Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 177 results ...

Abdul-Aziz, A-R (1995) Examination of the eclectic paradigm as applied to international contracting: with emphasis on the internalization dimension. Engineering, Construction and Architectural Management, 2(02), 105–20.

Abdullah, A H, Yaman, S K, Mohammad, H and Hassan, P F (2018) Construction manager’s technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(02), 153–77.

Abidin, N Z and Pasquire, C L (2005) Delivering sustainability through value management: Concept and performance overview. Engineering, Construction and Architectural Management, 12(02), 168–80.

Abraham, D M and Yeh, M H J (1999) Breakwater construction: an effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(02), 145–54.

Ahuja, V, Yang, J and Shankar, R (2010) IT-enhanced communication protocols for building project management. Engineering, Construction and Architectural Management, 17(02), 79.

Aibinu, A A, Dassanayake, D, Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(02), 190-213.

Aje, I (2012) The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(02), 159-72.

Al-Momani, A H (2000) Structuring information on residential building: a model of preference. Engineering, Construction and Architectural Management, 7(02), 179–90.

Al-Tabtabai, H and Alex, A P (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(02), 121–32.

Al-Tabtabai, H and Thomas, V P (2004) Negotiation and resolution of conflict using AHP: an application to project management. Engineering, Construction and Architectural Management, 11(02), 90–100.

Alaghbari, M W, Kadir, R A and Salim, E A (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(02), 192–206.

Alharbi, M, Emmitt, S and Demian, P (2015) What is architectural management? Towards a pragmatic definition. Engineering, Construction and Architectural Management, 22(02), 151-68.

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: a comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(02), 159–73.

Alshawi, M and Hassan, Z (1999) Integrated models for construction planning: object flow and relationship. Engineering, Construction and Architectural Management, 6(02), 197–212.

Amadi, C, Carrillo, P and Tuuli, M (2019) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.

Ansell, M, Evans, R, Holmes, M, Price, A and Pasquire, C (2009) An application of the construction management framework in highways major maintenance. Engineering, Construction and Architectural Management, 16(02), 162–74.

Arayici, Y and Aouad, G (2005) Computer integrated construction: an approach to requirements engineering. Engineering, Construction and Architectural Management, 12(02), 194–215.

Arditi, D, Koksal, A and Kale, S (2000) Business failures in the construction industry. Engineering, Construction and Architectural Management, 7(02), 120–32.

Arditi, D, Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(02), 90–103.

Back, W E and Sanders, S R (1998) Industry expectations for engineering graduates. Engineering, Construction and Architectural Management, 5(02), 137–43.

Balatbat, M C A, Lin, C-Y and Carmichael, D G (2011) Management efficiency performance of construction businesses: Australian data. Engineering, Construction and Architectural Management, 18(02), 140–58.

Baldwin, A, Li, H, Huang, T, Kong, C W, Guo, H L, Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(02), 150–61.

Barima, O and Rowlinson, S M (2010) Critical, manifest variables in virtual construction project value delivery. Engineering, Construction and Architectural Management, 17(02), 209.

Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(02), 201–15.

Besaiso, H, Fenn, P, Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine. Engineering, Construction and Architectural Management, 25(02), 241–56.

Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(02), 133–44.

Blismas, N G, Sher, W D, Thorpe, A and Baldwin, A N (2004) Factors influencing project delivery within construction clients' multi-project environments. Engineering, Construction and Architectural Management, 11(02), 113–25.

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration I: principles. Engineering, Construction and Architectural Management, 8(02), 104–13.

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration II: application. Engineering, Construction and Architectural Management, 8(02), 114–29.

Bowen, P A, Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: a South African study. Engineering, Construction and Architectural Management, 6(02), 91–104.

Bröchner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(02), 91–101.

Chalker, M and Loosemore, M (2016) Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(02), 192-210.

Chan, D W M, Lam, P T I, Chan, A P C and Wong, J M W (2011) Guaranteed maximum price (GMP) contracts in practice: a case study of a private office development project in Hong Kong. Engineering, Construction and Architectural Management, 18(02), 188–205.

Chan, I Y S, Leung, M-y and Yuan, T (2014) Structural relationships between cultural values and coping behaviors of professionals in the stressful construction industry. Engineering, Construction and Architectural Management, 21(02), 133-51.

