Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 465 results ...

Şentürk, H A and Yazici, G (2004) Case Study: Izmit Domestic and Industrial Water Supply Build–Operate–Transfer Project. Journal of Construction Engineering and Management, 130(03), 449–54.

Abdel-Razek, R H (1997) How Construction Managers Would Like Their Performance to Be Evaluated. Journal of Construction Engineering and Management, 123(03), 208–13.

Abdelrahman, M, Zayed, T and Elyamany, A (2008) Best-Value Model Based on Project Specific Characteristics. Journal of Construction Engineering and Management, 134(03), 179–88.

Abdollahipour, S, Jeong, D H S, Burman, R R and Gunsaulis, F (2012) Performance Assessment of On-Grade Horizontal Directional Drilling. Journal of Construction Engineering and Management, 138(03), 458–68.

AbouRizk, S M and Halpin, D W (1992) Statistical Properties of Construction Duration Data. Journal of Construction Engineering and Management, 118(03), 525–44.

Abu‐Hijleh, S F and Ibbs, C W (1989) Schedule‐Based Construction Incentives. Journal of Construction Engineering and Management, 115(03), 430–43.

Abudayyeh, O, Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of Trends in Construction Research: 1985–2002. Journal of Construction Engineering and Management, 130(03), 433–9.

Abudayyeh, O, Russell, J, Johnston, D and Rowings, J (2000) Construction Engineering and Management Undergraduate Education. Journal of Construction Engineering and Management, 126(03), 169–75.

Adami, V S, Verschoore, J R and Antunes Junior, J A V (2019) Effect of Relational Characteristics on Management of Wind Farm Interorganizational Construction Projects. Journal of Construction Engineering and Management, 145(03).

Agbulos, A, Mohamed, Y, Al-Hussein, M, AbouRizk, S and Roesch, J (2006) Application of Lean Concepts and Simulation Analysis to Improve Efficiency of Drainage Operations Maintenance Crews. Journal of Construction Engineering and Management, 132(03), 291–9.

Agyekum-Mensah, G, Reid, A and Temitope, T A (2020) Methodological Pluralism: Investigation into Construction Engineering and Management Research Methods. Journal of Construction Engineering and Management, 146(03).

Ahuja, H N and Aranachalam, V (1984) Risk Evaluation in Resource Allocation. Journal of Construction Engineering and Management, 110(03), 324–36.

Al Qady, M and Kandil, A (2010) Concept Relation Extraction from Construction Documents Using Natural Language Processing. Journal of Construction Engineering and Management, 136(03), 294–302.

Al-Bayati, A J, Abudayyeh, O, Fredericks, T and Butt, S E (2017) Reducing Fatality Rates of the Hispanic Workforce in the U.S. Construction Industry: Challenges and Strategies. Journal of Construction Engineering and Management, 143(03).

Al‐Bahar, J F and Crandall, K C (1990) Systematic Risk Management Approach for Construction Projects. Journal of Construction Engineering and Management, 116(03), 533–46.

Alarcón, L F and Ashley, D B (1996) Modeling Project Performance for Decision Making . Journal of Construction Engineering and Management, 122(03), 265–73.

Alhazmi, T and McCaffer, R (2000) Project Procurement System Selection Model. Journal of Construction Engineering and Management, 126(03), 176–84.

Alkass, S and Harris, F (1988) Expert System for Earthmoving Equipment Selection in Road Construction. Journal of Construction Engineering and Management, 114(03), 426–40.

Alkass, S, Aronian, A and Moselhi, O (1993) Computer‐Aided Equipment Selection for Transporting and Placing Concrete. Journal of Construction Engineering and Management, 119(03), 445–65.

Alruqi, W M and Hallowell, M R (2019) Critical Success Factors for Construction Safety: Review and Meta-Analysis of Safety Leading Indicators. Journal of Construction Engineering and Management, 145(03).

Amir, T (1986) Transient Response Analysis of a Dual Cycle System. Journal of Construction Engineering and Management, 112(03), 403–10.

Amirkhanian, S N, Burati, J L and Mirchandani, H C (1994) Effect of Testing Variability on Contractor Payment for Asphalt Pavements. Journal of Construction Engineering and Management, 120(03), 579–92.

Anand, K B and Ramamurthy, K (2003) Laboratory-Based Productivity Study on Alternative Masonry Systems. Journal of Construction Engineering and Management, 129(03), 237–42.

Anastasopoulos, P C, Labi, S, Bhargava, A and Mannering, F L (2012) Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays. Journal of Construction Engineering and Management, 138(03), 390–8.

Antunes, R, González, V A, Walsh, K, Rojas, O, O’Sullivan, M and Odeh, I (2018) Benchmarking Project-Driven Production in Construction Using Productivity Function: Capacity and Cycle Time. Journal of Construction Engineering and Management, 144(03).

Anvuur, A M and Kumaraswamy, M M (2007) Conceptual Model of Partnering and Alliancing. Journal of Construction Engineering and Management, 133(03), 225–34.

Arditi, D and Albulak, M Z (1986) Line‐of‐Balance Scheduling in Pavement Construction. Journal of Construction Engineering and Management, 112(03), 411–24.

Arditi, D and Gunaydin, H M (1998) Factors That Affect Process Quality in the Life Cycle of Building Projects. Journal of Construction Engineering and Management, 124(03), 194–203.

Arditi, D, Khisty, C J and Yasamis, F (1997) Incentive/Disincentive Provisions in Highway Contracts. Journal of Construction Engineering and Management, 123(03), 302–7.

Asgari, S, Afshar, A and Madani, K (2014) Cooperative Game Theoretic Framework for Joint Resource Management in Construction. Journal of Construction Engineering and Management, 140(03).

Ashley, D B and Bonner, J J (1987) Political Risks in International Construction. Journal of Construction Engineering and Management, 113(03), 447–67.

Atherinis, D, Bakowski, B, Velcek, M and Moon, S (2018) Developing and Laboratory Testing a Smart System for Automated Falsework Inspection in Construction. Journal of Construction Engineering and Management, 144(03).

Awolusi, I G and Marks, E D (2017) Safety Activity Analysis Framework to Evaluate Safety Performance in Construction. Journal of Construction Engineering and Management, 143(03).

Ayhan, B U and Tokdemir, O B (2020) Accident Analysis for Construction Safety Using Latent Class Clustering and Artificial Neural Networks. Journal of Construction Engineering and Management, 146(03).

Babar, S, Thaheem, M J and Ayub, B (2017) Estimated Cost at Completion: Integrating Risk into Earned Value Management. Journal of Construction Engineering and Management, 143(03).

Baccarini, D and Love, P E D (2014) Statistical Characteristics of Cost Contingency in Water Infrastructure Projects. Journal of Construction Engineering and Management, 140(03).

Barati, K, Shen, X, Li, N and Carmichael, D G (2022) Automatic Mass Estimation of Construction Vehicles by Modeling Operational and Engine Data. Journal of Construction Engineering and Management, 148(03).

Basha, I M and Gab‐Allah, A A (1991) Value Engineering in Egyptian Bridge Construction. Journal of Construction Engineering and Management, 117(03), 393–401.

Bashford, H H, Sawhney, A, Walsh, K D and Kot, K (2003) Implications of Even Flow Production Methodology for U.S. Housing Industry. Journal of Construction Engineering and Management, 129(03), 330–7.

Beavers, J E, Moore, J R and Schriver, W R (2009) Steel Erection Fatalities in the Construction Industry. Journal of Construction Engineering and Management, 135(03), 227–34.

Becerik-Gerber, B, Jazizadeh, F, Li, N and Calis, G (2012) Application Areas and Data Requirements for BIM-Enabled Facilities Management. Journal of Construction Engineering and Management, 138(03), 431–42.

Beliveau, Y, Dixit, S and Dal, T (1993) Dynamic Damping of Payload Motion for Cranes. Journal of Construction Engineering and Management, 119(03), 631–44.

Bernold, L E and Guler, N (1993) Analysis of Back Injuries in Construction. Journal of Construction Engineering and Management, 119(03), 607–21.

Bernold, L E, Lorenc, S J and Davis, M L (2001) Technological Intervention to Eliminate Back Injury Risks for Nailing. Journal of Construction Engineering and Management, 127(03), 245–50.

Bernold, L E, Lorenc, S J and Luces, E (1997) Intelligent Technology for Truck Crane Accident Prevention. Journal of Construction Engineering and Management, 123(03), 276–84.

Birrell, G S (1985) General Contractors' Management: How Subs Evaluate IT. Journal of Construction Engineering and Management, 111(03), 244–59.

Blacud, N A, Bogus, S M, Diekmann, J E and Molenaar, K R (2009) Sensitivity of Construction Activities under Design Uncertainty. Journal of Construction Engineering and Management, 135(03), 199–206.

Blakey, L H (1990) Bar Codes: Prescription for Precision, Performance, and Productivity. Journal of Construction Engineering and Management, 116(03), 468–79.

Blomberg, D, Cotellesso, P, Sitzabee, W and Thal, A E (2014) Discovery of Internal and External Factors Causing Military Construction Cost Premiums. Journal of Construction Engineering and Management, 140(03).

Borges, S K (1987) Roller‐Compacted Concrete Pavement: U.S. Air Force Decision Model. Journal of Construction Engineering and Management, 113(03), 480–7.

Bosserman, B E and Ford, M E (1984) Development of Computerized Specifications. Journal of Construction Engineering and Management, 110(03), 375–84.

Bossink, B A G (2004) Managing Drivers of Innovation in Construction Networks. Journal of Construction Engineering and Management, 130(03), 337–45.

Bowen, P and Zhang, R P (2020) Cross-Boundary Contact, Work-Family Conflict, Antecedents, and Consequences: Testing an Integrated Model for Construction Professionals. Journal of Construction Engineering and Management, 146(03).

Bowen, P, Edwards, P, Lingard, H and Cattell, K (2014) Predictive Modeling of Workplace Stress among Construction Professionals. Journal of Construction Engineering and Management, 140(03).

Bowen, P, Edwards, P, Lingard, H and Cattell, K (2014) Workplace Stress, Stress Effects, and Coping Mechanisms in the Construction Industry. Journal of Construction Engineering and Management, 140(03).

Bresnen, M J, Bryman, A E, Ford, J R, Beardsworth, A D and Keil, T E (1986) Leader Orientation of Construction Site Managers. Journal of Construction Engineering and Management, 112(03), 370–86.

Brosque, C, Skeie, G and Fischer, M (2021) Comparative Analysis of Manual and Robotic Concrete Drilling for Installation Hangers. Journal of Construction Engineering and Management, 147(03).

