Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 189 results ...
Aaron, M A, Mohan, M K and Gangadhar, M (2011) Building relationally integrated value networks (RIVANS). Engineering, Construction and Architectural Management, 18(01), 102–20.
Abdirad, H and Dossick, C S (2019) Restructuration of architectural practice in integrated project delivery (IPD): two case studies. Engineering, Construction and Architectural Management, 26(01), 104–17.
Abdul-Aziz, A-R and Tan, A C N (1998) GATT, GATS and the global construction industry. Engineering, Construction and Architectural Management, 5(01), 31–7.
Akintoye, A and Fitzgerald, E (1995) Design and build: a survey of architects' views. Engineering, Construction and Architectural Management, 2(01), 27–44.
Akintoye, A, Taylor, C and Fitzgerald, E (1998) Risk analysis and management of Private Finance Initiative projects. Engineering, Construction and Architectural Management, 5(01), 9–21.
Alarcón, L F and Bastias, A (2000) A computer environment to support the strategic decision-making process in construction firms. Engineering, Construction and Architectural Management, 7(01), 63–75.
Alavipour, S R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(01), 118–38.
Alazzaz, F and Whyte, A (2015) Linking employee empowerment with productivity in off-site construction. Engineering, Construction and Architectural Management, 22(01), 21-37.
AlSehaimi, A O, Fazenda, P T and Koskela, L (2014) Improving construction management practice with the Last Planner System: a case study. Engineering, Construction and Architectural Management, 21(01), 51-64.
Alves Tenório de Morais, G and Casado Lordsleem Júnior, A (2019) Building maintenance management activities in a public institution. Engineering, Construction and Architectural Management, 26(01), 85–103.
Andersen, T and Gaarslev, T (1996) Perspectives on artificial intelligence in the construction industry. Engineering, Construction and Architectural Management, 3(01), 3-14.
Ankrah, N A, Proverbs, D and Debrah, Y (2009) Factors influencing the culture of a construction project organisation: an empirical investigation. Engineering, Construction and Architectural Management, 16(01), 26–47.
Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(01), 62-76.
Anumba, C J, Pan, J, Issa, R R A and Mutis, I (2008) Collaborative project information management in a semantic web environment. Engineering, Construction and Architectural Management, 15(01), 78–94.
Arif, M, Al Zubi, M, Gupta, A D, Egbu, C, Walton, R O and Islam, R (2017) Knowledge sharing maturity model for Jordanian construction sector. Engineering, Construction and Architectural Management, 24(01), 170-88.
Arif, M, Egbu, C, Alom, O and Khalfan, M M A (2009) Measuring knowledge retention: a case study of a construction consultancy in the UAE. Engineering, Construction and Architectural Management, 16(01), 92–108.
Asiedu, R O, Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(01), 21-39.
Atkinson, A R (2002) The pathology of building defects; a human error. Engineering, Construction and Architectural Management, 9(01), 53–61.
Badenfelt, U (2008) The selection of sharing ratios in target cost contracts. Engineering, Construction and Architectural Management, 15(01), 54–65.
- Type: Journal Article
- Keywords: Construction industry; contracts; risk management; Sweden; target costs
- ISBN/ISSN: 0969-9988
- URL: http://www.emeraldinsight.com/10.1108/09699980810842061
- Abstract:
Purpose – The purpose of this paper is to provide a broader understanding of target cost arrangements by empirical study of the choice of sharing ratios from the perspective of both clients and contractors. Design/methodology/approach – Eight Swedish construction clients and eight contractors were interviewed. These interviews were followed by a case study of a large construction project with a target cost contract. The data for the case study were gathered through interviews, contract documents and non-participant observation. The impact of perceived risks on the selection process is discussed in terms of agency theory. Findings – Key factors influencing the selection of a sharing ratio included perceptions of fairness, knowledge of target cost contracts, and long-term relationships. The perceived level of risk is affected by the perceived performance risk and the perceived relational risk. Consequently, attention should be paid to the impact of long-term relationships on the design and outcome of target cost contracts since such relationships reduce the risks associated with asymmetric information, such as relational risk. Originality/value – This study identifies factors that previous research has ignored in relation to the negotiation of target cost contracts.
