Öz, Ö (2001) Sources of competitive advantage of Turkish construction companies in international markets. Construction Management and Economics, 19(02), 135-44.

Agapiou, A, Clausen, L E, Flanagan, R, Norman, G and Notman, D (1998) The role of logistics in the materials flow control process: experiences from abroad. Construction Management and Economics, 16(02), 131-7.

Agapiou, A, Price, A D F and McCaffer, R (1995) Planning future construction skill requirements: understanding labour resource issues1. Construction Management and Economics, 13(02), 149-61.

Ahmad, I U, Russell, J S and Abou-Zeid, A (1995) Information technology (IT) and integration in the construction industry. Construction Management and Economics, 13(02), 163-71.

Akintoye, A (1994) Design and build: a survey of construction contractors' views. Construction Management and Economics, 12(02), 155-63.

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(02), 105-13.

Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(02), 161-72.

Akintoye, A, Ajewolfe, O and Olomolaiye, P O (1992) Construction cost information management in Nigeria. Construction Management and Economics, 10(02), 107-16.

Akintoye, A, Bowen, P A and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(02), 159-75.

Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(02), 61.

Alkass, S, Mazerolle, M and Harris, F C (1998) Note - Rigour in research and peer-review: a reply. Construction Management and Economics, 16(02), 139-40.

Allam, S I G (1988) Multi-project scheduling: a new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(02), 93-115.

Ameen, J R M, Neale, R H and Abrahamson, M (2003) An application of regression analysis to quality a claim for increased costs. Construction Management and Economics, 21(02), 156-65.

Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(02), 75.

Andi and Minato, T (2004) Representing causal mechanism of defective designs: exploration through case studies. Construction Management and Economics, 22(02), 183-92.

Aniekwu, A N and Okpala, D C (1988) The effect of systemic factors on contract services in Nigeria. Construction Management and Economics, 6(02), 171-82.

Aoieong, R T, Tang, S L and Ahmed, S M (2002) A process approach in measuring quality costs of construction projects: model development. Construction Management and Economics, 20(02), 179-92.

Aouad, G F and Price, A D F (1994) Construction planning and information technology in the UK and USA construction industries: a comparative study. Construction Management and Economics, 12(02), 97-106.

Arditi, D and Lee, D-E (2003) Assessing the corporate service quality performance of design build contractors using quality function deployment. Construction Management and Economics, 21(02), 175-85.

Arditi, D and Lee, D-E (2004) Note - Service quality performance of design/build contractors using quality function deployment. Construction Management and Economics, 22(02), 123-7.

Arditi, D, Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(02), 171-81.

Arlain, A G and Rakhra, A S (1988) Building code assessment framework. Construction Management and Economics, 6(02), 117-31.

Assaf, S A (1987) Feasibility assessment of large-scale housing development in Saudi Arabia: a case study. Construction Management and Economics, 5(02), 157-68.

Atkin, B (1993) Stereotypes and themes in building designs: insights for model builders. Construction Management and Economics, 11(02), 119-30.

Austin, S A, Baldwin, A N, Baizhan, L and Waskett, P (2000) Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18(02), 173-82.

Azman, M A, Hon, C K H, Skitmore, M, Lee, B L and Xia, B (2019) A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia. Construction Management and Economics, 37(02), 72–88.

Baker, S, Ponniah, D and Smith, S (1999) Risk response techniques employed currently for major projects. Construction Management and Economics, 17(02), 205-13.

Baldwin, A N, Austin, S A, Hassan, T M and Thorpe, A (1999) Modelling information flow during the conceptual and schematic stages of building design. Construction Management and Economics, 17(02), 155-67.

Betts, M and Liow, S R (1993) The relationship between teaching methods and educational objectives in building education. Construction Management and Economics, 11(02), 131-41.

Birnie, J and Yates, A (1991) Cost prediction using decision/risk analysis methodologies. Construction Management and Economics, 9(02), 171-86.

Blismas, N, Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(02), 121-30.

Bon, R (1988) Replacement simulation model: a framework for building portfolio decisions. Construction Management and Economics, 6(02), 149-59.

Bon, R and Pietroforte, R (1993) New construction versus maintenance and repair construction technology in the US since World War II. Construction Management and Economics, 11(02), 151-62.

Bröchner, J (1990) Impacts of information technology on the structure of construction. Construction Management and Economics, 8(02), 205-18.

Brandon, P S (1984) Cost versus quality: a zero sum game?. Construction Management and Economics, 2(02), 111-26.

Bresnen, M and Marshall, N (2000) Partnering in construction: a critical review of issues, problems and dilemmas. Construction Management and Economics, 18(02), 229-37.

Brett-Jones, A T (1983) Barchester low-rise: a case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(02), 91-117.

Briscoe, G H, Dainty, A R J, Millett, S J and Neale, R H (2004) Client-led strategies for construction supply chain improvement. Construction Management and Economics, 22(02), 193-201.

Brownlie, S M and Harris, F C (1987) A review of finance for large-scale construction. Construction Management and Economics, 5(02), 115-21.

