ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 66 results ...

Aaron, M A, Mohan, M K and Gangadhar, M (2011) Building relationally integrated value networks (RIVANS). Engineering, Construction and Architectural Management, 18(01), 102–20.

Abdullahi, B, Ibrahim, Y M, Ibrahim, A and Bala, K (2019) Development of e-tendering evaluation system for Nigerian public sector. Journal of Engineering, Design and Technology , 18(01), 122–49.

Abuzeinab, A, Arif, M, Qadri, M A and Kulonda, D (2018) Green business models in the construction sector: An analysis of outcomes and benefits. Construction Innovation, 18(01), 20-42.

Acheamfour, V K, Kissi, E, Adjei-Kumi, T and Adinyira, E (2019) Review of empirical arguments on contractor pre-qualification criteria. Journal of Engineering, Design and Technology , 18(01), 70–83.

Adamtey, S A (2022) An Empirical Study to Assist Owners in Selecting the Right Procurement Method for Design-Build Projects. International Journal of Construction Education and Research, 18(01), 67–84.

Adu, E T and Opawole, A (2019) Assessment of performance of teamwork in construction projects delivery in South-Southern Nigeria. Journal of Engineering, Design and Technology , 18(01), 230–50.

Afolabi, A, O, Oluwatayo, A, Oyeyipo, O, Ojelabi, R and Fagbenle, O (2018) Assessment of Designers’ Perception of Post Conflict Housing Schemes for Internally Displaced Persons. Construction Economics and Building, 18(01), 27-47.

Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(01), 77-89.

Al Hattab, M, Zankoul, E, Barakat, M and Hamzeh, F (2018) Crane overlap and operational flexibility: Balancing utilization, duration, and safety. Construction Innovation, 18(01), 43-63.

Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(01), 15-27.

Ariyachandra, M, Jayasena, H and Perera, B (2022) Competencies Expected from an Information Manager Working in BIM Based Projects. International Journal of Construction Education and Research, 18(01), 49–66.

Belniak, S, Lesniak, A, Plebankiewicz, E and Zima, K (2013) The influence of the building shape on the costs of its construction. Journal of Financial Management of Property and Construction, 18(01), 90-102.

Caetano, L F, de Souza, H A and Gomes, A P (2022) Effect of the exposed steel structure on the thermal performance of buildings. Architectural Engineering and Design Management, 18(01), 38–55.

Christos, V, John, E T and James, S (2011) The logistics of construction supply chains: the builders' merchant perspective. Engineering, Construction and Architectural Management, 18(01), 66–81.

Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(01), 91-100.

Dadzie, J, Runeson, G and Ding, G (2019) Assessing determinants of sustainable upgrade of existing buildings. Journal of Engineering, Design and Technology , 18(01), 270–92.

Dosumu, O, S (2018) Perceived Effects of Prevalent Errors in Contract Documents on Construction Projects . Construction Economics and Building, 18(01), 1-26.

Edwards, D J, Holt, G D and Harris, F C (2000) A model for predicting plant maintenance costs. Construction Management and Economics, 18(01), 65-75.

Fielden, S L, Davidson, M J, Gale, A W and Davey, C L (2000) Women in construction: the untapped resource. Construction Management and Economics, 18(01), 113-21.

Fraser, C (2000) The influence of personal characteristics on effectiveness of construction site managers. Construction Management and Economics, 18(01), 29-36.

Friedrich, D (2022) Consumer and expert behaviour towards biobased wood-polymer building products: a comparative multi-factorial study according to theory of planned behaviour. Architectural Engineering and Design Management, 18(01), 73–92.

Garnett, N and Pickrell, S (2000) Benchmarking for construction: theory and practice. Construction Management and Economics, 18(01), 55-63.

Hadiwattege, C, Senaratne, S, Sandanayake, Y and Fernando, N (2022) Merging Academic Research and Industry Requirements for Innovative Construction Management Practices in Sri Lanka: A Study on Critical Success Factors. International Journal of Construction Education and Research, 18(01), 32–48.