Ballard, G, Harper, N and Zabelle, T (2003) Learning to see work flow: an application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(01), 6–14.
Bangwal, D and Tiwari, P (2019) Environmental design and awareness impact on organization image. Engineering, Construction and Architectural Management, 26(01), 29–45.
Bassioni, H A, Hassan, T M and Price, A D F (2008) Evaluation and analysis of criteria and sub-criteria of a construction excellence model. Engineering, Construction and Architectural Management, 15(01), 21–41.
Bibby, L, Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(01), 7–26.
Blismas, N, Wakefield, R and Hauser, B (2010) Concrete prefabricated housing via advances in systems technologies: Development of a technology roadmap. Engineering, Construction and Architectural Management, 17(01), 110.
Blyth, K and Kaka, A (2006) A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13(01), 82–95.
Bowen, P, Govender, R, Edwards, P and Cattell, K (2016) An explanatory model of attitudinal fear of HIV/AIDS testing in the construction industry. Engineering, Construction and Architectural Management, 23(01), 92-112.
Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(01), 60-74.
Brandon, P S and Ribeiro, F L (1997) The assessment of applications for the house renovation grant system (HRGS): a multistrategy knowledge-based framework. Engineering, Construction and Architectural Management, 4(01), 41–57.
Butcher, D C A and Sheehan, M J (2010) Excellent contractor performance in the UK construction industry. Engineering, Construction and Architectural Management, 17(01), 35–45.
Carmichael, R, Edwards, D J and Holt, G D (2007) Plant managers' perceptions of plant security systems. Engineering, Construction and Architectural Management, 14(01), 65–78.
Carreira, P, Castelo, T, Gomes, C C, Ferreira, A, Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(01), 90-112.
Chang-Richards, Y, Wilkinson, S, Seville, E and Brunsdon, D (2017) Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand. Engineering, Construction and Architectural Management, 24(01), 2-20.
Chau, K W (1998) The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong. Engineering, Construction and Architectural Management, 5(01), 38–50.
Chen, Y and Kamara, J M (2008) Using mobile computing for construction site information management. Engineering, Construction and Architectural Management, 15(01), 7–20.
Chen, Y Q, Zhang, S J, Liu, L S and Hu, J (2015) Risk perception and propensity in bid/no-bid decision-making of construction projects. Engineering, Construction and Architectural Management, 22(01), 2-20.
Christos, V, John, E T and James, S (2011) The logistics of construction supply chains: the builders' merchant perspective. Engineering, Construction and Architectural Management, 18(01), 66–81.
Daget, Y T and Zhang, H (2019) Decision-making model for the evaluation of industrialized housing systems in Ethiopia. Engineering, Construction and Architectural Management, 27(01), 296–320.
Dainty, A R J, Raiden, A B and Neale, R H (2004) Psychological contract expectations of construction project managers. Engineering, Construction and Architectural Management, 11(01), 33–44.
Dalgliesh, C D, Bowen, P A and Hill, R C (1997) Environmental sustainability in the delivery of affordable housing in South Africa. Engineering, Construction and Architectural Management, 4(01), 23–39.
Damodaran, L, Hansen, J R, Hassan, T M and Olphert, C W (1999) Impact of Large Scale Engineering products and processes on society-the eLSEwise view. Engineering, Construction and Architectural Management, 6(01), 63–70.
Davies, K, McMeel, D J and Wilkinson, S (2017) Making friends with Frankenstein: Hybrid practice in BIM. Engineering, Construction and Architectural Management, 24(01), 78-93.
Day, A K (1996) The Maquette, the model and the computer: organizational futures for design and construction. Engineering, Construction and Architectural Management, 3(01), 15-28.
