Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 285 results ...

Öz, Ö (2001) Sources of competitive advantage of Turkish construction companies in international markets. Construction Management and Economics, 19(02), 135-44.

Agapiou, A, Clausen, L E, Flanagan, R, Norman, G and Notman, D (1998) The role of logistics in the materials flow control process: experiences from abroad. Construction Management and Economics, 16(02), 131-7.

Agapiou, A, Price, A D F and McCaffer, R (1995) Planning future construction skill requirements: understanding labour resource issues1. Construction Management and Economics, 13(02), 149-61.

Ahmad, I U, Russell, J S and Abou-Zeid, A (1995) Information technology (IT) and integration in the construction industry. Construction Management and Economics, 13(02), 163-71.

Akintoye, A (1994) Design and build: a survey of construction contractors' views. Construction Management and Economics, 12(02), 155-63.

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(02), 105-13.

Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(02), 161-72.

Akintoye, A, Ajewolfe, O and Olomolaiye, P O (1992) Construction cost information management in Nigeria. Construction Management and Economics, 10(02), 107-16.

Akintoye, A, Bowen, P A and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(02), 159-75.

Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(02), 61.

Alkass, S, Mazerolle, M and Harris, F C (1998) Note - Rigour in research and peer-review: a reply. Construction Management and Economics, 16(02), 139-40.

Allam, S I G (1988) Multi-project scheduling: a new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(02), 93-115.

Ameen, J R M, Neale, R H and Abrahamson, M (2003) An application of regression analysis to quality a claim for increased costs. Construction Management and Economics, 21(02), 156-65.

Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(02), 75.

Andi and Minato, T (2004) Representing causal mechanism of defective designs: exploration through case studies. Construction Management and Economics, 22(02), 183-92.

Aniekwu, A N and Okpala, D C (1988) The effect of systemic factors on contract services in Nigeria. Construction Management and Economics, 6(02), 171-82.

Aoieong, R T, Tang, S L and Ahmed, S M (2002) A process approach in measuring quality costs of construction projects: model development. Construction Management and Economics, 20(02), 179-92.

Aouad, G F and Price, A D F (1994) Construction planning and information technology in the UK and USA construction industries: a comparative study. Construction Management and Economics, 12(02), 97-106.

Arditi, D and Lee, D-E (2003) Assessing the corporate service quality performance of design build contractors using quality function deployment. Construction Management and Economics, 21(02), 175-85.

Arditi, D and Lee, D-E (2004) Note - Service quality performance of design/build contractors using quality function deployment. Construction Management and Economics, 22(02), 123-7.

Arditi, D, Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(02), 171-81.

Arlain, A G and Rakhra, A S (1988) Building code assessment framework. Construction Management and Economics, 6(02), 117-31.

Assaf, S A (1987) Feasibility assessment of large-scale housing development in Saudi Arabia: a case study. Construction Management and Economics, 5(02), 157-68.

Atkin, B (1993) Stereotypes and themes in building designs: insights for model builders. Construction Management and Economics, 11(02), 119-30.

Austin, S A, Baldwin, A N, Baizhan, L and Waskett, P (2000) Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18(02), 173-82.

Azman, M A, Hon, C K H, Skitmore, M, Lee, B L and Xia, B (2019) A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia. Construction Management and Economics, 37(02), 72–88.

Baker, S, Ponniah, D and Smith, S (1999) Risk response techniques employed currently for major projects. Construction Management and Economics, 17(02), 205-13.

Baldwin, A N, Austin, S A, Hassan, T M and Thorpe, A (1999) Modelling information flow during the conceptual and schematic stages of building design. Construction Management and Economics, 17(02), 155-67.

Betts, M and Liow, S R (1993) The relationship between teaching methods and educational objectives in building education. Construction Management and Economics, 11(02), 131-41.

Birnie, J and Yates, A (1991) Cost prediction using decision/risk analysis methodologies. Construction Management and Economics, 9(02), 171-86.

Blismas, N, Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(02), 121-30.

Bon, R (1988) Replacement simulation model: a framework for building portfolio decisions. Construction Management and Economics, 6(02), 149-59.

Bon, R and Pietroforte, R (1993) New construction versus maintenance and repair construction technology in the US since World War II. Construction Management and Economics, 11(02), 151-62.

Bröchner, J (1990) Impacts of information technology on the structure of construction. Construction Management and Economics, 8(02), 205-18.

Brandon, P S (1984) Cost versus quality: a zero sum game?. Construction Management and Economics, 2(02), 111-26.

Bresnen, M and Marshall, N (2000) Partnering in construction: a critical review of issues, problems and dilemmas. Construction Management and Economics, 18(02), 229-37.

Brett-Jones, A T (1983) Barchester low-rise: a case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(02), 91-117.

Briscoe, G H, Dainty, A R J, Millett, S J and Neale, R H (2004) Client-led strategies for construction supply chain improvement. Construction Management and Economics, 22(02), 193-201.

Brownlie, S M and Harris, F C (1987) A review of finance for large-scale construction. Construction Management and Economics, 5(02), 115-21.

