Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 465 results ...

Şentürk, H A and Yazici, G (2004) Case Study: Izmit Domestic and Industrial Water Supply Build–Operate–Transfer Project. Journal of Construction Engineering and Management, 130(03), 449–54.

Abdel-Razek, R H (1997) How Construction Managers Would Like Their Performance to Be Evaluated. Journal of Construction Engineering and Management, 123(03), 208–13.

Abdelrahman, M, Zayed, T and Elyamany, A (2008) Best-Value Model Based on Project Specific Characteristics. Journal of Construction Engineering and Management, 134(03), 179–88.

Abdollahipour, S, Jeong, D H S, Burman, R R and Gunsaulis, F (2012) Performance Assessment of On-Grade Horizontal Directional Drilling. Journal of Construction Engineering and Management, 138(03), 458–68.

AbouRizk, S M and Halpin, D W (1992) Statistical Properties of Construction Duration Data. Journal of Construction Engineering and Management, 118(03), 525–44.

Abu‐Hijleh, S F and Ibbs, C W (1989) Schedule‐Based Construction Incentives. Journal of Construction Engineering and Management, 115(03), 430–43.

Abudayyeh, O, Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of Trends in Construction Research: 1985–2002. Journal of Construction Engineering and Management, 130(03), 433–9.

Abudayyeh, O, Russell, J, Johnston, D and Rowings, J (2000) Construction Engineering and Management Undergraduate Education. Journal of Construction Engineering and Management, 126(03), 169–75.

Adami, V S, Verschoore, J R and Antunes Junior, J A V (2019) Effect of Relational Characteristics on Management of Wind Farm Interorganizational Construction Projects. Journal of Construction Engineering and Management, 145(03).

Agbulos, A, Mohamed, Y, Al-Hussein, M, AbouRizk, S and Roesch, J (2006) Application of Lean Concepts and Simulation Analysis to Improve Efficiency of Drainage Operations Maintenance Crews. Journal of Construction Engineering and Management, 132(03), 291–9.

Agyekum-Mensah, G, Reid, A and Temitope, T A (2020) Methodological Pluralism: Investigation into Construction Engineering and Management Research Methods. Journal of Construction Engineering and Management, 146(03).

Ahuja, H N and Aranachalam, V (1984) Risk Evaluation in Resource Allocation. Journal of Construction Engineering and Management, 110(03), 324–36.

Al Qady, M and Kandil, A (2010) Concept Relation Extraction from Construction Documents Using Natural Language Processing. Journal of Construction Engineering and Management, 136(03), 294–302.

Al-Bayati, A J, Abudayyeh, O, Fredericks, T and Butt, S E (2017) Reducing Fatality Rates of the Hispanic Workforce in the U.S. Construction Industry: Challenges and Strategies. Journal of Construction Engineering and Management, 143(03).

Al‐Bahar, J F and Crandall, K C (1990) Systematic Risk Management Approach for Construction Projects. Journal of Construction Engineering and Management, 116(03), 533–46.

Alarcón, L F and Ashley, D B (1996) Modeling Project Performance for Decision Making . Journal of Construction Engineering and Management, 122(03), 265–73.

Alhazmi, T and McCaffer, R (2000) Project Procurement System Selection Model. Journal of Construction Engineering and Management, 126(03), 176–84.

Alkass, S and Harris, F (1988) Expert System for Earthmoving Equipment Selection in Road Construction. Journal of Construction Engineering and Management, 114(03), 426–40.

Alkass, S, Aronian, A and Moselhi, O (1993) Computer‐Aided Equipment Selection for Transporting and Placing Concrete. Journal of Construction Engineering and Management, 119(03), 445–65.

Alruqi, W M and Hallowell, M R (2019) Critical Success Factors for Construction Safety: Review and Meta-Analysis of Safety Leading Indicators. Journal of Construction Engineering and Management, 145(03).

Amir, T (1986) Transient Response Analysis of a Dual Cycle System. Journal of Construction Engineering and Management, 112(03), 403–10.

Amirkhanian, S N, Burati, J L and Mirchandani, H C (1994) Effect of Testing Variability on Contractor Payment for Asphalt Pavements. Journal of Construction Engineering and Management, 120(03), 579–92.

Anand, K B and Ramamurthy, K (2003) Laboratory-Based Productivity Study on Alternative Masonry Systems. Journal of Construction Engineering and Management, 129(03), 237–42.

Anastasopoulos, P C, Labi, S, Bhargava, A and Mannering, F L (2012) Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays. Journal of Construction Engineering and Management, 138(03), 390–8.

Antunes, R, González, V A, Walsh, K, Rojas, O, O’Sullivan, M and Odeh, I (2018) Benchmarking Project-Driven Production in Construction Using Productivity Function: Capacity and Cycle Time. Journal of Construction Engineering and Management, 144(03).

Anvuur, A M and Kumaraswamy, M M (2007) Conceptual Model of Partnering and Alliancing. Journal of Construction Engineering and Management, 133(03), 225–34.

Arditi, D and Albulak, M Z (1986) Line‐of‐Balance Scheduling in Pavement Construction. Journal of Construction Engineering and Management, 112(03), 411–24.

Arditi, D and Gunaydin, H M (1998) Factors That Affect Process Quality in the Life Cycle of Building Projects. Journal of Construction Engineering and Management, 124(03), 194–203.

Arditi, D, Khisty, C J and Yasamis, F (1997) Incentive/Disincentive Provisions in Highway Contracts. Journal of Construction Engineering and Management, 123(03), 302–7.

Asgari, S, Afshar, A and Madani, K (2014) Cooperative Game Theoretic Framework for Joint Resource Management in Construction. Journal of Construction Engineering and Management, 140(03).

Ashley, D B and Bonner, J J (1987) Political Risks in International Construction. Journal of Construction Engineering and Management, 113(03), 447–67.

Atherinis, D, Bakowski, B, Velcek, M and Moon, S (2018) Developing and Laboratory Testing a Smart System for Automated Falsework Inspection in Construction. Journal of Construction Engineering and Management, 144(03).

Awolusi, I G and Marks, E D (2017) Safety Activity Analysis Framework to Evaluate Safety Performance in Construction. Journal of Construction Engineering and Management, 143(03).

Ayhan, B U and Tokdemir, O B (2020) Accident Analysis for Construction Safety Using Latent Class Clustering and Artificial Neural Networks. Journal of Construction Engineering and Management, 146(03).

Babar, S, Thaheem, M J and Ayub, B (2017) Estimated Cost at Completion: Integrating Risk into Earned Value Management. Journal of Construction Engineering and Management, 143(03).

Baccarini, D and Love, P E D (2014) Statistical Characteristics of Cost Contingency in Water Infrastructure Projects. Journal of Construction Engineering and Management, 140(03).

Barati, K, Shen, X, Li, N and Carmichael, D G (2022) Automatic Mass Estimation of Construction Vehicles by Modeling Operational and Engine Data. Journal of Construction Engineering and Management, 148(03).

Basha, I M and Gab‐Allah, A A (1991) Value Engineering in Egyptian Bridge Construction. Journal of Construction Engineering and Management, 117(03), 393–401.

Bashford, H H, Sawhney, A, Walsh, K D and Kot, K (2003) Implications of Even Flow Production Methodology for U.S. Housing Industry. Journal of Construction Engineering and Management, 129(03), 330–7.

Beavers, J E, Moore, J R and Schriver, W R (2009) Steel Erection Fatalities in the Construction Industry. Journal of Construction Engineering and Management, 135(03), 227–34.

Becerik-Gerber, B, Jazizadeh, F, Li, N and Calis, G (2012) Application Areas and Data Requirements for BIM-Enabled Facilities Management. Journal of Construction Engineering and Management, 138(03), 431–42.

Beliveau, Y, Dixit, S and Dal, T (1993) Dynamic Damping of Payload Motion for Cranes. Journal of Construction Engineering and Management, 119(03), 631–44.

Bernold, L E and Guler, N (1993) Analysis of Back Injuries in Construction. Journal of Construction Engineering and Management, 119(03), 607–21.

Bernold, L E, Lorenc, S J and Davis, M L (2001) Technological Intervention to Eliminate Back Injury Risks for Nailing. Journal of Construction Engineering and Management, 127(03), 245–50.

Bernold, L E, Lorenc, S J and Luces, E (1997) Intelligent Technology for Truck Crane Accident Prevention. Journal of Construction Engineering and Management, 123(03), 276–84.

Birrell, G S (1985) General Contractors' Management: How Subs Evaluate IT. Journal of Construction Engineering and Management, 111(03), 244–59.

Blacud, N A, Bogus, S M, Diekmann, J E and Molenaar, K R (2009) Sensitivity of Construction Activities under Design Uncertainty. Journal of Construction Engineering and Management, 135(03), 199–206.

Blakey, L H (1990) Bar Codes: Prescription for Precision, Performance, and Productivity. Journal of Construction Engineering and Management, 116(03), 468–79.

Blomberg, D, Cotellesso, P, Sitzabee, W and Thal, A E (2014) Discovery of Internal and External Factors Causing Military Construction Cost Premiums. Journal of Construction Engineering and Management, 140(03).

Borges, S K (1987) Roller‐Compacted Concrete Pavement: U.S. Air Force Decision Model. Journal of Construction Engineering and Management, 113(03), 480–7.

Bosserman, B E and Ford, M E (1984) Development of Computerized Specifications. Journal of Construction Engineering and Management, 110(03), 375–84.

Bossink, B A G (2004) Managing Drivers of Innovation in Construction Networks. Journal of Construction Engineering and Management, 130(03), 337–45.

Bowen, P and Zhang, R P (2020) Cross-Boundary Contact, Work-Family Conflict, Antecedents, and Consequences: Testing an Integrated Model for Construction Professionals. Journal of Construction Engineering and Management, 146(03).

Bowen, P, Edwards, P, Lingard, H and Cattell, K (2014) Predictive Modeling of Workplace Stress among Construction Professionals. Journal of Construction Engineering and Management, 140(03).

Bowen, P, Edwards, P, Lingard, H and Cattell, K (2014) Workplace Stress, Stress Effects, and Coping Mechanisms in the Construction Industry. Journal of Construction Engineering and Management, 140(03).

Bresnen, M J, Bryman, A E, Ford, J R, Beardsworth, A D and Keil, T E (1986) Leader Orientation of Construction Site Managers. Journal of Construction Engineering and Management, 112(03), 370–86.

Brosque, C, Skeie, G and Fischer, M (2021) Comparative Analysis of Manual and Robotic Concrete Drilling for Installation Hangers. Journal of Construction Engineering and Management, 147(03).

