Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 304 results ...

Çıdık, M S and Boyd, D (2020) “Shared sense of purposefulness”: a new concept to understand the practice of coordinating design in construction. Construction Management and Economics, 38(01), 18–31.

Ababio, B K and Lu, W (2023) Barriers and enablers of circular economy in construction: a multi-system perspective towards the development of a practical framework. Construction Management and Economics, 41(01), 3–21.

Abdul-Aziz, A-R (2012) Control mechanisms exercised in Malaysian housing public-private partnerships. Construction Management and Economics, 30(01), 37–55.

Abdul-Aziz, A-R and Wong, S S (2010) Exploring the internationalization of Malaysian contractors: the international entrepreneurship dimension. Construction Management and Economics, 28(01), 61.

Abdul-Aziz, A-R, Ngau, D P, Lim, Y M and Nuruddin, A R (2011) Internationalization of Malaysian quantity surveying firms: exploring the best fit models. Construction Management and Economics, 29(01), 49–58.

Abdul-Rahman, H (1995) The cost of non-conformance during a highway project: a case study. Construction Management and Economics, 13(01), 23-32.

Abdul-Rahman, H, Yahya, I A, Berawi, M A and Wah, L W (2008) Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(01), 15–27.

Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: an investigation. Construction Management and Economics, 24(01), 81-96.

Adams, O (1997) Contractor development in Nigeria: perceptions of contractors and professionals. Construction Management and Economics, 15(01), 95-108.

Agren, R and Wing, R D (2014) Five moments in the history of industrialized building. Construction Management and Economics, 32(01), 7-15.

Ahadzie, D K, Proverbs, D G, Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(01), 89–102.

Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(01), 45-54.

Aikivuori, A (1996) Periods and demand for private sector housing refurbishment. Construction Management and Economics, 14(01), 3-12.

Akan, G T, Arditi, D and Imre, M (1984) Priority ranking of highway improvement projects. Construction Management and Economics, 2(01), 49-55.

Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(01), 77-89.

Akintoye, A and Skitmore, M R (1994) Models of UK private sector quarterly construction demand. Construction Management and Economics, 12(01), 3-14.

Akintoye, A and Sommerville, J (1995) Distributed lag relationships between UK construction orders and output. Construction Management and Economics, 13(01), 33-42.

Al-Kharashi, A and Skitmore, M (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(01), 3–23.

Al-Shawi, M and Hope, A E (1989) Expert systems and contractual disputes: extension of time under JCT 80. Construction Management and Economics, 7(01), 65-74.

Al-Tabtabai, H and Diekmann, J E (1992) Judgemental forecasting in construction projects. Construction Management and Economics, 10(01), 19-30.

Andersen, L P, Nørdam, L, Joensson, T, Kines, P and Nielsen, K J (2018) Social identity, safety climate and self-reported accidents among construction workers. Construction Management and Economics, 36(01), 22-31.

Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(01), 69-80.

Aniekwu, A N and Okpala, D C (1988) Contractual arrangement and the performance of the Nigerian construction industry (the structural component). Construction Management and Economics, 6(01), 3-11.

Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(01), 3-16.

Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(01), 13-24.

Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(01), 15-27.

Badi, S, Ochieng, E, Nasaj, M and Papadaki, M (2021) Technological, organisational and environmental determinants of smart contracts adoption: UK construction sector viewpoint. Construction Management and Economics, 39(01), 36–54.

Bageis, A S and Fortune, C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(01), 53–71.

Baron, T (1984) Housing in the inner cities. Construction Management and Economics, 2(01), 13-24.

Baron, T (1983) The challenge for the UK housing industry in the 1980s and the planning system. Construction Management and Economics, 1(01), 17-29.

Beeston, D (1986) Combining risks in estimating. Construction Management and Economics, 4(01), 75-9.

Ben Mahmoud, B, Lehoux, N and Blanchet, P (2024) Integration mechanisms for material suppliers in the construction supply chain: a systematic literature review. Construction Management and Economics, 42(01), 70–107.

Benes, J and Diepeveen, W J (1985) Flexible planning in construction firms. Construction Management and Economics, 3(01), 25-31.

Benjaoran, V, Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(01), 93-105.

Bennett, J (1993) Japan's building industry: the new model. Construction Management and Economics, 11(01), 3-17.

Berkeley, D, Humphreys, P C and Thomas, R D (1991) Project risk action management. Construction Management and Economics, 9(01), 3-17.

Betts, M (1987) British public expenditure on construction less than claimed?. Construction Management and Economics, 5(01), 13-20.

Betts, M and Ofori, G (1993) Competitive advantage in construction: reply. Construction Management and Economics, 11(01), 73-4.

Bildsten, L (2014) Buyer-supplier relationships in industrialized building. Construction Management and Economics, 32(01), 146-59.

Bos-de Vos, M, Wamelink, J W F H and Volker, L (2016) Trade-offs in the value capture of architectural firms: The significance of professional value. Construction Management and Economics, 34(01), 21-34.

Boudeau, C (2013) Design team meetings and the coordination of expertise: the roof garden of a hospital. Construction Management and Economics, 31(01), 78-89.

Bowlby, R L and Schriver, W R (1986) Observations on productivity and composition of building output in the United States, 1972-82. Construction Management and Economics, 4(01), 1-18.

Brandon, P S and Ribeiro, F L (1998) A knowledge-based system for assessing applications for house renovation grants. Construction Management and Economics, 16(01), 57-69.