Burchett, J F and Tummala, V M R (1998) An application of the risk management process (RMP) in capital investment decisions for an EHV transmission line construction project. Construction Management and Economics, 16(02), 235-44.

Bygballe, L E, Håkansson, H and Jahre, M (2013) A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(02), 104-18.

Carbonara, N and Pellegrino, R (2020) The role of public private partnerships in fostering innovation. Construction Management and Economics, 38(02), 140–56.

Carmichael, D G (1986) Shovel-truck queues: a reconciliation of theory and practice. Construction Management and Economics, 4(02), 161-77.

Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(02), 189-96.

Chang, A S and Tien, C-C (2006) Quantifying uncertainty and equivocality in engineering projects. Construction Management and Economics, 24(02), 171-84.

Chang, C-Y (2013) A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(02), 99-103.

Chau, K W and Lai, L W C (1994) A comparison between growth in labour productivity in the construction industry and the economy. Construction Management and Economics, 12(02), 183-5.

Chau, K W and So, A T P (1995) A fuzzy expert system for contract decision making. Construction Management and Economics, 13(02), 95-103.

Chen, J J (1996) The impact of public construction investment upon special economic zones: the Chinese experience. Construction Management and Economics, 14(02), 175-82.

Cherns, A B and Bryant, D T (1984) Studying the client's role in construction management. Construction Management and Economics, 2(02), 177-84.

Chiang, Y-H, Tang, B-S and Wong, F K W (2008) Volume building as competitive strategy. Construction Management and Economics, 26(02), 161–76.

Connaughton, J, Meikle, J and Teerikangas, S (2015) Mergers, acquisitions and the evolution of construction professional services firms. Construction Management and Economics, 33(02), 146-59.

Cornick, T and Osbon, K (1994) A study of the contractor's quantity surveying practice during the construction process. Construction Management and Economics, 12(02), 107-11.

Cuervo, J C and Low, S P (2005) Significance of internalization factors for Singapore transnational construction corporations. Construction Management and Economics, 23(02), 147-62.

Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(02), 91-104.

Dainty, A R J, Bagilhole, B M and Neale, R H (2000) A grounded theory of women's career under-achievement in large UK construction companies. Construction Management and Economics, 18(02), 239-50.

Dainty, A R J, Cheng, M-I and Moore, D R (2003) Redefining performance measures for construction project managers: an empirical evaluation. Construction Management and Economics, 21(02), 209-18.

Dansoh, A (2005) Strategic planning practice of construction firms in Ghana. Construction Management and Economics, 23(02), 163-–8.

Dansoh, A, Frimpong, S and Oppong, G D (2020) Exploring the dimensions of traditional authority influencing stakeholder management at the pre-construction stage of infrastructure projects. Construction Management and Economics, 38(02), 189–206.

Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(02), 115-25.

Dawood, N N and Neale, R H (1993) Forecasting the sales of pre-cast concrete building products. Construction Management and Economics, 11(02), 81-98.

de Valence, G and Runeson, G (2015) Graham Ive and the methodology of construction economics. Construction Management and Economics, 33(02), 126-33.

Dewlaney, K S and Hallowell, M (2012) Prevention through design and construction safety management strategies for high performance sustainable building construction. Construction Management and Economics, 30(02), 165-77.

Drew, D S, Lai, P Y, Li, H and Lo, H P (2002) Correcting the fee-technical score variability imbalance in two-envelope fee tendering. Construction Management and Economics, 20(02), 157-66.

Edwards, B and Eckblad, J (1984) Motivating the British construction industry. Construction Management and Economics, 2(02), 145-56.

Edwards, D J and Holt, G D (2006) Hand-arm vibration exposure from construction tools: results of a field study. Construction Management and Economics, 24(02), 209-17.

Ekstrom, M A, Bjornsson, H C and Nass, C I (2003) Accounting for rater credibility when evaluating AEC subcontractors. Construction Management and Economics, 21(02), 197-208.

Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(02), 199–211.

Ewin, N A, Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(02), 109-33.

Faulkner, A C, Sargent, J H and Wearne, S H (1989) Civil engineers' managerial roles and needs: report of survey. Construction Management and Economics, 7(02), 155-74.

Fellows, M F, Phua, F T T and Tutt, D E (2023) Building bridges: the bilingual language work of migrant construction workers. Construction Management and Economics, 41(02), 153–71.

Fellows, R F (1991) Escalation management: forecasting the effects of inflation on building projects. Construction Management and Economics, 9(02), 187-204.

Finch, E F, Flanagan, R and Marsh, L (1996) Auto-ID application in construction. Construction Management and Economics, 14(02), 121-9.

Flanagan, R and Norman, G (1985) Sealed bid auctions: an application to the building industry. Construction Management and Economics, 3(02), 145-61.

Flanagan, R and Norman, G (1983) The accuracy and monitoring of quantity surveyors' price forecasting for building work. Construction Management and Economics, 1(02), 157-80.