BuHamdan, S, Duncheva, T and Alwisy, A (2021) Developing a BIM and Simulation-Based Hazard Assessment and Visualization Framework for CLT Construction Design. Journal of Construction Engineering and Management, 147(03).

  • Type: Journal Article
  • Keywords: Social sustainability; Health and safety; Construction industry; Cross laminated timber (CLT); Discrete event simulation; Building information modeling (BIM); Visualization; Design;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002000
  • Abstract:
    One emerging trend in sustainable medium-density construction is the use of mass timber products such as cross laminated timber (CLT), which is a novel approach that involves numerous connectors. Researchers have not previously investigated the potential health impacts of different connectors. This paper proposes a framework to correlate the specification of CLT connectors to the potential risk of exposure to hand arm vibration syndrome (HAVS). We also propose an innovative adaptation of the Location-Based Management System flow line by adding a health risk dimension. The usefulness of the proposed framework is tested using a cutting-edge case study building, the tallest timber building in Scotland. The contribution of this research is a novel appreciation of the impact on installers’ Health & Safety based on the specified type of CLT connectors. With the methodology outlined in this paper, a HAVS variable can be added to design analysis to increase social sustainability in the built environment alongside other sustainability pillars. The findings are relevant to structural engineers, architects, key industry stakeholders, and researchers in the built environment.

C. William, I and Ashley, D B (1987) Impact of Various Construction Contract Clauses. Journal of Construction Engineering and Management, 113(03), 501–21.

Carr, R I (1997) Engineering and Construction Management: Leadership and Opportunity. Journal of Construction Engineering and Management, 123(03), 292–6.

Carty, G J (1995) Construction . Journal of Construction Engineering and Management, 121(03), 319–28.

Castillo, T, Alarcón, L F and Salvatierra, J L (2018) Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects. Journal of Construction Engineering and Management, 144(03).

Chai, C, de Brito, J, Gaspar, P L and Silva, A (2014) Predicting the Service Life of Exterior Wall Painting: Techno-Economic Analysis of Alternative Maintenance Strategies. Journal of Construction Engineering and Management, 140(03).

Chan, A P C, Nwaogu, J M and Naslund, J A (2020) Mental Ill-Health Risk Factors in the Construction Industry: Systematic Review. Journal of Construction Engineering and Management, 146(03).

Chan, E H and Au, M C (2009) Factors Influencing Building Contractors’ Pricing for Time-Related Risks in Tenders. Journal of Construction Engineering and Management, 135(03), 135–45.

Chang, L and Chen, P (2001) BOT Financial Model: Taiwan High Speed Rail Case. Journal of Construction Engineering and Management, 127(03), 214–22.

Chang, L, Hancher, D E, Napier, T R and Kapolnek, R G (1988) Methods to Identify and Assess New Building Technology. Journal of Construction Engineering and Management, 114(03), 408–25.

Chao, L and Chien, C (2009) Estimating Project S-Curves Using Polynomial Function and Neural Networks. Journal of Construction Engineering and Management, 135(03), 169–77.

Charlie, W A, Osman, M A and Ali, E M (1984) Construction on Expansive Soils in Sudan. Journal of Construction Engineering and Management, 110(03), 359–74.

Chegu Badrinath, A and Hsieh, S (2019) Empirical Approach to Identify Operational Critical Success Factors for BIM Projects. Journal of Construction Engineering and Management, 145(03).

Cherkos, F D and Jha, K N (2021) Drivers of Road Sector Public-Private Partnership Adoption in New and Inexperienced Markets. Journal of Construction Engineering and Management, 147(03).

Chi, S and Caldas, C H (2012) Image-Based Safety Assessment: Automated Spatial Safety Risk Identification of Earthmoving and Surface Mining Activities. Journal of Construction Engineering and Management, 138(03), 341–51.

Chiang, Y H, Zhou, L, Li, J, Lam, P T I and Wong, K W (2014) Achieving Sustainable Building Maintenance through Optimizing Life-Cycle Carbon, Cost, and Labor: Case in Hong Kong. Journal of Construction Engineering and Management, 140(03).

Chiang, Y, Wong, F K and Liang, S (2018) Fatal Construction Accidents in Hong Kong. Journal of Construction Engineering and Management, 144(03).

Cho, Y, Kabassi, K, Pyeon, J, Choi, K, Wang, C and Norton, T (2013) Effectiveness Study of Methods for Removing Temporary Pavement Markings in Roadway Construction Zones. Journal of Construction Engineering and Management, 139(03), 257–66.

Choi, K, Kwak, Y H, Pyeon, J and Son, K (2012) Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects. Journal of Construction Engineering and Management, 138(03), 323–30.

Choi, K, Lee, H W, Bae, J and Bilbo, D (2016) Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions. Journal of Construction Engineering and Management, 142(03).

Choo, H J, Tommelein, I D, Ballard, G and Zabelle, T R (1999) WorkPlan: Constraint-Based Database for Work Package Scheduling. Journal of Construction Engineering and Management, 125(03), 151–60.

Christini, G, Fetsko, M and Hendrickson, C (2004) Environmental Management Systems and ISO 14001 Certification for Construction Firms. Journal of Construction Engineering and Management, 130(03), 330–6.

Chua, D K H and Li, G M (2002) RISim: Resource-Interacted Simulation Modeling in Construction. Journal of Construction Engineering and Management, 128(03), 195–202.

Chua, D K H, Kog, Y C and Loh, P K (1999) Critical Success Factors for Different Project Objectives. Journal of Construction Engineering and Management, 125(03), 142–50.

Chua, D K H, Kog, Y C, Loh, P K and Jaselskis, E J (1997) Model for Construction Budget Performance—Neural Network Approach. Journal of Construction Engineering and Management, 123(03), 214–22.

Chua, D K H, Shen, L J and Bok, S H (2003) Constraint-Based Planning with Integrated Production Scheduler over Internet. Journal of Construction Engineering and Management, 129(03), 293–301.

Chung, B, Skibniewski, M J and Kwak, Y H (2009) Developing ERP Systems Success Model for the Construction Industry. Journal of Construction Engineering and Management, 135(03), 207–16.

Cirilovic, J, Vajdic, N, Mladenovic, G and Queiroz, C (2014) Developing Cost Estimation Models for Road Rehabilitation and Reconstruction: Case Study of Projects in Europe and Central Asia. Journal of Construction Engineering and Management, 140(03).

Cohenca‐Zall, D, Laufer, A, Shapira, A and Howell, G A (1994) Process of Planning during Construction. Journal of Construction Engineering and Management, 120(03), 561–78.

Collinge, W (2020) Stakeholder Engagement in Construction: Exploring Corporate Social Responsibility, Ethical Behaviors, and Practices. Journal of Construction Engineering and Management, 146(03).

Committee on Construction Equipment and Techniques (1991) Trenchless Excavation Construction Methods: Classification and Evaluation. Journal of Construction Engineering and Management, 117(03), 521–36.

Comu, S, Iorio, J, Taylor, J E and Dossick, C S (2013) Quantifying the Impact of Facilitation on Transactive Memory System Formation in Global Virtual Project Networks. Journal of Construction Engineering and Management, 139(03), 294–303.

Cox, R F, Issa, R R A and Koblegard, K (2005) Management’s Perception of Key Behavioral Indicators for Construction. Journal of Construction Engineering and Management, 131(03), 368–76.

Cruz, C O, Marques, R C and Pereira, I (2015) Alternative Contractual Arrangements for Urban Light Rail Systems: Lessons from Two Case Studies. Journal of Construction Engineering and Management, 141(03).

Dabke, S, Salem, O, Genaidy, A and Daraiseh, N (2008) Job Satisfaction of Women in Construction Trades. Journal of Construction Engineering and Management, 134(03), 205–16.

Dai, J, Goodrum, P M and Maloney, W F (2009) Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity. Journal of Construction Engineering and Management, 135(03), 217–26.

Darwish, M, Elsayed, A Y and Nassar, K (2018) Design and Constructability of a Novel Funicular Arched Steel Truss Falsework. Journal of Construction Engineering and Management, 144(03).

Davis, K, Ledbetter, W B and Burati, J L (1989) Measuring Design and Construction Quality Costs. Journal of Construction Engineering and Management, 115(03), 385–400.

De La Garza, J M and Mitropoulos, P (1992) Flavors and Mixins of Expert Systems Technology Transfer Model for AEC Industry. Journal of Construction Engineering and Management, 118(03), 435–53.

Dias Barkokebas, R and Li, X (2021) Use of Virtual Reality to Assess the Ergonomic Risk of Industrialized Construction Tasks. Journal of Construction Engineering and Management, 147(03).

Diekmann, J E (1983) Probabilistic Estimating: Mathematics and Applications. Journal of Construction Engineering and Management, 109(03), 297–308.

Diekmann, J E and Kraiem, Z (1988) Explanation of Construction Engineering Knowledge in Expert Systems. Journal of Construction Engineering and Management, 114(03), 364–89.

Doan, P and Menyah, K (2013) Impact of Irreversibility and Uncertainty on the Timing of Infrastructure Projects. Journal of Construction Engineering and Management, 139(03), 331–8.

Doloi, H (2013) Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects. Journal of Construction Engineering and Management, 139(03), 267–79.

Dossick, C S and Sakagami, M (2008) Implementing Web-Based Project Management Systems in the United States and Japan. Journal of Construction Engineering and Management, 134(03), 189–96.

Duerr, D (1991) Transportation of Shippingport Reactor Pressure Vessel. Journal of Construction Engineering and Management, 117(03), 551–64.

Duff, A R (1987) Interference in Stochastic Flow‐line Models. Journal of Construction Engineering and Management, 113(03), 385–98.

Dutta, A, Breloff, S P, Dai, F, Sinsel, E W, Warren, C M and Wu, J Z (2020) Identifying Potentially Risky Phases Leading to Knee Musculoskeletal Disorders during Shingle Installation Operations. Journal of Construction Engineering and Management, 146(03).

Dzeng, R and Tommelein, I D (1997) Boiler Erection Scheduling Using Product Models and Case-Based Reasoning. Journal of Construction Engineering and Management, 123(03), 338–47.

Easa, S M and Can, E K (1985) Optimization Model for Aggregate Blending. Journal of Construction Engineering and Management, 111(03), 216–30.

El Sayed, A Y, Darwish, M and Nassar, K (2021) Design and Constructability of Novel Extendable Arched Steel Truss Falsework. Journal of Construction Engineering and Management, 147(03).

El Wardani, M A, Messner, J I and Horman, M J (2006) Comparing Procurement Methods for Design-Build Projects. Journal of Construction Engineering and Management, 132(03), 230–8.