Brege, S, Stehn, L and Nord, T (2014) Business models in industrialized building of multi-storey houses. Construction Management and Economics, 32(01), 208-26.

Bresnen, M (2017) Being careful what we wish for? Challenges and opportunities afforded through engagement with business and management research. Construction Management and Economics, 35(01), 24-34.

Bresnen, M J, Ford, J R, Bryman, A E and Keil, E T (1986) Labour recruitment strategies and selection practices on construction sites. Construction Management and Economics, 4(01), 37-55.

Brooks, T, Scott, L, Spillane, J P and Hayward, K (2020) Irish construction cross border trade and Brexit: Practitioner perceptions on the periphery of Europe. Construction Management and Economics, 38(01), 71–90.

Brown, A D and Phua, F T T (2011) Subjectively construed identities and discourse: towards a research agenda for construction management. Construction Management and Economics, 29(01), 83–95.

Burchett, J F, Tummala, V M R and Leung, H M (1999) A world-wide survey of current practices in the management of risk within electrical supply projects. Construction Management and Economics, 17(01), 77-90.

Carrillo, P M (1996) Technology transfer on joint venture projects in developing countries. Construction Management and Economics, 14(01), 45-54.

Carrillo, P M (1994) Technology transfer: a survey of international construction companies. Construction Management and Economics, 12(01), 45-51.

Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(01), 81–92.

Chahrour, R, Hafeez, M A, Ahmad, A M, Sulieman, H I, Dawood, H, Rodriguez-Trejo, S, Kassem, M, Naji, K K and Dawood, N (2021) Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(01), 55–72.

Chang, Y, Wilkinson, S, Potangaroa, R and Seville, E (2011) Identifying factors affecting resource availability for post-disaster reconstruction: a case study in China. Construction Management and Economics, 29(01), 37–48.

Chapman, R J (1999) The likelihood and impact of changes of key project personnel on the design process. Construction Management and Economics, 17(01), 99-106.

Chau, K W (1997) Note - Monte Carlo simulation of construction costs using subjective data: response. Construction Management and Economics, 15(01), 109-15.

Chau, K W (1995) The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong. Construction Management and Economics, 13(01), 15-21.

Chau, K W, Raftery, J and Walker, A (1998) Note - The baby and the bathwater: research methods in construction management. Construction Management and Economics, 16(01), 99-104.

Cheah, C Y J, Kang, J and Chew, D A S (2007) Strategic analysis of large local construction firms in China. Construction Management and Economics, 25(01), 25-38.

Chen, Z, Li, H, Shen, Q and Xu, W (2004) An empirical model for decision-making on ISO 14000 acceptance in the Shanghai construction industry. Construction Management and Economics, 22(01), 55-73.

Chinyio, E A, Olomolaiye, P O, Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(01), 91-8.

Chiu, H N and Tsai, D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(01), 55-66.

Chow, L K and Ng, S T (2010) Delineating the performance standards of engineering consultants at design stage. Construction Management and Economics, 28(01), 11.

Coenen, T B J, Visscher, K and Volker, L (2023) A systemic perspective on transition barriers to a circular infrastructure sector. Construction Management and Economics, 41(01), 22–43.

Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(01), 91-100.

Cuervo, J C and Pheng, L S (2003) Ownership advantages/disadvantages of Singapore transnational construction corporations. Construction Management and Economics, 21(01), 81-94.

Dann, N, Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(01), 97-104.

Davis, C and Cochrane, S R (1987) Optimization of future manpower requirements in a multi-discipline consultancy. Construction Management and Economics, 5(01), 45-56.

Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(01), 19-30.

Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: an application to the pre-cast industry. Construction Management and Economics, 13(01), 53-64.

Dawood, N N (1998) Estimating project and activity duration: a risk management approach using network analysis. Construction Management and Economics, 16(01), 41-8.

Denny-Smith, G, Williams, M, Loosemore, M, Sunindijo, R Y and Piggott, L (2024) What social value do Indigenous contractors create?. Construction Management and Economics, 42(01), 16–34.

Drew, D S, Tang, S L Y and Lo, H P (2002) Developing a tendering strategy in two-envelope fee tendering based on technical score-fee variability. Construction Management and Economics, 20(01), 67-81.

Du, J, Zhao, D and Zhang, O (2019) Impacts of human communication network topology on group optimism bias in Capital Project Planning: a human-subject experiment. Construction Management and Economics, 37(01), 44–60.

Duff, A R, Robertson, I T, Phillips, R A and Cooper, M D (1994) Improving safety by the modification of behaviour. Construction Management and Economics, 12(01), 67-78.

Dunn, B (2004) The regionalization of international contracting and its implications for models of construction spending. Construction Management and Economics, 22(01), 93-100.

Dursun, O and Stoy, C (2011) Time-cost relationship of building projects: statistical adequacy of categorization with respect to project location. Construction Management and Economics, 29(01), 97–106.

Dzeng, R-J and Wang, S-S (2008) An analysis of infrastructure development based on national competitiveness perspectives. Construction Management and Economics, 26(01), 47–61.

Edwards, D J, Holt, G D and Harris, F C (2000) A model for predicting plant maintenance costs. Construction Management and Economics, 18(01), 65-75.

Edwards, P J and Bowen, P A (1998) Practices, barriers and benefits of risk management process in building services cost estimation: comment. Construction Management and Economics, 16(01), 105-8.

Egbu, C O (1999) Skills, knowledge and competencies for managing construction refurbishment works. Construction Management and Economics, 17(01), 29-43.

