ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 62 results ...
Hosseini, M, R, Chileshe, N, Jepson, J and M,Arashpour (2016) Critical success factors for implementing risk management systems in developing countries . Construction Economics and Building, 16(01), 18-32.
Panahi, B, Preece, C, N, Wan, N, and Zakaria, W, N, W. (2016) Personal-organisational value conflicts and job satisfaction of internal construction stakeholders . Construction Economics and Building, 16(01), 1-17.
Ankrah, N A, Proverbs, D and Debrah, Y (2009) Factors influencing the culture of a construction project organisation: an empirical investigation. Engineering, Construction and Architectural Management, 16(01), 26–47.
Arif, M, Egbu, C, Alom, O and Khalfan, M M A (2009) Measuring knowledge retention: a case study of a construction consultancy in the UAE. Engineering, Construction and Architectural Management, 16(01), 92–108.
Babatunde, S O, Perera, S and Zhou, L (2016) Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors. Construction Innovation, 16(01), 81-110.
Barrows, M, Clevenger, C M, Abdallah, M and Wu, W (2020) Value of Certifications when Seeking Construction Employment. International Journal of Construction Education and Research, 16(01), 61–79.
Bildsten, L, Björnfot, A and Sandberg, E (2011) Value-driven purchasing of kitchen cabinets in industrialized housing. Journal of Financial Management of Property and Construction, 16(01), 73–83.
Bröchner, J and Lagerqvist, O (2016) From ideas to construction innovations: firms and universities collaborating. Construction Economics and Building, 16(01), 76-89.
Brandon, P S and Ribeiro, F L (1998) A knowledge-based system for assessing applications for house renovation grants. Construction Management and Economics, 16(01), 57-69.
Chau, K W, Raftery, J and Walker, A (1998) Note - The baby and the bathwater: research methods in construction management. Construction Management and Economics, 16(01), 99-104.
Chinyio, E A, Olomolaiye, P O, Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(01), 91-8.
Chinyio, E, Suresh, S and Salisu, J B (2018) The impacts of monetary rewards on public sector employees in construction: A case of Jigawa state in Nigeria. Journal of Engineering, Design and Technology, 16(01), 125-42.
Criado-Perez, C, Collins, C G, Jackson, C J, Oldfield, P, Pollard, B and Sanders, K (2020) Beyond an ‘informed opinion’: evidence-based practice in the built environment. Architectural Engineering and Design Management, 16(01), 23–40.
Darrington, J W and Howell, G A (2011) Motivation and incentives in relational contracts. Journal of Financial Management of Property and Construction, 16(01), 42–51.
Dawood, N N (1998) Estimating project and activity duration: a risk management approach using network analysis. Construction Management and Economics, 16(01), 41-8.
Ding, G and Forsythe, P (2016) A comparative study of floor construction on sloping sites: an analysis of cumulative energy demand and greenhouse gas emissions. Construction Economics and Building, 16(01), 33-49.
Edwards, P J and Bowen, P A (1998) Practices, barriers and benefits of risk management process in building services cost estimation: comment. Construction Management and Economics, 16(01), 105-8.
Enshassi, A, Mohamed, S and El-Ghandour, S (2009) Problems associated with the process of claim management in Palestine: Contractors' perspective. Engineering, Construction and Architectural Management, 16(01), 61–72.
Famakin, I O and Abisuga, A O (2016) Effect of path-goal leadership styles on the commitment of employees on construction projects. International Journal of Construction Management, 16(01), 67-76.
Harriss, C (1998) Why research without theory is not research: a reply to Seymour et al.. Construction Management and Economics, 16(01), 113-6.
Hassan, N M, Al Maazmi, T, Al Hadhrami, A and Al Hosani, M (2016) Discrete event simulation: A vital tool for a concurrent life cycle design. Construction Innovation, 16(01), 67-80.
Heidemann, A and Gehbauer, F (2011) The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(01), 19–30.
Holt, G D (2016) Historical British antecedents of innovative construction project organisation and social structures. Construction Innovation, 16(01), 46-66.
Jaafar, M, Nuruddin, A R and Bakar, S P S A (2016) Managerial capabilities of housing developers: Building the competitive advantage of a firm. International Journal of Construction Management, 16(01), 27-38.
Jose, S-G and Christine, P (2011) Value theory in lean construction. Journal of Financial Management of Property and Construction, 16(01), 8–18.
Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(01), 48–60.
Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(01), 8–25.
Kermanshachi, S, Dao, B, Rouhanizadeh, B, Shane, J and Anderson, S (2020) Development of the Project Complexity Assessment and Management Framework for Heavy Industrial Projects. International Journal of Construction Education and Research, 16(01), 24–42.
Kulkarni, S, Chapman, C, Shah, H, Parn, E A and Edwards, D J (2018) Designing an efficient tidal turbine blade through bio-mimicry: a systematic review. Journal of Engineering, Design and Technology, 16(01), 101-24.
Kumar, S, Dhingra, A and Singh, B (2018) Lean-Kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(01), 143-60.
Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(01), 17-29.
Leathem, T M (2020) Development and Evaluation of a Model for Clarifying ACCE Student Learning Outcomes. International Journal of Construction Education and Research, 16(01), 43–60.
Lou, E C, Lee, A and Goulding, J (2020) E-readiness in construction (ERiC): self-assessment framework for UK small and medium enterprise building services providers. Architectural Engineering and Design Management, 16(01), 3–22.
Louise, B, Anders, B and Erik, S (2011) Value-driven purchasing of kitchen cabinets in industrialised housing. Journal of Financial Management of Property and Construction, 16(01), 73–83.