El-adaway, I H and Kandil, A A (2010) Multiagent System for Construction Dispute Resolution (MAS-COR). Journal of Construction Engineering and Management, 136(03), 303–15.

El-Bibany, H (1997) Parametric Constraint Management in Planning and Scheduling: Computational Basis. Journal of Construction Engineering and Management, 123(03), 348–53.

El-Diraby, T E (2006) Web-Services Environment for Collaborative Management of Product Life-Cycle Costs. Journal of Construction Engineering and Management, 132(03), 300–13.

El-Gohary, N M and El-Diraby, T E (2010) Dynamic Knowledge-Based Process Integration Portal for Collaborative Construction. Journal of Construction Engineering and Management, 136(03), 316–28.

El-Rayes, K (2001) Object-Oriented Model for Repetitive Construction Scheduling. Journal of Construction Engineering and Management, 127(03), 199–205.

El-Razek, M E A and Basha, I M (2001) Constructability Improvement of Bridges Using Stepping Formwork. Journal of Construction Engineering and Management, 127(03), 206–13.

El‐Itr, Z and Kangari, R (1994) Minority Contractors: Framework for New Policy Development. Journal of Construction Engineering and Management, 120(03), 632–48.

Elazouni, A M and Metwally, F G (2000) D-SUB: Decision Support System for Subcontracting Construction Works. Journal of Construction Engineering and Management, 126(03), 191–200.

Eldin, N and Hikle, V (2003) Pilot Study of Quality Function Deployment in Construction Projects. Journal of Construction Engineering and Management, 129(03), 314–29.

Eldin, N N (1997) Concurrent Engineering: A Schedule Reduction Tool. Journal of Construction Engineering and Management, 123(03), 354–62.

Eldin, N N (1989) Measurement of Work Progress: Quantitative Technique. Journal of Construction Engineering and Management, 115(03), 462–74.

Eldin, N N and Senouci, A B (1992) Use of Scrap Tires in Road Construction. Journal of Construction Engineering and Management, 118(03), 561–76.

Ellis, R D and Lee, S (2006) Measuring Project Level Productivity on Transportation Projects. Journal of Construction Engineering and Management, 132(03), 314–20.

Eskins, W A (1998) CONSTRUCTION OF THE NEW COLEMAN BRIDGE: FIFTH ROEBLING LECTURE, 1997. Journal of Construction Engineering and Management, 124(03), 173–5.

Everett, J G and Farghal, S (1994) Learning Curve Predictors for Construction Field Operations. Journal of Construction Engineering and Management, 120(03), 603–16.

Everett, J G and Yang, I (1997) Workers' Comp. Premiums: Disparities in Penalties for Identical Losses. Journal of Construction Engineering and Management, 123(03), 312–7.

Everett, J G, Halkali, H and Schlaff, T G (1998) Time-Lapse Video Applications for Construction Project Management. Journal of Construction Engineering and Management, 124(03), 204–9.

Fan, S (2014) Intellectual Property Rights in Building Information Modeling Application in Taiwan. Journal of Construction Engineering and Management, 140(03).

Fang, D P, Huang, X Y and Hinze, J (2004) Benchmarking Studies on Construction Safety Management in China. Journal of Construction Engineering and Management, 130(03), 424–32.

Farahani, A, Wallbaum, H and Dalenbäck, J (2020) Cost-Optimal Maintenance and Renovation Planning in Multifamily Buildings with Annual Budget Constraints. Journal of Construction Engineering and Management, 146(03).

Farnsworth, C B, Warr, R O, Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC Project Delivery on Managing Process Risk in Transportation Construction. Journal of Construction Engineering and Management, 142(03).

Fente, J, Schexnayder, C and Knutson, K (2000) Defining a Probability Distribution Function for Construction Simulation. Journal of Construction Engineering and Management, 126(03), 234–41.

Fischer, M and Tatum, C B (1997) Characteristics of Design-Relevant Constructability Knowledge. Journal of Construction Engineering and Management, 123(03), 253–60.

Fisher, D J and O'Connor, J T (1991) Constructability for Piping Automation: Field Operations. Journal of Construction Engineering and Management, 117(03), 468–85.

Fondahl, J W (1991) The Development of the Construction Engineer: Past Progress and Future Problems. Journal of Construction Engineering and Management, 117(03), 380–92.

Franz, B and Roberts, B A M (2022) Thematic Analysis of Successful and Unsuccessful Project Delivery Teams in the Building Construction Industry. Journal of Construction Engineering and Management, 148(03).

Freire, J and Alarcón, L F (2002) Achieving Lean Design Process: Improvement Methodology. Journal of Construction Engineering and Management, 128(03), 248–56.

Friedrich, D R, Daly, J P and Dick, W G (1987) Revisions, Repairs, and Rework on Large Projects. Journal of Construction Engineering and Management, 113(03), 488–500.

Frutos, J D and Borenstein, D (2003) Object-Oriented Model for Customer-Building Company Interaction in Mass Customization Environment. Journal of Construction Engineering and Management, 129(03), 302–13.

Gao, T, Ergan, S, Akinci, B and Garrett, J H (2014) Proactive Productivity Management at Job Sites: Understanding Characteristics of Assumptions Made for Construction Processes during Planning Based on Case Studies and Interviews. Journal of Construction Engineering and Management, 140(03).

Gao, Y, González, V A and Yiu, T W (2020) Exploring the Relationship between Construction Workers’ Personality Traits and Safety Behavior. Journal of Construction Engineering and Management, 146(03).

Gavilan, R M and Bernold, L E (1994) Source Evaluation of Solid Waste in Building Construction. Journal of Construction Engineering and Management, 120(03), 536–52.

Gibson, G E, Kaczmarowski, J H and Lore, H E (1995) Preproject-Planning Process for Capital Facilities. Journal of Construction Engineering and Management, 121(03), 312–8.

Gibson, G E, McGinnis, C I, Flanigan, W S and Wood, J E (1996) Constructability in Public Sector . Journal of Construction Engineering and Management, 122(03), 274–80.

Gilly, B A, Touran, A and Asai, T (1987) Quality Control Circles in Construction. Journal of Construction Engineering and Management, 113(03), 427–39.

Girmscheid, G and Brockmann, C (2010) Inter- and Intraorganizational Trust in International Construction Joint Ventures. Journal of Construction Engineering and Management, 136(03), 353–60.

Gonzalez‐Quevedo, A A, AbouRizk, S M, Iseley, D T and Halpin, D W (1993) Comparison of Two Simulation Methodologies in Construction. Journal of Construction Engineering and Management, 119(03), 573–89.

Gransberg, D D (1996) Optimizing Haul Unit Size and Number Based on Loading Facility Characteristics . Journal of Construction Engineering and Management, 122(03), 248–53.

Gransberg, D D, Dillon, W D, Reynolds, L and Boyd, J (1999) Quantitative Analysis of Partnered Project Performance. Journal of Construction Engineering and Management, 125(03), 161–6.

Gransberg, D D, Karaca, I and Senadheera, S (2004) Calculating Roller Requirements for Chip Seal Projects. Journal of Construction Engineering and Management, 130(03), 378–84.

Gugel, J G and Russell, J S (1994) Model for Constructability Approach Selection. Journal of Construction Engineering and Management, 120(03), 509–21.

Gunduz, M and Elsherbeny, H A (2020) Operational Framework for Managing Construction-Contract Administration Practitioners’ Perspective through Modified Delphi Method. Journal of Construction Engineering and Management, 146(03).

Gunhan, S and Arditi, D (2005) Factors Affecting International Construction. Journal of Construction Engineering and Management, 131(03), 273–82.

Gurmu, A T and Ongkowijoyo, C S (2020) Predicting Construction Labor Productivity Based on Implementation Levels of Human Resource Management Practices. Journal of Construction Engineering and Management, 146(03).

Hadavi, A and Krizek, R J (1993) Short‐Term Goal Setting for Construction. Journal of Construction Engineering and Management, 119(03), 622–30.

Hagerty, D J, Schmitt, N G and Vandevelde, G T (1988) Shot‐Rock Fill Construction: Case History. Journal of Construction Engineering and Management, 114(03), 489–502.

Haj Seiyed Taghia, S A, Darvishvand, H R and Ebrahimi, M (2020) Economic Analyses for Low-Strength Concrete Wrapped with CFRP to Improve the Mechanical Properties and Seismic Parameters. Journal of Construction Engineering and Management, 146(03).

Halpin, D W (1993) Process‐Based Research to Meet the International Challenge. Journal of Construction Engineering and Management, 119(03), 415–25.

Halpin, D W, Paulson, B C, Schub, A and Willenbrock, J H (1987) Construction Education and Research in Central Europe. Journal of Construction Engineering and Management, 113(03), 468–79.

Hamledari, H, Sajedi, S, McCabe, B and Fischer, M (2021) Automation of Inspection Mission Planning Using 4D BIMs and in Support of Unmanned Aerial Vehicle–Based Data Collection. Journal of Construction Engineering and Management, 147(03).

Hampson, K and Fischer, M (1997) Structural Designs and Construction Technologies for California Highway Bridges. Journal of Construction Engineering and Management, 123(03), 269–75.

Han, S H, Diekmann, J E and Ock, J H (2005) Contractor’s Risk Attitudes in the Selection of International Construction Projects. Journal of Construction Engineering and Management, 131(03), 283–92.

Han, S H, Diekmann, J E, Lee, Y and Ock, J H (2004) Multicriteria Financial Portfolio Risk Management for International Projects. Journal of Construction Engineering and Management, 130(03), 346–56.

Hancher, D E, Garza, J M d l and Eckert, G K (1997) Improving Workers' Compensation Management in Construction. Journal of Construction Engineering and Management, 123(03), 285–91.

Handa, V K and Barcia, R M (1986) Linear Scheduling Using Optimal Control Theory. Journal of Construction Engineering and Management, 112(03), 387–93.

Hanna, A S (2012) Using the Earned Value Management System to Improve Electrical Project Control. Journal of Construction Engineering and Management, 138(03), 449–57.

Hanna, A S, Chang, C, Sullivan, K T and Lackney, J A (2008) Impact of Shift Work on Labor Productivity for Labor Intensive Contractor. Journal of Construction Engineering and Management, 134(03), 197–204.

Hanna, A S, Russell, J S, Gotzion, T W and Nordheim, E V (1999) Impact of Change Orders on Labor Efficiency for Mechanical Construction. Journal of Construction Engineering and Management, 125(03), 176–84.

Harris, R B (1992) A Challenge for Research. Journal of Construction Engineering and Management, 118(03), 422–34.

