Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 187 results ...

Abdul-Aziz, A-R and Wong, S-S (2011) Business networks and internationalisation of contractors from developing countries: an explorative study. Engineering, Construction and Architectural Management, 18(03), 282–96.

Abeid, J and Arditi, D (2003) Photo-net: an integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(03), 162–71.

Abidel-Razek, R H (1998) Factors affecting construction quality in Egypt: identification and relative importance. Engineering, Construction and Architectural Management, 5(03), 220–7.

Adam, A, Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(03), 393-406.

Adesi, M, Owusu-Manu, D and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(03), 458–74.

Ahmed, S M, Ahmad, R and Saram, D D D (1999) Risk management trends in the Hong Kong construction industry: a comparison of contractors and owners perceptions. Engineering, Construction and Architectural Management, 6(03), 225–34.

Aka, A, Isah, A D, Eze, C J and Timileyin, O (2019) Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process. Engineering, Construction and Architectural Management, 27(03), 658–79.

Al-Hussein, M, Kumar, J, Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(03), 290–306.

Alkoc, E and Erbatur, F (1998) Site expert: a prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(03), 238–51.

Andary, E G, Abi Shdid, C, Chowdhury, A and Ahmad, I (2019) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(03), 609–33.

Arboleda, C A and Abraham, D M (2006) Evaluation of flexibility in capital investments of infrastructure systems. Engineering, Construction and Architectural Management, 13(03), 254–74.

Augenbroe, G, Verheij, H and Schwarzmuller, G (2002) Project web sites with design management extensions. Engineering, Construction and Architectural Management, 9(03), 259–71.

Austin, S A, Baldwin, A N and Steele, J L (2002) Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9(03), 249–58.

Ballard, G (2002) Managing work flow on design projects: a case study. Engineering, Construction and Architectural Management, 9(03), 284–91.

Barrett, J, Goulding, J and Qualter, P (2013) The social life of the novel idea: what did social psychologists ever do for us?. Engineering, Construction and Architectural Management, 20(03), 250-66.

Beran, V and Dlask, P (2007) Nonlinear optimisation and rational cash flow. Engineering, Construction and Architectural Management, 14(03), 277–92.

Bevan, E A M and Yung, P (2015) Implementation of corporate social responsibility in Australian construction SMEs. Engineering, Construction and Architectural Management, 22(03), 295-311.

Boussabaine, A H, Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(03), 213–24.

Bowen, P and Cattell, K (2008) Job satisfaction of South African quantity surveyors. Engineering, Construction and Architectural Management, 15(03), 260–9.

Brewer, G and Strahorn, S (2012) Trust and the Project Management Body of Knowledge. Engineering, Construction and Architectural Management, 19(03), 286-305.

Carrillo, P (2005) Lessons learned practices in the engineering, procurement and construction sector. Engineering, Construction and Architectural Management, 12(03), 236–50.

Carrillo, P and Heavey, I (2000) UK contractors’ acquisitions strategy for Central and Eastern Europe. Engineering, Construction and Architectural Management, 7(03), 322–8.

Carrillo, P M (1998) Mergers and acquisitions: the impact on information systems and information technology. Engineering, Construction and Architectural Management, 5(03), 276–84.

Chand, A M and Loosemore, M (2016) Hospital disaster management’s understanding of built environment impacts on healthcare services during extreme weather events. Engineering, Construction and Architectural Management, 23(03), 385-402.

Cheah, C Y J and Garvin, M J (2004) An open framework for corporate strategy in construction. Engineering, Construction and Architectural Management, 11(03), 176–88.

Chen, L and Mohamed, S (2007) Empirical study of interactions between knowledge management activities. Engineering, Construction and Architectural Management, 14(03), 242–60.

Cheung, E, Chan, A P C and Kajewski, S (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(03), 292–308.

Chileshe, N and Kikwasi, G J (2014) Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry. Engineering, Construction and Architectural Management, 21(03), 291-319.

Chinowsky, P S, Molenaar, K and Bastias, A (2007) Measuring achievement of learning organizations in construction. Engineering, Construction and Architectural Management, 14(03), 215–27.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

Dabous, S A and Alkass, S (2010) A multi-attribute ranking method for bridge management. Engineering, Construction and Architectural Management, 17(03), 282–91.