Forsythe, P J (2007) A conceptual framework for studying customer satisfaction in residential construction. Construction Management and Economics, 25(02), 171–82.

Fox, S (2003) A matrix to indicate the utility of technologies. Construction Management and Economics, 21(02), 187-96.

Furusaka, S and Gray, C (1984) A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(02), 157-76.

Galea, N, Powell, A and Salignac, F (2023) The role of homosociality in maintaining men’s powerfulness in construction companies. Construction Management and Economics, 41(02), 172–82.

Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(02), 185–97.

Gerth, R, Boqvist, A, Bjelkemyr, M and Lindberg, B (2013) Design for construction: utilizing production experiences in development. Construction Management and Economics, 31(02), 135-50.

Glass, J (2005) A best practice process model for hybrid concrete construction. Construction Management and Economics, 23(02), 169-84.

Goh, B-H (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17(02), 231-41.

Goh, B-H (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: the case of the Singapore residential sector. Construction Management and Economics, 18(02), 209-17.

Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: partnering in-between systems of production, values and interests. Construction Management and Economics, 31(02), 119-34.

Graafland, J and Nijhof, A (2007) Transparency, market operation and trust in the Dutch construction industry: an exploratory study. Construction Management and Economics, 25(02), 195–205.

Gray, C (1986) 'Intelligent' construction time and cost analysis. Construction Management and Economics, 4(02), 135-50.

Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(02), 133-44.

Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(02), 121-44.

Green, S D (1996) A metaphorical analysis of client organizations and the briefing process. Construction Management and Economics, 14(02), 155-64.

Green, S D (1999) The missing arguments of lean construction. Construction Management and Economics, 17(02), 133--7.

Gregori, T and Pietroforte, R (2015) An input-output analysis of the construction sector in emerging markets. Construction Management and Economics, 33(02), 134-45.

Guo, K, Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: a public–private partnership perspective. Construction Management and Economics, 39(02), 156–72.

Gyi, D E, Gibb, A G F and Haslam, R A (1999) The quality of accident and health data in the construction industry: interviews with senior managers. Construction Management and Economics, 17(02), 197-204.

Haan, J D, Voordijk, H and Joosten, G-J (2002) Market strategies and core capabilities in the building industry. Construction Management and Economics, 20(02), 109-18.

Hague, D J (1985) Incentives and motivation in the construction industry: a critique. Construction Management and Economics, 3(02), 163-70.

Hamzeh, F R, Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(02), 61–71.

Han, S S and Ofori, G (2001) Construction industry in China's regional economy, 1990-1998. Construction Management and Economics, 19(02), 189-205.

Hanna, A S, Iskandar, K A and Lotfallah, W (2019) Benchmarking project performance: a guideline for assessing vulnerability of mechanical and electrical projects to productivity loss . Construction Management and Economics, 37(02), 101–11.

Hartwig, J and Kockat, J (2016) Macroeconomic effects of energetic building retrofit: Input-output sensitivity analyses. Construction Management and Economics, 34(02), 79-97.

Hatush, Z and Skitmore, M R (1997) Evaluating contractor prequalification data: selection criteria and project success factors. Construction Management and Economics, 15(02), 129-47.

Haynes, N S and Love, P E D (2004) Psychological adjustment and coping among construction project managers. Construction Management and Economics, 22(02), 129-40.

Hedborg, S and Rosander, L (2024) Self-organizing in urban development: developers coordinating between construction projects. Construction Management and Economics, 42(02), 114–28.

Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(02), 171-82.

Hegarty, T, Wright, S, Wordsworth, R and Lord, B (2023) Deferential Tailoring: a grounded theory of how women respond and adapt to social conditions and gender-related challenges in the New Zealand construction industry. Construction Management and Economics, 41(02), 138–52.

Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatised infrastructure projects. Construction Management and Economics, 20(02), 143-56.

Hosein, R and Lewis, T M (2005) Quantifying the relationship between aggregate GDP and construction value added in a small petroleum rich economy � a case study of Trinidad and Tobago. Construction Management and Economics, 23(02), 185-97.

Hua, G B (2007) Applying the strategic alignment model to business and ICT strategies of Singapore's small and medium-sized architecture, engineering and construction enterprises. Construction Management and Economics, 25(02), 157–69.

Huat, T P and Pheng, L S (1994) The fuzzy industry maturity grid (FIMG) and its application to the Singapore construction industry. Construction Management and Economics, 12(02), 125-38.

Hui, E C-M, Lo, T K K, Chen, J and Wang, Z (2012) Housing and consumer markets in urban China. Construction Management and Economics, 30(02), 117-31.

Hung, Y-H, Smith-Jackson, T and Winchester, W (2011) Use of attitude congruence to identify safety interventions for small residential builders. Construction Management and Economics, 29(02), 113–30.

Hwang, B-G, Thomas, S R, Degezelle, D and Caldas, C H (2008) Development of a benchmarking framework for pharmaceutical capital projects. Construction Management and Economics, 26(02), 177–95.

Ibbs, W C (1991) Innovative contract incentive features for construction. Construction Management and Economics, 9(02), 157-69.

