-bid building price forecasting accuracy: price intensity theory. Engineering, Construction and Architectural Management, 6(03), 267–75.

Hammarlund, Y (1995) Environments of construction. Engineering, Construction and Architectural Management, 2(03), 209–25.

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects. Engineering, Construction and Architectural Management, 26(03), 386–407.

Hassim, S, Muniandy, R, Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia. Engineering, Construction and Architectural Management, 25(03), 443–57.

Hawwash, K and Barnes, M (1997) The potential for adopting the NEC's family of contracts on PFI projects. Engineering, Construction and Architectural Management, 4(03), 203–14.

Heintz, J L (2002) Collaborative design planning networks. Engineering, Construction and Architectural Management, 9(03), 181–91.

Henderson, J R and Ruikar, K (2010) Technology implementation strategies for construction organisations. Engineering, Construction and Architectural Management, 17(03), 309–27.

Henderson, J R, Ruikar, K D and Dainty, A R J (2013) The need to improve double-loop learning and design-construction feedback loops: A survey of industry practice. Engineering, Construction and Architectural Management, 20(03), 290-306.

Holt, G D (2018) Let’s change tack, not wind direction: a response to Kog and Yaman (2016). Engineering, Construction and Architectural Management, 25(03), 335–41.

Hughes, D, Williams, T and Ren, Z (2012) Is incentivisation significant in ensuring successful partnered projects?. Engineering, Construction and Architectural Management, 19(03), 306-19.

Hwang, B-G, Zhao, X and Tan, L L G (2015) Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(03), 327-46.

Ilhan, B and Yaman, H (2011) A comparative input-output analysis of the construction sector in Turkey and EU countries. Engineering, Construction and Architectural Management, 18(03), 248–65.

Jaafari, A and Manivong, K (1999) The need for life-cycle integration of project processes. Engineering, Construction and Architectural Management, 6(03), 235–55.

Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity?. Engineering, Construction and Architectural Management, 24(03), 537-52.

Jennings, M J and Betts, M (1996) Competitive strategy for quantity surveying practices: the importance of information technology. Engineering, Construction and Architectural Management, 3(03), 163–86.

Johnson, R, Clayton, M, Xia, G E, Woo, J-H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(03), 241–8.

Juan, Y, Lin, I and Tsai, J (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(03), 515–34.

Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(03), 256–66.

Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(03), 211–22.

Kartam, N A (1999) Design/construction integration: issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(03), 299–314.

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(03), 315–28.

Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(03), 228–37.

Lahdenperä, P and Tanhuanpää, V-P (2000) Creation of a new design management system based on process optimization and proactive strategy. Engineering, Construction and Architectural Management, 7(03), 267–77.

Lam, K C and Oshodi, O S (2016) Forecasting construction output: A comparison of artificial neural network and Box-Jenkins model. Engineering, Construction and Architectural Management, 23(03), 302-22.

Lam, K C, Ng, S T, Hu, T, Skitmore, M R and Cheung, S-O (2000) Decision support system for contractor pre-qualification—artificial neural network model. Engineering, Construction and Architectural Management, 7(03), 251–66.

Lam, T and Gale, K (2014) Highway maintenance: impact of framework agreements on contractor performance. Engineering, Construction and Architectural Management, 21(03), 336-47.

Landin, A M and Persson, M H (1998) Evaluation of quality systems for specialist contractors. Engineering, Construction and Architectural Management, 5(03), 210–9.

Langston, C (2014) Construction efficiency: a tale of two developed countries. Engineering, Construction and Architectural Management, 21(03), 320-35.

Lansley, P R, Luck, R A C and Lupton, S (1995) The organization of construction research in British universities. Engineering, Construction and Architectural Management, 2(03), 179–95.

Leblanc, H, Thomson, C, Cameron, I and Nitithamyong, P (2013) Developing a planned work process model for housing associations. Engineering, Construction and Architectural Management, 20(03), 232-49.

Leung, M-y, Chan, Y S I and Dongyu, C (2011) Structural linear relationships between job stress, burnout, physiological stress, and performance of construction project managers. Engineering, Construction and Architectural Management, 18(03), 312–28.