Chan, J K W, Tam, C M and Cheung, R K C (2005) Construction firms at the crossroads in Hong Kong: Going insolvency or seeking opportunity. Engineering, Construction and Architectural Management, 12(02), 111–24.

Chang, S-h (2013) Evaluating essential liabilities on design professionals under earthquake’s impact: Taiwan experience. Engineering, Construction and Architectural Management, 20(02), 181-94.

Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(02), 321–48.

Chileshe, N, Rameezdeen, R and Hosseini, M R (2016) Drivers for adopting reverse logistics in the construction industry: A qualitative study. Engineering, Construction and Architectural Management, 23(02), 134-57.

Chinda, T and Mohamed, S (2008) Structural equation model of construction safety culture. Engineering, Construction and Architectural Management, 15(02), 114–31.

Cox, A and Townsend, M (1997) Latham as half-way house: a relational competence approach to better practice in construction procurement. Engineering, Construction and Architectural Management, 4(02), 143–58.

Dainty, A R J, Bagilhole, B M and Neale, R H (2000) The compatibility of construction companies’ human resource development policies with employee career expectations. Engineering, Construction and Architectural Management, 7(02), 169–78.

Dalal, J, Mohapatra, P K J and Mitra, G C (2010) Prioritization of rural roads: AHP in group decision. Engineering, Construction and Architectural Management, 17(02), 58.

Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(02), 30.

Edirisinghe, R (2019) Digital skin of the construction site. Engineering, Construction and Architectural Management, 26(02), 184–223.

Emmitt, S (1999) Architectural management: an evolving field. Engineering, Construction and Architectural Management, 6(02), 188–96.

Ezulike, E L and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(02), 144–9.

Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(02), 182–8.

Fergusson, H and Langford, D A (2006) Strategies for managing environmental issues in construction organizations. Engineering, Construction and Architectural Management, 13(02), 171–85.

Flanagan, R, Norman, G and Worrall, H (1995) Trade performance of the UK building materials and components industries. Engineering, Construction and Architectural Management, 2(02), 141–62.

Fortune, C and Setiawan, S (2005) Partnering practice and the delivery of construction projects for Housing Associations in the UK. Engineering, Construction and Architectural Management, 12(02), 181–93.

Gerrish, T, Ruikar, K, Cook, M, Johnson, M and Phillip, M (2017) Using BIM capabilities to improve existing building energy modelling practices. Engineering, Construction and Architectural Management, 24(02), 190-208.

Glass, J and Simmonds, M (2007) “Considerate construction”: case studies of current practice. Engineering, Construction and Architectural Management, 14(02), 131–49.

Gluch, P and Räisänen, C (2012) What tensions obstruct an alignment between project and environmental management practices?. Engineering, Construction and Architectural Management, 19(02), 127-40.

Goodrum, P M, Wan, Y and Fenouil, P C (2009) A decision-making system for accelerating roadway construction. Engineering, Construction and Architectural Management, 16(02), 116–35.

Gunarathna, C, Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(02), 178–201.

Hansen, K L, MGann, D and Groák, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(02), 115–26.

Hao, J L, Hill, M J and Shen, L Y (2008) Managing construction waste on-site through system dynamics modelling: the case of Hong Kong. Engineering, Construction and Architectural Management, 15(02), 103–13.

Hare, B and Cameron, I (2012) Health and safety gateways for construction project planning. Engineering, Construction and Architectural Management, 19(02), 192-204.

  • Type: Journal Article
  • Keywords: gateway; health and safety; integration; pre-construction planning; United Kingdom
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/09699981211206115
  • Abstract:
    Purpose - This paper aims to report on the findings from a research project, commissioned by the UK Health and Safety Executive (HSE), investigating the integration of health and safety (H&S) with construction planning. Design/methodology/approach - A combination of group and individual interviews were undertaken with qualitative methods of analysis to develop an integrated process model. Findings - The model developed uses "Gateway" decision points, which allows flexibility and the early integration of H&S at a strategic level, although detailed planning is still required through the use of integrated management tools. Practical implications - This study will help practitioners who wish to integrate CDM principles using a process model. It has also informed the HSE with policy decisions for their review of the Construction Design and Management Regulations 1994. Originality/value - Previous research on construction H&S has tended to concentrate on site management. This study extends knowledge and understanding of how H&S can be integrated at the planning stage of projects.