Imbert, I D C (1990) Human issues affecting construction in developing countries. Construction Management and Economics, 8(02), 219-28.

Islam, M D M and Faniran, O O (2005) Structural equation model of project planning effectiveness. Construction Management and Economics, 23(02), 215-23.

Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(02), 163-6.

Kaka, A P (1994) Contractors' financial budgeting using computer simulation. Construction Management and Economics, 12(02), 113-24.

Kaminsky, J (2019) The global influence of national cultural values on construction permitting. Construction Management and Economics, 37(02), 89–100.

Kangari, R and Riggs, L S (1988) Portfolio management in construction. Construction Management and Economics, 6(02), 161-9.

Karrbom Gustavsson, T, Hallin, A and Dobers, P (2024) Stakeholder involvement in distributed projects: a performative approach to large scale urban sustainable development projects and the case of Stockholm Royal Seaport. Construction Management and Economics, 42(02), 146–61.

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(02), 135-46.

Kenley, R (2019) CME Forum: a response to “Construction flow index: a metric of production flow quality in construction”. Construction Management and Economics, 37(02), 112–9.

Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(02), 113-32.

Kim, Y-W and Kim, S-C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(02), 163–72.

Kokkonen, A and Vaagaasar, A L (2018) Managing collaborative space in multi-partner projects. Construction Management and Economics, 36(02), 83-95.

Kometa, S T, Olomolaiye, P O and Harris, F C (1995) Quantifying client-generated risk by project consultants. Construction Management and Economics, 13(02), 137-47.

Kometa, S T, Olomolaiye, P O and Harris, F C (1996) Validation of the model for evaluating client-generated risk by project consultants. Construction Management and Economics, 14(02), 131-45.

Kuitert, L, Willems, J and Volker, L (2024) Value integration in multi-functional urban projects: a value driven perspective on sustainability transitions. Construction Management and Economics, 42(02), 182–98.

Lam, K C, Hu, T, Ng, S T, Skitmore, M R and Cheung, S O (2001) A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19(02), 175-88.

Lam, K C, Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(02), 127-45.

Lam, Y T, Alum, J and Neale, R H (1994) Design and development of a KBES for planning and scheduling ready-mixed concrete supply. Construction Management and Economics, 12(02), 165-70.

Lambropoulos, J, Manolopoulos, N and Pantouvakis, J P (1996) SEMANTIC: smart earth moving analysis and estimation of cost. Construction Management and Economics, 14(02), 79-92.

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: an analysis of 30 Melbourne case studies. Construction Management and Economics, 26(02), 147–60.

Lansley, P R (1983) A practical approach to auditing organizational flexibility. Construction Management and Economics, 1(02), 145-56.

Lansley, P R (1987) Corporate strategy and survival in the UK construction industry. Construction Management and Economics, 5(02), 141-55.

Larsson, J, Eriksson, P E, Lingegård, S and Järvenpää, A (2022) Innovation outcomes and processes in infrastructure projects – a comparative study of Design-Build and Design-Build-Maintenance contracts. Construction Management and Economics, 40(02), 142–56.

Le, P L, Jarroudi, I, Dao, T and Chaabane, A (2021) Integrated construction supply chain: an optimal decision-making model with third-party logistics partnership. Construction Management and Economics, 39(02), 133–55.

Leather, P and Rolfe, S (1997) Fit for the task: the future of the small scale domestic repair and maintenance industry in the UK. Construction Management and Economics, 15(02), 201-12.

Leiringer, R, Gottlieb, S C, Fang, Y and Mo, X (2022) In search of sustainable construction: the role of building environmental assessment methods as policies enforcing green building. Construction Management and Economics, 40(02), 104–22.

Leishman, C and Warren, F (2006) Private housing design customization through house type substitution. Construction Management and Economics, 24(02), 149-58.

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(02), 119-44.

Leu, S-S and Hung, T-H (2002) A genetic algorithm-based optimal resource-constrained schedule simulation model. Construction Management and Economics, 20(02), 131-41.

Leung, M-Y and Chan, H K L (2007) Antecedents of commitment in construction management. Construction Management and Economics, 25(02), 113–27.

Leung, M-y, Liang, Q and Yu, J (2016) Development of a mindfulness-stress-performance model for construction workers. Construction Management and Economics, 34(02), 110-28.

Li, H and Love, P E D (1999) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(02), 169-76.

Li, H, Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(02), 151-64.

Lin, Y-H, Lee, P-C and Chang, T-P (2008) Integrating grey number and Minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information. Construction Management and Economics, 26(02), 115–23.

Lingard, H and Francis, V (2006) Does a supportive work environment moderate the relationship between work-family conflict and burnout among construction professionals?. Construction Management and Economics, 24(02), 185-96.

Lingard, H and Holmes, N (2001) Understandings of occupational health and safety risk control in small business construction firms: barriers to implementing technological controls. Construction Management and Economics, 19(02), 217-26.

Liu, A M M, Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: towards a conceptual model and a research agenda. Construction Management and Economics, 29(02), 173–83.