Li, H, Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(03), 211–20.

Li, J, Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(03), 242–53.

Liao, L, Teo Ai Lin, E and Low, S P (2019) Assessing building information modeling implementation readiness in building projects in Singapore. Engineering, Construction and Architectural Management, 27(03), 700–24.

Lingard, H, Turner, M and Charlesworth, S (2015) Growing pains: Work-life impacts in small-to-medium sized construction firms. Engineering, Construction and Architectural Management, 22(03), 312-26.

Liu, Q, Ye, G and Feng, Y (2019) Workers’ safety behaviors in the off-site manufacturing plant. Engineering, Construction and Architectural Management, 27(03), 765–84.

Lockley, S R, Watson, R and Shaaban, S (2002) Managing e-commerce in construction - revolution or e-business as usual?. Engineering, Construction and Architectural Management, 9(03), 232–40.

Loosemore, M (2014) Improving construction productivity: a subcontractor's perspective. Engineering, Construction and Architectural Management, 21(03), 245-60.

Loosemore, M (1998) The methodological challenges posed by the confrontational nature of the construction industry. Engineering, Construction and Architectural Management, 5(03), 285–93.

Love, P E D, Edwards, D J and Sohal, A (2004) Total quality management in Australian contracting organisations: pre-conditions for successful implementation. Engineering, Construction and Architectural Management, 11(03), 189–98.

Luu, D T, Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - an empirical survey. Engineering, Construction and Architectural Management, 10(03), 209–18.

Ma, L, Liu, C and Mills, A (2016) Construction labor productivity convergence: A conditional frontier approach. Engineering, Construction and Architectural Management, 23(03), 283-301.

Macmillan, S, Steele, J, Kirby, P, Spence, R and Austin, S A (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(03), 174–80.

Mahamid, I (2012) Factors affecting contractor's business failure: contractors' perspective. Engineering, Construction and Architectural Management, 19(03), 269-85.

Manley, K (2008) Implementation of innovation by manufacturers subcontracting to construction projects. Engineering, Construction and Architectural Management, 15(03), 230–45.

Mansfield, J R (2008) The ethics of conservation: some dilemmas in cultural built heritage projects in England. Engineering, Construction and Architectural Management, 15(03), 270–81.

Mansfield, J R (2009) The use of formalised risk management approaches by UK design consultants in conservation refurbishment projects. Engineering, Construction and Architectural Management, 16(03), 273–87.

Mattila, K G and Abraham, D M (1998) Linear scheduling: past research efforts and future directions. Engineering, Construction and Architectural Management, 5(03), 294–303.

Mei, T, Wang, Q, Xiao, Y and Yang, M (2017) Rent-seeking behavior of BIM- and IPD-based construction project in China. Engineering, Construction and Architectural Management, 24(03), 514-36.

Merrow, E W and Croker, W H (1995) Invited paper: Improved business results through benchmarking. Engineering, Construction and Architectural Management, 2(03), 167–78.

Mezher, T M and Tawil, W (1998) Causes of delay in the construction industry in Lebanon. Engineering, Construction and Architectural Management, 5(03), 252–60.

Mitchell, A, Frame, I, Coday, A and Hoxley, M (2011) A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, 18(03), 297–311.

Mohamed, S and Chinda, T (2011) System dynamics modelling of construction safety culture. Engineering, Construction and Architectural Management, 18(03), 266–81.

Mohamed, Y, Borrego, D, Francisco, L, Al-Hussein, M, AbouRizk, S and Hermann, U (2007) Simulation-based scheduling of module assembly yards: case study. Engineering, Construction and Architectural Management, 14(03), 293–311.

Mokhtar, A H M (2002) Coordinating and customizing design information through the internet. Engineering, Construction and Architectural Management, 9(03), 222–31.

Molwus, J J, Erdogan, B and Ogunlana, S (2017) Using structural equation modelling to understand the relationships among critical success factors for stakeholder management in construction. Engineering, Construction and Architectural Management, 24(03), 426-50.

Moore, D R (2001) William of Sen to Bob the Builder: non-cognate cultural perceptions of constructors. Engineering, Construction and Architectural Management, 8(03), 177–84.