Ehwi, R J, Oti-Sarpong, K, Shojaei, R and Burgess, G (2022) Offsite Manufacturing Research: A Systematic Review of Methodologies Used. Construction Management and Economics, 40(01), 1–24.

Ekeskär, A, Havenvid, & I, Karrbom Gustavsson, T and Eriksson, P E (2022) Construction logistics in a multi-project context: coopetition among main contractors and the role of third-party logistics providers. Construction Management and Economics, 40(01), 25–40.

Enshassi, A and Burgess, R (1991) Managerial effectiveness and the style of management in the Middle East: an empirical analysis. Construction Management and Economics, 9(01), 79-92.

Eriksson, P E, Olander, S, Szentes, H and Widen, K (2014) Managing short-term efficiency and long-term development through industrialized construction. Construction Management and Economics, 32(01), 97-108.

Ewart, K, Shields, T J and Silcock, G W (1987) An analysis of the cost of compliance with the Fire Service Order, Northern Ireland, 1985. Construction Management and Economics, 5(01), 3-12.

Fan, L, Ho, C and Ng, V C-W (2001) A study of quantity surveyors' ethical behaviour. Construction Management and Economics, 19(01), 19-36.

Fellows, R F (1993) Competitive advantage in construction: comment. Construction Management and Economics, 11(01), 71-2.

Fielden, S L, Davidson, M J, Gale, A W and Davey, C L (2000) Women in construction: the untapped resource. Construction Management and Economics, 18(01), 113-21.

Finch, E F (1992) Environmental assessment of construction projects. Construction Management and Economics, 10(01), 5-18.

Fo, S, Marsh, x and Cockerham, G (2003) Assessing the capability of construction processes to realize building designs. Construction Management and Economics, 21(01), 7-10.

Fortune, C and Skitmore, M R (1994) Quantification skills in the construction industry. Construction Management and Economics, 12(01), 79-88.

Fraser, C (2000) The influence of personal characteristics on effectiveness of construction site managers. Construction Management and Economics, 18(01), 29-36.

Gann, D M and Barlow, J (1996) Flexibility in building use: the technical feasibility of converting redundant offices into flats. Construction Management and Economics, 14(01), 55-66.

Garnett, N and Pickrell, S (2000) Benchmarking for construction: theory and practice. Construction Management and Economics, 18(01), 55-63.

Goh, B-H (1996) Residential construction demand forecasting using economic indicators: a comparative study of artificial neural networks and multiple regression. Construction Management and Economics, 14(01), 25-34.

Gottsche, J, Kelly, M and Taggart, M (2016) Assessing the impact of energy management initiatives on the energy usage during the construction phase of an educational building project in Ireland. Construction Management and Economics, 34(01), 46-60.

Green, S D (1989) Tendering: optimization and rationality. Construction Management and Economics, 7(01), 52-63.

Green, S D and Simister, S J (1999) Modelling client business processes as an aid to strategic briefing. Construction Management and Economics, 17(01), 63-76.

Green, S D, Larsen, G D and Kao, C-C (2008) Competitive strategy revisited: contested concepts and dynamic capabilities. Construction Management and Economics, 26(01), 63–78.

Greenwood, D J (2001) Subcontractor procurement: are relationships changing?. Construction Management and Economics, 19(01), 5-7.

Gremyr, I, Bäckstrand, J, Fredriksson, A, Gatenholm, G and Halldórsson, & (2023) Blueprinting construction logistics services for quality improvement. Construction Management and Economics, 41(01), 60–78.

Gundes, S (2011) Exploring the dynamics of the Turkish construction industry using input-output analysis. Construction Management and Economics, 29(01), 59–68.

Håkansson, H and Ingemansson, M (2013) Industrial renewal within the construction network. Construction Management and Economics, 31(01), 40-61.

Hallowell, M (2010) Cost-effectiveness of construction safety programme elements. Construction Management and Economics, 28(01), 34.

Hallowell, M R, Alexander, D and Gambatese, J A (2017) Energy-based safety risk assessment: Does magnitude and intensity of energy predict injury severity?. Construction Management and Economics, 35(01), 64-77.

Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(01), 19-28.

Harriss, C (1998) Why research without theory is not research: a reply to Seymour et al.. Construction Management and Economics, 16(01), 113-6.

Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(01), 49.

Hatush, Z and Skitmore, M R (1997) Criteria for contractor selection. Construction Management and Economics, 15(01), 19-38.

Haupt, T C, Munshi, M and Smallwood, J (2005) HIV and AIDS in South African construction: is age nothing but a number?. Construction Management and Economics, 23(01), 107-19.

Hedgren, E and Stehn, L (2014) The impact of clients' decision-making on their adoption of industrialized building. Construction Management and Economics, 32(01), 126-45.

Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(01), 49-61.

Hietajärvi, A-M and Aaltonen, K (2018) The formation of a collaborative project identity in an infrastructure alliance project. Construction Management and Economics, 36(01), 1-21.

Ho, C M-F and Ng, V C-W (2003) Quantity surveyors' background and training, and their ethical concepts, conceptions and interests considerations. Construction Management and Economics, 21(01), 43-67.

Holt, L (1983) A case study of the construction of a terephthalic acid plant for Imperial Chemicals Limited at the Davies Works, Wilton, Cleveland, UK. Construction Management and Economics, 1(01), 57-74.

Hopkin, T, Lu, S-L, Rogers, P and Sexton, M (2016) Detecting defects in the UK new-build housing sector: A learning perspective. Construction Management and Economics, 34(01), 35-45.