Hartman, F and Snelgrove, P (1996) Risk Allocation in Lump-Sum Contracts—Concept of Latent Dispute . Journal of Construction Engineering and Management, 122(03), 291–6.

Hassanein, A and Melin, J (1997) Crew Design Methodology for Construction Contractors. Journal of Construction Engineering and Management, 123(03), 203–7.

Hastak, M, Halpin, D W and Vanegas, J (1996) COMPASS—New Paradigm for Project Cost Control Strategy and Planning . Journal of Construction Engineering and Management, 122(03), 254–64.

Hegazy, T (1999) Optimization of Resource Allocation and Leveling Using Genetic Algorithms. Journal of Construction Engineering and Management, 125(03), 167–75.

Hegazy, T and Ayed, A (1998) Neural Network Model for Parametric Cost Estimation of Highway Projects. Journal of Construction Engineering and Management, 124(03), 210–8.

Hegazy, T and Wassef, N (2001) Cost Optimization in Projects with Repetitive Nonserial Activities. Journal of Construction Engineering and Management, 127(03), 183–91.

Herbsman, Z (1986) SERC—A Model for Estimating Construction Inputs. Journal of Construction Engineering and Management, 112(03), 425–39.

Herbsman, Z J, Tong Chen, W and Epstein, W C (1995) Time Is Money: Innovative Contracting Methods in Highway Construction. Journal of Construction Engineering and Management, 121(03), 273–81.

Hester, W T, Kuprenas, J A and H. Randolph, T (1987) Arbitration: A Look at its Form and Performance. Journal of Construction Engineering and Management, 113(03), 353–67.

Hicks, J C (1993) Haul‐Unit Performance. Journal of Construction Engineering and Management, 119(03), 646–53.

Hicks, J C (1992) Heavy Construction Estimates, with and without Computers. Journal of Construction Engineering and Management, 118(03), 545–60.

Hinze, J and Appelgate, L L (1991) Costs of Construction Injuries. Journal of Construction Engineering and Management, 117(03), 537–50.

Hinze, J, Devenport, J N and Giang, G (2006) Analysis of Construction Worker Injuries That Do Not Result in Lost Time. Journal of Construction Engineering and Management, 132(03), 321–6.

Hiyassat, M A S (2001) Applying Modified Minimum Moment Method to Multiple Resource Leveling. Journal of Construction Engineering and Management, 127(03), 192–8.

Ho Song, M and Fischer, M (2020) Empirical Determination of the Smallest Batch Sizes for Daily Planning. Journal of Construction Engineering and Management, 146(03).

Hornaday, W C, Haas, C T, O'Connor, J T and Wen, J (1993) Computer‐Aided Planning for Heavy Lifts. Journal of Construction Engineering and Management, 119(03), 498–515.

Huang, X and Bernold, L E (1997) CAD-Integrated Excavation and Pipe Laying. Journal of Construction Engineering and Management, 123(03), 318–23.

Huang, X and Hinze, J (2003) Analysis of Construction Worker Fall Accidents. Journal of Construction Engineering and Management, 129(03), 262–71.

Hughes, P J, O'Connor, J T and Traver, A E (1989) Pipe Manipulator Enhancements for Increased Automation. Journal of Construction Engineering and Management, 115(03), 412–23.

Huo, T, Ren, H, Cai, W, Shen, G Q, Liu, B, Zhu, M and Wu, H (2018) Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong. Journal of Construction Engineering and Management, 144(03).

Hwang, B, Thomas, S R, Haas, C T and Caldas, C H (2009) Measuring the Impact of Rework on Construction Cost Performance. Journal of Construction Engineering and Management, 135(03), 187–98.

Hwang, S, Park, M, Lee, H, Lee, S and Kim, H (2015) Postdisaster Interdependent Built Environment Recovery Efforts and the Effects of Governmental Plans: Case Analysis Using System Dynamics. Journal of Construction Engineering and Management, 141(03).

Ibbs, C W (1997) Quantitative Impacts of Project Change: Size Issues. Journal of Construction Engineering and Management, 123(03), 308–11.

Ioannou, P G (1989) Evaluation of Subsurface Exploration Programs. Journal of Construction Engineering and Management, 115(03), 339–56.

Ioannou, P G (2022) Risk-Sensitive Competitive Bidding Model and Impact of Risk Aversion and Cost Uncertainty on Optimum Bid. Journal of Construction Engineering and Management, 148(03).

Ioannou, P G and Martinez, J C (1996) Comparison of Construction Alternatives Using Matched Simulation Experiments . Journal of Construction Engineering and Management, 122(03), 231–41.

Isidore, L J and Back, W E (2002) Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration. Journal of Construction Engineering and Management, 128(03), 211–9.

Jaafari, A and Mateffy, V K (1990) Realistic Model for Equipment Replacement. Journal of Construction Engineering and Management, 116(03), 514–32.

Jackson, J T (1990) Technical Specifications' Effect on Construction. Journal of Construction Engineering and Management, 116(03), 463–7.

Jafarzadeh, R, Wilkinson, S, González, V, Ingham, J M and Amiri, G G (2014) Predicting Seismic Retrofit Construction Cost for Buildings with Framed Structures Using Multilinear Regression Analysis. Journal of Construction Engineering and Management, 140(03).

Jahren, C T and Ashe, A M (1990) Predictors of Cost‐Overrun Rates. Journal of Construction Engineering and Management, 116(03), 548–52.

Jain, K K and Bhattacharjee, B (2012) Application of Fuzzy Concepts to the Visual Assessment of Deteriorating Reinforced Concrete Structures. Journal of Construction Engineering and Management, 138(03), 399–408.

Jang, W, Yu, G, Jung, W, Kim, D and Han, S H (2018) Financial Conflict Resolution for Public-Private Partnership Projects Using a Three-Phase Game Framework. Journal of Construction Engineering and Management, 144(03).

Jarrah, R, Kulkarni, D and O’Connor, J T (2007) Cash Flow Projections for Selected TxDoT Highway Projects. Journal of Construction Engineering and Management, 133(03), 235–41.

Jaselskis, E J and Talukhaba, A (1998) Bidding Considerations in Developing Countries. Journal of Construction Engineering and Management, 124(03), 185–93.

Jaselskis, E J, Gao, Z and Walters, R C (2005) Improving Transportation Projects Using Laser Scanning. Journal of Construction Engineering and Management, 131(03), 377–84.

Jergeas, G F and Hartman, F T (1994) Contractors' Construction‐Claims Avoidance. Journal of Construction Engineering and Management, 120(03), 553–60.

Ji, Y and Leite, F (2020) Optimized Planning Approach for Multiple Tower Cranes and Material Supply Points Using Mixed-Integer Programming. Journal of Construction Engineering and Management, 146(03).

Johnston, D W, Kahn, K P and Phillips, J B (1989) Formwork Pressures in Tall and Thick Concrete Walls. Journal of Construction Engineering and Management, 115(03), 444–61.

Kagan, H A, Leary, D J and Pratter, G E K (1986) Design Engineers' Responsibilities During Construction. Journal of Construction Engineering and Management, 112(03), 394–402.

Kaiser, M J (2006) Offshore Decommissioning Cost Estimation in the Gulf of Mexico. Journal of Construction Engineering and Management, 132(03), 249–58.

Kale, S and Arditi, D (2002) Competitive Positioning in United States Construction Industry. Journal of Construction Engineering and Management, 128(03), 238–47.

Kale, S and Arditi, D (2010) Innovation Diffusion Modeling in the Construction Industry. Journal of Construction Engineering and Management, 136(03), 329–40.

Kalu, T C U (1990) New Approach to Construction Management. Journal of Construction Engineering and Management, 116(03), 494–513.

Kam, C, Song, M H and Senaratna, D (2017) {[}VDC Scorecard{]}: Formulation, Application, and Validation. Journal of Construction Engineering and Management, 143(03).

Kangari, R and Bakheet, M (2001) Construction Surety Bonding. Journal of Construction Engineering and Management, 127(03), 232–8.

Kangari, R, Pruitt, J D and Cheema, T S (1988) Slipforming IBM Tower. Journal of Construction Engineering and Management, 114(03), 472–88.

Kannan, G and Vorster, M (2000) Development of an Experience Database for Truck Loading Operations. Journal of Construction Engineering and Management, 126(03), 201–9.

Kar, S and Jha, K N (2021) Investigation into Lead Time of Construction Materials and Influencing Factors. Journal of Construction Engineering and Management, 147(03).

Karaa, F A and Nasr, A Y (1986) Resource Management in Construction. Journal of Construction Engineering and Management, 112(03), 346–57.

Karaftath, L L (1988) Rolling Resistance of Off‐Road Vehicles. Journal of Construction Engineering and Management, 114(03), 458–71.

Karan, E P, Sivakumar, R, Irizarry, J and Guhathakurta, S (2014) Digital Modeling of Construction Site Terrain Using Remotely Sensed Data and Geographic Information Systems Analyses. Journal of Construction Engineering and Management, 140(03).

Karshenas, S (1997) Strength Variability of Conventional Slab Formwork Systems. Journal of Construction Engineering and Management, 123(03), 324–30.

Katsuragawa, C M, Lucko, G, Isaac, S and Su, Y (2021) Fuzzy Linear and Repetitive Scheduling for Construction Projects. Journal of Construction Engineering and Management, 147(03).

Kavanagh, D P (1985) Siren: A Repetitive Construction Simulation Model. Journal of Construction Engineering and Management, 111(03), 308–23.

Kelley, M N (1991) Ft. Drum Estimating and Bidding from Contractor's Point of View. Journal of Construction Engineering and Management, 117(03), 565–71.

Kim, B and Reinschmidt, K F (2009) Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution. Journal of Construction Engineering and Management, 135(03), 178–86.

Kim, B, Lee, H, Park, H and Kim, H (2013) Estimation of Greenhouse Gas Emissions from Land-Use Changes due to Road Construction in the Republic of Korea. Journal of Construction Engineering and Management, 139(03), 339–46.

Kim, B, Lim, H, Kim, H and Hong, T (2012) Determining the Value of Governmental Subsidies for the Installation of Clean Energy Systems Using Real Options. Journal of Construction Engineering and Management, 138(03), 422–30.

Kim, K and Cho, Y K (2021) Automatic Recognition of Workers’ Motions in Highway Construction by Using Motion Sensors and Long Short-Term Memory Networks. Journal of Construction Engineering and Management, 147(03).

Kim, K and de la Garza, J M (2005) Critical Path Method with Multiple Calendars. Journal of Construction Engineering and Management, 131(03), 330–42.