Hastheetham, A and Hadikusumo, B H W (2011) Theoretical framework of strategic behaviours in Thai contractors: An empirical case study. Engineering, Construction and Architectural Management, 18(02), 206–25.

Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: an introduction to the problem. Engineering, Construction and Architectural Management, 8(02), 80–9.

Hindle, R D and Rwelamila, P D (1998) Resistance to change: architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(02), 150–8.

Hong, Y, Hammad, A W, Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(02), 154–83.

Huo, X, Yu, A T W, Zezhou, W and Jayantha, W M (2019) Site planning and design of green residential building projects: case studies in China. Engineering, Construction and Architectural Management, 27(02), 525–43.

Hwang, B-G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(02), 190-205.

Hwang, B-G, Tan, H F and Sathish, S (2013) Capital project performance measurement and benchmarking in Singapore. Engineering, Construction and Architectural Management, 20(02), 143-59.

Hwang, B-G, Zhao, X and Chin, E W Y (2017) International construction joint ventures between Singapore and developing countries: Risk assessment and allocation preferences. Engineering, Construction and Architectural Management, 24(02), 209-28.

Hyung, W, Kim, S and Jo, J (2019) Improved similarity measure in case-based reasoning: a case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(02), 561–78.

Isik, Z, Arditi, D, Dilmen, I and Birgonul, M T (2010) The role of exogenous factors in the strategic performance of construction companies. Engineering, Construction and Architectural Management, 17(02), 34.

Jaafar, M, Ramayah, T, Abdul-Aziz, A-R and Saad, B (2007) Technology readiness among managers of Malaysian construction firms. Engineering, Construction and Architectural Management, 14(02), 180–91.

Jiang, W and Lu, Y (2017) Influence of initial trust on control from client perspective: Construction industry in China. Engineering, Construction and Architectural Management, 24(02), 326-45.

Johari, S and Jha, K N (2019) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(02), 321–40.

Junnonen, J M (1998) Strategy formation in construction firms. Engineering, Construction and Architectural Management, 5(02), 107–14.

Kagioglou, M, Cooper, R, Aouad, G F and Sexton, M (2000) Rethinking construction: the generic design and construction process protocol. Engineering, Construction and Architectural Management, 7(02), 141–53.

Kaplanogu, S B and Arditi, D (2009) Pre-project peer reviews in GMP/lump sum contracts. Engineering, Construction and Architectural Management, 16(02), 175–85.

Kavishe, N, Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects. Engineering, Construction and Architectural Management, 25(02), 202–40.

Kikwasi, G J (2011) An evaluation of construction skills in Tanzania. Engineering, Construction and Architectural Management, 18(02), 127–39.

Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(02), 126–32.

Kpamma, Z E, Adjei-Kumi, T, Ayarkwa, J and Adinyira, E (2017) Participatory design, wicked problems, choosing by advantages. Engineering, Construction and Architectural Management, 24(02), 289-307.

Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(02), 95–111.

Kumaraswamy, M M, Ng, S T, Ugwu, O O, Palaneeswaran, E and Rahman, M M (2004) Empowering collaborative decisions in complex construction project scenarios. Engineering, Construction and Architectural Management, 11(02), 133–42.

Lam, K C, Hu, T, Cheung, S O, Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(02), 130–44.

Langford, D, Rowlinson, S M and Sawacha, E (2000) Safety behaviour and safety management: its influence on the attitudes of workers in the UK construction industry. Engineering, Construction and Architectural Management, 7(02), 133–40.

Lê, M A T and Brønn, C (2007) Linking experience and learning: application to multi-project building environments. Engineering, Construction and Architectural Management, 14(02), 150–63.

Lee, J, Blumenstein, M, Guan, H and Loo, Y-C (2013) Minimising uncertainty in long-term prediction of bridge element. Engineering, Construction and Architectural Management, 20(02), 127-42.

Leung, M-y, Liu, A M M and Ng, S T (2005) Is there a relationship between construction conflicts and participants' satisfaction?. Engineering, Construction and Architectural Management, 12(02), 149–67.