Liu, A M-M (2003) The quest for quality in public housing projects: a behaviour to outcome paradigm. Construction Management and Economics, 21(02), 147-58.

Liu, A M-M and Walker, A (1998) Evaluation of project outcomes. Construction Management and Economics, 16(02), 209-19.

Liu, Q, Feng, Y, London, K and Zhang, P (2023) Influence of personal characteristics and environmental stressors on mental health for multicultural construction workplaces in Australia. Construction Management and Economics, 41(02), 116–37.

Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(02), 103–13.

Loosemore, M (1999) Bargaining tactics in construction disputes. Construction Management and Economics, 17(02), 177-88.

Loosemore, M and Galea, N (2008) Genderlect and conflict in the Australian construction industry. Construction Management and Economics, 26(02), 125–35.

Loosemore, M and Lim, B T H (2018) Mapping corporate social responsibility strategies in the construction and engineering industry. Construction Management and Economics, 36(02), 67-82.

Loosemore, M, Phua, F, Dunn, K and Ozguc, U (2010) Operatives’ experiences of cultural diversity on Australian construction sites. Construction Management and Economics, 28(02), 88.

Love, P E D and Li, H (2000) Overcoming the problems associated with quality certification. Construction Management and Economics, 18(02), 139-49.

Love, P E D, Skitmore, M R and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(02), 221-33.

Low S P (1994) Balancing construction and marketing in world economic development: the four global scenarios. Construction Management and Economics, 12(02), 171-82.

Lowe, J G (1987) The measurement of productivity in the construction industry. Construction Management and Economics, 5(02), 101-13.

Lu, S-L and Sexton, M (2010) Career journeys and turning points of senior female managers in small construction firms. Construction Management and Economics, 28(02), 39.

Lutz, J D and Hijazi, A (1993) Planning repetitive construction: current practice. Construction Management and Economics, 11(02), 99-110.

MacSporran, C and Tucker, S N (1996) Target budget levels for building operating costs. Construction Management and Economics, 14(02), 103-19.

Male, S (1990) Professional authority, power and emerging forms of 'profession' in quantity surveying. Construction Management and Economics, 8(02), 191-204.

Manoliadis, O, Tsolas, I and Nakou, A (2006) Sustainable construction and drivers of change in Greece: a Delphi study. Construction Management and Economics, 24(02), 113-20.

Marshall, H E (1985) A graphical approach to discount payback. Construction Management and Economics, 3(02), 105-20.

Mastrandrea, F (1986) The liability of the construction project manager. Construction Management and Economics, 4(02), 105-34.

McGuffin, A A and Obonyo, E (2010) Enhancing performance: a case study of the effects of employee coaching in construction practice. Construction Management and Economics, 28(02), 9.

Menches, C L and Chen, J (2013) Using ecological momentary assessment to understand a construction worker's daily disruptions and decisions. Construction Management and Economics, 31(02), 180-94.

Miskawi, Z (1989) An S-curve equation for project control. Construction Management and Economics, 7(02), 115-24.

Mok, C K, Tummala, V M R and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(02), 161-75.

Murphy, R (2013) Strategic planning in construction professional service firms: a study of Irish QS practices. Construction Management and Economics, 31(02), 151-66.

Muya, M, Price, A D F and Edum-Fotwe, F T (2006) Overview of funding for construction craft skills training in Sub-Saharan Africa: a case study of Zambia. Construction Management and Economics, 24(02), 197-208.

Myers, D (2003) The future of construction economics as an academic discipline. Construction Management and Economics, 21(02), 103-6.

Nam, C H and Tatum, C B (1988) Major characteristics of constructed products and resulting limitations of construction technology. Construction Management and Economics, 6(02), 133-48.

Narbaev, T, De Marco, A and Orazalin, N (2020) A multi-disciplinary meta-review of the public–private partnerships research. Construction Management and Economics, 38(02), 109–25.

Navon, R and Maor, D (1995) Equipment replacement and optimal size of a civil engineering fleet. Construction Management and Economics, 13(02), 173-83.

Newaz, M T, Ershadi, M, Jefferies, M, Pillay, M and Davis, P (2023) A systematic review of contemporary safety management research: a multi-level approach to identifying trending domains in the construction industry. Construction Management and Economics, 41(02), 97–115.

Newton, S (1991) An agenda for cost modelling research. Construction Management and Economics, 9(02), 97-112.

Ng, F P, Björnsson, H C and Chiu, S S (2004) Valuing a price cap contract for material procurement as a real option. Construction Management and Economics, 22(02), 141-50.

Ng, S T, Fan, R Y C, Wong, J M W, Chan, A P C, Chiang, Y H, Lam, P T I and Kumaraswamy, M (2009) Coping with structural change in construction: experiences gained from advanced economies. Construction Management and Economics, 27(02), 165–80.

Ng, S T, Mak, M M Y, Skitmore, M R, Lam, K C and Varnam, M (2001) The predictive ability of Bromilow's time-cost model. Construction Management and Economics, 19(02), 165-73.