Helen, L, Ron, W and Patrick, C (2011) The development and testing of a hierarchical measure of project OHS performance. Engineering, Construction and Architectural Management, 18(01), 30–49.

Hellas, M S, Chaib, R and Verzea, I (2019) Artificial intelligence treating the problem of uncertainty in quantitative risk analysis (QRA). Journal of Engineering, Design and Technology , 18(01), 40–54.

Higgins, D M (2013) The black swan effect and the impact on Australian property forecasting. Journal of Financial Management of Property and Construction, 18(01), 76-89.

Hosseini, M R, Bosch-Sijtsema, P, Arashpour, M, Chileshe, N and Merschbrock, C (2018) A qualitative investigation of perceived impacts of virtuality on effectiveness of hybrid construction project teams. Construction Innovation, 18(01), 109-31.

Hughes, W, Hillebrandt, P and Murdoch, J (2000) The impact of contract duration on the cost of cash retention. Construction Management and Economics, 18(01), 11-4.

Hulio, Z H and Jiang, W (2019) An assessment of effects of non-stationary operational conditions on wind turbine under different wind scenario. Journal of Engineering, Design and Technology , 18(01), 102–21.

Ibn Majdoub Hassani, Z, El Barkany, A, Jabri, A, El Abbassi, I and Darcherif, A M (2019) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology , 18(01), 172–89.

James, M W W, Albert, P C C and Chiang, Y H (2011) Construction manpower demand forecasting: A comparative study of univariate time series, multiple regression and econometric modelling techniques. Engineering, Construction and Architectural Management, 18(01), 7–29.

Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(01), 53-75.

Ke, Y, Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(01), 6-25.

Khanzadi, M, Nasirzadeh, F, Mir, M and Nojedehi, P (2018) Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach. Construction Innovation, 18(01), 2-19.

Kim, J-C, Kim, D-H, Kim, J-J, Ye, J-S and Lee, H-S (2000) Segmenting the Korean housing market using multiple discriminant analysis. Construction Management and Economics, 18(01), 45-54.

Kissi, E, Adjei-Kumi, T, Amoah, P and Gyimah, J (2018) Forecasting Construction Tender Price Index in Ghana using Autoregressive Integrated Moving Average with Exogenous Variables Model . Construction Economics and Building, 18(01), 70-82.

Kurkela, M, Maksimainen, M, Julin, A, Virtanen, J, Männistö, I, Vaaja, M T and Hyyppä, H (2022) Applying photogrammetry to reconstruct 3D luminance point clouds of indoor environments. Architectural Engineering and Design Management, 18(01), 56–72.

Lines, B C, Kakarapalli, R and Nguyen, P H (2022) Does Best Value Procurement Cost More than Low-Bid? A Total Project Cost Perspective. International Journal of Construction Education and Research, 18(01), 85–100.

Luo, Z, Chen, Y, Cen, K, Pan, H, Zhong, M and He, J (2019) Research on comprehensive environmental impact assessment of shale gas development. Journal of Engineering, Design and Technology , 18(01), 1–20.

Ma, L and Liu, C (2018) Decomposition of temporal changes in construction labour productivity. International Journal of Construction Management, 18(01), 65-77.

Macieira, M, Mendonça, P, Miranda Guedes, J and Tereso, A (2022) Evaluating the efficiency of membrane’s refurbishment solutions to perform vertical extensions in old buildings using a multicriteria decision-support model. Architectural Engineering and Design Management, 18(01), 1–25.

Martin, H, Koylass, J and Welch, F (2018) An exploration of the consistency limits of the analytical hierarchy process and its impact on contractor selection. International Journal of Construction Management, 18(01), 14-25.

Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(01), 90-108.