Burchett, J F and Tummala, V M R (1998) An application of the risk management process (RMP) in capital investment decisions for an EHV transmission line construction project. Construction Management and Economics, 16(02), 235-44.

Bygballe, L E, Håkansson, H and Jahre, M (2013) A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(02), 104-18.

Carbonara, N and Pellegrino, R (2020) The role of public private partnerships in fostering innovation. Construction Management and Economics, 38(02), 140–56.

Carmichael, D G (1986) Shovel-truck queues: a reconciliation of theory and practice. Construction Management and Economics, 4(02), 161-77.

Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(02), 189-96.

Chang, A S and Tien, C-C (2006) Quantifying uncertainty and equivocality in engineering projects. Construction Management and Economics, 24(02), 171-84.

Chang, C-Y (2013) A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(02), 99-103.

Chau, K W and Lai, L W C (1994) A comparison between growth in labour productivity in the construction industry and the economy. Construction Management and Economics, 12(02), 183-5.

Chau, K W and So, A T P (1995) A fuzzy expert system for contract decision making. Construction Management and Economics, 13(02), 95-103.

Chen, J J (1996) The impact of public construction investment upon special economic zones: the Chinese experience. Construction Management and Economics, 14(02), 175-82.

Cherns, A B and Bryant, D T (1984) Studying the client's role in construction management. Construction Management and Economics, 2(02), 177-84.

Chiang, Y-H, Tang, B-S and Wong, F K W (2008) Volume building as competitive strategy. Construction Management and Economics, 26(02), 161–76.

Connaughton, J, Meikle, J and Teerikangas, S (2015) Mergers, acquisitions and the evolution of construction professional services firms. Construction Management and Economics, 33(02), 146-59.

Cornick, T and Osbon, K (1994) A study of the contractor's quantity surveying practice during the construction process. Construction Management and Economics, 12(02), 107-11.

Cuervo, J C and Low, S P (2005) Significance of internalization factors for Singapore transnational construction corporations. Construction Management and Economics, 23(02), 147-62.

Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(02), 91-104.

Dainty, A R J, Bagilhole, B M and Neale, R H (2000) A grounded theory of women's career under-achievement in large UK construction companies. Construction Management and Economics, 18(02), 239-50.

Dainty, A R J, Cheng, M-I and Moore, D R (2003) Redefining performance measures for construction project managers: an empirical evaluation. Construction Management and Economics, 21(02), 209-18.

Dansoh, A (2005) Strategic planning practice of construction firms in Ghana. Construction Management and Economics, 23(02), 163-–8.

Dansoh, A, Frimpong, S and Oppong, G D (2020) Exploring the dimensions of traditional authority influencing stakeholder management at the pre-construction stage of infrastructure projects. Construction Management and Economics, 38(02), 189–206.

Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(02), 115-25.

Dawood, N N and Neale, R H (1993) Forecasting the sales of pre-cast concrete building products. Construction Management and Economics, 11(02), 81-98.

de Valence, G and Runeson, G (2015) Graham Ive and the methodology of construction economics. Construction Management and Economics, 33(02), 126-33.

Dewlaney, K S and Hallowell, M (2012) Prevention through design and construction safety management strategies for high performance sustainable building construction. Construction Management and Economics, 30(02), 165-77.

Drew, D S, Lai, P Y, Li, H and Lo, H P (2002) Correcting the fee-technical score variability imbalance in two-envelope fee tendering. Construction Management and Economics, 20(02), 157-66.

Edwards, B and Eckblad, J (1984) Motivating the British construction industry. Construction Management and Economics, 2(02), 145-56.

Edwards, D J and Holt, G D (2006) Hand-arm vibration exposure from construction tools: results of a field study. Construction Management and Economics, 24(02), 209-17.

Ekstrom, M A, Bjornsson, H C and Nass, C I (2003) Accounting for rater credibility when evaluating AEC subcontractors. Construction Management and Economics, 21(02), 197-208.

Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(02), 199–211.

Ewin, N A, Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(02), 109-33.

Faulkner, A C, Sargent, J H and Wearne, S H (1989) Civil engineers' managerial roles and needs: report of survey. Construction Management and Economics, 7(02), 155-74.

Fellows, M F, Phua, F T T and Tutt, D E (2023) Building bridges: the bilingual language work of migrant construction workers. Construction Management and Economics, 41(02), 153–71.

Fellows, R F (1991) Escalation management: forecasting the effects of inflation on building projects. Construction Management and Economics, 9(02), 187-204.

Finch, E F, Flanagan, R and Marsh, L (1996) Auto-ID application in construction. Construction Management and Economics, 14(02), 121-9.

Flanagan, R and Norman, G (1985) Sealed bid auctions: an application to the building industry. Construction Management and Economics, 3(02), 145-61.

Flanagan, R and Norman, G (1983) The accuracy and monitoring of quantity surveyors' price forecasting for building work. Construction Management and Economics, 1(02), 157-80.

Forsythe, P J (2007) A conceptual framework for studying customer satisfaction in residential construction. Construction Management and Economics, 25(02), 171–82.