Daniel, E I, Pasquire, C, Dickens, G and Ballard, H G (2017) The relationship between the Last Planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(03), 407-25.

Deng, X, Low, S P, Zhao, X and Chang, T (2018) Identifying micro variables contributing to political risks in international construction projects. Engineering, Construction and Architectural Management, 25(03), 317–34.

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(03), 287–98.

Drew, D S, Tang, S L Y and Lui, C K (2004) Balancing fee and quality in two envelope fee bidding. Engineering, Construction and Architectural Management, 11(03), 159–75.

Duncan, K, Philips, P and Prus, M (2012) Using stochastic frontier regression to estimate the construction cost inefficiency of prevailing wage laws. Engineering, Construction and Architectural Management, 19(03), 320-34.

Duyshart, B, Walker, D, Mohamed, S and Hampson, K (2003) An example of developing a business model for information and communication technologies (ICT) adoption on construction projects - the National Museum of Australia project. Engineering, Construction and Architectural Management, 10(03), 179–92.

Edwards, D J and Holt, G D (2007) Perceptions of workplace vibration hazards among a small sample of UK construction professionals. Engineering, Construction and Architectural Management, 14(03), 261–76.

Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: a tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(03), 225–32.

Edwards, D J, Nicholas, J and Sharp, R (2001) Forecasting UK construction plant sales. Engineering, Construction and Architectural Management, 8(03), 171–6.

Edwards, D, Parn, E A, Sing, M C and Thwala, W D (2019) Risk of excavators overturning. Engineering, Construction and Architectural Management, 26(03), 479–98.

Ekanayake, E, Shen, G and Kumaraswamy, M M (2019) Mapping the knowledge domains of value management: a bibliometric approach. Engineering, Construction and Architectural Management, 26(03), 499–514.

Elbeltagi, E, Ammar, M, Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(03), 265-82.

Ezulike, E L, Perry, J G and Hawwash, K (1997) The barriers to entry into the PFI market. Engineering, Construction and Architectural Management, 4(03), 179–93.

Faruqi, S and Smith, N J (1997) Karachi light rail transit: a private finance proposal. Engineering, Construction and Architectural Management, 4(03), 233–46.

Fenis, S M, Diekmann, J E and Huang, P-Y (1995) A GIS-based pipeline planning system. Engineering, Construction and Architectural Management, 2(03), 227–38.

Ford, D N and Bhargav, S (2006) Project management quality and the value of flexible strategies. Engineering, Construction and Architectural Management, 13(03), 275–89.

Forsythe, P (2006) Consumer-perceived appearance tolerances in construction quality management. Engineering, Construction and Architectural Management, 13(03), 307–18.

Forsythe, P J (2016) Construction service quality and satisfaction for a targeted housing customer. Engineering, Construction and Architectural Management, 23(03), 323-48.

Gan, X, Chang, R, Langston, C and Wen, T (2019) Exploring the interactions among factors impeding the diffusion of prefabricated building technologies. Engineering, Construction and Architectural Management, 26(03), 535–53.

Goh, B-H (1998) Forecasting residential construction demand in Singapore: a comparative study of the accuracy of time series, regression and artificial neural network techniques. Engineering, Construction and Architectural Management, 5(03), 261–75.

Golizadeh, H, Hosseini, M R, Martek, I, Edwards, D, Gheisari, M, Banihashemi, S and Zhang, J (2019) Scientometric analysis of research on “remotely piloted aircraft”. Engineering, Construction and Architectural Management, 27(03), 634–57.

Gravina da Rocha, C, El Ghoz, H B and Jr Guadanhim, S (2019) A model for implementing product modularity in buildings design. Engineering, Construction and Architectural Management, 27(03), 680–99.

Griffith, A (2000) Integrated management systems: a single management system solution for project control?. Engineering, Construction and Architectural Management, 7(03), 232–40.

Griffith, A (1996) Review of environmental assessment in UK building construction: current awareness, concerns and issues. Engineering, Construction and Architectural Management, 3(03), 205–17.

Grimsey, D and Graham, R (1997) PFI in the NHS (Private finance initiative in the UK National Health Service). Engineering, Construction and Architectural Management, 4(03), 215–31.