BuHamdan, S, Duncheva, T and Alwisy, A (2021) Developing a BIM and Simulation-Based Hazard Assessment and Visualization Framework for CLT Construction Design. Journal of Construction Engineering and Management, 147(03).

C. William, I and Ashley, D B (1987) Impact of Various Construction Contract Clauses. Journal of Construction Engineering and Management, 113(03), 501–21.

Carr, R I (1997) Engineering and Construction Management: Leadership and Opportunity. Journal of Construction Engineering and Management, 123(03), 292–6.

Carty, G J (1995) Construction . Journal of Construction Engineering and Management, 121(03), 319–28.

Castillo, T, Alarcón, L F and Salvatierra, J L (2018) Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects. Journal of Construction Engineering and Management, 144(03).

Chai, C, de Brito, J, Gaspar, P L and Silva, A (2014) Predicting the Service Life of Exterior Wall Painting: Techno-Economic Analysis of Alternative Maintenance Strategies. Journal of Construction Engineering and Management, 140(03).

Chan, A P C, Nwaogu, J M and Naslund, J A (2020) Mental Ill-Health Risk Factors in the Construction Industry: Systematic Review. Journal of Construction Engineering and Management, 146(03).

Chan, E H and Au, M C (2009) Factors Influencing Building Contractors’ Pricing for Time-Related Risks in Tenders. Journal of Construction Engineering and Management, 135(03), 135–45.

Chang, L and Chen, P (2001) BOT Financial Model: Taiwan High Speed Rail Case. Journal of Construction Engineering and Management, 127(03), 214–22.

Chang, L, Hancher, D E, Napier, T R and Kapolnek, R G (1988) Methods to Identify and Assess New Building Technology. Journal of Construction Engineering and Management, 114(03), 408–25.

Chao, L and Chien, C (2009) Estimating Project S-Curves Using Polynomial Function and Neural Networks. Journal of Construction Engineering and Management, 135(03), 169–77.

Charlie, W A, Osman, M A and Ali, E M (1984) Construction on Expansive Soils in Sudan. Journal of Construction Engineering and Management, 110(03), 359–74.

Chegu Badrinath, A and Hsieh, S (2019) Empirical Approach to Identify Operational Critical Success Factors for BIM Projects. Journal of Construction Engineering and Management, 145(03).

Cherkos, F D and Jha, K N (2021) Drivers of Road Sector Public-Private Partnership Adoption in New and Inexperienced Markets. Journal of Construction Engineering and Management, 147(03).

Chi, S and Caldas, C H (2012) Image-Based Safety Assessment: Automated Spatial Safety Risk Identification of Earthmoving and Surface Mining Activities. Journal of Construction Engineering and Management, 138(03), 341–51.

Chiang, Y H, Zhou, L, Li, J, Lam, P T I and Wong, K W (2014) Achieving Sustainable Building Maintenance through Optimizing Life-Cycle Carbon, Cost, and Labor: Case in Hong Kong. Journal of Construction Engineering and Management, 140(03).

Chiang, Y, Wong, F K and Liang, S (2018) Fatal Construction Accidents in Hong Kong. Journal of Construction Engineering and Management, 144(03).

Cho, Y, Kabassi, K, Pyeon, J, Choi, K, Wang, C and Norton, T (2013) Effectiveness Study of Methods for Removing Temporary Pavement Markings in Roadway Construction Zones. Journal of Construction Engineering and Management, 139(03), 257–66.

Choi, K, Kwak, Y H, Pyeon, J and Son, K (2012) Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects. Journal of Construction Engineering and Management, 138(03), 323–30.

Choi, K, Lee, H W, Bae, J and Bilbo, D (2016) Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions. Journal of Construction Engineering and Management, 142(03).

Choo, H J, Tommelein, I D, Ballard, G and Zabelle, T R (1999) WorkPlan: Constraint-Based Database for Work Package Scheduling. Journal of Construction Engineering and Management, 125(03), 151–60.

Christini, G, Fetsko, M and Hendrickson, C (2004) Environmental Management Systems and ISO 14001 Certification for Construction Firms. Journal of Construction Engineering and Management, 130(03), 330–6.

Chua, D K H and Li, G M (2002) RISim: Resource-Interacted Simulation Modeling in Construction. Journal of Construction Engineering and Management, 128(03), 195–202.

Chua, D K H, Kog, Y C and Loh, P K (1999) Critical Success Factors for Different Project Objectives. Journal of Construction Engineering and Management, 125(03), 142–50.

Chua, D K H, Kog, Y C, Loh, P K and Jaselskis, E J (1997) Model for Construction Budget Performance—Neural Network Approach. Journal of Construction Engineering and Management, 123(03), 214–22.

Chua, D K H, Shen, L J and Bok, S H (2003) Constraint-Based Planning with Integrated Production Scheduler over Internet. Journal of Construction Engineering and Management, 129(03), 293–301.

Chung, B, Skibniewski, M J and Kwak, Y H (2009) Developing ERP Systems Success Model for the Construction Industry. Journal of Construction Engineering and Management, 135(03), 207–16.

Cirilovic, J, Vajdic, N, Mladenovic, G and Queiroz, C (2014) Developing Cost Estimation Models for Road Rehabilitation and Reconstruction: Case Study of Projects in Europe and Central Asia. Journal of Construction Engineering and Management, 140(03).

Cohenca‐Zall, D, Laufer, A, Shapira, A and Howell, G A (1994) Process of Planning during Construction. Journal of Construction Engineering and Management, 120(03), 561–78.

Collinge, W (2020) Stakeholder Engagement in Construction: Exploring Corporate Social Responsibility, Ethical Behaviors, and Practices. Journal of Construction Engineering and Management, 146(03).

Committee on Construction Equipment and Techniques (1991) Trenchless Excavation Construction Methods: Classification and Evaluation. Journal of Construction Engineering and Management, 117(03), 521–36.

Comu, S, Iorio, J, Taylor, J E and Dossick, C S (2013) Quantifying the Impact of Facilitation on Transactive Memory System Formation in Global Virtual Project Networks. Journal of Construction Engineering and Management, 139(03), 294–303.

Cox, R F, Issa, R R A and Koblegard, K (2005) Management’s Perception of Key Behavioral Indicators for Construction. Journal of Construction Engineering and Management, 131(03), 368–76.

Cruz, C O, Marques, R C and Pereira, I (2015) Alternative Contractual Arrangements for Urban Light Rail Systems: Lessons from Two Case Studies. Journal of Construction Engineering and Management, 141(03).

Dabke, S, Salem, O, Genaidy, A and Daraiseh, N (2008) Job Satisfaction of Women in Construction Trades. Journal of Construction Engineering and Management, 134(03), 205–16.

Dai, J, Goodrum, P M and Maloney, W F (2009) Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity. Journal of Construction Engineering and Management, 135(03), 217–26.

Darwish, M, Elsayed, A Y and Nassar, K (2018) Design and Constructability of a Novel Funicular Arched Steel Truss Falsework. Journal of Construction Engineering and Management, 144(03).

Davis, K, Ledbetter, W B and Burati, J L (1989) Measuring Design and Construction Quality Costs. Journal of Construction Engineering and Management, 115(03), 385–400.

De La Garza, J M and Mitropoulos, P (1992) Flavors and Mixins of Expert Systems Technology Transfer Model for AEC Industry. Journal of Construction Engineering and Management, 118(03), 435–53.

Dias Barkokebas, R and Li, X (2021) Use of Virtual Reality to Assess the Ergonomic Risk of Industrialized Construction Tasks. Journal of Construction Engineering and Management, 147(03).

Diekmann, J E (1983) Probabilistic Estimating: Mathematics and Applications. Journal of Construction Engineering and Management, 109(03), 297–308.

Diekmann, J E and Kraiem, Z (1988) Explanation of Construction Engineering Knowledge in Expert Systems. Journal of Construction Engineering and Management, 114(03), 364–89.

Doan, P and Menyah, K (2013) Impact of Irreversibility and Uncertainty on the Timing of Infrastructure Projects. Journal of Construction Engineering and Management, 139(03), 331–8.

Doloi, H (2013) Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects. Journal of Construction Engineering and Management, 139(03), 267–79.

Dossick, C S and Sakagami, M (2008) Implementing Web-Based Project Management Systems in the United States and Japan. Journal of Construction Engineering and Management, 134(03), 189–96.

Duerr, D (1991) Transportation of Shippingport Reactor Pressure Vessel. Journal of Construction Engineering and Management, 117(03), 551–64.

Duff, A R (1987) Interference in Stochastic Flow‐line Models. Journal of Construction Engineering and Management, 113(03), 385–98.

Dutta, A, Breloff, S P, Dai, F, Sinsel, E W, Warren, C M and Wu, J Z (2020) Identifying Potentially Risky Phases Leading to Knee Musculoskeletal Disorders during Shingle Installation Operations. Journal of Construction Engineering and Management, 146(03).

Dzeng, R and Tommelein, I D (1997) Boiler Erection Scheduling Using Product Models and Case-Based Reasoning. Journal of Construction Engineering and Management, 123(03), 338–47.

Easa, S M and Can, E K (1985) Optimization Model for Aggregate Blending. Journal of Construction Engineering and Management, 111(03), 216–30.

El Sayed, A Y, Darwish, M and Nassar, K (2021) Design and Constructability of Novel Extendable Arched Steel Truss Falsework. Journal of Construction Engineering and Management, 147(03).

El Wardani, M A, Messner, J I and Horman, M J (2006) Comparing Procurement Methods for Design-Build Projects. Journal of Construction Engineering and Management, 132(03), 230–8.

El-adaway, I H and Kandil, A A (2010) Multiagent System for Construction Dispute Resolution (MAS-COR). Journal of Construction Engineering and Management, 136(03), 303–15.

El-Bibany, H (1997) Parametric Constraint Management in Planning and Scheduling: Computational Basis. Journal of Construction Engineering and Management, 123(03), 348–53.

El-Diraby, T E (2006) Web-Services Environment for Collaborative Management of Product Life-Cycle Costs. Journal of Construction Engineering and Management, 132(03), 300–13.

El-Gohary, N M and El-Diraby, T E (2010) Dynamic Knowledge-Based Process Integration Portal for Collaborative Construction. Journal of Construction Engineering and Management, 136(03), 316–28.

El-Rayes, K (2001) Object-Oriented Model for Repetitive Construction Scheduling. Journal of Construction Engineering and Management, 127(03), 199–205.

El-Razek, M E A and Basha, I M (2001) Constructability Improvement of Bridges Using Stepping Formwork. Journal of Construction Engineering and Management, 127(03), 206–13.