Muya, M, Price, A D F and Edum-Fotwe, F T (2006) Construction craft skills requirements in sub-Saharan Africa: a focus on Zambia. Engineering, Construction and Architectural Management, 13(03), 223–41.

Nassar, K (2003) Construction contracts in a competitive market: C3M, a simulation game. Engineering, Construction and Architectural Management, 10(03), 172–8.

Ndekugri, I, Daeche, H and Zhou, D (2013) The project insurance option in infrastructure procurement. Engineering, Construction and Architectural Management, 20(03), 267-89.

Nepal, M P and Park, M (2004) Downtime model development for construction equipment management. Engineering, Construction and Architectural Management, 11(03), 199–210.

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(03), 462–78.

Ng, S T and Chow, L-K (2004) Evaluating engineering consultants' general capabilities during the pre-selection process - a Hong Kong study. Engineering, Construction and Architectural Management, 11(03), 150–8.

Ng, S T, Shi, J and Fang, Y (2009) Enhancing the logistics of construction materials through activity-based simulation approach. Engineering, Construction and Architectural Management, 16(03), 224–37.

Ng, S T, Skitmore, R M and Leung, T K C (2005) Manageability of stress among construction project participants. Engineering, Construction and Architectural Management, 12(03), 264–82.

Nguyen, T H, Shehab, T and Gao, Z (2008) Selecting an architecture-engineering team by using fuzzy set theory. Engineering, Construction and Architectural Management, 15(03), 282–98.

Nicholas, J, Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers’ financial turnover. Engineering, Construction and Architectural Management, 7(03), 221–31.

Ning, Y, Feng, M, Feng, J and Liu, X (2019) Understanding clients’ experience of trust and distrust in dwelling fit-out projects. Engineering, Construction and Architectural Management, 26(03), 444–61.

Ochieng, E G, Price, A D F, Ruan, X, Egbu, C O and Moore, D (2013) The effect of cross-cultural uncertainty and complexity within multicultural construction teams. Engineering, Construction and Architectural Management, 20(03), 307-24.

Ofori, G and Chan, S L (2000) Growth paths of construction enterprises in Singapore, 1980–98. Engineering, Construction and Architectural Management, 7(03), 307–21.

Olatunji, O A, Aje, O I and Makanjuola, S (2017) Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(03), 378-92.

Otter, A F d and Prins, M (2002) Architectural design management within the digital design team. Engineering, Construction and Architectural Management, 9(03), 162–73.

Owen, G and Merna, A (1997) The private finance initiative. Engineering, Construction and Architectural Management, 4(03), 163–77.

Palaneeswaran, E and Kumaraswamy, M M (2000) Benchmarking contractor selection practices in public-sector construction—a proposed model. Engineering, Construction and Architectural Management, 7(03), 285–99.

Pasquire, C (1999) The implications of environmental issues on UK construction management. Engineering, Construction and Architectural Management, 6(03), 276–86.

Payne, H (1997) Key legal issues in projects procured under the private finance initiative. Engineering, Construction and Architectural Management, 4(03), 195–202.

Peansupap, V and Walker, D H T (2009) Exploratory factors influencing design practice learning within a Thai context. Engineering, Construction and Architectural Management, 16(03), 238–53.

Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(03), 342–57.

Perry, J G (1995) The New Engineering Contract: principles of design and risk allocation. Engineering, Construction and Architectural Management, 2(03), 197–208.

Prasertrungruang, T and Hadikusumo, B H W (2007) Heavy equipment management practices and problems in Thai highway contractors. Engineering, Construction and Architectural Management, 14(03), 228–41.

Proverbs, D G, Olomolaiye, P O and Harris, F C (1996) Planned construction times and labour utilization: a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(03), 219–32.

Ren, Z, Anumba, C J and Ugwu, O O (2001) Construction claims management: towards an agent-based approach. Engineering, Construction and Architectural Management, 8(03), 185–97.

Rodriguez, F S, Spilski, J, Hekele, F, Beese, N O and Lachmann, T (2019) Physical and cognitive demands of work in building construction. Engineering, Construction and Architectural Management, 27(03), 745–64.