Gunner, J and Skitmore, M R (1999) Pre-bid building price forecasting accuracy: price intensity theory. Engineering, Construction and Architectural Management, 6(03), 267–75.

Hammarlund, Y (1995) Environments of construction. Engineering, Construction and Architectural Management, 2(03), 209–25.

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects. Engineering, Construction and Architectural Management, 26(03), 386–407.

Hassim, S, Muniandy, R, Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia. Engineering, Construction and Architectural Management, 25(03), 443–57.

Hawwash, K and Barnes, M (1997) The potential for adopting the NEC's family of contracts on PFI projects. Engineering, Construction and Architectural Management, 4(03), 203–14.

Heintz, J L (2002) Collaborative design planning networks. Engineering, Construction and Architectural Management, 9(03), 181–91.

Henderson, J R and Ruikar, K (2010) Technology implementation strategies for construction organisations. Engineering, Construction and Architectural Management, 17(03), 309–27.

Henderson, J R, Ruikar, K D and Dainty, A R J (2013) The need to improve double-loop learning and design-construction feedback loops: A survey of industry practice. Engineering, Construction and Architectural Management, 20(03), 290-306.

Holt, G D (2018) Let’s change tack, not wind direction: a response to Kog and Yaman (2016). Engineering, Construction and Architectural Management, 25(03), 335–41.

Hughes, D, Williams, T and Ren, Z (2012) Is incentivisation significant in ensuring successful partnered projects?. Engineering, Construction and Architectural Management, 19(03), 306-19.

Hwang, B-G, Zhao, X and Tan, L L G (2015) Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(03), 327-46.

Ilhan, B and Yaman, H (2011) A comparative input-output analysis of the construction sector in Turkey and EU countries. Engineering, Construction and Architectural Management, 18(03), 248–65.

Jaafari, A and Manivong, K (1999) The need for life-cycle integration of project processes. Engineering, Construction and Architectural Management, 6(03), 235–55.

Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity?. Engineering, Construction and Architectural Management, 24(03), 537-52.

Jennings, M J and Betts, M (1996) Competitive strategy for quantity surveying practices: the importance of information technology. Engineering, Construction and Architectural Management, 3(03), 163–86.

Johnson, R, Clayton, M, Xia, G E, Woo, J-H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(03), 241–8.

Juan, Y, Lin, I and Tsai, J (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(03), 515–34.

Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(03), 256–66.

Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(03), 211–22.

Kartam, N A (1999) Design/construction integration: issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(03), 299–314.

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(03), 315–28.

Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(03), 228–37.

Lahdenperä, P and Tanhuanpää, V-P (2000) Creation of a new design management system based on process optimization and proactive strategy. Engineering, Construction and Architectural Management, 7(03), 267–77.

Lam, K C and Oshodi, O S (2016) Forecasting construction output: A comparison of artificial neural network and Box-Jenkins model. Engineering, Construction and Architectural Management, 23(03), 302-22.

Lam, K C, Ng, S T, Hu, T, Skitmore, M R and Cheung, S-O (2000) Decision support system for contractor pre-qualification—artificial neural network model. Engineering, Construction and Architectural Management, 7(03), 251–66.

Lam, T and Gale, K (2014) Highway maintenance: impact of framework agreements on contractor performance. Engineering, Construction and Architectural Management, 21(03), 336-47.

Landin, A M and Persson, M H (1998) Evaluation of quality systems for specialist contractors. Engineering, Construction and Architectural Management, 5(03), 210–9.

Langston, C (2014) Construction efficiency: a tale of two developed countries. Engineering, Construction and Architectural Management, 21(03), 320-35.

Lansley, P R, Luck, R A C and Lupton, S (1995) The organization of construction research in British universities. Engineering, Construction and Architectural Management, 2(03), 179–95.

Leblanc, H, Thomson, C, Cameron, I and Nitithamyong, P (2013) Developing a planned work process model for housing associations. Engineering, Construction and Architectural Management, 20(03), 232-49.

Leung, M-y, Chan, Y S I and Dongyu, C (2011) Structural linear relationships between job stress, burnout, physiological stress, and performance of construction project managers. Engineering, Construction and Architectural Management, 18(03), 312–28.

Li, H, Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(03), 211–20.