El‐Itr, Z and Kangari, R (1994) Minority Contractors: Framework for New Policy Development. Journal of Construction Engineering and Management, 120(03), 632–48.

Elazouni, A M and Metwally, F G (2000) D-SUB: Decision Support System for Subcontracting Construction Works. Journal of Construction Engineering and Management, 126(03), 191–200.

Eldin, N and Hikle, V (2003) Pilot Study of Quality Function Deployment in Construction Projects. Journal of Construction Engineering and Management, 129(03), 314–29.

Eldin, N N (1997) Concurrent Engineering: A Schedule Reduction Tool. Journal of Construction Engineering and Management, 123(03), 354–62.

Eldin, N N (1989) Measurement of Work Progress: Quantitative Technique. Journal of Construction Engineering and Management, 115(03), 462–74.

Eldin, N N and Senouci, A B (1992) Use of Scrap Tires in Road Construction. Journal of Construction Engineering and Management, 118(03), 561–76.

Ellis, R D and Lee, S (2006) Measuring Project Level Productivity on Transportation Projects. Journal of Construction Engineering and Management, 132(03), 314–20.

Eskins, W A (1998) CONSTRUCTION OF THE NEW COLEMAN BRIDGE: FIFTH ROEBLING LECTURE, 1997. Journal of Construction Engineering and Management, 124(03), 173–5.

Everett, J G and Farghal, S (1994) Learning Curve Predictors for Construction Field Operations. Journal of Construction Engineering and Management, 120(03), 603–16.

Everett, J G and Yang, I (1997) Workers' Comp. Premiums: Disparities in Penalties for Identical Losses. Journal of Construction Engineering and Management, 123(03), 312–7.

Everett, J G, Halkali, H and Schlaff, T G (1998) Time-Lapse Video Applications for Construction Project Management. Journal of Construction Engineering and Management, 124(03), 204–9.

Fan, S (2014) Intellectual Property Rights in Building Information Modeling Application in Taiwan. Journal of Construction Engineering and Management, 140(03).

Fang, D P, Huang, X Y and Hinze, J (2004) Benchmarking Studies on Construction Safety Management in China. Journal of Construction Engineering and Management, 130(03), 424–32.

Farahani, A, Wallbaum, H and Dalenbäck, J (2020) Cost-Optimal Maintenance and Renovation Planning in Multifamily Buildings with Annual Budget Constraints. Journal of Construction Engineering and Management, 146(03).

Farnsworth, C B, Warr, R O, Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC Project Delivery on Managing Process Risk in Transportation Construction. Journal of Construction Engineering and Management, 142(03).

Fente, J, Schexnayder, C and Knutson, K (2000) Defining a Probability Distribution Function for Construction Simulation. Journal of Construction Engineering and Management, 126(03), 234–41.

Fischer, M and Tatum, C B (1997) Characteristics of Design-Relevant Constructability Knowledge. Journal of Construction Engineering and Management, 123(03), 253–60.

Fisher, D J and O'Connor, J T (1991) Constructability for Piping Automation: Field Operations. Journal of Construction Engineering and Management, 117(03), 468–85.

Fondahl, J W (1991) The Development of the Construction Engineer: Past Progress and Future Problems. Journal of Construction Engineering and Management, 117(03), 380–92.

Franz, B and Roberts, B A M (2022) Thematic Analysis of Successful and Unsuccessful Project Delivery Teams in the Building Construction Industry. Journal of Construction Engineering and Management, 148(03).

Freire, J and Alarcón, L F (2002) Achieving Lean Design Process: Improvement Methodology. Journal of Construction Engineering and Management, 128(03), 248–56.

Friedrich, D R, Daly, J P and Dick, W G (1987) Revisions, Repairs, and Rework on Large Projects. Journal of Construction Engineering and Management, 113(03), 488–500.

Frutos, J D and Borenstein, D (2003) Object-Oriented Model for Customer-Building Company Interaction in Mass Customization Environment. Journal of Construction Engineering and Management, 129(03), 302–13.

Gao, T, Ergan, S, Akinci, B and Garrett, J H (2014) Proactive Productivity Management at Job Sites: Understanding Characteristics of Assumptions Made for Construction Processes during Planning Based on Case Studies and Interviews. Journal of Construction Engineering and Management, 140(03).

Gao, Y, González, V A and Yiu, T W (2020) Exploring the Relationship between Construction Workers’ Personality Traits and Safety Behavior. Journal of Construction Engineering and Management, 146(03).

Gavilan, R M and Bernold, L E (1994) Source Evaluation of Solid Waste in Building Construction. Journal of Construction Engineering and Management, 120(03), 536–52.

Gibson, G E, Kaczmarowski, J H and Lore, H E (1995) Preproject-Planning Process for Capital Facilities. Journal of Construction Engineering and Management, 121(03), 312–8.

Gibson, G E, McGinnis, C I, Flanigan, W S and Wood, J E (1996) Constructability in Public Sector . Journal of Construction Engineering and Management, 122(03), 274–80.

Gilly, B A, Touran, A and Asai, T (1987) Quality Control Circles in Construction. Journal of Construction Engineering and Management, 113(03), 427–39.

Girmscheid, G and Brockmann, C (2010) Inter- and Intraorganizational Trust in International Construction Joint Ventures. Journal of Construction Engineering and Management, 136(03), 353–60.

Gonzalez‐Quevedo, A A, AbouRizk, S M, Iseley, D T and Halpin, D W (1993) Comparison of Two Simulation Methodologies in Construction. Journal of Construction Engineering and Management, 119(03), 573–89.

Gransberg, D D (1996) Optimizing Haul Unit Size and Number Based on Loading Facility Characteristics . Journal of Construction Engineering and Management, 122(03), 248–53.

Gransberg, D D, Dillon, W D, Reynolds, L and Boyd, J (1999) Quantitative Analysis of Partnered Project Performance. Journal of Construction Engineering and Management, 125(03), 161–6.

Gransberg, D D, Karaca, I and Senadheera, S (2004) Calculating Roller Requirements for Chip Seal Projects. Journal of Construction Engineering and Management, 130(03), 378–84.

Gugel, J G and Russell, J S (1994) Model for Constructability Approach Selection. Journal of Construction Engineering and Management, 120(03), 509–21.

Gunduz, M and Elsherbeny, H A (2020) Operational Framework for Managing Construction-Contract Administration Practitioners’ Perspective through Modified Delphi Method. Journal of Construction Engineering and Management, 146(03).

Gunhan, S and Arditi, D (2005) Factors Affecting International Construction. Journal of Construction Engineering and Management, 131(03), 273–82.

Gurmu, A T and Ongkowijoyo, C S (2020) Predicting Construction Labor Productivity Based on Implementation Levels of Human Resource Management Practices. Journal of Construction Engineering and Management, 146(03).

Hadavi, A and Krizek, R J (1993) Short‐Term Goal Setting for Construction. Journal of Construction Engineering and Management, 119(03), 622–30.

Hagerty, D J, Schmitt, N G and Vandevelde, G T (1988) Shot‐Rock Fill Construction: Case History. Journal of Construction Engineering and Management, 114(03), 489–502.

Haj Seiyed Taghia, S A, Darvishvand, H R and Ebrahimi, M (2020) Economic Analyses for Low-Strength Concrete Wrapped with CFRP to Improve the Mechanical Properties and Seismic Parameters. Journal of Construction Engineering and Management, 146(03).

Halpin, D W (1993) Process‐Based Research to Meet the International Challenge. Journal of Construction Engineering and Management, 119(03), 415–25.

Halpin, D W, Paulson, B C, Schub, A and Willenbrock, J H (1987) Construction Education and Research in Central Europe. Journal of Construction Engineering and Management, 113(03), 468–79.

Hamledari, H, Sajedi, S, McCabe, B and Fischer, M (2021) Automation of Inspection Mission Planning Using 4D BIMs and in Support of Unmanned Aerial Vehicle–Based Data Collection. Journal of Construction Engineering and Management, 147(03).

Hampson, K and Fischer, M (1997) Structural Designs and Construction Technologies for California Highway Bridges. Journal of Construction Engineering and Management, 123(03), 269–75.

Han, S H, Diekmann, J E and Ock, J H (2005) Contractor’s Risk Attitudes in the Selection of International Construction Projects. Journal of Construction Engineering and Management, 131(03), 283–92.

Han, S H, Diekmann, J E, Lee, Y and Ock, J H (2004) Multicriteria Financial Portfolio Risk Management for International Projects. Journal of Construction Engineering and Management, 130(03), 346–56.

Hancher, D E, Garza, J M d l and Eckert, G K (1997) Improving Workers' Compensation Management in Construction. Journal of Construction Engineering and Management, 123(03), 285–91.

Handa, V K and Barcia, R M (1986) Linear Scheduling Using Optimal Control Theory. Journal of Construction Engineering and Management, 112(03), 387–93.

Hanna, A S (2012) Using the Earned Value Management System to Improve Electrical Project Control. Journal of Construction Engineering and Management, 138(03), 449–57.

Hanna, A S, Chang, C, Sullivan, K T and Lackney, J A (2008) Impact of Shift Work on Labor Productivity for Labor Intensive Contractor. Journal of Construction Engineering and Management, 134(03), 197–204.

Hanna, A S, Russell, J S, Gotzion, T W and Nordheim, E V (1999) Impact of Change Orders on Labor Efficiency for Mechanical Construction. Journal of Construction Engineering and Management, 125(03), 176–84.

Harris, R B (1992) A Challenge for Research. Journal of Construction Engineering and Management, 118(03), 422–34.

Hartman, F and Snelgrove, P (1996) Risk Allocation in Lump-Sum Contracts—Concept of Latent Dispute . Journal of Construction Engineering and Management, 122(03), 291–6.

Hassanein, A and Melin, J (1997) Crew Design Methodology for Construction Contractors. Journal of Construction Engineering and Management, 123(03), 203–7.

Hastak, M, Halpin, D W and Vanegas, J (1996) COMPASS—New Paradigm for Project Cost Control Strategy and Planning . Journal of Construction Engineering and Management, 122(03), 254–64.

Hegazy, T (1999) Optimization of Resource Allocation and Leveling Using Genetic Algorithms. Journal of Construction Engineering and Management, 125(03), 167–75.

Hegazy, T and Ayed, A (1998) Neural Network Model for Parametric Cost Estimation of Highway Projects. Journal of Construction Engineering and Management, 124(03), 210–8.

Hegazy, T and Wassef, N (2001) Cost Optimization in Projects with Repetitive Nonserial Activities. Journal of Construction Engineering and Management, 127(03), 183–91.