Delaney, F T and Wamuziri, S C (2004) The impact of mergers and acquisitions on shareholder wealth in the UK construction industry. Engineering, Construction and Architectural Management, 11(01), 65–73.
Deng, Y and Poon, S W (2013) Meeting sustainability challenges of mega-event flagships. Engineering, Construction and Architectural Management, 20(01), 46-62.
Dester, W S and Blockley, D L (1995) Safety: behaviour and culture in construction. Engineering, Construction and Architectural Management, 2(01), 17–26.
Du, J, Jing, H, Castro-Lacouture, D and Sugumaran, V (2019) Multi-agent simulation for managing design changes in prefabricated construction projects. Engineering, Construction and Architectural Management, 27(01), 270–95.
Duffield, C (1998) Commercial viability of privately financed heating systems in Europe: a case study. Engineering, Construction and Architectural Management, 5(01), 3–8.
Dunlop, P and Smith, S D (2004) Planning, estimation and productivity in the lean concrete pour. Engineering, Construction and Architectural Management, 11(01), 55–64.
Durdyev, S, Hosseini, M R, Martek, I, Ismail, S and Arashpour, M (2019) Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(01), 186–204.
Edwards, D J and Holt, G D (2000) ESTIVATE: a model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7(01), 52–62.
Ekambaram, P, Love, P E D, Kumaraswamy, M M and Ng, T S T (2014) Causal ascription of rework in building and civil engineering projects: A multivariate exploration. Engineering, Construction and Architectural Management, 21(01), 111-26.
Emmitt, S (2001) Technological gatekeepers: the management of trade literature by design offices. Engineering, Construction and Architectural Management, 8(01), 2–8.
Enshassi, A, Mohamed, S and El-Ghandour, S (2009) Problems associated with the process of claim management in Palestine: Contractors' perspective. Engineering, Construction and Architectural Management, 16(01), 61–72.
Evans, R C and Kaka, A P (1998) Analysis of the accuracy of standard/average value curves using food retail building projects as case studies. Engineering, Construction and Architectural Management, 5(01), 58–67.
Faraj, I (2003) Geometric verification of design. Engineering, Construction and Architectural Management, 10(01), 56–70.
Farran, M and Zayed, T (2012) New life-cycle costing approach for infrastructure rehabilitation. Engineering, Construction and Architectural Management, 19(01), 40–60.
Garas, F and Hunter, I (1999) The eLSEwise initiative. Engineering, Construction and Architectural Management, 6(01), 6–3.
Gerbov, A, Singh, V and Herva, M (2018) Challenges in applying design research studies to assess benefits of BIM in infrastructure projects: Reflections from Finnish case studies. Engineering, Construction and Architectural Management, 25(01), 2-20.
Gibb, A G F and Isack, F (2001) Client drivers for construction projects: implications for standardization. Engineering, Construction and Architectural Management, 8(01), 46–58.
Gilbert, G L and Walker, D H T (2001) Motivation of Australian white-collar construction employees: a gender issue?. Engineering, Construction and Architectural Management, 8(01), 59–66.
Glass, J and Baiche, B (2001) Perceptions of hybrid concrete construction in the UK construction industry. Engineering, Construction and Architectural Management, 8(01), 67–77.
Gowri, K and Depanni, S (1998) The Health and Safety Expert System (HASES): an expert system framework for building inspections. Engineering, Construction and Architectural Management, 5(01), 92–102.
Griffith, A (1995) The current status of environmental management systems in construction. Engineering, Construction and Architectural Management, 2(01), 5–16.
Hackett, J A and Hicks, C M (2007) Estimating as a profession in UK construction. Engineering, Construction and Architectural Management, 14(01), 26–51.
Han, J, Rapoport, A and Fong, P S (2019) Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(01), 49–65.
Hannus, M, Luiten, G T, Watson, A S, Deguine, M, Sauce, G and Rijn, T P J V (1999) ICT tools for improving the competitiveness of the LSE industry. Engineering, Construction and Architectural Management, 6(01), 30–7.