Li, J, Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(03), 242–53.

Liao, L, Teo Ai Lin, E and Low, S P (2019) Assessing building information modeling implementation readiness in building projects in Singapore. Engineering, Construction and Architectural Management, 27(03), 700–24.

Lingard, H, Turner, M and Charlesworth, S (2015) Growing pains: Work-life impacts in small-to-medium sized construction firms. Engineering, Construction and Architectural Management, 22(03), 312-26.

Liu, Q, Ye, G and Feng, Y (2019) Workers’ safety behaviors in the off-site manufacturing plant. Engineering, Construction and Architectural Management, 27(03), 765–84.

Lockley, S R, Watson, R and Shaaban, S (2002) Managing e-commerce in construction - revolution or e-business as usual?. Engineering, Construction and Architectural Management, 9(03), 232–40.

Loosemore, M (2014) Improving construction productivity: a subcontractor's perspective. Engineering, Construction and Architectural Management, 21(03), 245-60.

Loosemore, M (1998) The methodological challenges posed by the confrontational nature of the construction industry. Engineering, Construction and Architectural Management, 5(03), 285–93.

Love, P E D, Edwards, D J and Sohal, A (2004) Total quality management in Australian contracting organisations: pre-conditions for successful implementation. Engineering, Construction and Architectural Management, 11(03), 189–98.

Luu, D T, Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - an empirical survey. Engineering, Construction and Architectural Management, 10(03), 209–18.

Ma, L, Liu, C and Mills, A (2016) Construction labor productivity convergence: A conditional frontier approach. Engineering, Construction and Architectural Management, 23(03), 283-301.

Macmillan, S, Steele, J, Kirby, P, Spence, R and Austin, S A (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(03), 174–80.

Mahamid, I (2012) Factors affecting contractor's business failure: contractors' perspective. Engineering, Construction and Architectural Management, 19(03), 269-85.

Manley, K (2008) Implementation of innovation by manufacturers subcontracting to construction projects. Engineering, Construction and Architectural Management, 15(03), 230–45.

Mansfield, J R (2008) The ethics of conservation: some dilemmas in cultural built heritage projects in England. Engineering, Construction and Architectural Management, 15(03), 270–81.

Mansfield, J R (2009) The use of formalised risk management approaches by UK design consultants in conservation refurbishment projects. Engineering, Construction and Architectural Management, 16(03), 273–87.

Mattila, K G and Abraham, D M (1998) Linear scheduling: past research efforts and future directions. Engineering, Construction and Architectural Management, 5(03), 294–303.

Mei, T, Wang, Q, Xiao, Y and Yang, M (2017) Rent-seeking behavior of BIM- and IPD-based construction project in China. Engineering, Construction and Architectural Management, 24(03), 514-36.

Merrow, E W and Croker, W H (1995) Invited paper: Improved business results through benchmarking. Engineering, Construction and Architectural Management, 2(03), 167–78.

Mezher, T M and Tawil, W (1998) Causes of delay in the construction industry in Lebanon. Engineering, Construction and Architectural Management, 5(03), 252–60.

Mitchell, A, Frame, I, Coday, A and Hoxley, M (2011) A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, 18(03), 297–311.

Mohamed, S and Chinda, T (2011) System dynamics modelling of construction safety culture. Engineering, Construction and Architectural Management, 18(03), 266–81.

Mohamed, Y, Borrego, D, Francisco, L, Al-Hussein, M, AbouRizk, S and Hermann, U (2007) Simulation-based scheduling of module assembly yards: case study. Engineering, Construction and Architectural Management, 14(03), 293–311.

Mokhtar, A H M (2002) Coordinating and customizing design information through the internet. Engineering, Construction and Architectural Management, 9(03), 222–31.

Molwus, J J, Erdogan, B and Ogunlana, S (2017) Using structural equation modelling to understand the relationships among critical success factors for stakeholder management in construction. Engineering, Construction and Architectural Management, 24(03), 426-50.

Moore, D R (2001) William of Sen to Bob the Builder: non-cognate cultural perceptions of constructors. Engineering, Construction and Architectural Management, 8(03), 177–84.