Herbsman, Z (1986) SERC—A Model for Estimating Construction Inputs. Journal of Construction Engineering and Management, 112(03), 425–39.

Herbsman, Z J, Tong Chen, W and Epstein, W C (1995) Time Is Money: Innovative Contracting Methods in Highway Construction. Journal of Construction Engineering and Management, 121(03), 273–81.

Hester, W T, Kuprenas, J A and H. Randolph, T (1987) Arbitration: A Look at its Form and Performance. Journal of Construction Engineering and Management, 113(03), 353–67.

Hicks, J C (1993) Haul‐Unit Performance. Journal of Construction Engineering and Management, 119(03), 646–53.

Hicks, J C (1992) Heavy Construction Estimates, with and without Computers. Journal of Construction Engineering and Management, 118(03), 545–60.

Hinze, J and Appelgate, L L (1991) Costs of Construction Injuries. Journal of Construction Engineering and Management, 117(03), 537–50.

Hinze, J, Devenport, J N and Giang, G (2006) Analysis of Construction Worker Injuries That Do Not Result in Lost Time. Journal of Construction Engineering and Management, 132(03), 321–6.

Hiyassat, M A S (2001) Applying Modified Minimum Moment Method to Multiple Resource Leveling. Journal of Construction Engineering and Management, 127(03), 192–8.

Ho Song, M and Fischer, M (2020) Empirical Determination of the Smallest Batch Sizes for Daily Planning. Journal of Construction Engineering and Management, 146(03).

Hornaday, W C, Haas, C T, O'Connor, J T and Wen, J (1993) Computer‐Aided Planning for Heavy Lifts. Journal of Construction Engineering and Management, 119(03), 498–515.

Huang, X and Bernold, L E (1997) CAD-Integrated Excavation and Pipe Laying. Journal of Construction Engineering and Management, 123(03), 318–23.

Huang, X and Hinze, J (2003) Analysis of Construction Worker Fall Accidents. Journal of Construction Engineering and Management, 129(03), 262–71.

Hughes, P J, O'Connor, J T and Traver, A E (1989) Pipe Manipulator Enhancements for Increased Automation. Journal of Construction Engineering and Management, 115(03), 412–23.

Huo, T, Ren, H, Cai, W, Shen, G Q, Liu, B, Zhu, M and Wu, H (2018) Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong. Journal of Construction Engineering and Management, 144(03).

Hwang, B, Thomas, S R, Haas, C T and Caldas, C H (2009) Measuring the Impact of Rework on Construction Cost Performance. Journal of Construction Engineering and Management, 135(03), 187–98.

Hwang, S, Park, M, Lee, H, Lee, S and Kim, H (2015) Postdisaster Interdependent Built Environment Recovery Efforts and the Effects of Governmental Plans: Case Analysis Using System Dynamics. Journal of Construction Engineering and Management, 141(03).

Ibbs, C W (1997) Quantitative Impacts of Project Change: Size Issues. Journal of Construction Engineering and Management, 123(03), 308–11.

Ioannou, P G (1989) Evaluation of Subsurface Exploration Programs. Journal of Construction Engineering and Management, 115(03), 339–56.

Ioannou, P G (2022) Risk-Sensitive Competitive Bidding Model and Impact of Risk Aversion and Cost Uncertainty on Optimum Bid. Journal of Construction Engineering and Management, 148(03).

Ioannou, P G and Martinez, J C (1996) Comparison of Construction Alternatives Using Matched Simulation Experiments . Journal of Construction Engineering and Management, 122(03), 231–41.

Isidore, L J and Back, W E (2002) Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration. Journal of Construction Engineering and Management, 128(03), 211–9.

Jaafari, A and Mateffy, V K (1990) Realistic Model for Equipment Replacement. Journal of Construction Engineering and Management, 116(03), 514–32.

Jackson, J T (1990) Technical Specifications' Effect on Construction. Journal of Construction Engineering and Management, 116(03), 463–7.

Jafarzadeh, R, Wilkinson, S, González, V, Ingham, J M and Amiri, G G (2014) Predicting Seismic Retrofit Construction Cost for Buildings with Framed Structures Using Multilinear Regression Analysis. Journal of Construction Engineering and Management, 140(03).

Jahren, C T and Ashe, A M (1990) Predictors of Cost‐Overrun Rates. Journal of Construction Engineering and Management, 116(03), 548–52.

Jain, K K and Bhattacharjee, B (2012) Application of Fuzzy Concepts to the Visual Assessment of Deteriorating Reinforced Concrete Structures. Journal of Construction Engineering and Management, 138(03), 399–408.

Jang, W, Yu, G, Jung, W, Kim, D and Han, S H (2018) Financial Conflict Resolution for Public-Private Partnership Projects Using a Three-Phase Game Framework. Journal of Construction Engineering and Management, 144(03).

Jarrah, R, Kulkarni, D and O’Connor, J T (2007) Cash Flow Projections for Selected TxDoT Highway Projects. Journal of Construction Engineering and Management, 133(03), 235–41.

Jaselskis, E J and Talukhaba, A (1998) Bidding Considerations in Developing Countries. Journal of Construction Engineering and Management, 124(03), 185–93.

Jaselskis, E J, Gao, Z and Walters, R C (2005) Improving Transportation Projects Using Laser Scanning. Journal of Construction Engineering and Management, 131(03), 377–84.

Jergeas, G F and Hartman, F T (1994) Contractors' Construction‐Claims Avoidance. Journal of Construction Engineering and Management, 120(03), 553–60.

Ji, Y and Leite, F (2020) Optimized Planning Approach for Multiple Tower Cranes and Material Supply Points Using Mixed-Integer Programming. Journal of Construction Engineering and Management, 146(03).

Johnston, D W, Kahn, K P and Phillips, J B (1989) Formwork Pressures in Tall and Thick Concrete Walls. Journal of Construction Engineering and Management, 115(03), 444–61.

Kagan, H A, Leary, D J and Pratter, G E K (1986) Design Engineers' Responsibilities During Construction. Journal of Construction Engineering and Management, 112(03), 394–402.

Kaiser, M J (2006) Offshore Decommissioning Cost Estimation in the Gulf of Mexico. Journal of Construction Engineering and Management, 132(03), 249–58.

Kale, S and Arditi, D (2002) Competitive Positioning in United States Construction Industry. Journal of Construction Engineering and Management, 128(03), 238–47.

Kale, S and Arditi, D (2010) Innovation Diffusion Modeling in the Construction Industry. Journal of Construction Engineering and Management, 136(03), 329–40.

Kalu, T C U (1990) New Approach to Construction Management. Journal of Construction Engineering and Management, 116(03), 494–513.

Kam, C, Song, M H and Senaratna, D (2017) {[}VDC Scorecard{]}: Formulation, Application, and Validation. Journal of Construction Engineering and Management, 143(03).

Kangari, R and Bakheet, M (2001) Construction Surety Bonding. Journal of Construction Engineering and Management, 127(03), 232–8.

Kangari, R, Pruitt, J D and Cheema, T S (1988) Slipforming IBM Tower. Journal of Construction Engineering and Management, 114(03), 472–88.

Kannan, G and Vorster, M (2000) Development of an Experience Database for Truck Loading Operations. Journal of Construction Engineering and Management, 126(03), 201–9.

Kar, S and Jha, K N (2021) Investigation into Lead Time of Construction Materials and Influencing Factors. Journal of Construction Engineering and Management, 147(03).

Karaa, F A and Nasr, A Y (1986) Resource Management in Construction. Journal of Construction Engineering and Management, 112(03), 346–57.

Karaftath, L L (1988) Rolling Resistance of Off‐Road Vehicles. Journal of Construction Engineering and Management, 114(03), 458–71.

Karan, E P, Sivakumar, R, Irizarry, J and Guhathakurta, S (2014) Digital Modeling of Construction Site Terrain Using Remotely Sensed Data and Geographic Information Systems Analyses. Journal of Construction Engineering and Management, 140(03).

Karshenas, S (1997) Strength Variability of Conventional Slab Formwork Systems. Journal of Construction Engineering and Management, 123(03), 324–30.

Katsuragawa, C M, Lucko, G, Isaac, S and Su, Y (2021) Fuzzy Linear and Repetitive Scheduling for Construction Projects. Journal of Construction Engineering and Management, 147(03).

Kavanagh, D P (1985) Siren: A Repetitive Construction Simulation Model. Journal of Construction Engineering and Management, 111(03), 308–23.

Kelley, M N (1991) Ft. Drum Estimating and Bidding from Contractor's Point of View. Journal of Construction Engineering and Management, 117(03), 565–71.

Kim, B and Reinschmidt, K F (2009) Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution. Journal of Construction Engineering and Management, 135(03), 178–86.

Kim, B, Lee, H, Park, H and Kim, H (2013) Estimation of Greenhouse Gas Emissions from Land-Use Changes due to Road Construction in the Republic of Korea. Journal of Construction Engineering and Management, 139(03), 339–46.

Kim, B, Lim, H, Kim, H and Hong, T (2012) Determining the Value of Governmental Subsidies for the Installation of Clean Energy Systems Using Real Options. Journal of Construction Engineering and Management, 138(03), 422–30.

Kim, K and Cho, Y K (2021) Automatic Recognition of Workers’ Motions in Highway Construction by Using Motion Sensors and Long Short-Term Memory Networks. Journal of Construction Engineering and Management, 147(03).

Kim, K and de la Garza, J M (2005) Critical Path Method with Multiple Calendars. Journal of Construction Engineering and Management, 131(03), 330–42.

Kim, T and Chi, S (2019) Accident Case Retrieval and Analyses: Using Natural Language Processing in the Construction Industry. Journal of Construction Engineering and Management, 145(03).

Kisi, K P, Mani, N, Rojas, E M and Foster, E T (2017) Optimal Productivity in Labor-Intensive Construction Operations: Pilot Study. Journal of Construction Engineering and Management, 143(03).

Kittinaraporn, W, Tuprakay, S and Prasittisopin, L (2022) Effective Modeling for Construction Activities of Recycled Aggregate Concrete Using Artificial Neural Network. Journal of Construction Engineering and Management, 148(03).

Klanšek, U (2016) Mixed-Integer Nonlinear Programming Model for Nonlinear Discrete Optimization of Project Schedules under Restricted Costs. Journal of Construction Engineering and Management, 142(03).

Koehn, E &, Kothari, R K and Pan, C (1995) Safety in Developing Countries: Professional and Bureaucratic Problems. Journal of Construction Engineering and Management, 121(03), 261–5.

Koehn, E and Manuel, J (1988) Variation in Work Improvement Potential for Small/Medium Contractors. Journal of Construction Engineering and Management, 114(03), 505–9.