Li, B, Akintoye, A, Edwards, P J and Hardcastle, C (2005) PFI procurement for construction projects in the UK: Findings from a questionnaire survey. Engineering, Construction and Architectural Management, 12(02), 125–48.

Li, H, Jin, Z, Li, V, Liu, G and Skitmore, R M (2013) An entry mode decision-making model for the international expansion of construction enterprises. Engineering, Construction and Architectural Management, 20(02), 160-80.

Li, X, Wang, X and Lei, L (2019) The application of an ANP-Fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(02), 356–84.

Liang, L Y, Thompson, R G and Young, D M (2004) Optimizing the design of sewer networks using genetic algorithms and tabu search. Engineering, Construction and Architectural Management, 11(02), 101–12.

Limsila, K and Ogunlana, S O (2008) Performance and leadership outcome correlates of leadership styles and subordinate commitment. Engineering, Construction and Architectural Management, 15(02), 164–84.

Ling, F Y Y and Lee, S Y (2012) Careers development in construction firms: application of Sun Tzu's Art of War principles. Engineering, Construction and Architectural Management, 19(02), 173-91.

Ling, F Y Y, Tan, P C, Ning, Y, Teo, A and Gunawansa, A (2015) Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore. Engineering, Construction and Architectural Management, 22(02), 169-89.

Lingard, H, Cooke, T and Blismas, N (2011) Coworkers' response to occupational health and safety: an overlooked dimension of group-level safety climate in the construction industry?. Engineering, Construction and Architectural Management, 18(02), 159–75.

Liu, A M-M (1999) A research model of project complexity and goal commitment effects on project outcome. Engineering, Construction and Architectural Management, 6(02), 105–11.

Liu, J, Lin, S and Feng, Y (2018) Understanding why Chinese contractors are not willing to purchase construction insurance. Engineering, Construction and Architectural Management, 25(02), 257–72.

Liu, T and Wilkinson, S (2014) Using public-private partnerships for the building and management of school assets and services. Engineering, Construction and Architectural Management, 21(02), 206-23.

Lombardi, P (1997) Decision making in urban regeneration plans. Engineering, Construction and Architectural Management, 4(02), 127–42.

Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(02), 115–37.

Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(02), 189–98.

Loudoun, R and Townsend, K (2017) Implementing health promotion programs in the Australian construction industry: Levers and agents for change. Engineering, Construction and Architectural Management, 24(02), 260-74.

Love, P E D, Smith, J, Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(02), 191–201.

Lu, X and Davis, S (2018) Priming effects on safety decisions in a virtual construction simulator. Engineering, Construction and Architectural Management, 25(02), 273–94.

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(02), 127–36.

Mawdesley, M J, Askew, W H and Al-Jibouri, S H (2004) Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11(02), 83–9.

Meiling, J, Backlund, F and Johnsson, H (2012) Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management, 19(02), 141-58.

Mellado, F, Lou, E C and Becerra, C L C (2019) Synthesising performance in the construction industry. Engineering, Construction and Architectural Management, 27(02), 579–608.

Molad, C and Back, W E (1995) EDI's role as an enabler for electronic commerce and information integration. Engineering, Construction and Architectural Management, 2(02), 93–104.

Mpofu, B, Ochieng, E G, Moobela, C and Pretorius, A (2017) Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(02), 346-76.

Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: a FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(02), 177–87.

Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(02), 186–200.

Ng, S T, Skitmore, M R and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(02), 155–65.

Nwaogu, J M, Chan, A P, Hon, C K and Darko, A (2019) Review of global mental health research in the construction industry. Engineering, Construction and Architectural Management, 27(02), 385–410.

O'Reilly, M P and Mawdesley, M J (1994) The evaluation of construction disputes: a risk approach. Engineering, Construction and Architectural Management, 1(02), 103–14.

Ofori, G and Gang, G (2001) ISO 9000 certification of Singapore construction enterprises: its costs and benefits and its role in the development of the industry. Engineering, Construction and Architectural Management, 8(02), 145–57.

Oyedele, L O (2010) Sustaining architects' and engineers' motivation in design firms: An investigation of critical success factors. Engineering, Construction and Architectural Management, 17(02), 96.