Fox, S (2003) A matrix to indicate the utility of technologies. Construction Management and Economics, 21(02), 187-96.

Furusaka, S and Gray, C (1984) A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(02), 157-76.

Galea, N, Powell, A and Salignac, F (2023) The role of homosociality in maintaining men’s powerfulness in construction companies. Construction Management and Economics, 41(02), 172–82.

Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(02), 185–97.

Gerth, R, Boqvist, A, Bjelkemyr, M and Lindberg, B (2013) Design for construction: utilizing production experiences in development. Construction Management and Economics, 31(02), 135-50.

Glass, J (2005) A best practice process model for hybrid concrete construction. Construction Management and Economics, 23(02), 169-84.

Goh, B-H (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17(02), 231-41.

Goh, B-H (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: the case of the Singapore residential sector. Construction Management and Economics, 18(02), 209-17.

Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: partnering in-between systems of production, values and interests. Construction Management and Economics, 31(02), 119-34.

Graafland, J and Nijhof, A (2007) Transparency, market operation and trust in the Dutch construction industry: an exploratory study. Construction Management and Economics, 25(02), 195–205.

Gray, C (1986) 'Intelligent' construction time and cost analysis. Construction Management and Economics, 4(02), 135-50.

Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(02), 133-44.

Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(02), 121-44.

Green, S D (1996) A metaphorical analysis of client organizations and the briefing process. Construction Management and Economics, 14(02), 155-64.

Green, S D (1999) The missing arguments of lean construction. Construction Management and Economics, 17(02), 133--7.

Gregori, T and Pietroforte, R (2015) An input-output analysis of the construction sector in emerging markets. Construction Management and Economics, 33(02), 134-45.

Guo, K, Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: a public–private partnership perspective. Construction Management and Economics, 39(02), 156–72.

Gyi, D E, Gibb, A G F and Haslam, R A (1999) The quality of accident and health data in the construction industry: interviews with senior managers. Construction Management and Economics, 17(02), 197-204.

Haan, J D, Voordijk, H and Joosten, G-J (2002) Market strategies and core capabilities in the building industry. Construction Management and Economics, 20(02), 109-18.

Hague, D J (1985) Incentives and motivation in the construction industry: a critique. Construction Management and Economics, 3(02), 163-70.

Hamzeh, F R, Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(02), 61–71.

Han, S S and Ofori, G (2001) Construction industry in China's regional economy, 1990-1998. Construction Management and Economics, 19(02), 189-205.

Hanna, A S, Iskandar, K A and Lotfallah, W (2019) Benchmarking project performance: a guideline for assessing vulnerability of mechanical and electrical projects to productivity loss . Construction Management and Economics, 37(02), 101–11.

Hartwig, J and Kockat, J (2016) Macroeconomic effects of energetic building retrofit: Input-output sensitivity analyses. Construction Management and Economics, 34(02), 79-97.

Hatush, Z and Skitmore, M R (1997) Evaluating contractor prequalification data: selection criteria and project success factors. Construction Management and Economics, 15(02), 129-47.

Haynes, N S and Love, P E D (2004) Psychological adjustment and coping among construction project managers. Construction Management and Economics, 22(02), 129-40.

Hedborg, S and Rosander, L (2024) Self-organizing in urban development: developers coordinating between construction projects. Construction Management and Economics, 42(02), 114–28.

Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(02), 171-82.

Hegarty, T, Wright, S, Wordsworth, R and Lord, B (2023) Deferential Tailoring: a grounded theory of how women respond and adapt to social conditions and gender-related challenges in the New Zealand construction industry. Construction Management and Economics, 41(02), 138–52.

Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatised infrastructure projects. Construction Management and Economics, 20(02), 143-56.

Hosein, R and Lewis, T M (2005) Quantifying the relationship between aggregate GDP and construction value added in a small petroleum rich economy � a case study of Trinidad and Tobago. Construction Management and Economics, 23(02), 185-97.

Hua, G B (2007) Applying the strategic alignment model to business and ICT strategies of Singapore's small and medium-sized architecture, engineering and construction enterprises. Construction Management and Economics, 25(02), 157–69.

Huat, T P and Pheng, L S (1994) The fuzzy industry maturity grid (FIMG) and its application to the Singapore construction industry. Construction Management and Economics, 12(02), 125-38.

Hui, E C-M, Lo, T K K, Chen, J and Wang, Z (2012) Housing and consumer markets in urban China. Construction Management and Economics, 30(02), 117-31.

Hung, Y-H, Smith-Jackson, T and Winchester, W (2011) Use of attitude congruence to identify safety interventions for small residential builders. Construction Management and Economics, 29(02), 113–30.

Hwang, B-G, Thomas, S R, Degezelle, D and Caldas, C H (2008) Development of a benchmarking framework for pharmaceutical capital projects. Construction Management and Economics, 26(02), 177–95.

Ibbs, W C (1991) Innovative contract incentive features for construction. Construction Management and Economics, 9(02), 157-69.

Imbert, I D C (1990) Human issues affecting construction in developing countries. Construction Management and Economics, 8(02), 219-28.