Konon, W and Schuring, J R (1985) Vibration Criteria for Historic Buildings. Journal of Construction Engineering and Management, 111(03), 208–15.

Laborde, M and Sanvido, V (1994) Introducing New Process Technologies into Construction Companies. Journal of Construction Engineering and Management, 120(03), 488–508.

Laefer, D F and Manke, J P (2008) Building Reuse Assessment for Sustainable Urban Reconstruction. Journal of Construction Engineering and Management, 134(03), 217–27.

Laufer, A, Shapira, A, Cohenca‐Zall, D and Howell, G A (1993) Prebid and Preconstruction Planning Process. Journal of Construction Engineering and Management, 119(03), 426–44.

Laurent, J and Leicht, R M (2019) Practices for Designing Cross-Functional Teams for Integrated Project Delivery. Journal of Construction Engineering and Management, 145(03).

Lee, C, Chong, H, Li, Q and Wang, X (2020) Joint Contract–Function Effects on BIM-Enabled EPC Project Performance. Journal of Construction Engineering and Management, 146(03).

Lee, D (2005) Probability of Project Completion Using Stochastic Project Scheduling Simulation. Journal of Construction Engineering and Management, 131(03), 310–8.

Lee, D and Arditi, D (2006) Automated Statistical Analysis in Stochastic Project Scheduling Simulation. Journal of Construction Engineering and Management, 132(03), 268–77.

Lee, D, Lim, T and Arditi, D (2012) Stochastic Project Financing Analysis System for Construction. Journal of Construction Engineering and Management, 138(03), 376–89.

Lee, K, Han, S H, Park, H and David Jeong, H (2016) Empirical Analysis of Host-Country Effects in the International Construction Market: An Industry-Level Approach. Journal of Construction Engineering and Management, 142(03).

Lee, S and Yu, J (2016) Comparative Study of BIM Acceptance between Korea and the United States. Journal of Construction Engineering and Management, 142(03).

Lee, Y Y R, Samad, H and Miang Goh, Y (2020) Perceived Importance of Authentic Learning Factors in Designing Construction Safety Simulation Game-Based Assignment: Random Forest Approach. Journal of Construction Engineering and Management, 146(03).

Leung, M, Yu, J and Chan, Y S (2014) Focus Group Study to Explore Critical Factors of Public Engagement Process for Mega Development Projects. Journal of Construction Engineering and Management, 140(03).

Levitt, R E, Kartam, N A and Kunz, J C (1988) Artificial Intelligence Techniques for Generating Construction Project Plans. Journal of Construction Engineering and Management, 114(03), 329–43.

Li, F, Phoon, K K, Du, X and Zhang, M (2013) Improved AHP Method and Its Application in Risk Identification. Journal of Construction Engineering and Management, 139(03), 312–20.

Li, H and Love, P (1997) Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization. Journal of Construction Engineering and Management, 123(03), 233–7.

Li, H, Shen, L Y and Love, P E D (1999) ANN-Based Mark-Up Estimation System with Self-Explanatory Capacities. Journal of Construction Engineering and Management, 125(03), 185–9.

Li, T H Y, Thomas Ng, S and Skitmore, M (2016) Modeling Multi-Stakeholder Multi-Objective Decisions during Public Participation in Major Infrastructure and Construction Projects: A Decision Rule Approach. Journal of Construction Engineering and Management, 142(03).

Li, Y, Wang, X and Wang, Y (2017) Using Bargaining Game Theory for Risk Allocation of Public-Private Partnership Projects: Insights from Different Alternating Offer Sequences of Participants. Journal of Construction Engineering and Management, 143(03).

Liao, P, Shi, H, Su, Y and Luo, X (2018) Development of Data-Driven Influence Model to Relate the Workplace Environment to Human Error. Journal of Construction Engineering and Management, 144(03).

Lijauco, F, Gajendran, T, Brewer, G and Rasoolimanesh, S M (2020) Impacts of Culture on Innovation Propensity in Small to Medium Enterprises in Construction. Journal of Construction Engineering and Management, 146(03).

Lim, B T H, Ling, F Y Y, Ibbs, C W, Raphael, B and Ofori, G (2011) Empirical Analysis of the Determinants of Organizational Flexibility in the Construction Business. Journal of Construction Engineering and Management, 137(03), 225–37.

Lim, B T H, Ling, F Y Y, Ibbs, C W, Raphael, B and Ofori, G (2012) Mathematical Models for Predicting Organizational Flexibility of Construction Firms in Singapore. Journal of Construction Engineering and Management, 138(03), 361–75.

Lin, C and Huang, H (2010) Improved Baseline Productivity Analysis Technique. Journal of Construction Engineering and Management, 136(03), 367–76.

Lin, K and Haas, C T (1996) An Interactive Planning Environment for Critical Operations . Journal of Construction Engineering and Management, 122(03), 212–22.

Lin, Y and Ho, S P (2013) Impacts of Governance Structure Strategies on the Performance of Construction Joint Ventures. Journal of Construction Engineering and Management, 139(03), 304–11.

Lindhard, S M, Hamzeh, F, Gonzalez, V A, Wandahl, S and Ussing, L F (2019) Impact of Activity Sequencing on Reducing Variability. Journal of Construction Engineering and Management, 145(03).

Liu, C and Lu, M (2015) Optimizing Earthmoving Job Planning Based on Evaluation of Temporary Haul Road Networks Design for Mass Earthworks Projects. Journal of Construction Engineering and Management, 141(03).

  • Type: Journal Article
  • Keywords: Earthmoving; Planning; Optimization; Analytical techniques; Project planning and design;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000940
  • Abstract:
    As a critical component of planning mass earthworks projects, designing effective haul road networks is conducive to delivering the project on time and under budget. The research reported in this paper proposes a grid-based temporary road network design method applicable to a site for which grading design has been completed. Further adding to the existing body of knowledge, a quantitative methodology is proposed for optimizing the detailed planning of earthmoving jobs based on a particular temporary haul road network design. Each job is defined in terms of the source cell, the destination cell, the earth volume, and the shortest-hauling-time path between source and destination. Through seamless integration of the Floyd-Warshall algorithm and linear programming model, the shortest average haul time for a truckload can be obtained while automatically fulfilling site grading design specifications. Based on the resulting average haul time, cost equations are defined to account for (1) the direct truck-hauling crew cost; and (2) building, maintenance, and removal costs of temporary haul roads. As such, the cost associated with executing the optimized earthmoving job plan over a particular haul road network design can be readily assessed, making it straightforward for project managers to compare alternatives. The proposed methodology is demonstrated in steps using a numerical example and further applied in a case study based on a real-world project in northern Alberta.

Liu, Y, Jarvamardi, A, Zhang, Y, Liu, M, Hsiang, S M, Yang, S, Yu, X and Jiang, Z (2021) Comparative Study on Perception of Causes for Construction Task Delay in China and the United States. Journal of Construction Engineering and Management, 147(03).

Louis, J and Dunston, P S (2017) Methodology for Real-Time Monitoring of Construction Operations Using Finite State Machines and Discrete-Event Operation Models. Journal of Construction Engineering and Management, 143(03).

Love, P E D, Edwards, D J, Irani, Z and Sharif, A (2012) Participatory Action Research Approach to Public Sector Procurement Selection. Journal of Construction Engineering and Management, 138(03), 311–22.

Love, P E D, Edwards, D J, Watson, H and Davis, P (2010) Rework in Civil Infrastructure Projects: Determination of Cost Predictors. Journal of Construction Engineering and Management, 136(03), 275–82.

Love, P E D, Wang, X, Sing, C and Tiong, R L K (2013) Determining the Probability of Project Cost Overruns. Journal of Construction Engineering and Management, 139(03), 321–30.

Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT Simulation Model. Journal of Construction Engineering and Management, 126(03), 219–26.

Lu, W, Liu, A M M, Rowlinson, S and Poon, S W (2013) Sharpening Competitive Edge through Procurement Innovation: Perspectives from Chinese International Construction Companies. Journal of Construction Engineering and Management, 139(03), 347–51.

Lyu, H, Sun, W, Shen, S and Zhou, A (2020) Risk Assessment Using a New Consulting Process in Fuzzy AHP. Journal of Construction Engineering and Management, 146(03).

Ma, G, Jia, J, Ding, J, Wu, M and Wang, D (2021) Examining the Impact of Social Media Use on Project Management Performance: Evidence from Construction Projects in China. Journal of Construction Engineering and Management, 147(03).

Mahdavian, A, Shojaei, A, Salem, M, Yuan, J S and Oloufa, A A (2021) Data-Driven Predictive Modeling of Highway Construction Cost Items. Journal of Construction Engineering and Management, 147(03).

Mahoney, J J and Tatum, C B (1994) Construction Site Applications of CAD. Journal of Construction Engineering and Management, 120(03), 617–31.

Mallon, J C and Mulligan, D E (1993) Quality Function Deployment—A System for Meeting Customers' Needs. Journal of Construction Engineering and Management, 119(03), 516–31.

Malone, E K and Issa, R R (2014) Predictive Models for Work-Life Balance and Organizational Commitment of Women in the U.S. Construction Industry. Journal of Construction Engineering and Management, 140(03).

Maloney, W F (1990) Framework for Analysis of Performance. Journal of Construction Engineering and Management, 116(03), 399–415.

Maloney, W F (1983) Productivity Improvement: The Influence of Labor. Journal of Construction Engineering and Management, 109(03), 321–34.

Maloney, W F and McFillen, J M (1987) Influence of Foremen on Performance. Journal of Construction Engineering and Management, 113(03), 399–415.

Maloney, W F and McFillen, J M (1987) Worker Perceptions of Contractor Behavior. Journal of Construction Engineering and Management, 113(03), 416–26.

Manrique, J D, Al-Hussein, M, Bouferguene, A, Safouhi, H and Nasseri, R (2011) Combinatorial Algorithm for Optimizing Wood Waste in Framing Designs. Journal of Construction Engineering and Management, 137(03), 188–97.

Manrique, J D, Al-Hussein, M, Telyas, A and Funston, G (2007) Case Study-Based Challenges of Quality Concrete Finishing for Architecturally Complex Structures. Journal of Construction Engineering and Management, 133(03), 208–16.

Manrique, J D, Al-Hussein, M, Telyas, A and Funston, G (2007) Constructing a Complex Precast Tilt-Up-Panel Structure Utilizing an Optimization Model, 3D CAD, and Animation. Journal of Construction Engineering and Management, 133(03), 199–207.