Kim, T and Chi, S (2019) Accident Case Retrieval and Analyses: Using Natural Language Processing in the Construction Industry. Journal of Construction Engineering and Management, 145(03).

Kisi, K P, Mani, N, Rojas, E M and Foster, E T (2017) Optimal Productivity in Labor-Intensive Construction Operations: Pilot Study. Journal of Construction Engineering and Management, 143(03).

Kittinaraporn, W, Tuprakay, S and Prasittisopin, L (2022) Effective Modeling for Construction Activities of Recycled Aggregate Concrete Using Artificial Neural Network. Journal of Construction Engineering and Management, 148(03).

Klanšek, U (2016) Mixed-Integer Nonlinear Programming Model for Nonlinear Discrete Optimization of Project Schedules under Restricted Costs. Journal of Construction Engineering and Management, 142(03).

Koehn, E &, Kothari, R K and Pan, C (1995) Safety in Developing Countries: Professional and Bureaucratic Problems. Journal of Construction Engineering and Management, 121(03), 261–5.

Koehn, E and Manuel, J (1988) Variation in Work Improvement Potential for Small/Medium Contractors. Journal of Construction Engineering and Management, 114(03), 505–9.

Konon, W and Schuring, J R (1985) Vibration Criteria for Historic Buildings. Journal of Construction Engineering and Management, 111(03), 208–15.

Laborde, M and Sanvido, V (1994) Introducing New Process Technologies into Construction Companies. Journal of Construction Engineering and Management, 120(03), 488–508.

Laefer, D F and Manke, J P (2008) Building Reuse Assessment for Sustainable Urban Reconstruction. Journal of Construction Engineering and Management, 134(03), 217–27.

Laufer, A, Shapira, A, Cohenca‐Zall, D and Howell, G A (1993) Prebid and Preconstruction Planning Process. Journal of Construction Engineering and Management, 119(03), 426–44.

Laurent, J and Leicht, R M (2019) Practices for Designing Cross-Functional Teams for Integrated Project Delivery. Journal of Construction Engineering and Management, 145(03).

Lee, C, Chong, H, Li, Q and Wang, X (2020) Joint Contract–Function Effects on BIM-Enabled EPC Project Performance. Journal of Construction Engineering and Management, 146(03).

Lee, D (2005) Probability of Project Completion Using Stochastic Project Scheduling Simulation. Journal of Construction Engineering and Management, 131(03), 310–8.

Lee, D and Arditi, D (2006) Automated Statistical Analysis in Stochastic Project Scheduling Simulation. Journal of Construction Engineering and Management, 132(03), 268–77.

Lee, D, Lim, T and Arditi, D (2012) Stochastic Project Financing Analysis System for Construction. Journal of Construction Engineering and Management, 138(03), 376–89.

Lee, K, Han, S H, Park, H and David Jeong, H (2016) Empirical Analysis of Host-Country Effects in the International Construction Market: An Industry-Level Approach. Journal of Construction Engineering and Management, 142(03).

Lee, S and Yu, J (2016) Comparative Study of BIM Acceptance between Korea and the United States. Journal of Construction Engineering and Management, 142(03).

Lee, Y Y R, Samad, H and Miang Goh, Y (2020) Perceived Importance of Authentic Learning Factors in Designing Construction Safety Simulation Game-Based Assignment: Random Forest Approach. Journal of Construction Engineering and Management, 146(03).

Leung, M, Yu, J and Chan, Y S (2014) Focus Group Study to Explore Critical Factors of Public Engagement Process for Mega Development Projects. Journal of Construction Engineering and Management, 140(03).

Levitt, R E, Kartam, N A and Kunz, J C (1988) Artificial Intelligence Techniques for Generating Construction Project Plans. Journal of Construction Engineering and Management, 114(03), 329–43.

Li, F, Phoon, K K, Du, X and Zhang, M (2013) Improved AHP Method and Its Application in Risk Identification. Journal of Construction Engineering and Management, 139(03), 312–20.

Li, H and Love, P (1997) Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization. Journal of Construction Engineering and Management, 123(03), 233–7.

Li, H, Shen, L Y and Love, P E D (1999) ANN-Based Mark-Up Estimation System with Self-Explanatory Capacities. Journal of Construction Engineering and Management, 125(03), 185–9.

Li, T H Y, Thomas Ng, S and Skitmore, M (2016) Modeling Multi-Stakeholder Multi-Objective Decisions during Public Participation in Major Infrastructure and Construction Projects: A Decision Rule Approach. Journal of Construction Engineering and Management, 142(03).

Li, Y, Wang, X and Wang, Y (2017) Using Bargaining Game Theory for Risk Allocation of Public-Private Partnership Projects: Insights from Different Alternating Offer Sequences of Participants. Journal of Construction Engineering and Management, 143(03).

Liao, P, Shi, H, Su, Y and Luo, X (2018) Development of Data-Driven Influence Model to Relate the Workplace Environment to Human Error. Journal of Construction Engineering and Management, 144(03).

Lijauco, F, Gajendran, T, Brewer, G and Rasoolimanesh, S M (2020) Impacts of Culture on Innovation Propensity in Small to Medium Enterprises in Construction. Journal of Construction Engineering and Management, 146(03).

Lim, B T H, Ling, F Y Y, Ibbs, C W, Raphael, B and Ofori, G (2011) Empirical Analysis of the Determinants of Organizational Flexibility in the Construction Business. Journal of Construction Engineering and Management, 137(03), 225–37.

Lim, B T H, Ling, F Y Y, Ibbs, C W, Raphael, B and Ofori, G (2012) Mathematical Models for Predicting Organizational Flexibility of Construction Firms in Singapore. Journal of Construction Engineering and Management, 138(03), 361–75.

Lin, C and Huang, H (2010) Improved Baseline Productivity Analysis Technique. Journal of Construction Engineering and Management, 136(03), 367–76.

Lin, K and Haas, C T (1996) An Interactive Planning Environment for Critical Operations . Journal of Construction Engineering and Management, 122(03), 212–22.

Lin, Y and Ho, S P (2013) Impacts of Governance Structure Strategies on the Performance of Construction Joint Ventures. Journal of Construction Engineering and Management, 139(03), 304–11.

Lindhard, S M, Hamzeh, F, Gonzalez, V A, Wandahl, S and Ussing, L F (2019) Impact of Activity Sequencing on Reducing Variability. Journal of Construction Engineering and Management, 145(03).

Liu, C and Lu, M (2015) Optimizing Earthmoving Job Planning Based on Evaluation of Temporary Haul Road Networks Design for Mass Earthworks Projects. Journal of Construction Engineering and Management, 141(03).

Liu, Y, Jarvamardi, A, Zhang, Y, Liu, M, Hsiang, S M, Yang, S, Yu, X and Jiang, Z (2021) Comparative Study on Perception of Causes for Construction Task Delay in China and the United States. Journal of Construction Engineering and Management, 147(03).

Louis, J and Dunston, P S (2017) Methodology for Real-Time Monitoring of Construction Operations Using Finite State Machines and Discrete-Event Operation Models. Journal of Construction Engineering and Management, 143(03).

Love, P E D, Edwards, D J, Irani, Z and Sharif, A (2012) Participatory Action Research Approach to Public Sector Procurement Selection. Journal of Construction Engineering and Management, 138(03), 311–22.

Love, P E D, Edwards, D J, Watson, H and Davis, P (2010) Rework in Civil Infrastructure Projects: Determination of Cost Predictors. Journal of Construction Engineering and Management, 136(03), 275–82.

Love, P E D, Wang, X, Sing, C and Tiong, R L K (2013) Determining the Probability of Project Cost Overruns. Journal of Construction Engineering and Management, 139(03), 321–30.

Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT Simulation Model. Journal of Construction Engineering and Management, 126(03), 219–26.

Lu, W, Liu, A M M, Rowlinson, S and Poon, S W (2013) Sharpening Competitive Edge through Procurement Innovation: Perspectives from Chinese International Construction Companies. Journal of Construction Engineering and Management, 139(03), 347–51.

Lyu, H, Sun, W, Shen, S and Zhou, A (2020) Risk Assessment Using a New Consulting Process in Fuzzy AHP. Journal of Construction Engineering and Management, 146(03).

Ma, G, Jia, J, Ding, J, Wu, M and Wang, D (2021) Examining the Impact of Social Media Use on Project Management Performance: Evidence from Construction Projects in China. Journal of Construction Engineering and Management, 147(03).

Mahdavian, A, Shojaei, A, Salem, M, Yuan, J S and Oloufa, A A (2021) Data-Driven Predictive Modeling of Highway Construction Cost Items. Journal of Construction Engineering and Management, 147(03).

Mahoney, J J and Tatum, C B (1994) Construction Site Applications of CAD. Journal of Construction Engineering and Management, 120(03), 617–31.

Mallon, J C and Mulligan, D E (1993) Quality Function Deployment—A System for Meeting Customers' Needs. Journal of Construction Engineering and Management, 119(03), 516–31.

Malone, E K and Issa, R R (2014) Predictive Models for Work-Life Balance and Organizational Commitment of Women in the U.S. Construction Industry. Journal of Construction Engineering and Management, 140(03).

Maloney, W F (1990) Framework for Analysis of Performance. Journal of Construction Engineering and Management, 116(03), 399–415.

Maloney, W F (1983) Productivity Improvement: The Influence of Labor. Journal of Construction Engineering and Management, 109(03), 321–34.

Maloney, W F and McFillen, J M (1987) Influence of Foremen on Performance. Journal of Construction Engineering and Management, 113(03), 399–415.

Maloney, W F and McFillen, J M (1987) Worker Perceptions of Contractor Behavior. Journal of Construction Engineering and Management, 113(03), 416–26.

Manrique, J D, Al-Hussein, M, Bouferguene, A, Safouhi, H and Nasseri, R (2011) Combinatorial Algorithm for Optimizing Wood Waste in Framing Designs. Journal of Construction Engineering and Management, 137(03), 188–97.

Manrique, J D, Al-Hussein, M, Telyas, A and Funston, G (2007) Case Study-Based Challenges of Quality Concrete Finishing for Architecturally Complex Structures. Journal of Construction Engineering and Management, 133(03), 208–16.

Manrique, J D, Al-Hussein, M, Telyas, A and Funston, G (2007) Constructing a Complex Precast Tilt-Up-Panel Structure Utilizing an Optimization Model, 3D CAD, and Animation. Journal of Construction Engineering and Management, 133(03), 199–207.

Mansouri, S, Castronovo, F and Akhavian, R (2020) Analysis of the Synergistic Effect of Data Analytics and Technology Trends in the AEC/FM Industry. Journal of Construction Engineering and Management, 146(03).