Islam, M D M and Faniran, O O (2005) Structural equation model of project planning effectiveness. Construction Management and Economics, 23(02), 215-23.

Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(02), 163-6.

Kaka, A P (1994) Contractors' financial budgeting using computer simulation. Construction Management and Economics, 12(02), 113-24.

Kaminsky, J (2019) The global influence of national cultural values on construction permitting. Construction Management and Economics, 37(02), 89–100.

Kangari, R and Riggs, L S (1988) Portfolio management in construction. Construction Management and Economics, 6(02), 161-9.

Karrbom Gustavsson, T, Hallin, A and Dobers, P (2024) Stakeholder involvement in distributed projects: a performative approach to large scale urban sustainable development projects and the case of Stockholm Royal Seaport. Construction Management and Economics, 42(02), 146–61.

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(02), 135-46.

Kenley, R (2019) CME Forum: a response to “Construction flow index: a metric of production flow quality in construction”. Construction Management and Economics, 37(02), 112–9.

Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(02), 113-32.

Kim, Y-W and Kim, S-C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(02), 163–72.

Kokkonen, A and Vaagaasar, A L (2018) Managing collaborative space in multi-partner projects. Construction Management and Economics, 36(02), 83-95.

Kometa, S T, Olomolaiye, P O and Harris, F C (1995) Quantifying client-generated risk by project consultants. Construction Management and Economics, 13(02), 137-47.

Kometa, S T, Olomolaiye, P O and Harris, F C (1996) Validation of the model for evaluating client-generated risk by project consultants. Construction Management and Economics, 14(02), 131-45.

Kuitert, L, Willems, J and Volker, L (2024) Value integration in multi-functional urban projects: a value driven perspective on sustainability transitions. Construction Management and Economics, 42(02), 182–98.

Lam, K C, Hu, T, Ng, S T, Skitmore, M R and Cheung, S O (2001) A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19(02), 175-88.

Lam, K C, Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(02), 127-45.

Lam, Y T, Alum, J and Neale, R H (1994) Design and development of a KBES for planning and scheduling ready-mixed concrete supply. Construction Management and Economics, 12(02), 165-70.

Lambropoulos, J, Manolopoulos, N and Pantouvakis, J P (1996) SEMANTIC: smart earth moving analysis and estimation of cost. Construction Management and Economics, 14(02), 79-92.

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: an analysis of 30 Melbourne case studies. Construction Management and Economics, 26(02), 147–60.

Lansley, P R (1983) A practical approach to auditing organizational flexibility. Construction Management and Economics, 1(02), 145-56.

Lansley, P R (1987) Corporate strategy and survival in the UK construction industry. Construction Management and Economics, 5(02), 141-55.

Larsson, J, Eriksson, P E, Lingegård, S and Järvenpää, A (2022) Innovation outcomes and processes in infrastructure projects – a comparative study of Design-Build and Design-Build-Maintenance contracts. Construction Management and Economics, 40(02), 142–56.

Le, P L, Jarroudi, I, Dao, T and Chaabane, A (2021) Integrated construction supply chain: an optimal decision-making model with third-party logistics partnership. Construction Management and Economics, 39(02), 133–55.

Leather, P and Rolfe, S (1997) Fit for the task: the future of the small scale domestic repair and maintenance industry in the UK. Construction Management and Economics, 15(02), 201-12.

Leiringer, R, Gottlieb, S C, Fang, Y and Mo, X (2022) In search of sustainable construction: the role of building environmental assessment methods as policies enforcing green building. Construction Management and Economics, 40(02), 104–22.

Leishman, C and Warren, F (2006) Private housing design customization through house type substitution. Construction Management and Economics, 24(02), 149-58.

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(02), 119-44.

Leu, S-S and Hung, T-H (2002) A genetic algorithm-based optimal resource-constrained schedule simulation model. Construction Management and Economics, 20(02), 131-41.

Leung, M-Y and Chan, H K L (2007) Antecedents of commitment in construction management. Construction Management and Economics, 25(02), 113–27.

Leung, M-y, Liang, Q and Yu, J (2016) Development of a mindfulness-stress-performance model for construction workers. Construction Management and Economics, 34(02), 110-28.

Li, H and Love, P E D (1999) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(02), 169-76.

  • Type: Journal Article
  • Keywords: explanation facility; hyCMEd system; mark-up decision; rule extraction
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/014461999371664
  • Abstract:

    Rule-based expert systems and artificial neural networks are two major systems for developing intelligent decision support systems. The integration of the two systems can generate a new system which shares the strengths of both rule-based and artificial neural network systems. This research presents a computer based mark-up decision support system called InMES (integrated mark-up estimation system) that integrates a rule-based expert system and an artificial neural network (ANN) based expert system. The computer system represents an innovative approach for estimating a contractor’ s mark-up percentage for a construction project. A rule extraction method is developed to generate rules from a trained ANN. By using the explanation facility embedded in the rule-based expert system, InMES provides users with a clear explanation to justify the rationality of the estimated mark-up output. Cost data derived from a contractor’ s successful bids were used to train an ANN and, in conjunction with a rule-based expert system, select the expected mark-up for a project. The combination of both ANN- and rule-based expert systems for estimating mark-up allows significant benefits to be made from each individual system, such as understanding why and how the estimated mark-up was derived and also the effects of imposing rules and constraints on a company’s mark-up estimation. The mark-up decision support system presented can assist contractors in preparing a rational mark-up percentage for a project. Moreover, InMES as proposed will assist contractors in their tender decision making, that is, whether or not to submit a bid for a project considering the estimated mark-up.