Mansouri, S, Castronovo, F and Akhavian, R (2020) Analysis of the Synergistic Effect of Data Analytics and Technology Trends in the AEC/FM Industry. Journal of Construction Engineering and Management, 146(03).

Mattar, S G (1983) Segmental Post‐Tensioned Dolphin at Tagrin Point. Journal of Construction Engineering and Management, 109(03), 276–85.

Mattila, K G and Abraham, D M (1998) Resource Leveling of Linear Schedules Using Integer Linear Programming. Journal of Construction Engineering and Management, 124(03), 232–44.

McCahill, D F and Bernold, L E (1993) Resource‐Oriented Modeling and Simulation in Construction. Journal of Construction Engineering and Management, 119(03), 590–606.

McGartland, M R and Hendrickson, C T (1985) Expert Systems for Construction Project Monitoring. Journal of Construction Engineering and Management, 111(03), 293–307.

Menassa, C C, Mora, F P and Pearson, N (2009) Option Pricing Model to Analyze Cost–Benefit Trade-Offs of ADR Investments in AEC Projects. Journal of Construction Engineering and Management, 135(03), 156–68.

Menassa, C, Peña Mora, F and Pearson, N (2010) Study of Real Options with Exogenous Competitive Entry to Analyze Dispute Resolution Ladder Investments in Architecture, Engineering, and Construction Projects. Journal of Construction Engineering and Management, 136(03), 377–90.

Meng, X (2002) Guarantees for Contractor’s Performance and Owner’s Payment in China. Journal of Construction Engineering and Management, 128(03), 232–7.

Minchin, R E, Henriquez, N R, King, A M and Lewis, D W (2010) Owners Respond: Preferences for Task Performance, Delivery Systems, and Quality Management. Journal of Construction Engineering and Management, 136(03), 283–93.

Mitropoulos, P and Howell, G (2001) Model for Understanding, Preventing, and Resolving Project Disputes. Journal of Construction Engineering and Management, 127(03), 223–31.

Molenaar, K R (2005) Programmatic Cost Risk Analysis for Highway Megaprojects. Journal of Construction Engineering and Management, 131(03), 343–53.

Monzer, N, Fayek, A R, Lourenzutti, R and Siraj, N B (2019) Aggregation-Based Framework for Construction Risk Assessment with Heterogeneous Groups of Experts. Journal of Construction Engineering and Management, 145(03).

Moon, S, Choi, E and Hong, S (2016) Creation of Robust Design Alternatives for Temporary Construction in Value Engineering. Journal of Construction Engineering and Management, 142(03).

Moselhi, O, Assem, I and El-Rayes, K (2005) Change Orders Impact on Labor Productivity. Journal of Construction Engineering and Management, 131(03), 354–9.

Moselhi, O, Hegazy, T and Fazio, P (1993) DBID: Analogy‐Based DSS for Bidding in Construction. Journal of Construction Engineering and Management, 119(03), 466–79.

Moua, B and Russell, J S (2001) Comparison of Two Maintainability Programs. Journal of Construction Engineering and Management, 127(03), 239–44.

Moussourakis, J and Haksever, C (2004) Flexible Model for Time/Cost Tradeoff Problem. Journal of Construction Engineering and Management, 130(03), 307–14.

Naderpajouh, N, Hastak, M, Gokhale, S, Bayraktar, M E, Iyer, A and Arif, F (2015) Counterfeiting Risk Governance in the Capital Projects Supply Chain. Journal of Construction Engineering and Management, 141(03).

Nam, C H and Tatum, C B (1992) Government‐Industry Cooperation: Fast‐Track Concrete Innovation. Journal of Construction Engineering and Management, 118(03), 454–71.

Nam, C H and Tatum, C B (1992) Strategies for Technology Push: Lessons from Construction Innovations. Journal of Construction Engineering and Management, 118(03), 507–24.

Naouin, S G and Langford, D (1987) Management Contracting—The Client's View. Journal of Construction Engineering and Management, 113(03), 369–84.

Naresh, A L and Jahren, C T (1997) Communications and Tracking for Construction Vehicles. Journal of Construction Engineering and Management, 123(03), 261–8.

Nguyen, L H (2019) Relationships between Critical Factors Related to Team Behaviors and Client Satisfaction in Construction Project Organizations. Journal of Construction Engineering and Management, 145(03).

Nguyen, V U (1985) Tender Evaluation by Fuzzy Sets. Journal of Construction Engineering and Management, 111(03), 231–43.

Nima, M A, Abdul-Kadir, M R, Jaafar, M S and Alghulami, R G (2004) Constructability Concepts in Kuala Selangor Cable-Stayed Bridge in Malaysia. Journal of Construction Engineering and Management, 130(03), 315–21.

Niu, Y, Lu, W, Liu, D, Chen, K, Anumba, C and Huang, G G (2017) An SCO-Enabled Logistics and Supply Chain–Management System in Construction. Journal of Construction Engineering and Management, 143(03).

O’Connor, J T and Yang, L (2004) Project Performance versus Use of Technologies at Project and Phase Levels. Journal of Construction Engineering and Management, 130(03), 322–9.

O’Connor, J T, Shrestha, B K, Winkler, M and Ouk Choi, J (2021) Relationship between Commissioning and Start-Up Success Factors Achievement and Performance in Capital Projects. Journal of Construction Engineering and Management, 147(03).

Oberlender, G D and Trost, S M (2001) Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. Journal of Construction Engineering and Management, 127(03), 173–82.

Obiozo, R N and Smallwood, J J (2015) Biophilic Construction Site Model: Enhancing the Motivational and Humanistic Value of the Green Construction Site. Journal of Construction Engineering and Management, 141(03).

Osman, H M and El-Diraby, T E (2011) Knowledge-Enabled Decision Support System for Routing Urban Utilities. Journal of Construction Engineering and Management, 137(03), 198–213.

Oviedo-Haito, R J, Jiménez, J, Cardoso, F F and Pellicer, E (2014) Survival Factors for Subcontractors in Economic Downturns. Journal of Construction Engineering and Management, 140(03).

Owers, R and Weber, S L (1997) Strategic Plan for Southwest Indian Community's Construction Business. Journal of Construction Engineering and Management, 123(03), 331–7.

Pau, S H, Chau, K W and Wong, W G (1993) Prospects for No‐Dig Technology in Hong Kong Construction Industry. Journal of Construction Engineering and Management, 119(03), 550–9.

Paulson, B C (1985) Automation and Robotics for Construction. Journal of Construction Engineering and Management, 111(03), 190–207.

Pawan, P and Lorterapong, P (2016) A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects. Journal of Construction Engineering and Management, 142(03).

Peng, J (2004) Structural Modeling and Design Considerations for Double-Layer Shoring Systems. Journal of Construction Engineering and Management, 130(03), 368–77.

Pheng, L S and Pong, C Y (2003) Integrating ISO 9001 and OHSAS 18001 for Construction. Journal of Construction Engineering and Management, 129(03), 338–47.

Pietroforte, R and Stefani, T P (2004) ASCE Journal of Construction Engineering and Management: Review of the Years 1983–2000. Journal of Construction Engineering and Management, 130(03), 440–8.

Polat, G (2008) Factors Affecting the Use of Precast Concrete Systems in the United States. Journal of Construction Engineering and Management, 134(03), 169–78.

Powderham, A J and Tamaro, G J (1995) Mansion House London: Risk Assessment and Protection. Journal of Construction Engineering and Management, 121(03), 266–72.

Price, A D F and Shawa, H (1997) Survey of Project Related Finance in United Arab Emirates. Journal of Construction Engineering and Management, 123(03), 223–32.

Puddicombe, M S (1997) Designers and Contractors: Impediments to Integration. Journal of Construction Engineering and Management, 123(03), 245–52.

Rasdorf, W J and Abudayyeh, O Y (1991) Cost‐ and Schedule‐Control Integration: Issues and Needs. Journal of Construction Engineering and Management, 117(03), 486–502.

Raymond, A J, Kendall, A, DeJong, J T, Kavazanjian, E, Woolley, M A and Martin, K K (2021) Life Cycle Sustainability Assessment of Fugitive Dust Control Methods. Journal of Construction Engineering and Management, 147(03).

Recarte Suazo, G A and Jaselskis, E J (1993) Comparison of Construction Safety Codes in United States and Honduras. Journal of Construction Engineering and Management, 119(03), 560–72.

Reda, R and Carr, R I (1989) Time‐Cost Trade‐Off Among Related Activities. Journal of Construction Engineering and Management, 115(03), 475–86.

Rekapalli, P V and Martinez, J C (2011) Discrete-Event Simulation-Based Virtual Reality Environments for Construction Operations: Technology Introduction. Journal of Construction Engineering and Management, 137(03), 214–24.

Reyna, S M, Vanegas, J A and Khan, A H (1994) Construction Technologies for Sewer Rehabilitation. Journal of Construction Engineering and Management, 120(03), 467–87.

Rogge, D F and Tucker, R L (1987) Research Needs in Steel and Concrete Construction. Journal of Construction Engineering and Management, 113(03), 440–6.

Rojas, E M and Mukherjee, A (2005) General-Purpose Situational Simulation Environment for Construction Education. Journal of Construction Engineering and Management, 131(03), 319–29.

Rosenfeld, Y, Navon, R and Cohen, L (1998) Methodology for Prioritizing Cost-Effective Construction Technologies. Journal of Construction Engineering and Management, 124(03), 176–84.

Russell, J S and Jaselskis, E J (1992) Quantitative Study of Contractor Evaluation Programs and Their Impact. Journal of Construction Engineering and Management, 118(03), 612–24.

Russell, J S, Skibniewski, M J and Vanegas, J A (1990) Framework for Construction Robot Fleet Management System. Journal of Construction Engineering and Management, 116(03), 448–62.

Rutherford, A W (1989) Organizational Evolution I‐595 Port Everglades Expressway. Journal of Construction Engineering and Management, 115(03), 357–69.

Samuels, A F and Bruder, M J (1996) Construction Representative: Scheduling and Cost Management . Journal of Construction Engineering and Management, 122(03), 281–90.

Sarisley, E F (1990) Construction Methods and Costs of Stress‐Laminated Timber Bridges. Journal of Construction Engineering and Management, 116(03), 432–47.

Sawhney, A and AbouRizk, S M (1995) HSM-Simulation–Based Planning Method for Construction Projects. Journal of Construction Engineering and Management, 121(03), 297–303.

Sawhney, A and Mund, A (2002) Adaptive Probabilistic Neural Network-based Crane Type Selection System. Journal of Construction Engineering and Management, 128(03), 265–73.