Hassan, T M, McCaffer, R and Thorpe, A (1999) Emerging clients' needs for Large Scale Engineering projects. Engineering, Construction and Architectural Management, 6(01), 21–9.
Hatamleh, M T, Hiyassat, M, Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(01), 113-31.
Hegazy, T and Moselhi, O (1994) Estimator: a prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(01), 51–67.
Hegazy, T, Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(01), 94-110.
Hejducki, Z (2004) Sequencing problems in methods of organising construction processes. Engineering, Construction and Architectural Management, 11(01), 20–32.
Helen, L, Ron, W and Patrick, C (2011) The development and testing of a hierarchical measure of project OHS performance. Engineering, Construction and Architectural Management, 18(01), 30–49.
Holt, G D, Goulding, J S and Akintoye, A (2016) Enablers, challenges and relationships between research impact and theory generation. Engineering, Construction and Architectural Management, 23(01), 20-39.
Holt, G D, Olomolaiye, P O and Harris, F C (1994) Evaluating performance potential in the selection of construction contractors. Engineering, Construction and Architectural Management, 1(01), 29–50.
Holt, G D, Olomolaiye, P O and Harris, F C (1996) Tendering procedures, contractual arrangements and Latham: the contractors' view. Engineering, Construction and Architectural Management, 3(01), 97–115.
Huang, R-Y and Halpin, D W (2000) Graphically based LP modelling for linear scheduling analysis: the POLO system. Engineering, Construction and Architectural Management, 7(01), 41–51.
Hughes, W (1997) Construction management contracts: law and practice. Engineering, Construction and Architectural Management, 4(01), 59–79.
Hunter, I, Mitrovic, D, Hassan, T M, Gayoso, A and Garas, F (1999) The eLSEwise vision, development routes and recommendations1. Engineering, Construction and Architectural Management, 6(01), 51–62.
Hwang, B, Zhao, X and Lim, J (2019) Job satisfaction of project managers in green construction projects. Engineering, Construction and Architectural Management, 27(01), 205–26.
Hyde, R (1995) Buildability as a design concept for architects: a case study of laboratory buildings. Engineering, Construction and Architectural Management, 2(01), 45–56.
James, M W W, Albert, P C C and Chiang, Y H (2011) Construction manpower demand forecasting: A comparative study of univariate time series, multiple regression and econometric modelling techniques. Engineering, Construction and Architectural Management, 18(01), 7–29.
Jeong, K S, Kagioglou, M, Haigh, R, Amaratunga, D and Siriwardena, M L (2006) Embedding good practice sharing within process improvement. Engineering, Construction and Architectural Management, 13(01), 62–81.
Kärnä, S and Junnonen, J-M (2017) Designers’ performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(01), 154-69.
Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(01), 48–60.
Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(01), 133-45.
Kaka, A P, Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: a case study. Engineering, Construction and Architectural Management, 10(01), 15–26.
Kaka, A, Wong, C, Fortune, C and Langford, D (2008) Culture change through the use of appropriate pricing systems. Engineering, Construction and Architectural Management, 15(01), 66–77.
Kalutara, P, Zhang, G, Setunge, S and Wakefield, R (2017) Factors that influence Australian community buildings’ sustainable management. Engineering, Construction and Architectural Management, 24(01), 94-117.
Kamara, J M, Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements-a key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(01), 15–28.
Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(01), 8–25.
Karim, K, Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(01), 27–42.
Kirkham, R J, Boussabaine, A H and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an NHS acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(01), 38–52.
Kometa, S T, Olomolaiye, P O and Harris, F C (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering, Construction and Architectural Management, 2(01), 57–76.
Koukkari, H (2010) Transformation of a research centre toward an innovation partner in the construction sector. Engineering, Construction and Architectural Management, 17(01), 89–98.
Kululanga, G (2012) Capacity building of construction industries in Sub-Saharan developing countries: A case for Malawi. Engineering, Construction and Architectural Management, 19(01), 86–100.