Li, H, Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(02), 151-64.

Lin, Y-H, Lee, P-C and Chang, T-P (2008) Integrating grey number and Minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information. Construction Management and Economics, 26(02), 115–23.

Lingard, H and Francis, V (2006) Does a supportive work environment moderate the relationship between work-family conflict and burnout among construction professionals?. Construction Management and Economics, 24(02), 185-96.

Lingard, H and Holmes, N (2001) Understandings of occupational health and safety risk control in small business construction firms: barriers to implementing technological controls. Construction Management and Economics, 19(02), 217-26.

Liu, A M M, Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: towards a conceptual model and a research agenda. Construction Management and Economics, 29(02), 173–83.

Liu, A M-M (2003) The quest for quality in public housing projects: a behaviour to outcome paradigm. Construction Management and Economics, 21(02), 147-58.

Liu, A M-M and Walker, A (1998) Evaluation of project outcomes. Construction Management and Economics, 16(02), 209-19.

Liu, Q, Feng, Y, London, K and Zhang, P (2023) Influence of personal characteristics and environmental stressors on mental health for multicultural construction workplaces in Australia. Construction Management and Economics, 41(02), 116–37.

Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(02), 103–13.

Loosemore, M (1999) Bargaining tactics in construction disputes. Construction Management and Economics, 17(02), 177-88.

Loosemore, M and Galea, N (2008) Genderlect and conflict in the Australian construction industry. Construction Management and Economics, 26(02), 125–35.

Loosemore, M and Lim, B T H (2018) Mapping corporate social responsibility strategies in the construction and engineering industry. Construction Management and Economics, 36(02), 67-82.

Loosemore, M, Phua, F, Dunn, K and Ozguc, U (2010) Operatives’ experiences of cultural diversity on Australian construction sites. Construction Management and Economics, 28(02), 88.

Love, P E D and Li, H (2000) Overcoming the problems associated with quality certification. Construction Management and Economics, 18(02), 139-49.

Love, P E D, Skitmore, M R and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(02), 221-33.

Low S P (1994) Balancing construction and marketing in world economic development: the four global scenarios. Construction Management and Economics, 12(02), 171-82.

Lowe, J G (1987) The measurement of productivity in the construction industry. Construction Management and Economics, 5(02), 101-13.

Lu, S-L and Sexton, M (2010) Career journeys and turning points of senior female managers in small construction firms. Construction Management and Economics, 28(02), 39.

Lutz, J D and Hijazi, A (1993) Planning repetitive construction: current practice. Construction Management and Economics, 11(02), 99-110.

MacSporran, C and Tucker, S N (1996) Target budget levels for building operating costs. Construction Management and Economics, 14(02), 103-19.

Male, S (1990) Professional authority, power and emerging forms of 'profession' in quantity surveying. Construction Management and Economics, 8(02), 191-204.

Manoliadis, O, Tsolas, I and Nakou, A (2006) Sustainable construction and drivers of change in Greece: a Delphi study. Construction Management and Economics, 24(02), 113-20.

Marshall, H E (1985) A graphical approach to discount payback. Construction Management and Economics, 3(02), 105-20.

Mastrandrea, F (1986) The liability of the construction project manager. Construction Management and Economics, 4(02), 105-34.

McGuffin, A A and Obonyo, E (2010) Enhancing performance: a case study of the effects of employee coaching in construction practice. Construction Management and Economics, 28(02), 9.

Menches, C L and Chen, J (2013) Using ecological momentary assessment to understand a construction worker's daily disruptions and decisions. Construction Management and Economics, 31(02), 180-94.

Miskawi, Z (1989) An S-curve equation for project control. Construction Management and Economics, 7(02), 115-24.

Mok, C K, Tummala, V M R and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(02), 161-75.

Murphy, R (2013) Strategic planning in construction professional service firms: a study of Irish QS practices. Construction Management and Economics, 31(02), 151-66.

Muya, M, Price, A D F and Edum-Fotwe, F T (2006) Overview of funding for construction craft skills training in Sub-Saharan Africa: a case study of Zambia. Construction Management and Economics, 24(02), 197-208.

Myers, D (2003) The future of construction economics as an academic discipline. Construction Management and Economics, 21(02), 103-6.

Nam, C H and Tatum, C B (1988) Major characteristics of constructed products and resulting limitations of construction technology. Construction Management and Economics, 6(02), 133-48.

Narbaev, T, De Marco, A and Orazalin, N (2020) A multi-disciplinary meta-review of the public–private partnerships research. Construction Management and Economics, 38(02), 109–25.