Muya, M, Price, A D F and Edum-Fotwe, F T (2006) Construction craft skills requirements in sub-Saharan Africa: a focus on Zambia. Engineering, Construction and Architectural Management, 13(03), 223–41.

Nassar, K (2003) Construction contracts in a competitive market: C3M, a simulation game. Engineering, Construction and Architectural Management, 10(03), 172–8.

Ndekugri, I, Daeche, H and Zhou, D (2013) The project insurance option in infrastructure procurement. Engineering, Construction and Architectural Management, 20(03), 267-89.

Nepal, M P and Park, M (2004) Downtime model development for construction equipment management. Engineering, Construction and Architectural Management, 11(03), 199–210.

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(03), 462–78.

Ng, S T and Chow, L-K (2004) Evaluating engineering consultants' general capabilities during the pre-selection process - a Hong Kong study. Engineering, Construction and Architectural Management, 11(03), 150–8.

Ng, S T, Shi, J and Fang, Y (2009) Enhancing the logistics of construction materials through activity-based simulation approach. Engineering, Construction and Architectural Management, 16(03), 224–37.

Ng, S T, Skitmore, R M and Leung, T K C (2005) Manageability of stress among construction project participants. Engineering, Construction and Architectural Management, 12(03), 264–82.

Nguyen, T H, Shehab, T and Gao, Z (2008) Selecting an architecture-engineering team by using fuzzy set theory. Engineering, Construction and Architectural Management, 15(03), 282–98.

Nicholas, J, Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers’ financial turnover. Engineering, Construction and Architectural Management, 7(03), 221–31.

Ning, Y, Feng, M, Feng, J and Liu, X (2019) Understanding clients’ experience of trust and distrust in dwelling fit-out projects. Engineering, Construction and Architectural Management, 26(03), 444–61.

Ochieng, E G, Price, A D F, Ruan, X, Egbu, C O and Moore, D (2013) The effect of cross-cultural uncertainty and complexity within multicultural construction teams. Engineering, Construction and Architectural Management, 20(03), 307-24.

Ofori, G and Chan, S L (2000) Growth paths of construction enterprises in Singapore, 1980–98. Engineering, Construction and Architectural Management, 7(03), 307–21.

Olatunji, O A, Aje, O I and Makanjuola, S (2017) Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(03), 378-92.

Otter, A F d and Prins, M (2002) Architectural design management within the digital design team. Engineering, Construction and Architectural Management, 9(03), 162–73.

Owen, G and Merna, A (1997) The private finance initiative. Engineering, Construction and Architectural Management, 4(03), 163–77.

Palaneeswaran, E and Kumaraswamy, M M (2000) Benchmarking contractor selection practices in public-sector construction—a proposed model. Engineering, Construction and Architectural Management, 7(03), 285–99.

Pasquire, C (1999) The implications of environmental issues on UK construction management. Engineering, Construction and Architectural Management, 6(03), 276–86.

Payne, H (1997) Key legal issues in projects procured under the private finance initiative. Engineering, Construction and Architectural Management, 4(03), 195–202.

Peansupap, V and Walker, D H T (2009) Exploratory factors influencing design practice learning within a Thai context. Engineering, Construction and Architectural Management, 16(03), 238–53.

Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(03), 342–57.

Perry, J G (1995) The New Engineering Contract: principles of design and risk allocation. Engineering, Construction and Architectural Management, 2(03), 197–208.

Prasertrungruang, T and Hadikusumo, B H W (2007) Heavy equipment management practices and problems in Thai highway contractors. Engineering, Construction and Architectural Management, 14(03), 228–41.

Proverbs, D G, Olomolaiye, P O and Harris, F C (1996) Planned construction times and labour utilization: a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(03), 219–32.

Ren, Z, Anumba, C J and Ugwu, O O (2001) Construction claims management: towards an agent-based approach. Engineering, Construction and Architectural Management, 8(03), 185–97.

Rodriguez, F S, Spilski, J, Hekele, F, Beese, N O and Lachmann, T (2019) Physical and cognitive demands of work in building construction. Engineering, Construction and Architectural Management, 27(03), 745–64.

Rose, T and Manley, K (2010) Client recommendations for financial incentives on construction projects. Engineering, Construction and Architectural Management, 17(03), 252–67.