Kumar, V S S, Hanna, A S and Adams, T (2000) Assessment of working capital requirements by fuzzy set theory. Engineering, Construction and Architectural Management, 7(01), 93–103.
Lam, K C, Hu, T, Ng, S T, Yuen, R K K, Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(01), 31–45.
Lansley, P (2007) Making sense of research quality assessment. Engineering, Construction and Architectural Management, 14(01), 7–25.
Lansley, P (2013) Research assessment and the activity hypothesis. Engineering, Construction and Architectural Management, 20(01), 7-28.
Laufer, A, Shapira, A and Goren, I (1998) Implementing an integrative approach to project schedule compression. Engineering, Construction and Architectural Management, 5(01), 82–91.
Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(01), 69-81.
Li, H, Cheng, E W L and Love, P E D (2000) Partnering research in construction. Engineering, Construction and Architectural Management, 7(01), 76–92.
Li, X, Liu, Y, Wilkinson, S and Liu, T (2019) Driving forces influencing the uptake of sustainable housing in New Zealand. Engineering, Construction and Architectural Management, 26(01), 46–65.
Lian, J K M, Foo, Z Y and Ling, F Y Y (2018) Value of internships for professional careers in the built environment sector in Singapore. Engineering, Construction and Architectural Management, 25(01), 77-89.
Liao, X, Lee, C Y and Chong, H (2019) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(01), 227–44.
Lim, L J W and Ling, F Y Y (2012) Human resource practices of contractors that lead to job satisfaction of professional staff. Engineering, Construction and Architectural Management, 19(01), 101–18.
Ling, F Y Y (2005) Models for predicting quality of building projects. Engineering, Construction and Architectural Management, 12(01), 6–20.
Lingard, H and Francis, V (2007) “Negative interference” between Australian construction professionals' work and family roles: Evidence of an asymmetrical relationship. Engineering, Construction and Architectural Management, 14(01), 79–93.
Lingard, H, Blismas, N, Harley, J, Stranieri, A, Zhang, R P and Pirzadeh, P (2018) Making the invisible visible: Stimulating work health and safety-relevant thinking through the use of infographics in construction design. Engineering, Construction and Architectural Management, 25(01), 39-61.
Lingard, H, Saunders, L, Pirzadeh, P, Blismas, N, Kleiner, B and Wakefield, R (2015) The relationship between pre-construction decision-making and the effectiveness of risk control: Testing the time-safety influence curve. Engineering, Construction and Architectural Management, 22(01), 108-24.
Liu, A M-M and Fellows, R (2001) An Eastern perspective on partnering. Engineering, Construction and Architectural Management, 8(01), 9–19.
Liu, S, Jin, H, Liu, C, Xie, B and Mills, A (2019) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(01), 128–49.
Lobo, Y B and Wilkinson, S (2008) New approaches to solving the skills shortages in the New Zealand construction industry. Engineering, Construction and Architectural Management, 15(01), 42–53.
Loh, W H and Ofori, G (2000) Effect of registration on performance of construction subcontractors in Singapore. Engineering, Construction and Architectural Management, 7(01), 29–40.
Loosemore, M and Richard, J (2015) Valuing innovation in construction and infrastructure: Getting clients past a lowest price mentality. Engineering, Construction and Architectural Management, 22(01), 38-53.
Loosemore, M, Chow, V and McGeorge, D (2014) Managing the health risks of extreme weather events by managing hospital infrastructure. Engineering, Construction and Architectural Management, 21(01), 4-32.
Loraine, R K (1994) Project specific partnering. Engineering, Construction and Architectural Management, 1(01), 5–16.
Love, P E and Edwards, D J (2005) Taking the pulse of UK construction project managers' health: Influence of job demands, job control and social support on psychological wellbeing. Engineering, Construction and Architectural Management, 12(01), 88–101.