Rose, T and Manley, K (2010) Client recommendations for financial incentives on construction projects. Engineering, Construction and Architectural Management, 17(03), 252–67.

Rostami, A and Oduoza, C F (2017) Key risks in construction projects in Italy: Contractors’ perspective. Engineering, Construction and Architectural Management, 24(03), 451-62.

Ruikar, K, Anumba, C J and Carrillo, P (2005) End-user perspectives on use of project extranets in construction organisations. Engineering, Construction and Architectural Management, 12(03), 222–35.

Sang, K J C, Ison, S G and Dainty, A R J (2009) The job satisfaction of UK architects and relationships with work-life balance and turnover intentions. Engineering, Construction and Architectural Management, 16(03), 288–300.

Sarshar, M, Haigh, R, Finnemore, M, Aouad, G F, Barrett, P, Baldry, D and Sexton, M (2000) SPICE: a business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(03), 241–50.

Saurin, T A, Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(03), 283–98.

Scott, D and Anumba, C J (1996) An intelligent approach to the engineering management of subsidence cases. Engineering, Construction and Architectural Management, 3(03), 233–48.

Shurrab, M, Abbasi, G and Al Khazaleh, R (2018) Evaluating the effect of motivational dimensions on the construction project managers in Jordan. Engineering, Construction and Architectural Management, 25(03), 412–24.

Siva, J and London, K (2012) Client learning for successful architect-client relationships. Engineering, Construction and Architectural Management, 19(03), 253-68.

Sönmez, M, Yang, J B and Holt, G D (2001) Addressing the contractor selection problem using an evidential reasoning approach. Engineering, Construction and Architectural Management, 8(03), 198–210.

Soo, A and Oo, B L (2014) The effect of construction demand on contract auctions: an experiment. Engineering, Construction and Architectural Management, 21(03), 276-90.

Sun, H, Fan, Z, Zhou, Y and Shi, Y (2010) Empirical research on competitiveness factors: Analysis of real estate industry of Beijing and Tianjin. Engineering, Construction and Architectural Management, 17(03), 240–51.

Sundquist, V, Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(03), 358–73.

Tam, C M and Harris, F C (1996) Model for assessing building contractors' project performance. Engineering, Construction and Architectural Management, 3(03), 187–203.

Tan, Y, Shen, L-Y and Langston, C (2011) A fuzzy approach for assessing contractors' competitiveness. Engineering, Construction and Architectural Management, 18(03), 234–47.

Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(03), 251–63.

Tezel, A and Aziz, Z (2017) Visual management in highways construction and maintenance in England. Engineering, Construction and Architectural Management, 24(03), 486-513.

Thomson, D S, Austin, S A, Mills, G R and Devine-Wright, H (2013) Practitioner understanding of value in the UK building sector. Engineering, Construction and Architectural Management, 20(03), 214-31.

Toakley, A R and Marosszeky, M (2003) Towards total project quality - a review of research needs. Engineering, Construction and Architectural Management, 10(03), 219–28.

Toor, S-u-R and Ofori, G (2008) Tipping points that inspire leadership: An exploratory study of emergent project leaders. Engineering, Construction and Architectural Management, 15(03), 212–29.

Toor, S-u-R and Ogunlana, S (2009) Ineffective leadership: Investigating the negative attributes of leaders and organizational neutralizers. Engineering, Construction and Architectural Management, 16(03), 254–72.

Tuzmen, A (2002) A distributed process management system for collaborative building design. Engineering, Construction and Architectural Management, 9(03), 209–21.

Ugwu, O O, Anumba, C J and Thorpe, A (2001) Ontology development for agent-based collaborative design. Engineering, Construction and Architectural Management, 8(03), 211–24.