Nicolini, D (2002) In search of 'project chemistry'. Construction Management and Economics, 20(02), 167-77.

Odoemena, A T and Horita, M (2018) A strategic analysis of contract termination in public-private partnerships: Implications from cases in Sub-Saharan Africa. Construction Management and Economics, 36(02), 96-108.

Odusote, O O and Fellows, R F (1992) An examination of the importance of resource considerations when contractors make project selection decisions. Construction Management and Economics, 10(02), 137-51.

Ofori, G (1989) Housing in Singapore: determinants of success and lessons for the developing countries. Construction Management and Economics, 7(02), 137-53.

Ofori, G (1984) Improving the construction industry in declining developing economies. Construction Management and Economics, 2(02), 127-32.

Ofori, G (2003) Preparing Singapore's construction industry for the knowledge-based economy: practices, procedures and performance. Construction Management and Economics, 21(02), 113-25.

Ofori, G (1998) Sustainable construction: comment. Construction Management and Economics, 16(02), 141-5.

Ofori, G and Lean, C S (2001) Factors influencing development of construction enterprises in Singapore. Construction Management and Economics, 19(02), 145-54.

Ofori, G and Toor, S-U-R (2009) Research on cross-cultural leadership and management in construction: a review and directions for future research. Construction Management and Economics, 27(02), 119–33.

Ogunlana, S O (1991) Learning from experience in design cost estimating. Construction Management and Economics, 9(02), 133-50.

Ökmen, Ö and Öztaş, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(02), 12.

Olivieri, H, Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system. Construction Management and Economics, 36(02), 109-24.

Olomolaiye, P O and Ogunlana, S O (1989) A system for monitoring and improving construction operative productivity in Nigeria. Construction Management and Economics, 7(02), 175-86.

Pan, W, Gibb, A G F and Dainty, A R J (2007) Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(02), 183–94.

Peer, S (1986) An improved systematic activity sampling technique for work study. Construction Management and Economics, 4(02), 151-9.

Pellegrino, R, Costantino, N, Pietroforte, R and Sancilio, S (2012) Construction of multi-storey concrete structures in Italy: patterns of productivity and learning curves. Construction Management and Economics, 30(02), 103-15.

Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS Access� and MS Project�. Construction Management and Economics, 22(02), 203-11.

Petrovic-Lazarevic, S (2008) The development of corporate social responsibility in the Australian construction industry. Construction Management and Economics, 26(02), 93–101.

Phua, F T T (2013) Construction management research at the individual level of analysis: current status, gaps and future directions. Construction Management and Economics, 31(02), 167-79.

Picken, D H and Ilozor, B D (2003) Height and construction costs of building in Hong Kong. Construction Management and Economics, 21(02), 107-11.

Pietroforte, R, Bon, R and Gregori, T (2000) Regional development and construction in Italy: an input-output analysis, 1959-1992. Construction Management and Economics, 18(02), 151-9.

Powell, C (1989) Workload fluctuations and aspects of building quality. Construction Management and Economics, 7(02), 125-36.

Pretorius, F I H and Taylor, R G (1986) Conflict and individual coping behaviour in informal matrix organizations with the construction industry. Construction Management and Economics, 4(02), 87-104.

Prince, M W (1992) Implications of perception and strategy for engineers in construction management. Construction Management and Economics, 10(02), 93-105.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) European construction contractors: a productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(02), 221-30.

  • Type: Journal Article
  • Keywords: analysis of variance; Europe; in situ concrete; labour cost; productivity
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/014461999371727
  • Abstract:

    Site productivity levels for high-rise, in situ concrete operations are compared among three groups of European construction contractors. Results confirm significant differences between the contractor’ s productivity rates for each of the three countries investigated (Germany, France and the UK). German firms are the most efficient at reinforcement and concrete placing operations, whereas French firms are most productive at formwork. UK firms are the l east productive for two operations, namely form work and concrete. French firms are least productive at fixing reinforcement. Based on a specific model project, it is determined that French and German firms require significantly fewer man-hours to carry out the said concrete operations than do UK firms. UK contractors achieve the lowest levels of labour productivity for the operations involved. The UK also exhibited greater productivity variation, i.e. providing evidence of extreme (most and least efficient) levels of labour output for several concrete operations. Leading on from these analyses, a construction (labour) cost comparison indicates that French contractors are the least expensive. Furthermore, the ideal solution for clients would be to have French firms build their projects in the UK, since this combination provides the most economic solution to the model building overall.

Pu, W, Xu, F, Chen, R and Marques, R C (2020) PPP project procurement model selection in China: does it matter?. Construction Management and Economics, 38(02), 126–39.

Pulkka, L, Ristimäki, M, Rajakallio, K and Junnila, S (2016) Applicability and benefits of the ecosystem concept in the construction industry. Construction Management and Economics, 34(02), 129-16.

Radosavljevic, M and Horner, M (2007) Process planning methodology: dynamic short-term planning for off-site construction in Slovenia. Construction Management and Economics, 25(02), 143–56.