Love, P E D, Irani, Z, Cheng, E and Li, H (2002) A model for supporting inter-organizational relations in the supply chain. Engineering, Construction and Architectural Management, 9(01), 2–15.
Lu, W, Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(01), 118-32.
Lu, W, Li, Z and Wang, S (2017) The role of justice for cooperation and contract’s moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(01), 133-53.
Ma, L, Reed, R and Jin, X (2018) Identify the equilibrium of residential construction output: A vector error correction model approach. Engineering, Construction and Architectural Management, 25(01), 21-38.
MacLeod, I A (2010) The education of innovative engineers. Engineering, Construction and Architectural Management, 17(01), 21–34.
Mahamadu, A, Manu, P, Mahdjoubi, L, Booth, C, Aigbavboa, C and Abanda, F (2019) The importance of BIM capability assessment. Engineering, Construction and Architectural Management, 27(01), 24–48.
Mahdi, I M, Riley, M J, Fereig, S M and Alex, A P (2002) A multi-criteria approach to contractor selection. Engineering, Construction and Architectural Management, 9(01), 29–37.
Male, S and Mitrovic, D (1999) Trends in world markets and the LSE industry. Engineering, Construction and Architectural Management, 6(01), 7–20.
Manu, P, Ankrah, N, Proverbs, D and Suresh, S (2014) The health and safety impact of construction project features. Engineering, Construction and Architectural Management, 21(01), 65-93.
Maqsood, T, Walker, D H T and Finegan, A D (2007) Facilitating knowledge pull to deliver innovation through knowledge management: A case study. Engineering, Construction and Architectural Management, 14(01), 94–109.
Martin, J C, Akande, K and Falconer, R A (2010) Innovations from the Halcrow-Cardiff University strategic collaboration. Engineering, Construction and Architectural Management, 17(01), 64.
Matthews, J, Tyler, A and Thorpe, A (1996) Pre-construction project partnering: developing the process. Engineering, Construction and Architectural Management, 3(01), 117-131.
Melson, S and Kronstam, T (1999) An approach to infrastructure client projects. Engineering, Construction and Architectural Management, 6(01), 71–7.
Merna, A and Smith, N J (1994) Concession contracts for power generation. Engineering, Construction and Architectural Management, 1(01), 17–27.
Mitrovic, D, Male, S, Hunter, I and Watson, A (1999) Large Scale Engineering project process and user requirements. Engineering, Construction and Architectural Management, 6(01), 38–50.
Mokhtar, A N S, Wilkinson, S and Fassman, E (2015) Strategies for improving energy saving behaviour in commercial buildings in Malaysia. Engineering, Construction and Architectural Management, 22(01), 73-90.
Moohialdin, A S M, Lamari, F, Miska, M and Trigunarsyah, B (2019) Construction worker productivity in hot and humid weather conditions. Engineering, Construction and Architectural Management, 27(01), 83–108.
Moore, D (1996) Buildability assessment and the development of an automated design aid for managing the transfer of construction process knowledge. Engineering, Construction and Architectural Management, 3(01), 29-46.
Morrow, S, Hare, B and Cameron, I (2016) Design engineers’ perception of health and safety and its impact in the design process. Engineering, Construction and Architectural Management, 23(01), 40-59.
Mujumdar, P and Maheswari, J U (2019) Alternate beeline diagramming method network analysis for interdependent design entities. Engineering, Construction and Architectural Management, 26(01), 66–84.
Naoum, S and Haidar, A (2000) A hybrid knowledge base system and genetic algorithms for equipment selection. Engineering, Construction and Architectural Management, 7(01), 3–14.
Naoum, S G and Hackman, J (1996) Do site managers and the head office perceive productivity factors differently?. Engineering, Construction and Architectural Management, 3(01), 147–60.
Ofori, G, Leong, C and Pin, T (2002) Impact of foreign contractors on Singapore construction industry: a qualitative study. Engineering, Construction and Architectural Management, 9(01), 16–28.