Hossain, L (2009) Communications and coordination in construction projects. Construction Management and Economics, 27(01), 25–39.

Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(01), 5-18.

Hughes, W (1989) Identifying the environments of construction projects. Construction Management and Economics, 7(01), 29-40.

Hughes, W, Hillebrandt, P and Murdoch, J (2000) The impact of contract duration on the cost of cash retention. Construction Management and Economics, 18(01), 11-4.

Idrus, A B and Newman, J B (2002) Construciton related factors influencing the choice of concrete floor systems. Construction Management and Economics, 20(01), 13-9.

Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(01), 59-87.

Järvenpää, A, Eriksson, P E and Larsson, J (2022) Exploring a public client’s control systems in infrastructure projects from a relationship history perspective. Construction Management and Economics, 40(01), 56–71.

Jacobsson, M and Linderoth, H C J (2010) The influence of contextual elements, actors’ frames of reference, and technology on the adoption and use of ICT in construction projects: a Swedish case study. Construction Management and Economics, 28(01), 23.

Jansson, G, Johnsson, H and Engstrom, D (2014) Platform use in systems building. Construction Management and Economics, 32(01), 70-82.

Jenkins, A W (1984) Social policy and construction wage formation: the Alberta experience. Construction Management and Economics, 2(01), 25-36.

Jensen, D A (2010) A longitudinal study of a Type I differing conditions claim: investigating the contractor’s failure to meet the reasonable prudent standard. Construction Management and Economics, 28(01), 74.

Johnstone, I M (2001) Periodic refurbishment and reductions in national costs to sustain dwelling services. Construction Management and Economics, 19(01), 97-108.

Jonsson, H and Rudberg, M (2014) Classification of production systems for industrialized building: a production strategy perspective. Construction Management and Economics, 32(01), 53-69.

Kagioglou, M, Cooper, R and Aouad, G F (2001) Performance management in construction: a conceptual framework. Construction Management and Economics, 19(01), 85-95.

Kaka, A P (1996) Towards more flexible and accurate cash-flow forecasting. Construction Management and Economics, 14(01), 35-44.

Kaming, P F, Olomolaiye, P O, Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(01), 83-94.

Kangari, R and Halpin, D W (1990) Identification of factors influencing implementation of construction robotics. Construction Management and Economics, 8(01), 89-104.

Kapliński, O (1993) Diminishing non-uniformity of construction processes. Construction Management and Economics, 11(01), 53-61.

Kapliński, O and Meszek, W (1992) Catastrophic and strategic aspects of building processes balancing. Construction Management and Economics, 10(01), 81-8.

Kenley, R and Wilson, O D (1989) A construction project net cash-flow model. Construction Management and Economics, 7(01), 3-18.

Khalid, G (1994) Obsolescence in hedonic price estimation of the financial impact of commercial office buildings: the case of Kuala Lumpur. Construction Management and Economics, 12(01), 37-44.

Kim, J-C, Kim, D-H, Kim, J-J, Ye, J-S and Lee, H-S (2000) Segmenting the Korean housing market using multiple discriminant analysis. Construction Management and Economics, 18(01), 45-54.

Kim, J-L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(01), 3-19.

Kirkham, R J (2005) Re-engineering the whole life cycle costing process. Construction Management and Economics, 23(01), 9-14.

Korpela, J, Miettinen, R, Salmikivi, T and Ihalainen, J (2015) The challenges and potentials of utilizing building information modelling in facility management: the case of the Center for Properties and Facilities of the University of Helsinki. Construction Management and Economics, 33(01), 3-17.

Koskela, L (2017) Why is management research irrelevant?. Construction Management and Economics, 35(01), 4-23.

Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(01), 17-29.

Lahdenperä, P (2012) Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(01), 57–79.

Lai, L W C, Ng, F W N and Yung, P (2008) The Coase Theorem and a Coasian construction economics and management research agenda. Construction Management and Economics, 26(01), 29–46.

Lam, K C, So, A T P, Hu, T S, Ng, S T, Yuen, R K K, Lo, S M, Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(01), 63-76.

Lam, P T I and Wong, F W H (2009) Improving building project performance: how buildability benchmarking can help. Construction Management and Economics, 27(01), 41–52.

Langston, C (2013) The role of coordinate-based decision-making in the evaluation of sustainable built environments. Construction Management and Economics, 31(01), 62-77.

Lansley, P R (1986) Modelling construction organizations. Construction Management and Economics, 4(01), 19-36.

Lansley, P R (1985) Putting organization research into practice. Construction Management and Economics, 3(01), 1-14.

Larsen, G D and Ballal, T M A (2005) The diffusion of innovations within a UKCI context: an explanatory framework. Construction Management and Economics, 23(01), 81-91.

Larsson, J, Eriksson, P E, Olofsson, T and Simonsson, P (2014) Industrialized construction in the Swedish infrastructure sector: core elements and barriers. Construction Management and Economics, 32(01), 83-96.

Laufer, A (1992) A micro view of the project planning process. Construction Management and Economics, 10(01), 31-43.

Laufer, A (1987) Construction safety: economics, information and management involvement. Construction Management and Economics, 5(01), 73-90.

Laufer, A, Tucker, R L, Shapira, A and Shenhar, A J (1994) The multiplicity concept in construction project planning. Construction Management and Economics, 12(01), 53-65.

Laukkanen, T (1999) Construction work and education: occupational health and safety reviewed. Construction Management and Economics, 17(01), 53-62.