Parn, E A and Edwards, D (2019) Cyber threats confronting the digital built environment. Engineering, Construction and Architectural Management, 26(02), 245–66.

Perry, J G and Barnes, M (2000) Target cost contracts: an analysis of the interplay between fee, target, share and price. Engineering, Construction and Architectural Management, 7(02), 202–8.

Plantinga, H, Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager’s choice of procurement instruments. Engineering, Construction and Architectural Management, 26(02), 303–20.

Poh, P S H and Horner, R M W (1995) Cost-significant modelling: potential for use in South-East Asia. Engineering, Construction and Architectural Management, 2(02), 121–39.

Poon, C S, Yu, A T W and Ng, L H (2003) Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Engineering, Construction and Architectural Management, 10(02), 88–98.

Poortman, E R and Bons, H N M (1994) Information for the management of the building-materials flow. Engineering, Construction and Architectural Management, 1(02), 139–46.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(02), 174–81.

Rahman, M M and Kumaraswamy, M M (2002) Risk management trends in the construction industry: moving towards joint risk management. Engineering, Construction and Architectural Management, 9(02), 131–51.

Rajeh, M, Tookey, J E and Rotimi, J O B (2015) Estimating transaction costs in the New Zealand construction procurement: A structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(02), 242-67.

Rowlinson, S and Croker, N (2006) IT sophistication, performance and progress towards formal electronic communication in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 13(02), 154–70.

Salah, A and Moselhi, O (2015) Contingency modelling for construction projects using fuzzy-set theory. Engineering, Construction and Architectural Management, 22(02), 214-41.

Salvado, F, Almeida, N and Vale e Azevedo, A (2019) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(02), 441–57.

Sambasivan, M, Deepak, T J, Salim, A N and Ponniah, V (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics and structural equation modeling approach. Engineering, Construction and Architectural Management, 24(02), 308-25.

Sandrk, N I and Huemann, M (2016) Organizational culture of the Croatian construction industry. Engineering, Construction and Architectural Management, 23(02), 237-60.

Sarshar, M, Tanyer, A M, Aouad, G and Underwood, J (2002) A vision for construction IT 2005–2010: two case studies. Engineering, Construction and Architectural Management, 9(02), 152–60.

Schröpfer, V L M, Tah, J and Kurul, E (2017) Mapping the knowledge flow in sustainable construction project teams using social network analysis. Engineering, Construction and Architectural Management, 24(02), 229-59.

Scott, R (1995) Invited paper: Competitive advantage through alliancing. Engineering, Construction and Architectural Management, 2(02), 83–92.

Sebastian, R (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(02), 176–87.

Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(02), 186–200.

Seneviratne, K, Amaratunga, D and Haigh, R (2017) Managing housing needs of post conflict housing reconstruction: Sri Lankan perspective. Engineering, Construction and Architectural Management, 24(02), 275-88.

Sepasgozar, S M E, Loosemore, M and Davis, S R (2016) Conceptualising information and equipment technology adoption in construction: A critical review of existing research. Engineering, Construction and Architectural Management, 23(02), 158-76.

Shehab, T and Farooq, M (2013) Neural network cost estimating model for utility rehabilitation projects. Engineering, Construction and Architectural Management, 20(02), 118-26.

Shelton, J, Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(02), 177-91.

Simister, S J and Green, S D (1997) Recurring themes in value management practice. Engineering, Construction and Architectural Management, 4(02), 113–25.

Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(02), 66–80.

Singh, V and Holmström, J (2015) Needs and technology adoption: Observation from BIM experience. Engineering, Construction and Architectural Management, 22(02), 128-50.

Skitmore, M R and Lo, H P (2002) A method of identifying high outliers in construction contract auctions. Engineering, Construction and Architectural Management, 9(02), 90–130.

Stumpf, I (2000) Competitive pressures on middle-market contractors in the UK. Engineering, Construction and Architectural Management, 7(02), 159–68.

Sutrisna, M and Barrett, P (2007) Applying rich picture diagrams to model case studies of construction projects. Engineering, Construction and Architectural Management, 14(02), 164–79.

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(02), 267–84.

Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(02), 132–48.

Swan, W and Khalfan, M M A (2007) Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(02), 119–30.