Mattar, S G (1983) Segmental Post‐Tensioned Dolphin at Tagrin Point. Journal of Construction Engineering and Management, 109(03), 276–85.

Mattila, K G and Abraham, D M (1998) Resource Leveling of Linear Schedules Using Integer Linear Programming. Journal of Construction Engineering and Management, 124(03), 232–44.

McCahill, D F and Bernold, L E (1993) Resource‐Oriented Modeling and Simulation in Construction. Journal of Construction Engineering and Management, 119(03), 590–606.

McGartland, M R and Hendrickson, C T (1985) Expert Systems for Construction Project Monitoring. Journal of Construction Engineering and Management, 111(03), 293–307.

Menassa, C C, Mora, F P and Pearson, N (2009) Option Pricing Model to Analyze Cost–Benefit Trade-Offs of ADR Investments in AEC Projects. Journal of Construction Engineering and Management, 135(03), 156–68.

Menassa, C, Peña Mora, F and Pearson, N (2010) Study of Real Options with Exogenous Competitive Entry to Analyze Dispute Resolution Ladder Investments in Architecture, Engineering, and Construction Projects. Journal of Construction Engineering and Management, 136(03), 377–90.

Meng, X (2002) Guarantees for Contractor’s Performance and Owner’s Payment in China. Journal of Construction Engineering and Management, 128(03), 232–7.

Minchin, R E, Henriquez, N R, King, A M and Lewis, D W (2010) Owners Respond: Preferences for Task Performance, Delivery Systems, and Quality Management. Journal of Construction Engineering and Management, 136(03), 283–93.

Mitropoulos, P and Howell, G (2001) Model for Understanding, Preventing, and Resolving Project Disputes. Journal of Construction Engineering and Management, 127(03), 223–31.

Molenaar, K R (2005) Programmatic Cost Risk Analysis for Highway Megaprojects. Journal of Construction Engineering and Management, 131(03), 343–53.

Monzer, N, Fayek, A R, Lourenzutti, R and Siraj, N B (2019) Aggregation-Based Framework for Construction Risk Assessment with Heterogeneous Groups of Experts. Journal of Construction Engineering and Management, 145(03).

Moon, S, Choi, E and Hong, S (2016) Creation of Robust Design Alternatives for Temporary Construction in Value Engineering. Journal of Construction Engineering and Management, 142(03).

Moselhi, O, Assem, I and El-Rayes, K (2005) Change Orders Impact on Labor Productivity. Journal of Construction Engineering and Management, 131(03), 354–9.

Moselhi, O, Hegazy, T and Fazio, P (1993) DBID: Analogy‐Based DSS for Bidding in Construction. Journal of Construction Engineering and Management, 119(03), 466–79.

Moua, B and Russell, J S (2001) Comparison of Two Maintainability Programs. Journal of Construction Engineering and Management, 127(03), 239–44.

Moussourakis, J and Haksever, C (2004) Flexible Model for Time/Cost Tradeoff Problem. Journal of Construction Engineering and Management, 130(03), 307–14.

Naderpajouh, N, Hastak, M, Gokhale, S, Bayraktar, M E, Iyer, A and Arif, F (2015) Counterfeiting Risk Governance in the Capital Projects Supply Chain. Journal of Construction Engineering and Management, 141(03).

Nam, C H and Tatum, C B (1992) Government‐Industry Cooperation: Fast‐Track Concrete Innovation. Journal of Construction Engineering and Management, 118(03), 454–71.

Nam, C H and Tatum, C B (1992) Strategies for Technology Push: Lessons from Construction Innovations. Journal of Construction Engineering and Management, 118(03), 507–24.

Naouin, S G and Langford, D (1987) Management Contracting—The Client's View. Journal of Construction Engineering and Management, 113(03), 369–84.

Naresh, A L and Jahren, C T (1997) Communications and Tracking for Construction Vehicles. Journal of Construction Engineering and Management, 123(03), 261–8.

Nguyen, L H (2019) Relationships between Critical Factors Related to Team Behaviors and Client Satisfaction in Construction Project Organizations. Journal of Construction Engineering and Management, 145(03).

Nguyen, V U (1985) Tender Evaluation by Fuzzy Sets. Journal of Construction Engineering and Management, 111(03), 231–43.

Nima, M A, Abdul-Kadir, M R, Jaafar, M S and Alghulami, R G (2004) Constructability Concepts in Kuala Selangor Cable-Stayed Bridge in Malaysia. Journal of Construction Engineering and Management, 130(03), 315–21.

Niu, Y, Lu, W, Liu, D, Chen, K, Anumba, C and Huang, G G (2017) An SCO-Enabled Logistics and Supply Chain–Management System in Construction. Journal of Construction Engineering and Management, 143(03).

O’Connor, J T and Yang, L (2004) Project Performance versus Use of Technologies at Project and Phase Levels. Journal of Construction Engineering and Management, 130(03), 322–9.

O’Connor, J T, Shrestha, B K, Winkler, M and Ouk Choi, J (2021) Relationship between Commissioning and Start-Up Success Factors Achievement and Performance in Capital Projects. Journal of Construction Engineering and Management, 147(03).

Oberlender, G D and Trost, S M (2001) Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. Journal of Construction Engineering and Management, 127(03), 173–82.

Obiozo, R N and Smallwood, J J (2015) Biophilic Construction Site Model: Enhancing the Motivational and Humanistic Value of the Green Construction Site. Journal of Construction Engineering and Management, 141(03).

Osman, H M and El-Diraby, T E (2011) Knowledge-Enabled Decision Support System for Routing Urban Utilities. Journal of Construction Engineering and Management, 137(03), 198–213.

Oviedo-Haito, R J, Jiménez, J, Cardoso, F F and Pellicer, E (2014) Survival Factors for Subcontractors in Economic Downturns. Journal of Construction Engineering and Management, 140(03).

Owers, R and Weber, S L (1997) Strategic Plan for Southwest Indian Community's Construction Business. Journal of Construction Engineering and Management, 123(03), 331–7.

Pau, S H, Chau, K W and Wong, W G (1993) Prospects for No‐Dig Technology in Hong Kong Construction Industry. Journal of Construction Engineering and Management, 119(03), 550–9.

Paulson, B C (1985) Automation and Robotics for Construction. Journal of Construction Engineering and Management, 111(03), 190–207.

Pawan, P and Lorterapong, P (2016) A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects. Journal of Construction Engineering and Management, 142(03).

Peng, J (2004) Structural Modeling and Design Considerations for Double-Layer Shoring Systems. Journal of Construction Engineering and Management, 130(03), 368–77.

Pheng, L S and Pong, C Y (2003) Integrating ISO 9001 and OHSAS 18001 for Construction. Journal of Construction Engineering and Management, 129(03), 338–47.

Pietroforte, R and Stefani, T P (2004) ASCE Journal of Construction Engineering and Management: Review of the Years 1983–2000. Journal of Construction Engineering and Management, 130(03), 440–8.

Polat, G (2008) Factors Affecting the Use of Precast Concrete Systems in the United States. Journal of Construction Engineering and Management, 134(03), 169–78.

Powderham, A J and Tamaro, G J (1995) Mansion House London: Risk Assessment and Protection. Journal of Construction Engineering and Management, 121(03), 266–72.

Price, A D F and Shawa, H (1997) Survey of Project Related Finance in United Arab Emirates. Journal of Construction Engineering and Management, 123(03), 223–32.

Puddicombe, M S (1997) Designers and Contractors: Impediments to Integration. Journal of Construction Engineering and Management, 123(03), 245–52.

Rasdorf, W J and Abudayyeh, O Y (1991) Cost‐ and Schedule‐Control Integration: Issues and Needs. Journal of Construction Engineering and Management, 117(03), 486–502.

Raymond, A J, Kendall, A, DeJong, J T, Kavazanjian, E, Woolley, M A and Martin, K K (2021) Life Cycle Sustainability Assessment of Fugitive Dust Control Methods. Journal of Construction Engineering and Management, 147(03).

Recarte Suazo, G A and Jaselskis, E J (1993) Comparison of Construction Safety Codes in United States and Honduras. Journal of Construction Engineering and Management, 119(03), 560–72.

Reda, R and Carr, R I (1989) Time‐Cost Trade‐Off Among Related Activities. Journal of Construction Engineering and Management, 115(03), 475–86.

Rekapalli, P V and Martinez, J C (2011) Discrete-Event Simulation-Based Virtual Reality Environments for Construction Operations: Technology Introduction. Journal of Construction Engineering and Management, 137(03), 214–24.

Reyna, S M, Vanegas, J A and Khan, A H (1994) Construction Technologies for Sewer Rehabilitation. Journal of Construction Engineering and Management, 120(03), 467–87.

Rogge, D F and Tucker, R L (1987) Research Needs in Steel and Concrete Construction. Journal of Construction Engineering and Management, 113(03), 440–6.

Rojas, E M and Mukherjee, A (2005) General-Purpose Situational Simulation Environment for Construction Education. Journal of Construction Engineering and Management, 131(03), 319–29.

Rosenfeld, Y, Navon, R and Cohen, L (1998) Methodology for Prioritizing Cost-Effective Construction Technologies. Journal of Construction Engineering and Management, 124(03), 176–84.

Russell, J S and Jaselskis, E J (1992) Quantitative Study of Contractor Evaluation Programs and Their Impact. Journal of Construction Engineering and Management, 118(03), 612–24.

Russell, J S, Skibniewski, M J and Vanegas, J A (1990) Framework for Construction Robot Fleet Management System. Journal of Construction Engineering and Management, 116(03), 448–62.

Rutherford, A W (1989) Organizational Evolution I‐595 Port Everglades Expressway. Journal of Construction Engineering and Management, 115(03), 357–69.

Samuels, A F and Bruder, M J (1996) Construction Representative: Scheduling and Cost Management . Journal of Construction Engineering and Management, 122(03), 281–90.

Sarisley, E F (1990) Construction Methods and Costs of Stress‐Laminated Timber Bridges. Journal of Construction Engineering and Management, 116(03), 432–47.

Sawhney, A and AbouRizk, S M (1995) HSM-Simulation–Based Planning Method for Construction Projects. Journal of Construction Engineering and Management, 121(03), 297–303.

Sawhney, A and Mund, A (2002) Adaptive Probabilistic Neural Network-based Crane Type Selection System. Journal of Construction Engineering and Management, 128(03), 265–73.

Schnabel, J J and Martin, R E (1983) Parking Garage Supported on Structural Fill. Journal of Construction Engineering and Management, 109(03), 286–96.