Navon, R and Maor, D (1995) Equipment replacement and optimal size of a civil engineering fleet. Construction Management and Economics, 13(02), 173-83.

Newaz, M T, Ershadi, M, Jefferies, M, Pillay, M and Davis, P (2023) A systematic review of contemporary safety management research: a multi-level approach to identifying trending domains in the construction industry. Construction Management and Economics, 41(02), 97–115.

Newton, S (1991) An agenda for cost modelling research. Construction Management and Economics, 9(02), 97-112.

Ng, F P, Björnsson, H C and Chiu, S S (2004) Valuing a price cap contract for material procurement as a real option. Construction Management and Economics, 22(02), 141-50.

Ng, S T, Fan, R Y C, Wong, J M W, Chan, A P C, Chiang, Y H, Lam, P T I and Kumaraswamy, M (2009) Coping with structural change in construction: experiences gained from advanced economies. Construction Management and Economics, 27(02), 165–80.

Ng, S T, Mak, M M Y, Skitmore, M R, Lam, K C and Varnam, M (2001) The predictive ability of Bromilow's time-cost model. Construction Management and Economics, 19(02), 165-73.

Nicolini, D (2002) In search of 'project chemistry'. Construction Management and Economics, 20(02), 167-77.

Odoemena, A T and Horita, M (2018) A strategic analysis of contract termination in public-private partnerships: Implications from cases in Sub-Saharan Africa. Construction Management and Economics, 36(02), 96-108.

Odusote, O O and Fellows, R F (1992) An examination of the importance of resource considerations when contractors make project selection decisions. Construction Management and Economics, 10(02), 137-51.

Ofori, G (1989) Housing in Singapore: determinants of success and lessons for the developing countries. Construction Management and Economics, 7(02), 137-53.

Ofori, G (1984) Improving the construction industry in declining developing economies. Construction Management and Economics, 2(02), 127-32.

Ofori, G (2003) Preparing Singapore's construction industry for the knowledge-based economy: practices, procedures and performance. Construction Management and Economics, 21(02), 113-25.

Ofori, G (1998) Sustainable construction: comment. Construction Management and Economics, 16(02), 141-5.

Ofori, G and Lean, C S (2001) Factors influencing development of construction enterprises in Singapore. Construction Management and Economics, 19(02), 145-54.

Ofori, G and Toor, S-U-R (2009) Research on cross-cultural leadership and management in construction: a review and directions for future research. Construction Management and Economics, 27(02), 119–33.

Ogunlana, S O (1991) Learning from experience in design cost estimating. Construction Management and Economics, 9(02), 133-50.

Ökmen, Ö and Öztaş, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(02), 12.

Olivieri, H, Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system. Construction Management and Economics, 36(02), 109-24.

Olomolaiye, P O and Ogunlana, S O (1989) A system for monitoring and improving construction operative productivity in Nigeria. Construction Management and Economics, 7(02), 175-86.

Pan, W, Gibb, A G F and Dainty, A R J (2007) Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(02), 183–94.

Peer, S (1986) An improved systematic activity sampling technique for work study. Construction Management and Economics, 4(02), 151-9.

Pellegrino, R, Costantino, N, Pietroforte, R and Sancilio, S (2012) Construction of multi-storey concrete structures in Italy: patterns of productivity and learning curves. Construction Management and Economics, 30(02), 103-15.

Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS Access� and MS Project�. Construction Management and Economics, 22(02), 203-11.

Petrovic-Lazarevic, S (2008) The development of corporate social responsibility in the Australian construction industry. Construction Management and Economics, 26(02), 93–101.

Phua, F T T (2013) Construction management research at the individual level of analysis: current status, gaps and future directions. Construction Management and Economics, 31(02), 167-79.

Picken, D H and Ilozor, B D (2003) Height and construction costs of building in Hong Kong. Construction Management and Economics, 21(02), 107-11.

Pietroforte, R, Bon, R and Gregori, T (2000) Regional development and construction in Italy: an input-output analysis, 1959-1992. Construction Management and Economics, 18(02), 151-9.

Powell, C (1989) Workload fluctuations and aspects of building quality. Construction Management and Economics, 7(02), 125-36.

Pretorius, F I H and Taylor, R G (1986) Conflict and individual coping behaviour in informal matrix organizations with the construction industry. Construction Management and Economics, 4(02), 87-104.

Prince, M W (1992) Implications of perception and strategy for engineers in construction management. Construction Management and Economics, 10(02), 93-105.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) European construction contractors: a productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(02), 221-30.

Pu, W, Xu, F, Chen, R and Marques, R C (2020) PPP project procurement model selection in China: does it matter?. Construction Management and Economics, 38(02), 126–39.

Pulkka, L, Ristimäki, M, Rajakallio, K and Junnila, S (2016) Applicability and benefits of the ecosystem concept in the construction industry. Construction Management and Economics, 34(02), 129-16.

Radosavljevic, M and Horner, M (2007) Process planning methodology: dynamic short-term planning for off-site construction in Slovenia. Construction Management and Economics, 25(02), 143–56.