Raftery, J, Csete, J and Hui, S K-F (2001) Are risk attitudes robust? Qualitative evidence before and after a business cycle inflection. Construction Management and Economics, 19(02), 155-64.

Ranasinghe, M (1996) Mine restoration bond for clay mining and its impact on the prices of building materials in Sri Lanka. Construction Management and Economics, 14(02), 165-74.

Ray, R S, Hornibrook, J, Skitmore, M R and Zarkada-Fraser, A (1999) Ethics in tendering: a survey of Australian opinion and practice. Construction Management and Economics, 17(02), 139-53.

Roberts, J (1987) The business round-table construction industry cost effectiveness task force. Construction Management and Economics, 5(02), 95-100.

Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(02), 181–97.

Rogerson, R J, Giddings, B and Jefferies, M (2024) Constructing the future of the city centre: realizing visions. Construction Management and Economics, 42(02), 129–45.

Rooke, J D, Seymour, D E and Fellows, R F (2003) The claims culture: a taxonomy of attitudes in the industry. Construction Management and Economics, 21(02), 167-74.

Rosenfeld, Y (2009) Cost of quality versus cost of non-quality in construction: the crucial balance. Construction Management and Economics, 27(02), 107–17.

Roy, R, Brown, J and Gaze, C (2003) Re-engineering the construction process in the speculative house building sector. Construction Management and Economics, 21(02), 137-46.

Runeson, G and de Valence, G (2015) A critique of the methodology of building economics: trust the theories. Construction Management and Economics, 33(02), 117-25.

Russell, J S, Hancher, D E and Skibniewski, M J (1992) Contractor pre-qualification data for construction owners. Construction Management and Economics, 10(02), 117-35.

Sözen, Z and Kayahan, O (2001) Correlates of the length of the relationship between main and specialist trade contractors in the construction industry. Construction Management and Economics, 19(02), 131-3.

Saurin, T A, Formoso, C T and Guimarães, L B M (2004) Safety and production: an integrated planning and control model. Construction Management and Economics, 22(02), 159-69.

Sawhney, A and Mund, A (2001) IntelliCranes: an integrated crane type and model selection system. Construction Management and Economics, 19(02), 227-37.

Scharpff, J, Schraven, D, Volker, L, Spaan, M T J and de Weerdt, M M (2021) Can multiple contractors self-regulate their joint service delivery? A serious gaming experiment on road maintenance planning. Construction Management and Economics, 39(02), 99–116.

Scott, D (1987) Multi-objective economic evaluation of minor roading projects. Construction Management and Economics, 5(02), 169-81.

Scott, D and Kagiri, M (1992) Choosing the most appropriate method of construction with computer assistance. Construction Management and Economics, 10(02), 153-77.

Scott, S (1995) Checking the project plan. Construction Management and Economics, 13(02), 127-36.

Shammas-Toma, M, Seymour, D E and Clark, L (1998) Obstacles to implementing total quality management in the UK construction industry. Construction Management and Economics, 16(02), 177-92.

Sharafi, A, Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(02), 87–103.

Shash, A A (1993) Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(02), 111-8.

Shash, A A and Al-Amir, M (1997) Information technology in contractors' firms in Saudi Arabia. Construction Management and Economics, 15(02), 187-200.

Shen, Q, Li, H, Chung, J and Hui, P-Y (2004) A framework for identification and representation of client requirements in the briefing process. Construction Management and Economics, 22(02), 213-21.

Shields, T J, Silcock, G W and Donegan, H A (1990) Towards the development of a fire safety systems evaluation for public assembly buildings. Construction Management and Economics, 8(02), 147-58.

Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(02), 93-101.

Shohet, I M and Paciuk, M (2006) Service life prediction of exterior cladding components under failure conditions. Construction Management and Economics, 24(02), 131-48.

Shohet, I M, Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(02), 219-29.

Sidwell, A C (1990) Project management: dynamics and performance. Construction Management and Economics, 8(02), 159-79.

Sing, T-F (2002) Time to build options in construction processes. Construction Management and Economics, 20(02), 119-30.

Singh, S (1991) Cost estimation of prestressed concrete beam and reinforced concrete slab construction. Construction Management and Economics, 9(02), 205-15.

Skitmore, M R and Wilcock, J (1994) Estimating processes of smaller builders. Construction Management and Economics, 12(02), 139-54.

Skitmore, M R, Stradling, S G and Tuohy, A P (1989) Project management under uncertainty. Construction Management and Economics, 7(02), 103-13.

Smith, S D, Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(02), 219-28.

Sobotka, A (2000) Simulation modelling for logistics re-engineering in the construction company. Construction Management and Economics, 18(02), 183-95.

Soliman-Junior, J, Tzortzopoulos, P and Kagioglou, M (2022) Designers’ perspective on the use of automation to support regulatory compliance in healthcare building projects. Construction Management and Economics, 40(02), 123–41.

Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(02), 147-54.

Sozen, Z and Kucuk, M A (1999) Secondary subcontracting in the Turkish construction industry. Construction Management and Economics, 17(02), 215-20.