Lavy, S and Shohet, I M (2004) Integrated maintenance management of hospital buildings: a case study. Construction Management and Economics, 22(01), 25-34.

Legard, D A (1983) Probabilistic analysis of an idealized model of construction projects. Construction Management and Economics, 1(01), 31-45.

Lehtovaara, J, Seppänen, O, Peltokorpi, A, Kujansuu, P and Grönvall, M (2021) How takt production contributes to construction production flow: a theoretical model. Construction Management and Economics, 39(01), 73–95.

Leung, M-Y and Liu, A M M (2003) Analysis of value and project goal specificity in value management. Construction Management and Economics, 21(01), 11-9.

Leung, M-Y, Liu, A M M and Wong, M M-k (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(01), 55-67.

Leung, M-Y, Ng, T S, Skitmore, M and Cheung, S-O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(01), 33-44.

Lewis, T M (1984) A review of the causes of recent problems in the construction industry of Trinidad and Tobago. Construction Management and Economics, 2(01), 37-48.

Lewis, T M (2007) Impact of globalization on the construction sector in developing countries. Construction Management and Economics, 25(01), 7-23.

Li, H (1996) Selecting KBES development techniques for applications in the construction industry. Construction Management and Economics, 14(01), 67-74.

Lindblad, H (2019) Black boxing BIM: the public client’s strategy in BIM implementation. Construction Management and Economics, 37(01), 1–12.

Lindblad, H and Karrbom Gustavsson, T (2021) Public clients ability to drive industry change: the case of implementing BIM. Construction Management and Economics, 39(01), 21–35.

Lingard, H (2003) The impact of individual and job characteristics on 'burnout' among civil engineers in Australia and the implications for employee turnover. Construction Management and Economics, 21(01), 69-80.

Lingard, H and Turner, M (2015) Improving the health of male, blue collar construction workers: a social ecological perspective. Construction Management and Economics, 33(01), 18-34.

Lingard, H, Peihua Zhang, R, Blismas, N, Wakefield, R and Kleiner, B (2015) Are we on the same page? Exploring construction professionals’ mental models of occupational health and safety. Construction Management and Economics, 33(01), 73-84.

Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: preliminary evidence from Australian projects. Construction Management and Economics, 28(01), 100.

Loosemore, M (1999) A grounded theory of construction crisis management. Construction Management and Economics, 17(01), 9-19.

Loosemore, M (1995) Reactive management: communication and behavioural issues in dealing with the occurrence of client risks. Construction Management and Economics, 13(01), 65-80.

Loosemore, M and Chau, D W (2002) Racial discrimination towards Asian operatives in the Australian construction industry. Construction Management and Economics, 20(01), 91-102.

Low S P (1991) World markets in construction I: a regional analysis. Construction Management and Economics, 9(01), 63-71.

Low S P (1991) World markets in construction II: a country-by-country analysis. Construction Management and Economics, 9(01), 73-8.

Lowe, J G (1987) Monopoly and the materials supply industries of the UK. Construction Management and Economics, 5(01), 57-71.

Lowe, J G (1990) The fixed capital stock in use by the UK construction industry. Construction Management and Economics, 8(01), 63-75.

Lu, W, Olofsson, T and Stehn, L (2011) A lean-agile model of homebuilders' production systems. Construction Management and Economics, 29(01), 25–35.

Luo, J (2001) Assessing management and performance of Sino-foreign construction joint ventures. Construction Management and Economics, 19(01), 109-17.

Manavazhi, M R (2004) Assessment of the propensity for revisions in design projects through the dichotomous characterization of designer effort. Construction Management and Economics, 22(01), 47-54.

Mbachu, J and Nkado, R (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24(01), 31-44.

Mbachu, J and Nkado, R (2007) Factors constraining successful building project implementation in South Africa. Construction Management and Economics, 25(01), 39-54.

Mbiti, T K, Blismas, N, Wakefield, R and Lombardo, R (2011) System archetypes underlying the problematic behaviour of construction activity in Kenya. Construction Management and Economics, 29(01), 3–13.

McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: a case study. Construction Management and Economics, 16(01), 71-8.

McDonald, P (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(01), 1-12.

McFillen, J M and Maloney, W F (1988) New answers and new questions in construction worker motivation. Construction Management and Economics, 6(01), 35-48.

Mehmet, O and Yorucu, V (2008) Explosive construction in a micro-state: environmental limit and the Bon curve: evidence from North Cyprus. Construction Management and Economics, 26(01), 79–88.

Mehta, R and Bridwell, L (2005) Innovative construction technology for affordable mass housing in Tanzania, East Africa. Construction Management and Economics, 23(01), 69-79.

Meiling, J H, Sandberg, M and Johnsson, H (2014) A study of a plan-do-check-act method used in less industrialized activities: two cases from industrialized housebuilding. Construction Management and Economics, 32(01), 109-25.

Moatazed-Keivani, R, Ghanbari-Parsa, A R and Kagaya, S (1999) ISO 9000 standards: perceptions and experiences in the UK construction industry. Construction Management and Economics, 17(01), 107-19.

Morrison, N (1984) The accuracy of quantity surveyor's cost estimating. Construction Management and Economics, 2(01), 57-75.

Moselhi, O and Deb, B (1993) Project selection considering risk. Construction Management and Economics, 11(01), 45-52.

Moselhi, O, Li, J and Alkass, S (2004) Web-based integrated project control system. Construction Management and Economics, 22(01), 35-46.