  • Type: Journal Article
  • Keywords: collaborative design; knowledge acquisition; multi-agent systems; ontology development; portal frames; protocol analysis
  • ISBN/ISSN: 0969-9988
  • URL: http://www.ingentaconnect.com/search/expand?pub=infobike://bsc/ecam/2001/00000008/00000003/art00202&unc=
  • Abstract:
    Domain ontologies facilitate sharing and re-use of data and knowledge between distributed collaborating systems. A major problem in the design and application of intelligent systems is to capture and understand: the data and information model that describes the domain; the various levels of knowledge associated with problem solving; and the patterns of interaction, information and data flow in the problem solving space. This paper reports the development of an ontology for agent-based collaborative design of portal structures, using knowledge acquisition techniques and tools. It illustrates the application of the ontology in the development of a prototype multi-agent systems. The study shows that a common ontology facilitates interaction and negotiation between agents and other distributed systems. The paper discusses the findings from the knowledge acquisition, their implications in the design and implementation of multi-agent systems, and gives recommendations on developing agent-based systems for collaborative design and decision-support in the construction sector.

Uher, T E and Ritchie, J (1998) Promoting the health of construction workers. Engineering, Construction and Architectural Management, 5(03), 304–11.

Vilventhan, A and Kalidindi, S N (2016) Interrelationships of factors causing delays in the relocation of utilities: A cognitive mapping approach. Engineering, Construction and Architectural Management, 23(03), 349-68.

Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(03), 278–84.

Wan, S K M and Kumaraswamy, M M (2012) Improving building services coordination at the pre-installation stage. Engineering, Construction and Architectural Management, 19(03), 235-52.

Wan, S K M and Kumaraswamy, M M (2009) Industrial management approaches for improving material control in building services works. Engineering, Construction and Architectural Management, 16(03), 208–23.

Wang, Q, Guo, Z, Mei, T, Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies’ installation. Engineering, Construction and Architectural Management, 25(03), 374–411.

Wanigarathna, N, Sherratt, F, Price, A and Austin, S (2019) Design re-use: critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(03), 350–66.

Watson, R, Lockley, S R and Shaaban, S (2002) Creating usable models for re-usable data - managing electronic project specification information. Engineering, Construction and Architectural Management, 9(03), 272–83.

Wilde, P D, Augenbroe, G and Voorden, M V D (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(03), 192–208.

Wirahadikusumah, R (2003) Application of dynamic programming and simulation for sewer management. Engineering, Construction and Architectural Management, 10(03), 193–208.

Woodhead, R M and Male, S P (2000) The conditioning effect of objective decision-making on the client's capital proposal. Engineering, Construction and Architectural Management, 7(03), 300–6.

Worrall, L, Harris, K, Stewart, R, Thomas, A and McDermott, P (2010) Barriers to women in the UK construction industry. Engineering, Construction and Architectural Management, 17(03), 268–81.

Wu, G, Zhao, X, Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(03), 408–23.

Xu, Y and Turkan, Y (2019) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(03), 785–807.

Ying, F, Tookey, J and Roberti, J (2014) Addressing effective construction logistics through the lens of vehicle movements. Engineering, Construction and Architectural Management, 21(03), 261-75.

Zahoor, H, Chan, A P C, Gao, R and Utama, W P (2017) The factors contributing to construction accidents in Pakistan: Their prioritization using the Delphi technique. Engineering, Construction and Architectural Management, 24(03), 463-85.

Zarghami, S A and Gunawan, I (2019) A fuzzy-based vulnerability assessment model for infrastructure networks incorporating reliability and centrality. Engineering, Construction and Architectural Management, 27(03), 725–44.

Zhang, L, Fenn, P and Fu, Y (2019) To insist or to concede? Contractors’ behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(03), 424–43.

Zhang, R P, Pirzadeh, P, Lingard, H and Nevin, S (2018) Safety climate as a relative concept. Engineering, Construction and Architectural Management, 25(03), 298–316.

Zhang, R, Xing, J, Ye, K, Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(03), 367–85.

Zhao, X, Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(03), 369-84.

Zhao, X, Hwang, B-G and Low, S P (2015) Enterprise risk management in international construction firms: Drivers and hindrances. Engineering, Construction and Architectural Management, 22(03), 347-66.

Zhou, Y, Yang, Y and Yang, J (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(03), 554–74.

Zuo, J, Zhao, X, Nguyen, Q B M, Ma, T and Gao, S (2018) Soft skills of construction project management professionals and project success factors. Engineering, Construction and Architectural Management, 25(03), 425–42.