Tah, J H M and Carr, V (2000) Information modelling for a construction project risk management system. Engineering, Construction and Architectural Management, 7(02), 107–19.

Tai, S, Wang, Y and Anumba, C J (2009) A survey on communications in large-scale construction projects in China. Engineering, Construction and Architectural Management, 16(02), 136–49.

Tan, W (2003) Building competitive advantage: construction education in Japan. Engineering, Construction and Architectural Management, 10(02), 78–87.

Tan, W (2000) Total factor productivity in Singapore construction. Engineering, Construction and Architectural Management, 7(02), 154–8.

Tas, E, Yaman, H and Tanacan, L (2008) A building material evaluation and selection model for the Turkish construction sector. Engineering, Construction and Architectural Management, 15(02), 149–63.

Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(02), 83–94.

Tong, T K L (2003) Fuzzy optimisation of labour allocation by generic algorithms. Engineering, Construction and Architectural Management, 10(02), 146–55.

Underwood, J and Watson, A (2003) An XML metadata approach to seamless project information exchange between heterogeneous platforms.. Engineering, Construction and Architectural Management, 10(02), 128–45.

Ungureanu, L C, Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules’ quality. Engineering, Construction and Architectural Management, 26(02), 224–44.

Utama, W P, Chan, A P, Zahoor, H, Gao, R and Jumas, D Y (2019) Making decision toward overseas construction projects. Engineering, Construction and Architectural Management, 26(02), 285–302.

Vee, C and Skitmore, M R (2003) Professional ethics in the construction industry. Engineering, Construction and Architectural Management, 10(02), 117–27.

Walker, A and Wing, C K (1999) The relationship between construction project management theory and transaction cost economics. Engineering, Construction and Architectural Management, 6(02), 166–76.

Wall, J and Ahmed, V (2008) Lessons learned from a case study in deploying blended learning continuing professional development. Engineering, Construction and Architectural Management, 15(02), 185–202.

Walsh, K D, Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(02), 123–35.

Wang, X, Shi, L, Wang, B and Kan, M (2019) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(02), 483–501.

Wantanakorn, D, Mawdesley, M J and Askew, W H (1999) Management errors in construction. Engineering, Construction and Architectural Management, 6(02), 112–20.

Wesz, J G B, Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(02), 134–52.

White, D and Fortune, J (2012) Using systems thinking to evaluate a major project: The case of the Gateshead Millennium Bridge. Engineering, Construction and Architectural Management, 19(02), 205-28.

Willar, D, Trigunarsyah, B and Coffey, V (2016) Organisational culture and quality management system implementation in Indonesian construction companies. Engineering, Construction and Architectural Management, 23(02), 114-33.

Wu, S, Clements-Croome, D, Fairey, V, Albany, B, Sidhu, J, Desmond, D and Neale, K (2006) Reliability in the whole life cycle of building systems. Engineering, Construction and Architectural Management, 13(02), 136–53.

Xiao, H and Proverbs, D (2002) Construction time performance: an evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(02), 81–9.

Xie, L-l, Yang, Y, Hu, Y and Chan, A P C (2014) Understanding project stakeholders’ perceptions of public participation in China's infrastructure and construction projects: Social effects, benefits, forms, and barriers. Engineering, Construction and Architectural Management, 21(02), 224-40.

Ye, K, Shen, L and Lu, W (2014) A discriminant model for measuring competition intensity of construction market. Engineering, Construction and Architectural Management, 21(02), 152-69.

Yevu, S K and Yu, A T W (2019) The ecosystem of drivers for electronic procurement adoption for construction project procurement. Engineering, Construction and Architectural Management, 27(02), 411–40.

Zarghami, S A and Gunawan, I (2019) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(02), 341–55.

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(02), 170-89.

Zhang, L and Fan, W (2013) Improving performance of construction projects: A project manager's emotional intelligence approach. Engineering, Construction and Architectural Management, 20(02), 195-207.

Zhou, S, Ng, S T, Lee, S H, Xu, F J and Yang, Y (2019) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(02), 458–82.

Zohrehvandi, S, Vanhoucke, M, Soltani, R and Javadi, M (2019) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(02), 502–24.

Zuppa, D, Olbina, S and Issa, R (2016) Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(02), 211-36.