Murtagh, N, Roberts, A and Hind, R (2016) The relationship between motivations of architectural designers and environmentally sustainable construction design. Construction Management and Economics, 34(01), 61-75.

Navon, R and Arkin, H (1993) Economic comparison of an air-conditioner and a desert cooler for residences in arid areas. Construction Management and Economics, 11(01), 62-70.

Neves, J C and Bugalho, A (2008) Coordination and control in emerging international construction firms. Construction Management and Economics, 26(01), 3–13.

Nguyen Chau, T, Pham, T T T, Ha, T C V and Nguyen, D (2024) Corruption, market structure, and industry competition in the Vietnamese construction sector. Construction Management and Economics, 42(01), 54–69.

Nicolini, D, Holti, R and Smalley, M (2001) Integrating project activities: the theory and practice of managing the supply chain through clusters. Construction Management and Economics, 19(01), 37-47.

Nilsson Vestola, E and Eriksson, P E (2023) Engineered and emerged collaboration: vicious and virtuous cycles. Construction Management and Economics, 41(01), 79–96.

Nkado, R N (1995) Construction time-influencing factors: the contractor's perspective. Construction Management and Economics, 13(01), 81-9.

Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: the impact on labour. Construction Management and Economics, 16(01), 79-90.

O'Brien, M J and Pantouvakis, J P (1993) A new approach to the development of computer-aided estimating systems for the construction industry. Construction Management and Economics, 11(01), 30-44.

Ofori, G (1988) Construction industry and economic growth in Singapore. Construction Management and Economics, 6(01), 57-70.

Ofori, G (1985) Managing construction industry development. Construction Management and Economics, 3(01), 33-42.

Ofori, G (1991) Programmes for improving the performance of contracting firms in developing countries: a review of approaches and appropriate options. Construction Management and Economics, 9(01), 19-38.

Okpala, D C (1991) Evaluation and selection of construction projects in Nigeria. Construction Management and Economics, 9(01), 51-61.

Olomolaiye, P O and Ogunlana, S O (1989) An evaluation of production outputs in key building trades in Nigeria. Construction Management and Economics, 7(01), 75-86.

Oswald, D (2020) Safety indicators: questioning the quantitative dominance. Construction Management and Economics, 38(01), 11–17.

Pan, Z (2004) Commercial housing ownership predictors in urban China: an analysis of a national survey. Construction Management and Economics, 22(01), 85-91.

Peltokorpi, A, Olivieri, H, Granja, A D and Seppänen, O (2018) Categorizing modularization strategies to achieve various objectives of building investments. Construction Management and Economics, 36(01), 32-48.

Peng, C L, Scorpio, D E and Kibert, C J (1997) Strategies for successful construction and demolition waste recycling operation. Construction Management and Economics, 15(01), 49-57.

Phua, F T T (2005) Determining the relationship between fee structure and project performance between firms: an empirical study based on institutional and task environment perspectives. Construction Management and Economics, 23(01), 45-56.

Pietroforte, R (1997) Communication and governance in the building process. Construction Management and Economics, 15(01), 71-82.

Plessis, C D (2007) A strategic framework for sustainable construction in developing countries. Construction Management and Economics, 25(01), 67-76.

Pongpeng, J and Liston, J (2003) TenSeM: a multi-criteria and multi-decision -makers' model in tender evaluation. Construction Management and Economics, 21(01), 21-30.

Ponton, H, Osborne, A, Thompson, N and Greenwood, D (2020) The power of humour to unite and divide: a case study of design coordination meetings in construction. Construction Management and Economics, 38(01), 32–54.

Potts, K F (1988) An alternative payment system for major 'fast track' construction projects. Construction Management and Economics, 6(01), 25-33.

Preece, C and Male, S (1997) Promotional literature for competitive advantage in UK construction firms. Construction Management and Economics, 15(01), 59-69.

Pries, F and Janszen, F (1995) Innovation in the construction industry: the dominant role of the environment. Construction Management and Economics, 13(01), 43-51.

Pries, F, Dorée, A G, Veen, B V d and Vrijhoef, R (2004) Note: The role of leaders' paradigm in construction industry change. Construction Management and Economics, 22(01), 7-10.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors. Construction Management and Economics, 17(01), 45-52.

Radosaviljevic, M and Horner, R M W (2002) The evidence of complex variability in construction labour productivity. Construction Management and Economics, 20(01), 3-12.

Raftery, J (1999) Quasi-rational behaviour in the property and construction market. Construction Management and Economics, 17(01), 21-7.

Rahman, M M and Kumaraswamy, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(01), 45-54.

Raisbeck, P and Tang, L C M (2013) Identifying design development factors in Australian PPP projects using an AHP framework. Construction Management and Economics, 31(01), 20-39.

Ranasinghe, M (1994) Quantification and management of uncertainty in activity duration networks. Construction Management and Economics, 12(01), 15-29.

Ranasinghe, M (1998) Risk management in the insurance industry: insights for the engineering construction industry. Construction Management and Economics, 16(01), 31-9.

Ranasinghe, M and Russell, A D (1992) Analytical approach for economic risk quantification of large engineering projects: validation. Construction Management and Economics, 10(01), 45-68.

Rawlinson, S and Raftery, J (1997) Price stability and the business cycle: UK construction bidding patterns 1970-1991. Construction Management and Economics, 15(01), 5-18.

Robinson, W G, Chan, P W and Lau, T (2016) Sensors and sensibility: Examining the role of technological features in servitizing construction towards greater sustainability. Construction Management and Economics, 34(01), 4-20.