Ogunlana, S O and Chang, W P (1998) Worker motivation on selected construction sites in Bangkok, Thailand. Engineering, Construction and Architectural Management, 5(01), 68–81.
Oladinrin, O T and Ho, C M-F (2016) Embeddedness of codes of ethics in construction organizations. Engineering, Construction and Architectural Management, 23(01), 75-91.
Oo, B L and Lim, B T-H (2016) Game-based learning in construction management courses: A case of bidding game. Engineering, Construction and Architectural Management, 23(01), 4-19.
Oo, B L, Lo, H-P and Lim, B T-H (2012) The effect of bidding success in construction bidding. Engineering, Construction and Architectural Management, 19(01), 25–39.
Othman, A A E, Hassan, T M and Pasquire, C L (2005) Analysis of factors that drive brief development in construction. Engineering, Construction and Architectural Management, 12(01), 69–87.
Oyedele, L O and Tham, K W (2005) Examining architects' performance in Nigerian private and public sectors building projects. Engineering, Construction and Architectural Management, 12(01), 52–68.
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(01), 96–113.
Ozyurt, B, Dikmen, I and Birgonul, M T (2019) Clustering of host countries to facilitate learning between similar international construction markets. Engineering, Construction and Architectural Management, 27(01), 66–82.
Pan, W (2010) Strategies for managing innovation in UK housebuilding. Engineering, Construction and Architectural Management, 17(01), 78–88.
Peansupap, V and Walker, D (2005) Factors affecting ICT diffusion: A case study of three large Australian construction contractors. Engineering, Construction and Architectural Management, 12(01), 21–37.
Perkinson, G M, Sanvido, V E and Grobler, F (1994) A facility programming information framework. Engineering, Construction and Architectural Management, 1(01), 69–84.
Peter, L, David, E and Elliot, W (2011) Loosening the Gordian knot: the role of emotional intelligence in construction. Engineering, Construction and Architectural Management, 18(01), 50–65.
Phua, F T T and Rowlinson, S (2004) How important is cooperation to construction project success? A grounded empirical quantification. Engineering, Construction and Architectural Management, 11(01), 45–54.
Randeree, K and Chaudhry, A G (2012) Leadership – style, satisfaction and commitment: An exploration in the United Arab Emirates' construction sector. Engineering, Construction and Architectural Management, 19(01), 61–85.
Ribas, D A and Cachim, P (2019) Economic sustainability of buildings. Engineering, Construction and Architectural Management, 26(01), 2–28.
Rostami, A, Sommerville, J, Wong, I L and Lee, C (2015) Risk management implementation in small and medium enterprises in the UK construction industry. Engineering, Construction and Architectural Management, 22(01), 91-107.
Rowlinson, S M, Mohamed, S and Lam, S-W (2003) Hong Kong construction foremen's safety responsibilities a case study of management oversight. Engineering, Construction and Architectural Management, 10(01), 27–35.
Ruiz, L, Gómez, E, Santos, A G and Vega, S (2010) Study of light-multi-layered façades. Engineering, Construction and Architectural Management, 17(01), 77.
Ruiz, L, Gomez, E, Santos, A G and Vega, S (2010) Study of light-multi-layered facades. Engineering, Construction and Architectural Management, 17(01), 65–77.
Salvatierra, J L, Gálvez, M &, Bastías, F, Castillo, T, Herrera, R F and Alarcón, L F (2019) Developing a benchmarking system for architecture design firms. Engineering, Construction and Architectural Management, 26(01), 139–52.
Sang, L, Xia, D, Ni, G, Cui, Q, Wang, J and Wang, W (2019) Influence mechanism of job satisfaction and positive affect on knowledge sharing among project members. Engineering, Construction and Architectural Management, 27(01), 245–69.
Santoso, D S, Ogunlana, S O and Minato, T (2003) Assessment of risks in high rise building construction in Jakarta. Engineering, Construction and Architectural Management, 10(01), 43–55.