Schnabel, J J and Martin, R E (1983) Parking Garage Supported on Structural Fill. Journal of Construction Engineering and Management, 109(03), 286–96.

Schubert, F N (1991) U.S. Army Corps of Engineers and Afghanistan's Highways 1960–1967. Journal of Construction Engineering and Management, 117(03), 445–59.

Scott, S (1997) Delay Claims in U.K. Contracts. Journal of Construction Engineering and Management, 123(03), 238–44.

Seibert, J E and Evans, G W (1991) Time‐Constrained Resource Leveling. Journal of Construction Engineering and Management, 117(03), 503–20.

Selinger, S (1983) Payment Timing as a Factor in Bid Evaluation. Journal of Construction Engineering and Management, 109(03), 335–41.

Seo, J, Haas, C T, Saidi, K and Sreenivasan, S V (2000) Graphical Control Interface for Construction and Maintenance Equipment. Journal of Construction Engineering and Management, 126(03), 210–8.

Seo, S, Aramaki, T, Hwang, Y and Hanaki, K (2004) Fuzzy Decision-Making Tool for Environmental Sustainable Buildings. Journal of Construction Engineering and Management, 130(03), 415–23.

Seydel, J (2003) Evaluating and Comparing Bidding Optimization Effectiveness. Journal of Construction Engineering and Management, 129(03), 285–92.

Shahin, A, AbouRizk, S M and Mohamed, Y (2011) Modeling Weather-Sensitive Construction Activity Using Simulation. Journal of Construction Engineering and Management, 137(03), 238–46.

Shaked, O and Warszawski, A (1992) CONSCHED: Expert System for Scheduling of Modular Construction Projects. Journal of Construction Engineering and Management, 118(03), 488–506.

Shanmuganayagam, V (1989) Current Float Techniques for Resources Scheduling. Journal of Construction Engineering and Management, 115(03), 401–11.

Shapira, A (1995) Rational Design of Shoring-Tower–Based Formwork. Journal of Construction Engineering and Management, 121(03), 255–60.

Shapira, A and Raz, Y (2005) Comparative Analysis of Shoring Towers for High-Clearance Construction. Journal of Construction Engineering and Management, 131(03), 293–301.

Sharma, H, McIntyre, C, Gao, Z and Nguyen, T (2009) Developing a Traffic Closure Integrated Linear Schedule for Highway Rehabilitation Projects. Journal of Construction Engineering and Management, 135(03), 146–55.

Shash, A A (1998) Bidding Practices of Subcontractors in Colorado. Journal of Construction Engineering and Management, 124(03), 219–25.

Shen, L Y, Li, Q M, Drew, D and Shen, Q P (2004) Awarding Construction Contracts on Multicriteria Basis in China. Journal of Construction Engineering and Management, 130(03), 385–93.

Shen, L, Drew, D and Zhang, Z (1999) Optimal Bid Model for Price-Time Biparameter Construction Contracts. Journal of Construction Engineering and Management, 125(03), 204–9.

Shiha, A, Dorra, E M and Nassar, K (2020) Neural Networks Model for Prediction of Construction Material Prices in Egypt Using Macroeconomic Indicators. Journal of Construction Engineering and Management, 146(03).

Shirowzhan, S, Sepasgozar, S M E and Trinder, J (2021) Developing Metrics for Quantifying Buildings’ 3D Compactness and Visualizing Point Cloud Data on a Web-Based App and Dashboard. Journal of Construction Engineering and Management, 147(03).

Shohet, I M and Laufer, A (1996) Exterior Cladding Methods: A Technoeconomic Analysis . Journal of Construction Engineering and Management, 122(03), 242–7.

Shrestha, P and Behzadan, A H (2018) Chaos Theory–Inspired Evolutionary Method to Refine Imperfect Sensor Data for Data-Driven Construction Simulation. Journal of Construction Engineering and Management, 144(03).

Shrestha, P P and Fernane, J D (2017) Performance of Design-Build and Design-Bid-Build Projects for Public Universities. Journal of Construction Engineering and Management, 143(03).

Shuster, W D, Burkman, C E, Grosshans, J, Dadio, S and Losco, R (2015) Green Residential Demolitions: Case Study of Vacant Land Reuse in Storm Water Management in Cleveland. Journal of Construction Engineering and Management, 141(03).

Singh, P, Oh, J E, Labi, S and Sinha, K C (2007) Cost-Effectiveness Evaluation of Warranty Pavement Projects. Journal of Construction Engineering and Management, 133(03), 217–24.

Skibniewski, M J and Chao, L (1992) Evaluation of Advanced Construction Technology with AHP Method. Journal of Construction Engineering and Management, 118(03), 577–93.

Slaughter, E S (1993) Builders as Sources of Construction Innovation. Journal of Construction Engineering and Management, 119(03), 532–49.

Slaughter, E S (1998) Models of Construction Innovation. Journal of Construction Engineering and Management, 124(03), 226–31.

Smith, S D (1999) Earthmoving Productivity Estimation Using Linear Regression Techniques. Journal of Construction Engineering and Management, 125(03), 133–41.

Soetanto, R, Dainty, A R, Glass, J and Price, A D (2006) Empirical Evaluation of Structural Frame Performance Criteria: Realizing the Potential of Hybrid Concrete Construction. Journal of Construction Engineering and Management, 132(03), 278–90.

Son, J, Mattila, K G and Myers, D S (2005) Determination of Haul Distance and Direction in Mass Excavation. Journal of Construction Engineering and Management, 131(03), 302–9.

Song, L and AbouRizk, S M (2005) Quantifying Engineering Project Scope for Productivity Modeling. Journal of Construction Engineering and Management, 131(03), 360–7.

Songer, A D, Diekmann, J, Hendrickson, W and Flushing, D (2000) Situational Reengineering: Case Study Analysis. Journal of Construction Engineering and Management, 126(03), 185–90.

Sonmez, R, Iranagh, M A and Uysal, F (2016) Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time–Cost Trade-Off Problem. Journal of Construction Engineering and Management, 142(03).

Staab, G E (1987) Inspection Checklist for Sheet Pile Construction. Journal of Construction Engineering and Management, 113(03), 525–8.

Stager, D K (1996) Organizing and Managing a Finance-Design-Build Project in Turkey: Fourth Roebling Lecture, 1995 . Journal of Construction Engineering and Management, 122(03), 199–204.

Stanton, W A and Willenbrock, J H (1990) Conceptual Framework for Computer‐Based, Construction Safety Control. Journal of Construction Engineering and Management, 116(03), 383–98.

Stewart, W S and Tatum, C B (1988) Segmental Placement of Renton Outfall: Construction Innovation. Journal of Construction Engineering and Management, 114(03), 390–407.

Stukhart, G and Cook, E L (1990) Bar‐Code Standardization in Industrial Construction. Journal of Construction Engineering and Management, 116(03), 416–31.

Sturts Dossick, C and Schunk, T K (2007) Subcontractor Schedule Control Method. Journal of Construction Engineering and Management, 133(03), 262–5.

Su, Y and Lucko, G (2015) Synthetic Cash Flow Model with Singularity Functions. I: Theory for Periodic Phenomena and Time Value of Money. Journal of Construction Engineering and Management, 141(03).

Su, Y and Lucko, G (2015) Synthetic Cash Flow Model with Singularity Functions. II: Feasible Prompt Payment Discount Scenarios. Journal of Construction Engineering and Management, 141(03).

Su, Z, Wei, H, Zou, X and Qi, J (2019) Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. Journal of Construction Engineering and Management, 145(03).

Subramanyan, H, Sawant, P H and Bhatt, V (2012) Construction Project Risk Assessment: Development of Model Based on Investigation of Opinion of Construction Project Experts from India. Journal of Construction Engineering and Management, 138(03), 409–21.

Suhail, S A and Neale, R H (1994) CPM/LOB: New Methodology to Integrate CPM and Line of Balance. Journal of Construction Engineering and Management, 120(03), 667–84.

Sun, C and Xu, J (2011) Estimation of Time for Wenchuan Earthquake Reconstruction in China. Journal of Construction Engineering and Management, 137(03), 179–87.

Swiggum, K E, Anderson, S D and Russell, J S (1994) Case Study of Burlington Cable‐Stayed Bridge. Journal of Construction Engineering and Management, 120(03), 649–66.

Tam, C M, Tong, T K L, Leung, A W T and Chiu, G W C (2002) Site Layout Planning using Nonstructural Fuzzy Decision Support System. Journal of Construction Engineering and Management, 128(03), 220–31.

Tan, Y, Shen, L and Langston, C (2012) Competition Environment, Strategy, and Performance in the Hong Kong Construction Industry. Journal of Construction Engineering and Management, 138(03), 352–60.

Tang, W, Duffield, C F and Young, D M (2006) Partnering Mechanism in Construction: An Empirical Study on the Chinese Construction Industry. Journal of Construction Engineering and Management, 132(03), 217–29.

Tatum, C B (1988) Classification System for Construction Technology. Journal of Construction Engineering and Management, 114(03), 344–63.

Tatum, C B (1984) Organizing Large Projects: How Managers Decide. Journal of Construction Engineering and Management, 110(03), 346–58.

Tatum, C B (1984) What Prompts Construction Innovation?. Journal of Construction Engineering and Management, 110(03), 311–23.

Tatum, C B ( (2018) Construction Engineering Research: Integration and Innovation. Journal of Construction Engineering and Management, 144(03).

Tatum, C B ( (2018) Learning Construction Engineering: Why, What, and How?. Journal of Construction Engineering and Management, 144(03).

Thomas, H R (1991) Labor Productivity and Work Sampling: The Bottom Line. Journal of Construction Engineering and Management, 117(03), 423–44.

Thomas, H R and Bluedorn, A C (1986) Case Study of Organizational Changes. Journal of Construction Engineering and Management, 112(03), 358–69.

Thomas, H R and Daily, J (1983) Crew Performance Measurement Via Activity Sampling. Journal of Construction Engineering and Management, 109(03), 309–20.

Thomas, H R and Napolitan, C L (1995) Quantitative Effects of Construction Changes on Labor Productivity. Journal of Construction Engineering and Management, 121(03), 290–6.

Thomas, H R, Horman, M J, Minchin, R E and Chen, D (2003) Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle. Journal of Construction Engineering and Management, 129(03), 251–61.

Thomas, H R, Sanvido, V E and Sanders, S R (1989) Impact of Material Management on Productivity—A Case Study. Journal of Construction Engineering and Management, 115(03), 370–84.

Thomas, H R, Smith, G R and Ponderlick, R M (1992) Resolving Contract Disputes Based on Misrepresentations. Journal of Construction Engineering and Management, 118(03), 472–87.