Mahamadu, A-M, Manu, P, Booth, C, Olomolaiye, P, Coker, A, Ibrahim, A and Lamond, J (2018) Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector. Journal of Engineering, Design and Technology, 16(01), 2-24.
McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: a case study. Construction Management and Economics, 16(01), 71-8.
McWhirter, N and Shealy, T (2020) Case-based flipped classroom approach to teach sustainable infrastructure and decision-making. International Journal of Construction Education and Research, 16(01), 3–23.
Megahed, N (2018) Reflections on studio-based learning: assessment and critique. Journal of Engineering, Design and Technology, 16(01), 63-80.
Mollaoglu, S, Chergia, C, Ergen, E and Syal, M (2016) Diffusion of green building guidelines as innovation in developing countries. Construction Innovation, 16(01), 11-29.
Mpakati-Gama, E C, Brown, A and Sloan, B (2016) Embodied energy and carbon analysis of urban residential buildings in Malawi. International Journal of Construction Management, 16(01), 1-12.
Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: the impact on labour. Construction Management and Economics, 16(01), 79-90.
Ofori-Kuragu, J K, Baiden, B K and Badu, E (2016) Performance measurement tools for Ghanaian contractors. International Journal of Construction Management, 16(01), 13-26.
Okakpu, A, GhaffarianHoseini, A, Tookey, J, Haar, J and Ghaffarianhoseini, A (2020) Exploring the environmental influence on BIM adoption for refurbishment project using structural equation modelling. Architectural Engineering and Design Management, 16(01), 41–57.
Oluwatayo, A, A, Amole, D and Uwakonye, O (2016) Organisational life cycle, business orientation and performances of architectural firms in Nigeria . Construction Economics and Building, 16(01), 50-63.
Onyido, T B C, Boyd, D and Thurairajah, N (2016) Developing SMEs as environmental businesses. Construction Innovation, 16(01), 30-45.
Oo, B (2016) On the external validity of construction bidding experiment. Construction Economics and Building, 16(01), 64-75.
Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public–private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(01), 161-91.
Othman, A A E and Abdelwahab, N M A (2018) Achieving sustainability through integrating risk management into the architectural design process. Journal of Engineering, Design and Technology, 16(01), 25-43.
Pareek, P, Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(01), 54-66.
Pennanen, A, Ballard, G and Haahtela, Y (2011) Target costing and designing to targets in construction. Journal of Financial Management of Property and Construction, 16(01), 52–63.
Perera, S, Davis, S and Marosszeky, M (2011) Head contractor role in construction value-based management: Australian building industry experience. Journal of Financial Management of Property and Construction, 16(01), 31–41.
- Type: Journal Article
- Keywords: Australia; productivity rate
- ISBN/ISSN: 1366-4387
- URL: https://doi.org/10.1108/13664381111116061
- Abstract:
Purpose – Value in construction is defined in so many ways and used to mean many different things, often linked to cost, time, objectives and customers that there exists no concise and complete description of what constitutes value within a construction context. Hence, the purpose of this paper is to study the current perceptions of value by the construction players and compare with emerging theories of value in the literature. Design/methodology/approach – Empirical evidence of prevailing perceptions of value within the support role provided by the head contractor (HC) to the subcontractors (SCs) is presented based on two years of action research on six construction sites in Sydney, Australia. Findings – The results show that value management during the construction phase is currently understood as intrinsic to other HC functions. The paper presents a list of activities identified by HCs and SCs as key support services to be performed by the HC to enable efficient progression of construction. Research limitations/implications – There are limitations in generalising the outcomes of this study to the construction industry. Further research is required in advancing the role of the HC in overall construction organisation. Originality/value – This paper adds value in advancing the role of the HC in construction. Empirical evidence of value-based management closely following the current perceptions of the construction players compared to managing value as a separate function is presented.
Quaigrain, R A and Issa, M H (2018) Development and validation of disability management indicators for the construction industry. Journal of Engineering, Design and Technology, 16(01), 81-100.
Ranasinghe, M (1998) Risk management in the insurance industry: insights for the engineering construction industry. Construction Management and Economics, 16(01), 31-9.
Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(01), 77-93.
Riggio, M, Alhariri, N and Hansen, E (2020) Paths of innovation and knowledge management in timber construction in North America: a focus on water control design strategies in CLT building enclosures. Architectural Engineering and Design Management, 16(01), 58–83.
Seymour, D E, Rooke, J D and Crook, D (1998) The role of theory in construction management: reply to Runeson. Construction Management and Economics, 16(01), 109-12.
Sharma, A K and Vohra, E (2009) Critical evaluation of road infrastructure in India: a cross-country view. Engineering, Construction and Architectural Management, 16(01), 73–91.
Tam, C M and Fung, I W H (1998) Effectiveness of safety management strategies on safety performance in Hong Kong. Construction Management and Economics, 16(01), 49-51.
Wang, C-H and Huang, Y-C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(01), 5-16.
Yang, R J and Zou, P X W (2016) Building integrated photovoltaics (BIPV): Costs, benefits, risks, barriers and improvement strategy. International Journal of Construction Management, 16(01), 39-53.
Yapage, N and Liyanapathirana, S (2018) Behaviour of geosynthetic reinforced column supported embankments. Journal of Engineering, Design and Technology, 16(01), 44-62.
Zimina, D and Pasquire, C L (2011) Applying lean thinking in commercial management. Journal of Financial Management of Property and Construction, 16(01), 64–72.