Sarhan, J G, Xia, B, Fawzia, S, Karim, A, Olanipekun, A O and Coffey, V (2019) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique. Engineering, Construction and Architectural Management, 27(01), 1–23.
Saunders, A (1998) Aspects of funding for BOOT projects. Engineering, Construction and Architectural Management, 5(01), 22–30.
Semaan, N and Salem, M (2017) A deterministic contractor selection decision-support system for competitive bidding. Engineering, Construction and Architectural Management, 24(01), 61-77.
Seymour, D E, Shammas-Toma, M and Clark, L (1997) Limitations of the use of tolerances for communicating design requirements to site. Engineering, Construction and Architectural Management, 4(01), 3–22.
Sezer, A A and Bröchner, J (2019) Site managers’ ICT tools for monitoring resources in refurbishment. Engineering, Construction and Architectural Management, 27(01), 109–27.
Shahtaheri, M, Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(01), 40-60.
Sharma, A K and Vohra, E (2009) Critical evaluation of road infrastructure in India: a cross-country view. Engineering, Construction and Architectural Management, 16(01), 73–91.
Shen, Q and Liu, G (2004) Applications of value management in the construction industry in China. Engineering, Construction and Architectural Management, 11(01), 9–19.
Skitmore, M R and Drew, D S (2003) The analysis of pre-tender building price forecasting performance: a case study. Engineering, Construction and Architectural Management, 10(01), 27–35.
Stoy, C, Dreier, F and Schalcher, H-R (2007) Construction duration of residential building projects in Germany. Engineering, Construction and Architectural Management, 14(01), 52–64.
Thomson, D S, Austin, S A, Root, D S, Thorpe, A and Hammond, J W (2006) A problem-solving approach to value-adding decision making in construction design. Engineering, Construction and Architectural Management, 13(01), 43–61.
Tookey, J E, Murray, M, Hardcastle, C and Langford, D A (2001) Construction procurement routes: re-defining the contours of construction procurement. Engineering, Construction and Architectural Management, 8(01), 20–30.
Tran, H and Carmichael, D G (2013) A contractor's classification of owner payment practices. Engineering, Construction and Architectural Management, 20(01), 29-45.
Tuuli, M M and Rowlinson, S (2010) What empowers individuals and teams in project settings? A critical incident analysis. Engineering, Construction and Architectural Management, 17(01), 20.
Uher, T E (1996) Cost estimating practices in Australian construction. Engineering, Construction and Architectural Management, 3(01), 83-95.
Wafaa, N and Goulding, J S (2011) Offsite production: a model for building
Walker, D H T (1998) The contribution of the client representative to the creation and maintenance of good project inter-team relationships. Engineering, Construction and Architectural Management, 5(01), 51–67.
Wang, D, Fu, H and Fang, S (2019) The efficacy of trust for the governance of uncertainty and opportunism in megaprojects. Engineering, Construction and Architectural Management, 27(01), 150–67.
Wang, Y, Liu, J, Zuo, J and Rameezdeen, R (2019) Ways to improve the project management efficiency in a centralized public procurement system. Engineering, Construction and Architectural Management, 27(01), 168–85.
Williams, T P (2005) Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(01), 38–51.
Wong, C H, Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(01), 99–116.
Xia, B and Chan, A P C (2012) Measuring complexity for building projects: a Delphi study. Engineering, Construction and Architectural Management, 19(01), 7–24.
Yik, F W H, Lai, J H K, Chan, K T, Chau, C K and Lee, W L (2013) A portrait of building services engineers in Hong Kong. Engineering, Construction and Architectural Management, 20(01), 63-82.
Yung, P and Rafferty, K (2015) Statutory adjudication in Western Australia: Adjudicators’ views. Engineering, Construction and Architectural Management, 22(01), 54-72.
Zantke, G and Mangels, B (1999) Public sector client-private sector project: transferring the state construction administration into private hands. Engineering, Construction and Architectural Management, 6(01), 78–87.
Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(01), 33-50.