Thomas, M U (2010) Models for Managing Contingency Construction Operations. Journal of Construction Engineering and Management, 136(03), 391–8.

Tiong, R L K (1995) Competitive Advantage of Equity in BOT Tender. Journal of Construction Engineering and Management, 121(03), 282–9.

Tiong, R L K (1996) CSFs in Competitive Tendering and Negotiation Model for BOT Projects . Journal of Construction Engineering and Management, 122(03), 205–11.

Tiong, R L K (1995) Impact of Financial Package versus Technical Solution in a BOT Tender. Journal of Construction Engineering and Management, 121(03), 304–11.

Tischer, T E and Kuprenas, J A (2003) Bridge Falsework Productivity—Measurement and Influences. Journal of Construction Engineering and Management, 129(03), 243–50.

Tomlinson, D P and Rhomberg, E J (1988) Contract Officer in Military Service Contracts. Journal of Construction Engineering and Management, 114(03), 441–57.

Tommelein, I D, Levitt, R E and Hayes‐Roth, B (1992) Site‐Layout Modeling: How Can Artificial Intelligence Help?. Journal of Construction Engineering and Management, 118(03), 594–611.

Toole, T M (2002) Construction Site Safety Roles. Journal of Construction Engineering and Management, 128(03), 203–10.

Toor, S and Ofori, G (2010) Positive Psychological Capital as a Source of Sustainable Competitive Advantage for Organizations. Journal of Construction Engineering and Management, 136(03), 341–52.

Torbica, Z M and Stroh, R C (1999) Impact of Total Quality Management on Home-Buyer Satisfaction. Journal of Construction Engineering and Management, 125(03), 198–203.

Touran, A (1990) Integration of Simulation with Expert Systems. Journal of Construction Engineering and Management, 116(03), 480–93.

Touran, A (2010) Probabilistic Approach for Budgeting in Portfolio of Projects. Journal of Construction Engineering and Management, 136(03), 361–6.

Touran, A (2003) Probabilistic Model for Cost Contingency. Journal of Construction Engineering and Management, 129(03), 280–4.

Touran, A and Suphot, L (1997) Rank Correlations In Simulating Construction Costs. Journal of Construction Engineering and Management, 123(03), 297–301.

Townsend, K, Lingard, H, Bradley, L and Brown, K (2012) Complicated Working Time Arrangements: Construction Industry Case Study. Journal of Construction Engineering and Management, 138(03), 443–8.

Tsimberdonis, A I and Murphree, E L (1994) Equipment Management through Operational Failure Costs. Journal of Construction Engineering and Management, 120(03), 522–35.

Umer, W, Yu, Y and Antwi Afari, M F (2022) Quantifying the Effect of Mental Stress on Physical Stress for Construction Tasks. Journal of Construction Engineering and Management, 148(03).

van Buiten, M and Hartmann, A (2015) Asset Management Perspective on the Duration of Public-Private Partnership Contracts: Cost-Control Trade-off?. Journal of Construction Engineering and Management, 141(03).

Votto, R, Lee Ho, L and Berssaneti, F (2020) Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring. Journal of Construction Engineering and Management, 146(03).

W. L., S, Rybel, V W and Cochran, L (1986) Dewatering for Opal Springs Powerhouse Excavation. Journal of Construction Engineering and Management, 112(03), 440–51.

Walker, K K, Schexnayder, C, Mayo, R E and Walsh, K D (1996) Methods and Procedural Considerations in Demolishing Tall Concrete Chimneys . Journal of Construction Engineering and Management, 122(03), 223–30.

Walsh, K D, Sawhney, A and Bashford, H H (2007) Production Equations for Unsteady-State Construction Processes. Journal of Construction Engineering and Management, 133(03), 254–61.

Wang, Q, Guo, Z, Mintah, K, Li, Q, Mei, T and Li, P (2019) Cell-Based Transport Path Obstruction Detection Approach for 4D BIM Construction Planning. Journal of Construction Engineering and Management, 145(03).

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (2000) Evaluation and Management of Political Risks in China's BOT Projects. Journal of Construction Engineering and Management, 126(03), 242–50.

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (1999) Political Risks: Analysis of Key Contract Clauses in China's BOT Project. Journal of Construction Engineering and Management, 125(03), 190–7.

Wang, W (2004) Electronic-Based Procedure for Managing Unbalanced Bids. Journal of Construction Engineering and Management, 130(03), 455–60.

Warszawski, A (1984) Construction Management Program. Journal of Construction Engineering and Management, 110(03), 297–310.

Warszawski, A (1983) Planning and Organization of Research in Building. Journal of Construction Engineering and Management, 109(03), 261–75.

Warszawski, A and Navon, R (1991) Robot for Interior‐Finishing Works. Journal of Construction Engineering and Management, 117(03), 402–22.

Warszawski, A and Sacks, R (2004) Practical Multifactor Approach to Evaluating Risk of Investment in Engineering Projects. Journal of Construction Engineering and Management, 130(03), 357–67.

Warszawski, A and Sangrey, D A (1985) Robotics in Building Construction. Journal of Construction Engineering and Management, 111(03), 260–80.

Wibby, R J (1985) Portland Cement Concrete Thin‐Bonded Overlay. Journal of Construction Engineering and Management, 111(03), 281–92.

Wibowo, A (2006) CAPM-Based Valuation of Financial Government Supports to Infeasible and Risky Private Infrastructure Projects. Journal of Construction Engineering and Management, 132(03), 239–48.

Wilkinson, R W (1984) Computerized Specifications on a Small Project. Journal of Construction Engineering and Management, 110(03), 337–45.

William C., I (1986) Future Directions for Computerized Construction Research. Journal of Construction Engineering and Management, 112(03), 326–45.

Williams, G C and Haston, J S (1984) Construction Materials Engineer, a Perspective. Journal of Construction Engineering and Management, 110(03), 387–9.

Williams, T P (1991) Hypertext Data Base Applications in Construction. Journal of Construction Engineering and Management, 117(03), 460–7.

Wilmot, C G and Cheng, G (2003) Estimating Future Highway Construction Costs. Journal of Construction Engineering and Management, 129(03), 272–9.

Wong, T K and Logcher, R D (1986) Contractors in Cyclical Economic Environments. Journal of Construction Engineering and Management, 112(03), 310–25.

Woolery, J C (1994) Developing Specifications for Cellular‐Telephone Base Stations. Journal of Construction Engineering and Management, 120(03), 593–602.

Woolery, J C and Crandall, K C (1983) Stochastic Network Model for Planning Scheduling. Journal of Construction Engineering and Management, 109(03), 342–54.

Yang, Y, Park, C, Kim, J and Kim, J (2007) Management of Daily Progress in a Construction Project of Multiple Apartment Buildings. Journal of Construction Engineering and Management, 133(03), 242–53.

Ye, S and Tiong, R L K (2000) NPV-at-Risk Method in Infrastructure Project Investment Evaluation. Journal of Construction Engineering and Management, 126(03), 227–33.

Yi, K J, Lee, H and Choi, Y K (2002) Network Creation and Development for Repetitive-Unit Projects. Journal of Construction Engineering and Management, 128(03), 257–64.

Yiu, T W and Lee, H K (2011) How Do Personality Traits Affect Construction Dispute Negotiation? Study of Big Five Personality Model. Journal of Construction Engineering and Management, 137(03), 169–78.

Yiu, T W, Cheung, S O and Siu, L Y (2012) Application of Bandura’s Self-Efficacy Theory to Examining the Choice of Tactics in Construction Dispute Negotiation. Journal of Construction Engineering and Management, 138(03), 331–40.

Yoon, S, Weidner, T and Hastak, M (2021) Total-Package-Prioritization Mitigation Strategy for Deferred Maintenance of a Campus-Sized Institution. Journal of Construction Engineering and Management, 147(03).

Yoon, Y, Patel, S, Ji, R and Hastak, M (2017) Current State of Reflective Cracking in the United States. Journal of Construction Engineering and Management, 143(03).

Zack, J G (1993) “Claimsmanship”: Current Perspective. Journal of Construction Engineering and Management, 119(03), 480–97.

Zayed, T M and Halpin, D W (2004) Quantitative Assessment for Piles Productivity Factors. Journal of Construction Engineering and Management, 130(03), 405–14.

Zayed, T M and Halpin, D W (2004) Simulation as a Tool for Pile Productivity Assessment. Journal of Construction Engineering and Management, 130(03), 394–404.

Zayed, T, Sharifi, M R, Baciu, S and Amer, M (2008) Slip-Form Application to Concrete Structures. Journal of Construction Engineering and Management, 134(03), 157–68.

Zhang, H and Lin, Y (2023) Prediction of Ergonomic Risks and Impacts on Construction Schedule through Agent-Based Simulation. Journal of Construction Engineering and Management, 149(03).

Zhang, H, Li, H and Tam, C M (2006) Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints. Journal of Construction Engineering and Management, 132(03), 259–67.

Zhang, H, Yan, X, Li, H, Jin, R and Fu, H (2019) Real-Time Alarming, Monitoring, and Locating for Non-Hard-Hat Use in Construction. Journal of Construction Engineering and Management, 145(03).

Zhang, L and El-Gohary, N M (2016) Epistemology-Based Context-Aware Semantic Model for Sustainable Construction Practices. Journal of Construction Engineering and Management, 142(03).

Zhang, L, Cheng, J and Fan, W (2016) Party Selection for Integrated Project Delivery Based on Interorganizational Transactive Memory System. Journal of Construction Engineering and Management, 142(03).

Zhang, P and Ng, F F (2013) Explaining Knowledge-Sharing Intention in Construction Teams in Hong Kong. Journal of Construction Engineering and Management, 139(03), 280–93.

Zhang, S, Jiang, P, Zhang, Z and Wang, C (2021) WebGIS-Based Collaborative Construction Quality Control of RCC Gravity Dam Using Sensing Devices. Journal of Construction Engineering and Management, 147(03).

Zhao, X, Hwang, B, Pheng Low, S and Wu, P (2015) Reducing Hindrances to Enterprise Risk Management Implementation in Construction Firms. Journal of Construction Engineering and Management, 141(03).

Zhong, B, Wu, H, Xiang, R and Guo, J (2022) Automatic Information Extraction from Construction Quality Inspection Regulations: A Knowledge Pattern–Based Ontological Method. Journal of Construction Engineering and Management, 148(03).

Zuniga-Garcia, N, Machemehl, R B, Khwaja, N A, Pruner, K D and Fu, M (2021) Estimation of Road User Costs for Work Zones in Data-Limited or Time-Constrained Environments. Journal of Construction Engineering and Management, 147(03).