Rosenfeld, Y and Warszawski, A (1993) Forecasting methodology of national demand for construction labour. Construction Management and Economics, 11(01), 18-29.

Roy, R, Low, M and Waller, J (2005) Documentation, standardization and improvement of the construction process in house building. Construction Management and Economics, 23(01), 57-67.

Ruan, X, Ochieng, E G, Price, A D F and Egbu, C O (2012) Knowledge integration process in construction projects: a social network analysis approach to compare competitive and collaborative working. Construction Management and Economics, 30(01).

Rueda-Benavides, J, Gransberg, D, Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(01), 1–15.

Ruegg, R T and Fuller, S K (1985) The economics of fire protection: fast-response residential sprinklers. Construction Management and Economics, 3(01), 43-57.

Runeson, G (1988) Methodology and method for price-level forecasting in the building industry. Construction Management and Economics, 6(01), 49-55.

Rwelamila, P M D (2007) Project management competence in public sector infrastructure organisations. Construction Management and Economics, 25(01), 55-66.

Sacks, R, Seppänen, O, Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(01), 45-63.

Sacks, R, Whyte, J, Swissa, D, Raviv, G, Zhou, W and Shapira, A (2015) Safety by design: dialogues between designers and builders using virtual reality. Construction Management and Economics, 33(01), 55-72.

Schmidt, R, Vibaek, K S and Austin, S (2014) Evaluating the adaptability of an industrialized building using dependency structure matrices. Construction Management and Economics, 32(01), 160-82.

Scott, D (1984) Economic evaluation of minor roading projects. Construction Management and Economics, 2(01), 77-90.

Selinger, S and Stamler, H (1983) Computerized method for quantity surveying. Construction Management and Economics, 1(01), 75-87.

Seymour, D E and Pheng, L S (1990) The quality debate. Construction Management and Economics, 8(01), 13-29.

Seymour, D E, Crook, D and Rooke, J (1997) Note - The role of theory in construction management: a call for debate. Construction Management and Economics, 15(01), 117-9.

Seymour, D E, Rooke, J D and Crook, D (1998) The role of theory in construction management: reply to Runeson. Construction Management and Economics, 16(01), 109-12.

Sidwell, A C (1983) An evaluation of management contracting. Construction Management and Economics, 1(01), 47-55.

Singh, G and Banjoko, O O (1990) The development of a rational bill of quantities. Construction Management and Economics, 8(01), 31-47.

Skibniewski, M J (1991) Information management system for new construction technologies. Construction Management and Economics, 9(01), 39-49.

Skibniewski, M J and Kassouf, P J (1990) Potential for application of plastic liner plates in tunnelling works. Construction Management and Economics, 8(01), 3-11.

Skitmore, M R (2002) Raftery curve construction for tender price forecasts. Construction Management and Economics, 20(01), 83-9.

Skitmore, M R and Marsden, D E (1988) Which procurement system? Towards a universal procurement selection technique. Construction Management and Economics, 6(01), 71-89.

Skitmore, M R and Mills, A (1999) A needs based methodology for classifying construction clients and selecting contractors: comment. Construction Management and Economics, 17(01), 5-7.

Skitmore, R M (2004) Predicting the probability of winning sealed bid auctions: the effects of outliers on bidding models. Construction Management and Economics, 22(01), 101-9.

Sohail, M and Baldwin, A N (2004) Performance indicators for 'micro-projects' in developing countries. Construction Management and Economics, 22(01), 11-23.

Sterner, E (2002) 'Green procurement' of buildings: a study of Swedish clients' considerations. Construction Management and Economics, 20(01), 21-30.

Styhre, A, Brorström, S and Gluch, P (2022) The valuation of housing in low-amenity and low purchasing power city districts: social and economic value entangled by default. Construction Management and Economics, 40(01), 72–86.

Styre, A (2017) Thinking about materiality: The value of a construction management and engineering view. Construction Management and Economics, 35(01), 35-44.

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions for unbalanced bidding scenarios. Construction Management and Economics, 33(01), 35-54.

Sundquist, V, Gadde, L-E and Hulthén, K (2018) Reorganizing construction logistics for improved performance. Construction Management and Economics, 36(01), 49-65.

Svensson, I and Gluch, P (2022) Materiality in action: the role of objects in institutional work. Construction Management and Economics, 40(01), 41–55.

Tabish, S Z S and Jha, K N (2012) The impact of anti-corruption strategies on corruption free performance in public construction projects. Construction Management and Economics, 30(01), 21–35.

Tah, J H M, Thorpe, A and McCaffer, R (1994) A survey of indirect cost estimating in practice. Construction Management and Economics, 12(01), 31-6.

Tam, C M and Fung, I W H (1998) Effectiveness of safety management strategies on safety performance in Hong Kong. Construction Management and Economics, 16(01), 49-51.

Tan, W (1989) Sub-sector fluctuations in construction. Construction Management and Economics, 7(01), 41-51.

Tang, S L, Ying, K C, Anson, M and Lu, M (2005) RMCSIM: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(01), 15-31.

Tavakoli, A and Tulumen, S C (1990) Construction industry in Turkey. Construction Management and Economics, 8(01), 77-87.

Taylor, R G and Bowen, P A (1987) Building price-level forecasting: An examination of techniques and applications. Construction Management and Economics, 5(01), 21-44.

Thomson, D (2011) A pilot study of client complexity, emergent requirements and stakeholder perceptions of project success. Construction Management and Economics, 29(01), 69–82.