Schubert, F N (1991) U.S. Army Corps of Engineers and Afghanistan's Highways 1960–1967. Journal of Construction Engineering and Management, 117(03), 445–59.

Scott, S (1997) Delay Claims in U.K. Contracts. Journal of Construction Engineering and Management, 123(03), 238–44.

Seibert, J E and Evans, G W (1991) Time‐Constrained Resource Leveling. Journal of Construction Engineering and Management, 117(03), 503–20.

Selinger, S (1983) Payment Timing as a Factor in Bid Evaluation. Journal of Construction Engineering and Management, 109(03), 335–41.

Seo, J, Haas, C T, Saidi, K and Sreenivasan, S V (2000) Graphical Control Interface for Construction and Maintenance Equipment. Journal of Construction Engineering and Management, 126(03), 210–8.

Seo, S, Aramaki, T, Hwang, Y and Hanaki, K (2004) Fuzzy Decision-Making Tool for Environmental Sustainable Buildings. Journal of Construction Engineering and Management, 130(03), 415–23.

Seydel, J (2003) Evaluating and Comparing Bidding Optimization Effectiveness. Journal of Construction Engineering and Management, 129(03), 285–92.

Shahin, A, AbouRizk, S M and Mohamed, Y (2011) Modeling Weather-Sensitive Construction Activity Using Simulation. Journal of Construction Engineering and Management, 137(03), 238–46.

Shaked, O and Warszawski, A (1992) CONSCHED: Expert System for Scheduling of Modular Construction Projects. Journal of Construction Engineering and Management, 118(03), 488–506.

Shanmuganayagam, V (1989) Current Float Techniques for Resources Scheduling. Journal of Construction Engineering and Management, 115(03), 401–11.

Shapira, A (1995) Rational Design of Shoring-Tower–Based Formwork. Journal of Construction Engineering and Management, 121(03), 255–60.

Shapira, A and Raz, Y (2005) Comparative Analysis of Shoring Towers for High-Clearance Construction. Journal of Construction Engineering and Management, 131(03), 293–301.

Sharma, H, McIntyre, C, Gao, Z and Nguyen, T (2009) Developing a Traffic Closure Integrated Linear Schedule for Highway Rehabilitation Projects. Journal of Construction Engineering and Management, 135(03), 146–55.

Shash, A A (1998) Bidding Practices of Subcontractors in Colorado. Journal of Construction Engineering and Management, 124(03), 219–25.

Shen, L Y, Li, Q M, Drew, D and Shen, Q P (2004) Awarding Construction Contracts on Multicriteria Basis in China. Journal of Construction Engineering and Management, 130(03), 385–93.

Shen, L, Drew, D and Zhang, Z (1999) Optimal Bid Model for Price-Time Biparameter Construction Contracts. Journal of Construction Engineering and Management, 125(03), 204–9.

Shiha, A, Dorra, E M and Nassar, K (2020) Neural Networks Model for Prediction of Construction Material Prices in Egypt Using Macroeconomic Indicators. Journal of Construction Engineering and Management, 146(03).

Shirowzhan, S, Sepasgozar, S M E and Trinder, J (2021) Developing Metrics for Quantifying Buildings’ 3D Compactness and Visualizing Point Cloud Data on a Web-Based App and Dashboard. Journal of Construction Engineering and Management, 147(03).

Shohet, I M and Laufer, A (1996) Exterior Cladding Methods: A Technoeconomic Analysis . Journal of Construction Engineering and Management, 122(03), 242–7.

Shrestha, P and Behzadan, A H (2018) Chaos Theory–Inspired Evolutionary Method to Refine Imperfect Sensor Data for Data-Driven Construction Simulation. Journal of Construction Engineering and Management, 144(03).

Shrestha, P P and Fernane, J D (2017) Performance of Design-Build and Design-Bid-Build Projects for Public Universities. Journal of Construction Engineering and Management, 143(03).

Shuster, W D, Burkman, C E, Grosshans, J, Dadio, S and Losco, R (2015) Green Residential Demolitions: Case Study of Vacant Land Reuse in Storm Water Management in Cleveland. Journal of Construction Engineering and Management, 141(03).

Singh, P, Oh, J E, Labi, S and Sinha, K C (2007) Cost-Effectiveness Evaluation of Warranty Pavement Projects. Journal of Construction Engineering and Management, 133(03), 217–24.

Skibniewski, M J and Chao, L (1992) Evaluation of Advanced Construction Technology with AHP Method. Journal of Construction Engineering and Management, 118(03), 577–93.

Slaughter, E S (1993) Builders as Sources of Construction Innovation. Journal of Construction Engineering and Management, 119(03), 532–49.

Slaughter, E S (1998) Models of Construction Innovation. Journal of Construction Engineering and Management, 124(03), 226–31.

Smith, S D (1999) Earthmoving Productivity Estimation Using Linear Regression Techniques. Journal of Construction Engineering and Management, 125(03), 133–41.

Soetanto, R, Dainty, A R, Glass, J and Price, A D (2006) Empirical Evaluation of Structural Frame Performance Criteria: Realizing the Potential of Hybrid Concrete Construction. Journal of Construction Engineering and Management, 132(03), 278–90.

Son, J, Mattila, K G and Myers, D S (2005) Determination of Haul Distance and Direction in Mass Excavation. Journal of Construction Engineering and Management, 131(03), 302–9.

Song, L and AbouRizk, S M (2005) Quantifying Engineering Project Scope for Productivity Modeling. Journal of Construction Engineering and Management, 131(03), 360–7.

Songer, A D, Diekmann, J, Hendrickson, W and Flushing, D (2000) Situational Reengineering: Case Study Analysis. Journal of Construction Engineering and Management, 126(03), 185–90.

Sonmez, R, Iranagh, M A and Uysal, F (2016) Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time–Cost Trade-Off Problem. Journal of Construction Engineering and Management, 142(03).

Staab, G E (1987) Inspection Checklist for Sheet Pile Construction. Journal of Construction Engineering and Management, 113(03), 525–8.

Stager, D K (1996) Organizing and Managing a Finance-Design-Build Project in Turkey: Fourth Roebling Lecture, 1995 . Journal of Construction Engineering and Management, 122(03), 199–204.

Stanton, W A and Willenbrock, J H (1990) Conceptual Framework for Computer‐Based, Construction Safety Control. Journal of Construction Engineering and Management, 116(03), 383–98.

Stewart, W S and Tatum, C B (1988) Segmental Placement of Renton Outfall: Construction Innovation. Journal of Construction Engineering and Management, 114(03), 390–407.

Stukhart, G and Cook, E L (1990) Bar‐Code Standardization in Industrial Construction. Journal of Construction Engineering and Management, 116(03), 416–31.

Sturts Dossick, C and Schunk, T K (2007) Subcontractor Schedule Control Method. Journal of Construction Engineering and Management, 133(03), 262–5.

Su, Y and Lucko, G (2015) Synthetic Cash Flow Model with Singularity Functions. I: Theory for Periodic Phenomena and Time Value of Money. Journal of Construction Engineering and Management, 141(03).

Su, Y and Lucko, G (2015) Synthetic Cash Flow Model with Singularity Functions. II: Feasible Prompt Payment Discount Scenarios. Journal of Construction Engineering and Management, 141(03).

Su, Z, Wei, H, Zou, X and Qi, J (2019) Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. Journal of Construction Engineering and Management, 145(03).

Subramanyan, H, Sawant, P H and Bhatt, V (2012) Construction Project Risk Assessment: Development of Model Based on Investigation of Opinion of Construction Project Experts from India. Journal of Construction Engineering and Management, 138(03), 409–21.

Suhail, S A and Neale, R H (1994) CPM/LOB: New Methodology to Integrate CPM and Line of Balance. Journal of Construction Engineering and Management, 120(03), 667–84.

Sun, C and Xu, J (2011) Estimation of Time for Wenchuan Earthquake Reconstruction in China. Journal of Construction Engineering and Management, 137(03), 179–87.

Swiggum, K E, Anderson, S D and Russell, J S (1994) Case Study of Burlington Cable‐Stayed Bridge. Journal of Construction Engineering and Management, 120(03), 649–66.

Tam, C M, Tong, T K L, Leung, A W T and Chiu, G W C (2002) Site Layout Planning using Nonstructural Fuzzy Decision Support System. Journal of Construction Engineering and Management, 128(03), 220–31.

Tan, Y, Shen, L and Langston, C (2012) Competition Environment, Strategy, and Performance in the Hong Kong Construction Industry. Journal of Construction Engineering and Management, 138(03), 352–60.

Tang, W, Duffield, C F and Young, D M (2006) Partnering Mechanism in Construction: An Empirical Study on the Chinese Construction Industry. Journal of Construction Engineering and Management, 132(03), 217–29.

Tatum, C B (1988) Classification System for Construction Technology. Journal of Construction Engineering and Management, 114(03), 344–63.

Tatum, C B (1984) Organizing Large Projects: How Managers Decide. Journal of Construction Engineering and Management, 110(03), 346–58.

Tatum, C B (1984) What Prompts Construction Innovation?. Journal of Construction Engineering and Management, 110(03), 311–23.

Tatum, C B ( (2018) Construction Engineering Research: Integration and Innovation. Journal of Construction Engineering and Management, 144(03).

Tatum, C B ( (2018) Learning Construction Engineering: Why, What, and How?. Journal of Construction Engineering and Management, 144(03).

Thomas, H R (1991) Labor Productivity and Work Sampling: The Bottom Line. Journal of Construction Engineering and Management, 117(03), 423–44.

Thomas, H R and Bluedorn, A C (1986) Case Study of Organizational Changes. Journal of Construction Engineering and Management, 112(03), 358–69.

Thomas, H R and Daily, J (1983) Crew Performance Measurement Via Activity Sampling. Journal of Construction Engineering and Management, 109(03), 309–20.

Thomas, H R and Napolitan, C L (1995) Quantitative Effects of Construction Changes on Labor Productivity. Journal of Construction Engineering and Management, 121(03), 290–6.

Thomas, H R, Horman, M J, Minchin, R E and Chen, D (2003) Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle. Journal of Construction Engineering and Management, 129(03), 251–61.

Thomas, H R, Sanvido, V E and Sanders, S R (1989) Impact of Material Management on Productivity—A Case Study. Journal of Construction Engineering and Management, 115(03), 370–84.

Thomas, H R, Smith, G R and Ponderlick, R M (1992) Resolving Contract Disputes Based on Misrepresentations. Journal of Construction Engineering and Management, 118(03), 472–87.