Raftery, J, Csete, J and Hui, S K-F (2001) Are risk attitudes robust? Qualitative evidence before and after a business cycle inflection. Construction Management and Economics, 19(02), 155-64.

Ranasinghe, M (1996) Mine restoration bond for clay mining and its impact on the prices of building materials in Sri Lanka. Construction Management and Economics, 14(02), 165-74.

Ray, R S, Hornibrook, J, Skitmore, M R and Zarkada-Fraser, A (1999) Ethics in tendering: a survey of Australian opinion and practice. Construction Management and Economics, 17(02), 139-53.

Roberts, J (1987) The business round-table construction industry cost effectiveness task force. Construction Management and Economics, 5(02), 95-100.

Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(02), 181–97.

Rogerson, R J, Giddings, B and Jefferies, M (2024) Constructing the future of the city centre: realizing visions. Construction Management and Economics, 42(02), 129–45.

Rooke, J D, Seymour, D E and Fellows, R F (2003) The claims culture: a taxonomy of attitudes in the industry. Construction Management and Economics, 21(02), 167-74.

Rosenfeld, Y (2009) Cost of quality versus cost of non-quality in construction: the crucial balance. Construction Management and Economics, 27(02), 107–17.

Roy, R, Brown, J and Gaze, C (2003) Re-engineering the construction process in the speculative house building sector. Construction Management and Economics, 21(02), 137-46.

Runeson, G and de Valence, G (2015) A critique of the methodology of building economics: trust the theories. Construction Management and Economics, 33(02), 117-25.

Russell, J S, Hancher, D E and Skibniewski, M J (1992) Contractor pre-qualification data for construction owners. Construction Management and Economics, 10(02), 117-35.

Sözen, Z and Kayahan, O (2001) Correlates of the length of the relationship between main and specialist trade contractors in the construction industry. Construction Management and Economics, 19(02), 131-3.

Saurin, T A, Formoso, C T and Guimarães, L B M (2004) Safety and production: an integrated planning and control model. Construction Management and Economics, 22(02), 159-69.

Sawhney, A and Mund, A (2001) IntelliCranes: an integrated crane type and model selection system. Construction Management and Economics, 19(02), 227-37.

Scharpff, J, Schraven, D, Volker, L, Spaan, M T J and de Weerdt, M M (2021) Can multiple contractors self-regulate their joint service delivery? A serious gaming experiment on road maintenance planning. Construction Management and Economics, 39(02), 99–116.

Scott, D (1987) Multi-objective economic evaluation of minor roading projects. Construction Management and Economics, 5(02), 169-81.

Scott, D and Kagiri, M (1992) Choosing the most appropriate method of construction with computer assistance. Construction Management and Economics, 10(02), 153-77.

Scott, S (1995) Checking the project plan. Construction Management and Economics, 13(02), 127-36.

Shammas-Toma, M, Seymour, D E and Clark, L (1998) Obstacles to implementing total quality management in the UK construction industry. Construction Management and Economics, 16(02), 177-92.

Sharafi, A, Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(02), 87–103.

Shash, A A (1993) Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(02), 111-8.

Shash, A A and Al-Amir, M (1997) Information technology in contractors' firms in Saudi Arabia. Construction Management and Economics, 15(02), 187-200.

Shen, Q, Li, H, Chung, J and Hui, P-Y (2004) A framework for identification and representation of client requirements in the briefing process. Construction Management and Economics, 22(02), 213-21.

Shields, T J, Silcock, G W and Donegan, H A (1990) Towards the development of a fire safety systems evaluation for public assembly buildings. Construction Management and Economics, 8(02), 147-58.

Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(02), 93-101.

Shohet, I M and Paciuk, M (2006) Service life prediction of exterior cladding components under failure conditions. Construction Management and Economics, 24(02), 131-48.

Shohet, I M, Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(02), 219-29.

Sidwell, A C (1990) Project management: dynamics and performance. Construction Management and Economics, 8(02), 159-79.

Sing, T-F (2002) Time to build options in construction processes. Construction Management and Economics, 20(02), 119-30.

Singh, S (1991) Cost estimation of prestressed concrete beam and reinforced concrete slab construction. Construction Management and Economics, 9(02), 205-15.

Skitmore, M R and Wilcock, J (1994) Estimating processes of smaller builders. Construction Management and Economics, 12(02), 139-54.

Skitmore, M R, Stradling, S G and Tuohy, A P (1989) Project management under uncertainty. Construction Management and Economics, 7(02), 103-13.

Smith, S D, Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(02), 219-28.

Sobotka, A (2000) Simulation modelling for logistics re-engineering in the construction company. Construction Management and Economics, 18(02), 183-95.

Soliman-Junior, J, Tzortzopoulos, P and Kagioglou, M (2022) Designers’ perspective on the use of automation to support regulatory compliance in healthcare building projects. Construction Management and Economics, 40(02), 123–41.

Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(02), 147-54.

Sozen, Z and Kucuk, M A (1999) Secondary subcontracting in the Turkish construction industry. Construction Management and Economics, 17(02), 215-20.