Treloar, G J, Love, P E D and Holt, G D (2001) Using national input-output data for embodied energy analysis of individual residential buildings. Construction Management and Economics, 19(01), 49-61.

Treloar, G J, Love, P E D, Faniran, O O and Iyer-Raniga, U (2000) A hybrid life cycle assessment method for construction. Construction Management and Economics, 18(01), 5-9.

Troje, D and Gluch, P (2020) Populating the social realm: new roles arising from social procurement. Construction Management and Economics, 38(01), 55–70.

Tse, R Y C and Raftery, J (2001) The effects of money supply on construction flows. Construction Management and Economics, 19(01), 9-17.

Tucker, S N (1988) A single alternative formula for Department of Health and Social Security S-curves. Construction Management and Economics, 6(01), 13-23.

Turner, J R (2004) Farsighted project contract management: incomplete in its entirety. Construction Management and Economics, 22(01), 75-83.

van den Boomen, M, Spaan, M T J, Schoenmaker, R and Wolfert, A R M (2019) Untangling decision tree and real options analyses: a public infrastructure case study dealing with political decisions, structural integrity and price uncertainty. Construction Management and Economics, 37(01), 24–43.

van den Boomen, M, Spaan, M T J, Shang, Y and Wolfert, A R M (2020) Infrastructure maintenance and replacement optimization under multiple uncertainties and managerial flexibility. Construction Management and Economics, 38(01), 91–107.

Volker, L (2019) Looking out to look in: inspiration from social sciences for construction management research. Construction Management and Economics, 37(01), 13–23.

Walker, A and Hughes, W (1986) A conventionally-managed project: A systems-based case study. Construction Management and Economics, 4(01), 47-74.

Walker, A and Newcombe, R (2000) The positive use of power on a major construction project. Construction Management and Economics, 18(01), 37-44.

Walker, D H T and Shen, Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies. Construction Management and Economics, 20(01), 31-44.

Wang, C-H and Huang, Y-C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(01), 5-16.

Wang, Z, Han, F, Xia, B, Liu, J and Zhang, C (2023) Regional differences and heterogeneity of construction and demolition waste with economic growth: evidence from China. Construction Management and Economics, 41(01), 44–59.

Wells, J (2007) Informality in the construction sector in developing countries. Construction Management and Economics, 25(01), 87-93.

White, A (1985) The critical path method and construction contracts: a polemic. Construction Management and Economics, 3(01), 15-24.

Wikberg, F, Olofsson, T and Ekholm, A (2014) Design configuration with architectural objects: linking customer requirements with system capabilities in industrialized house-building platforms. Construction Management and Economics, 32(01), 196-207.

Winch, G and Campagnac, E (1995) The organization of building projects: an Anglo/French comparison. Construction Management and Economics, 13(01), 3-14.

Wong, E and Norman, G (1997) Economic evaluation of materials planning systems for construction. Construction Management and Economics, 15(01), 39-47.

Wong, J, Wong, P N K and Heng, L (2007) An investigation of leadership styles and relationship cultures of Chinese and expatriate managers in multinational construction companies in Hong Kong. Construction Management and Economics, 25(01), 95-106.

Wu, J, Kumaraswamy, M and Soo, G K L (2011) Dubious benefits from future exchange: an explanation of payment arrears from "continuing clients" in Mainland China. Construction Management and Economics, 29(01), 15–23.

Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(01), 77-84.

Yashiro, T (2014) Conceptual framework of the evolution and transformation of the idea of the industrialization of building in Japan. Construction Management and Economics, 32(01), 16-39.

Yau, N-J, Yang, J-B and Hsieh, T-Y (1999) Inducing rules for selecting retaining wall systems. Construction Management and Economics, 17(01), 91-8.

Yizhe, T and Youjie, L (1992) Unbalanced bidding on contracts with variation trends in client-provided quantities. Construction Management and Economics, 10(01), 69-80.

Yorucu, V and Keles, R (2007) The construction boom and environmental protection in Northern Cyprus as a consequence of the Annan Plan. Construction Management and Economics, 25(01), 77-86.

Yun, S and Caldas, C H (2009) Analysing decision variables that influence preliminary feasibility studies using data mining techniques. Construction Management and Economics, 27(01), 73–87.

Yunus, R and Yang, J (2014) Improving ecological performance of industrialized building systems in Malaysia. Construction Management and Economics, 32(01), 183-95.

Zarkada-Fraser, A and Skitmore, M R (2000) Decisions with moral content: collusion. Construction Management and Economics, 18(01), -11.

Zhai, X, Reed, R and Mills, A (2014) Factors impeding the offsite production of housing construction in China: an investigation of current practice. Construction Management and Economics, 32(01), 40-52.

Zhang, H and Li, H (2010) Multi-objective particle swarm optimization for construction time-cost tradeoff problems. Construction Management and Economics, 28(01), 88.

Zhang, H and Tam, C M (2003) Fuzzy decision making for dynamic resource allocation. Construction Management and Economics, 21(01), 31-41.

Zhang, S, Leiringer, R and Winch, G (2024) Procuring infrastructure public-private partnerships: capability development and learning from an owner perspective. Construction Management and Economics, 42(01), 35–53.

Zomer, T, Neely, A, Sacks, R and Parlikad, A (2021) Exploring the influence of socio-historical constructs on BIM implementation: an activity theory perspective. Construction Management and Economics, 39(01), 1–20.