Thomas, M U (2010) Models for Managing Contingency Construction Operations. Journal of Construction Engineering and Management, 136(03), 391–8.

Tiong, R L K (1995) Competitive Advantage of Equity in BOT Tender. Journal of Construction Engineering and Management, 121(03), 282–9.

Tiong, R L K (1996) CSFs in Competitive Tendering and Negotiation Model for BOT Projects . Journal of Construction Engineering and Management, 122(03), 205–11.

Tiong, R L K (1995) Impact of Financial Package versus Technical Solution in a BOT Tender. Journal of Construction Engineering and Management, 121(03), 304–11.

Tischer, T E and Kuprenas, J A (2003) Bridge Falsework Productivity—Measurement and Influences. Journal of Construction Engineering and Management, 129(03), 243–50.

Tomlinson, D P and Rhomberg, E J (1988) Contract Officer in Military Service Contracts. Journal of Construction Engineering and Management, 114(03), 441–57.

Tommelein, I D, Levitt, R E and Hayes‐Roth, B (1992) Site‐Layout Modeling: How Can Artificial Intelligence Help?. Journal of Construction Engineering and Management, 118(03), 594–611.

Toole, T M (2002) Construction Site Safety Roles. Journal of Construction Engineering and Management, 128(03), 203–10.

Toor, S and Ofori, G (2010) Positive Psychological Capital as a Source of Sustainable Competitive Advantage for Organizations. Journal of Construction Engineering and Management, 136(03), 341–52.

Torbica, Z M and Stroh, R C (1999) Impact of Total Quality Management on Home-Buyer Satisfaction. Journal of Construction Engineering and Management, 125(03), 198–203.

Touran, A (1990) Integration of Simulation with Expert Systems. Journal of Construction Engineering and Management, 116(03), 480–93.

Touran, A (2010) Probabilistic Approach for Budgeting in Portfolio of Projects. Journal of Construction Engineering and Management, 136(03), 361–6.

Touran, A (2003) Probabilistic Model for Cost Contingency. Journal of Construction Engineering and Management, 129(03), 280–4.

Touran, A and Suphot, L (1997) Rank Correlations In Simulating Construction Costs. Journal of Construction Engineering and Management, 123(03), 297–301.

Townsend, K, Lingard, H, Bradley, L and Brown, K (2012) Complicated Working Time Arrangements: Construction Industry Case Study. Journal of Construction Engineering and Management, 138(03), 443–8.

Tsimberdonis, A I and Murphree, E L (1994) Equipment Management through Operational Failure Costs. Journal of Construction Engineering and Management, 120(03), 522–35.

Umer, W, Yu, Y and Antwi Afari, M F (2022) Quantifying the Effect of Mental Stress on Physical Stress for Construction Tasks. Journal of Construction Engineering and Management, 148(03).

van Buiten, M and Hartmann, A (2015) Asset Management Perspective on the Duration of Public-Private Partnership Contracts: Cost-Control Trade-off?. Journal of Construction Engineering and Management, 141(03).

Votto, R, Lee Ho, L and Berssaneti, F (2020) Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring. Journal of Construction Engineering and Management, 146(03).

W. L., S, Rybel, V W and Cochran, L (1986) Dewatering for Opal Springs Powerhouse Excavation. Journal of Construction Engineering and Management, 112(03), 440–51.

Walker, K K, Schexnayder, C, Mayo, R E and Walsh, K D (1996) Methods and Procedural Considerations in Demolishing Tall Concrete Chimneys . Journal of Construction Engineering and Management, 122(03), 223–30.

Walsh, K D, Sawhney, A and Bashford, H H (2007) Production Equations for Unsteady-State Construction Processes. Journal of Construction Engineering and Management, 133(03), 254–61.

Wang, Q, Guo, Z, Mintah, K, Li, Q, Mei, T and Li, P (2019) Cell-Based Transport Path Obstruction Detection Approach for 4D BIM Construction Planning. Journal of Construction Engineering and Management, 145(03).

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (2000) Evaluation and Management of Political Risks in China's BOT Projects. Journal of Construction Engineering and Management, 126(03), 242–50.

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (1999) Political Risks: Analysis of Key Contract Clauses in China's BOT Project. Journal of Construction Engineering and Management, 125(03), 190–7.

Wang, W (2004) Electronic-Based Procedure for Managing Unbalanced Bids. Journal of Construction Engineering and Management, 130(03), 455–60.

Warszawski, A (1984) Construction Management Program. Journal of Construction Engineering and Management, 110(03), 297–310.

Warszawski, A (1983) Planning and Organization of Research in Building. Journal of Construction Engineering and Management, 109(03), 261–75.

Warszawski, A and Navon, R (1991) Robot for Interior‐Finishing Works. Journal of Construction Engineering and Management, 117(03), 402–22.

Warszawski, A and Sacks, R (2004) Practical Multifactor Approach to Evaluating Risk of Investment in Engineering Projects. Journal of Construction Engineering and Management, 130(03), 357–67.

Warszawski, A and Sangrey, D A (1985) Robotics in Building Construction. Journal of Construction Engineering and Management, 111(03), 260–80.

Wibby, R J (1985) Portland Cement Concrete Thin‐Bonded Overlay. Journal of Construction Engineering and Management, 111(03), 281–92.

Wibowo, A (2006) CAPM-Based Valuation of Financial Government Supports to Infeasible and Risky Private Infrastructure Projects. Journal of Construction Engineering and Management, 132(03), 239–48.

Wilkinson, R W (1984) Computerized Specifications on a Small Project. Journal of Construction Engineering and Management, 110(03), 337–45.

William C., I (1986) Future Directions for Computerized Construction Research. Journal of Construction Engineering and Management, 112(03), 326–45.

Williams, G C and Haston, J S (1984) Construction Materials Engineer, a Perspective. Journal of Construction Engineering and Management, 110(03), 387–9.

Williams, T P (1991) Hypertext Data Base Applications in Construction. Journal of Construction Engineering and Management, 117(03), 460–7.

Wilmot, C G and Cheng, G (2003) Estimating Future Highway Construction Costs. Journal of Construction Engineering and Management, 129(03), 272–9.

Wong, T K and Logcher, R D (1986) Contractors in Cyclical Economic Environments. Journal of Construction Engineering and Management, 112(03), 310–25.

Woolery, J C (1994) Developing Specifications for Cellular‐Telephone Base Stations. Journal of Construction Engineering and Management, 120(03), 593–602.

Woolery, J C and Crandall, K C (1983) Stochastic Network Model for Planning Scheduling. Journal of Construction Engineering and Management, 109(03), 342–54.

Yang, Y, Park, C, Kim, J and Kim, J (2007) Management of Daily Progress in a Construction Project of Multiple Apartment Buildings. Journal of Construction Engineering and Management, 133(03), 242–53.

Ye, S and Tiong, R L K (2000) NPV-at-Risk Method in Infrastructure Project Investment Evaluation. Journal of Construction Engineering and Management, 126(03), 227–33.

Yi, K J, Lee, H and Choi, Y K (2002) Network Creation and Development for Repetitive-Unit Projects. Journal of Construction Engineering and Management, 128(03), 257–64.

Yiu, T W and Lee, H K (2011) How Do Personality Traits Affect Construction Dispute Negotiation? Study of Big Five Personality Model. Journal of Construction Engineering and Management, 137(03), 169–78.

Yiu, T W, Cheung, S O and Siu, L Y (2012) Application of Bandura’s Self-Efficacy Theory to Examining the Choice of Tactics in Construction Dispute Negotiation. Journal of Construction Engineering and Management, 138(03), 331–40.

Yoon, S, Weidner, T and Hastak, M (2021) Total-Package-Prioritization Mitigation Strategy for Deferred Maintenance of a Campus-Sized Institution. Journal of Construction Engineering and Management, 147(03).

Yoon, Y, Patel, S, Ji, R and Hastak, M (2017) Current State of Reflective Cracking in the United States. Journal of Construction Engineering and Management, 143(03).

Zack, J G (1993) “Claimsmanship”: Current Perspective. Journal of Construction Engineering and Management, 119(03), 480–97.

Zayed, T M and Halpin, D W (2004) Quantitative Assessment for Piles Productivity Factors. Journal of Construction Engineering and Management, 130(03), 405–14.

Zayed, T M and Halpin, D W (2004) Simulation as a Tool for Pile Productivity Assessment. Journal of Construction Engineering and Management, 130(03), 394–404.

Zayed, T, Sharifi, M R, Baciu, S and Amer, M (2008) Slip-Form Application to Concrete Structures. Journal of Construction Engineering and Management, 134(03), 157–68.

Zhang, H and Lin, Y (2023) Prediction of Ergonomic Risks and Impacts on Construction Schedule through Agent-Based Simulation. Journal of Construction Engineering and Management, 149(03).

Zhang, H, Li, H and Tam, C M (2006) Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints. Journal of Construction Engineering and Management, 132(03), 259–67.

Zhang, H, Yan, X, Li, H, Jin, R and Fu, H (2019) Real-Time Alarming, Monitoring, and Locating for Non-Hard-Hat Use in Construction. Journal of Construction Engineering and Management, 145(03).

Zhang, L and El-Gohary, N M (2016) Epistemology-Based Context-Aware Semantic Model for Sustainable Construction Practices. Journal of Construction Engineering and Management, 142(03).

Zhang, L, Cheng, J and Fan, W (2016) Party Selection for Integrated Project Delivery Based on Interorganizational Transactive Memory System. Journal of Construction Engineering and Management, 142(03).

Zhang, P and Ng, F F (2013) Explaining Knowledge-Sharing Intention in Construction Teams in Hong Kong. Journal of Construction Engineering and Management, 139(03), 280–93.

Zhang, S, Jiang, P, Zhang, Z and Wang, C (2021) WebGIS-Based Collaborative Construction Quality Control of RCC Gravity Dam Using Sensing Devices. Journal of Construction Engineering and Management, 147(03).

Zhao, X, Hwang, B, Pheng Low, S and Wu, P (2015) Reducing Hindrances to Enterprise Risk Management Implementation in Construction Firms. Journal of Construction Engineering and Management, 141(03).

Zhong, B, Wu, H, Xiang, R and Guo, J (2022) Automatic Information Extraction from Construction Quality Inspection Regulations: A Knowledge Pattern–Based Ontological Method. Journal of Construction Engineering and Management, 148(03).

Zuniga-Garcia, N, Machemehl, R B, Khwaja, N A, Pruner, K D and Fu, M (2021) Estimation of Road User Costs for Work Zones in Data-Limited or Time-Constrained Environments. Journal of Construction Engineering and Management, 147(03).