Rostami, A and Oduoza, C F (2017) Key risks in construction projects in Italy: Contractors’ perspective. Engineering, Construction and Architectural Management, 24(03), 451-62.

Ruikar, K, Anumba, C J and Carrillo, P (2005) End-user perspectives on use of project extranets in construction organisations. Engineering, Construction and Architectural Management, 12(03), 222–35.

  • Type: Journal Article
  • Keywords: project management; internet; electronic commerce
  • ISBN/ISSN: 0969-9988
  • URL: http://miranda.emeraldinsight.com/vl=2715931/cl=96/nw=1/rpsv/cgi-bin/linker?ini=emerald&reqidx=/cw/mcb/09699988/v12n3/s1/p222
  • Abstract:
    Purpose - Web-based technologies such as project extranets have introduced a new concept for communication and collaboration during construction projects. Project extranets have been used in the industry for some time now to manage information and document flows throughout the lifecycle of construction projects. Very few end-user companies already using project extranets have documented and disseminated information about the implications of using this technology in terms of the impact on their businesses, benefits incurred and possible drawbacks. This paper aims to present findings from the UK. Design/methodology/approach - The methodology is case studies conducted with end-users of a leading project extranet application in the UK. Findings - Findings suggest that some of the perceived drawbacks of using project extranets are in fact not viewed as drawbacks by end-user companies. Also, the benefits incurred appear to outweigh some of the issues. The end-user organisations believe that an increasing number of organisations will be encouraged to use project extranets when they see "visionaries" and "market leaders" such as themselves, benefiting from the technology and leading the way to its wider adoption. Originality/value - Wider dissemination of this knowledge will encourage more construction companies to adopt the technology which has a proven record of success on projects for which it has been used. The paper highlights the drivers for the adoption of this technology and its impact on end-user business processes. It also documents the end-user viewpoint on the benefits and drawbacks of using project extranets.

Sang, K J C, Ison, S G and Dainty, A R J (2009) The job satisfaction of UK architects and relationships with work-life balance and turnover intentions. Engineering, Construction and Architectural Management, 16(03), 288–300.

Sarshar, M, Haigh, R, Finnemore, M, Aouad, G F, Barrett, P, Baldry, D and Sexton, M (2000) SPICE: a business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(03), 241–50.

Saurin, T A, Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(03), 283–98.

Scott, D and Anumba, C J (1996) An intelligent approach to the engineering management of subsidence cases. Engineering, Construction and Architectural Management, 3(03), 233–48.

Shurrab, M, Abbasi, G and Al Khazaleh, R (2018) Evaluating the effect of motivational dimensions on the construction project managers in Jordan. Engineering, Construction and Architectural Management, 25(03), 412–24.

Siva, J and London, K (2012) Client learning for successful architect-client relationships. Engineering, Construction and Architectural Management, 19(03), 253-68.

Sönmez, M, Yang, J B and Holt, G D (2001) Addressing the contractor selection problem using an evidential reasoning approach. Engineering, Construction and Architectural Management, 8(03), 198–210.

Soo, A and Oo, B L (2014) The effect of construction demand on contract auctions: an experiment. Engineering, Construction and Architectural Management, 21(03), 276-90.

Sun, H, Fan, Z, Zhou, Y and Shi, Y (2010) Empirical research on competitiveness factors: Analysis of real estate industry of Beijing and Tianjin. Engineering, Construction and Architectural Management, 17(03), 240–51.

Sundquist, V, Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(03), 358–73.

Tam, C M and Harris, F C (1996) Model for assessing building contractors' project performance. Engineering, Construction and Architectural Management, 3(03), 187–203.

Tan, Y, Shen, L-Y and Langston, C (2011) A fuzzy approach for assessing contractors' competitiveness. Engineering, Construction and Architectural Management, 18(03), 234–47.

Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(03), 251–63.

Tezel, A and Aziz, Z (2017) Visual management in highways construction and maintenance in England. Engineering, Construction and Architectural Management, 24(03), 486-513.

Thomson, D S, Austin, S A, Mills, G R and Devine-Wright, H (2013) Practitioner understanding of value in the UK building sector. Engineering, Construction and Architectural Management, 20(03), 214-31.

Toakley, A R and Marosszeky, M (2003) Towards total project quality - a review of research needs. Engineering, Construction and Architectural Management, 10(03), 219–28.