Mengistu, D G and Mahesh, G (2019) Dimensions for improvement of construction management practice in Ethiopian construction industry. Journal of Engineering, Design and Technology , 18(01), 21–39.

Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(01), 26-33.

Neshat, N, Hadian, H and Rahimi Alangi, S (2019) Technological learning modelling towards sustainable energy planning. Journal of Engineering, Design and Technology , 18(01), 84–101.

Ogbu, C P (2018) Survival practices of indigenous construction firms in Nigeria. International Journal of Construction Management, 18(01), 78-91.

Othman, A A E and Khalil, M H (2019) Divergent heritage sustainability: a threefold approach through lean talent management. Journal of Engineering, Design and Technology , 18(01), 150–71.

Patel, T D, Haupt, T C and Bhatt, T (2019) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology , 18(01), 251–69.

Peter, L, David, E and Elliot, W (2011) Loosening the Gordian knot: the role of emotional intelligence in construction. Engineering, Construction and Architectural Management, 18(01), 50–65.

Porter, D and Glick, S (2022) Spatial Visualization in Construction Management Education: A Review and Validation of the Literature Using Professionals and Related Practitioners. International Journal of Construction Education and Research, 18(01), 17–31.

Roghanian, E, Alipour, M and Rezaei, M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(01), 1-13.

Sánchez Vivas, L, Costello, K, Mobley, S, Mihelcic, J R and Mullins, G (2022) Determination of safety factors for structural bamboo design applications. Architectural Engineering and Design Management, 18(01), 26–37.

Safa, M, Reinsma, S, Haas, C T, Goodrum, P M and Caldas, C H (2018) A decision-making method for choosing concrete forming systems. International Journal of Construction Management, 18(01), 53-64.

Sahin, O, Miller, D and Mohamed, S (2018) Value-based modelling: An Australian case of off-site manufactured buildings. International Journal of Construction Management, 18(01), 34-52.

Saini, M, Arif, M and Kulonda, D J (2018) Critical factors for transferring and sharing tacit knowledge within lean and agile construction processes. Construction Innovation, 18(01), 64-89.

Soltani, M, Aouag, H and Mouss, M D (2019) An integrated framework using VSM, AHP and TOPSIS for simplifying the sustainability improvement process in a complex manufacturing process. Journal of Engineering, Design and Technology , 18(01), 211–29.

Sundaraj, G and Eaton, D (2013) Quantifying robustness in PFIs. Journal of Financial Management of Property and Construction, 18(01), 26-52.

Syed Abu Bakar, S P, Jaafar, M and Muhibudin, M (2019) Intensifying business success of Malaysian housing development firms through entrepreneurial learning. Journal of Engineering, Design and Technology , 18(01), 190–210.

Teräväinen, V, J, Junnonen, J-M, Ali-Löytty, S (2018) Organizational Culture: Case of the Finnish Construction Industry . Construction Economics and Building, 18(01), 48-69.

Treloar, G J, Love, P E D, Faniran, O O and Iyer-Raniga, U (2000) A hybrid life cycle assessment method for construction. Construction Management and Economics, 18(01), 5-9.

Wafaa, N and Goulding, J S (2011) Offsite production: a model for building down barriers: A European construction industry perspective. Engineering, Construction and Architectural Management, 18(01), 82–101.

Wagner, H E and Kulwiec, A (2022) Expanding Pre-apprenticeship Training Programs as a Model to Improve Recruitment and Retention of Building Construction Tradeswomen. International Journal of Construction Education and Research, 18(01), 3–16.

Walker, A and Newcombe, R (2000) The positive use of power on a major construction project. Construction Management and Economics, 18(01), 37-44.

Yap, J B H and Toh, H M (2019) Investigating the principal factors impacting knowledge management implementation in construction organisations. Journal of Engineering, Design and Technology , 18(01), 55–69.

Zarkada-Fraser, A and Skitmore, M R (2000) Decisions with moral content: collusion. Construction Management and Economics, 18(01), -11.