Srinivasan, R and Harris, F C (1991) Lane rental contracting. Construction Management and Economics, 9(02), 151-5.

Steele, A and Sodhi, D (2004) Black and minority ethnic contractors and consultants and UK housing associations' contracting power. Construction Management and Economics, 22(02), 151-7.

Styhre, A (2011) In the circuit of credibility: construction workers and the norms of "a good job". Construction Management and Economics, 29(02), 199–209.

Tam, C M, Tong, T K L, Cheung, S O and Chan, A P C (2001) Genetic algorithm model in optimizing the use of labour. Construction Management and Economics, 19(02), 207-15.

Tan, W (1999) Construction cost and building height. Construction Management and Economics, 17(02), 129-32.

Tang, S L, Lee, H K and Wong, K (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(02), 177-86.

Tang, Y H and Ogunlana, S O (2003) Modelling the dynamic performance of a construction organization. Construction Management and Economics, 21(02), 127-36.

Tavakoli, A and Kakalia, A (1993) MMS: a materials management system. Construction Management and Economics, 11(02), 143-9.

Tavakoli, N and Hosseini Nourzad, S H (2020) Win-win pricing method for BOT projects using a simulation-based evolutionary optimization. Construction Management and Economics, 38(02), 157–71.

Teo, M M and Loosemore, M (2011) Community-based protest against construction projects: a case study of movement continuity. Construction Management and Economics, 29(02), 131–44.

Trigunarsyah, B (2007) Project designers' role in improving constructability of Indonesian construction projects. Construction Management and Economics, 25(02), 207–15.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(02), 202.

van der Meer, J, Hartmann, A, van der Horst, A and Dewulf, G (2020) Multi-criteria decision analysis and quality of design decisions in infrastructure tenders: a contractor’s perspective. Construction Management and Economics, 38(02), 172–88.

van Mossel, H-J and Straub, A (2009) The need for customizing maintenance services in social housing. Construction Management and Economics, 27(02), 135–51.

Venselaar, M and Gruis, V (2016) Studying intra-organizational dynamics in implementing supply chain partnering: A case study about work floor experiences in a Dutch housing association. Construction Management and Economics, 34(02), 98-109.

Vigren, O (2024) Ecosystems in construction management and urban development: a comprehensive review of conceptualizations and contributions. Construction Management and Economics, 42(02), 162–81.

Waara, F (2008) Mitigating contractual hazards in public procurement: a study of Swedish local authorities. Construction Management and Economics, 26(02), 137–45.

Wakchaure, S S and Jha, K N (2012) Determination of bridge health index using analytical hierarchy process. Construction Management and Economics, 30(02), 133-49.

Walker, A and Hughes, W (1987) A project managed by a multi-disciplinary practice: a systems-based case study. Construction Management and Economics, 5(02), 123-40.

Walker, A and Hughes, W (1984) Private industrial project management: a systems-based case study. Construction Management and Economics, 2(02), 93-110.

Walker, D H T (1997) Choosing an appropriate research methodology. Construction Management and Economics, 15(02), 149-59.

Wang, C-H and Mei, Y-H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(02), 147-57.

Wang, C-H, Tsai, C-C and Cheng, Y-Y (2007) Knowledge-based diagnosis model for PCM executing problems in public construction. Construction Management and Economics, 25(02), 129–42.

Wang, R, Lu, W and Wei, Y (2021) Owners’ use of contract-based power in construction project transactions: restrictions from process specificity and uncertainty. Construction Management and Economics, 39(02), 117–32.

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (2000) Evaluation and management of foreign exchange and revenue risks in China's BOT projects. Construction Management and Economics, 18(02), 197-207.

Wang, W-C and Dzeng, R-J (2005) Applying cluster identification algorithm and simulation to generate probabilistic network schedules for design projects. Construction Management and Economics, 23(02), 199-213.

Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(02), 153–63.

Warszawski, A (1990) Expert systems for crane selection. Construction Management and Economics, 8(02), 179-90.

Wijesundera, D A and Harris, F C (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(02), 95-102.

Winch, G M (2015) Project organizing as a problem in information. Construction Management and Economics, 33(02), 106-16.

Winch, G, Usmani, A and Edkins, A (1998) Towards total project quality: a gap analysis approach. Construction Management and Economics, 16(02), 193-207.

Wong, K-C and Walker, A (2000) Property rights implications of public-private joint ventures. Construction Management and Economics, 18(02), 131-8.

Yang, J, Shen, P Q, Bourne, L, Ho, C M-F and Xue, X (2011) A typology of operational approaches for stakeholder analysis and engagement. Construction Management and Economics, 29(02), 145–62.

Ye, K, Shen, L and Tan, Y (2010) Response strategies to the competition in the Chinese construction market. Construction Management and Economics, 28(02), 24.

Zhang, H, Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(02), 159-69.

Zhang, J and Yuan, X (2021) Stochastic modelling of maintenance flexibility in Value for Money assessment of PPP road projects. Construction Management and Economics, 39(02), 173–91.