Toor, S-u-R and Ofori, G (2008) Tipping points that inspire leadership: An exploratory study of emergent project leaders. Engineering, Construction and Architectural Management, 15(03), 212–29.

Toor, S-u-R and Ogunlana, S (2009) Ineffective leadership: Investigating the negative attributes of leaders and organizational neutralizers. Engineering, Construction and Architectural Management, 16(03), 254–72.

Tuzmen, A (2002) A distributed process management system for collaborative building design. Engineering, Construction and Architectural Management, 9(03), 209–21.

Ugwu, O O, Anumba, C J and Thorpe, A (2001) Ontology development for agent-based collaborative design. Engineering, Construction and Architectural Management, 8(03), 211–24.

Uher, T E and Ritchie, J (1998) Promoting the health of construction workers. Engineering, Construction and Architectural Management, 5(03), 304–11.

Vilventhan, A and Kalidindi, S N (2016) Interrelationships of factors causing delays in the relocation of utilities: A cognitive mapping approach. Engineering, Construction and Architectural Management, 23(03), 349-68.

Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(03), 278–84.

Wan, S K M and Kumaraswamy, M M (2012) Improving building services coordination at the pre-installation stage. Engineering, Construction and Architectural Management, 19(03), 235-52.

Wan, S K M and Kumaraswamy, M M (2009) Industrial management approaches for improving material control in building services works. Engineering, Construction and Architectural Management, 16(03), 208–23.

Wang, Q, Guo, Z, Mei, T, Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies’ installation. Engineering, Construction and Architectural Management, 25(03), 374–411.

Wanigarathna, N, Sherratt, F, Price, A and Austin, S (2019) Design re-use: critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(03), 350–66.

Watson, R, Lockley, S R and Shaaban, S (2002) Creating usable models for re-usable data - managing electronic project specification information. Engineering, Construction and Architectural Management, 9(03), 272–83.

Wilde, P D, Augenbroe, G and Voorden, M V D (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(03), 192–208.

Wirahadikusumah, R (2003) Application of dynamic programming and simulation for sewer management. Engineering, Construction and Architectural Management, 10(03), 193–208.

Woodhead, R M and Male, S P (2000) The conditioning effect of objective decision-making on the client's capital proposal. Engineering, Construction and Architectural Management, 7(03), 300–6.

Worrall, L, Harris, K, Stewart, R, Thomas, A and McDermott, P (2010) Barriers to women in the UK construction industry. Engineering, Construction and Architectural Management, 17(03), 268–81.

Wu, G, Zhao, X, Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(03), 408–23.

Xu, Y and Turkan, Y (2019) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(03), 785–807.

Ying, F, Tookey, J and Roberti, J (2014) Addressing effective construction logistics through the lens of vehicle movements. Engineering, Construction and Architectural Management, 21(03), 261-75.

Zahoor, H, Chan, A P C, Gao, R and Utama, W P (2017) The factors contributing to construction accidents in Pakistan: Their prioritization using the Delphi technique. Engineering, Construction and Architectural Management, 24(03), 463-85.

Zarghami, S A and Gunawan, I (2019) A fuzzy-based vulnerability assessment model for infrastructure networks incorporating reliability and centrality. Engineering, Construction and Architectural Management, 27(03), 725–44.

Zhang, L, Fenn, P and Fu, Y (2019) To insist or to concede? Contractors’ behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(03), 424–43.

Zhang, R P, Pirzadeh, P, Lingard, H and Nevin, S (2018) Safety climate as a relative concept. Engineering, Construction and Architectural Management, 25(03), 298–316.

Zhang, R, Xing, J, Ye, K, Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(03), 367–85.

Zhao, X, Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(03), 369-84.

Zhao, X, Hwang, B-G and Low, S P (2015) Enterprise risk management in international construction firms: Drivers and hindrances. Engineering, Construction and Architectural Management, 22(03), 347-66.

Zhou, Y, Yang, Y and Yang, J (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(03), 554–74.

Zuo, J, Zhao, X, Nguyen, Q B M, Ma, T and Gao, S (2018) Soft skills of construction project management professionals and project success factors. Engineering, Construction and Architectural Management, 25(03), 425–42.