Srinivasan, R and Harris, F C (1991) Lane rental contracting. Construction Management and Economics, 9(02), 151-5.

Steele, A and Sodhi, D (2004) Black and minority ethnic contractors and consultants and UK housing associations' contracting power. Construction Management and Economics, 22(02), 151-7.

Styhre, A (2011) In the circuit of credibility: construction workers and the norms of "a good job". Construction Management and Economics, 29(02), 199–209.

Tam, C M, Tong, T K L, Cheung, S O and Chan, A P C (2001) Genetic algorithm model in optimizing the use of labour. Construction Management and Economics, 19(02), 207-15.

Tan, W (1999) Construction cost and building height. Construction Management and Economics, 17(02), 129-32.

Tang, S L, Lee, H K and Wong, K (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(02), 177-86.

Tang, Y H and Ogunlana, S O (2003) Modelling the dynamic performance of a construction organization. Construction Management and Economics, 21(02), 127-36.

Tavakoli, A and Kakalia, A (1993) MMS: a materials management system. Construction Management and Economics, 11(02), 143-9.

Tavakoli, N and Hosseini Nourzad, S H (2020) Win-win pricing method for BOT projects using a simulation-based evolutionary optimization. Construction Management and Economics, 38(02), 157–71.

Teo, M M and Loosemore, M (2011) Community-based protest against construction projects: a case study of movement continuity. Construction Management and Economics, 29(02), 131–44.

Trigunarsyah, B (2007) Project designers' role in improving constructability of Indonesian construction projects. Construction Management and Economics, 25(02), 207–15.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(02), 202.

van der Meer, J, Hartmann, A, van der Horst, A and Dewulf, G (2020) Multi-criteria decision analysis and quality of design decisions in infrastructure tenders: a contractor’s perspective. Construction Management and Economics, 38(02), 172–88.

van Mossel, H-J and Straub, A (2009) The need for customizing maintenance services in social housing. Construction Management and Economics, 27(02), 135–51.

Venselaar, M and Gruis, V (2016) Studying intra-organizational dynamics in implementing supply chain partnering: A case study about work floor experiences in a Dutch housing association. Construction Management and Economics, 34(02), 98-109.

Vigren, O (2024) Ecosystems in construction management and urban development: a comprehensive review of conceptualizations and contributions. Construction Management and Economics, 42(02), 162–81.

Waara, F (2008) Mitigating contractual hazards in public procurement: a study of Swedish local authorities. Construction Management and Economics, 26(02), 137–45.

Wakchaure, S S and Jha, K N (2012) Determination of bridge health index using analytical hierarchy process. Construction Management and Economics, 30(02), 133-49.

Walker, A and Hughes, W (1987) A project managed by a multi-disciplinary practice: a systems-based case study. Construction Management and Economics, 5(02), 123-40.

Walker, A and Hughes, W (1984) Private industrial project management: a systems-based case study. Construction Management and Economics, 2(02), 93-110.

Walker, D H T (1997) Choosing an appropriate research methodology. Construction Management and Economics, 15(02), 149-59.

Wang, C-H and Mei, Y-H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(02), 147-57.

Wang, C-H, Tsai, C-C and Cheng, Y-Y (2007) Knowledge-based diagnosis model for PCM executing problems in public construction. Construction Management and Economics, 25(02), 129–42.

Wang, R, Lu, W and Wei, Y (2021) Owners’ use of contract-based power in construction project transactions: restrictions from process specificity and uncertainty. Construction Management and Economics, 39(02), 117–32.

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (2000) Evaluation and management of foreign exchange and revenue risks in China's BOT projects. Construction Management and Economics, 18(02), 197-207.

Wang, W-C and Dzeng, R-J (2005) Applying cluster identification algorithm and simulation to generate probabilistic network schedules for design projects. Construction Management and Economics, 23(02), 199-213.

Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(02), 153–63.

Warszawski, A (1990) Expert systems for crane selection. Construction Management and Economics, 8(02), 179-90.

Wijesundera, D A and Harris, F C (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(02), 95-102.

Winch, G M (2015) Project organizing as a problem in information. Construction Management and Economics, 33(02), 106-16.

Winch, G, Usmani, A and Edkins, A (1998) Towards total project quality: a gap analysis approach. Construction Management and Economics, 16(02), 193-207.

Wong, K-C and Walker, A (2000) Property rights implications of public-private joint ventures. Construction Management and Economics, 18(02), 131-8.

Yang, J, Shen, P Q, Bourne, L, Ho, C M-F and Xue, X (2011) A typology of operational approaches for stakeholder analysis and engagement. Construction Management and Economics, 29(02), 145–62.

Ye, K, Shen, L and Tan, Y (2010) Response strategies to the competition in the Chinese construction market. Construction Management and Economics, 28(02), 24.

Zhang, H, Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(02), 159-69.

Zhang, J and Yuan, X (2021) Stochastic modelling of maintenance flexibility in Value for Money assessment of PPP road projects. Construction Management and Economics, 39(02), 173–91.