Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 15 results ...
Addy, M N, Akunyumu, S and Simons, B (2019) Key risk factors affecting renewable energy independent power producer (IPP) set-up projects in developing countries. Journal of Engineering, Design and Technology , 17(06), 1340–55.
Aghimien, D O, Aigbavboa, C O and Thwala, W D (2019) Microscoping the challenges of sustainable construction in developing countries. Journal of Engineering, Design and Technology , 17(06), 1110–28.
Asa, E, Anna, A S and Baffoe-Twum, E (2019) An investigation of mechanical behavior of concrete containing crushed waste glass. Journal of Engineering, Design and Technology , 17(06), 1285–303.
Bendak, S and Alhammadi, A A (2019) A multi-criteria decision-making approach to minimising fire risk in detached house designs. Journal of Engineering, Design and Technology , 17(06), 1146–60.
Bhaurkar, V P and Thakur, A G (2019) Investigation of crack in beams using anti-resonance technique and FEA approach. Journal of Engineering, Design and Technology , 17(06), 1266–84.
Entner, D, Prante, T, Vosgien, T, Zăvoianu, A, Saminger-Platz, S, Schwarz, M and Fink, K (2019) Potential identification and industrial evaluation of an integrated design automation workflow. Journal of Engineering, Design and Technology , 17(06), 1085–109.
Katoch, V and Mohan, S (2019) Design and fabrication of a safety frame for workers carrying out head lifting at construction sites. Journal of Engineering, Design and Technology , 17(06), 1250–65.
Matarneh, S, Danso-Amoako, M, Al-Bizri, S, Gaterell, M and Matarneh, R (2019) BIM-based facilities information: streamlining the information exchange process. Journal of Engineering, Design and Technology , 17(06), 1304–22.
Oke, A E, Ogunsemi, D R and Adeyelu, M (2019) Quadrant and gap analysis of required and exhibited quantity surveyors’ competencies. Journal of Engineering, Design and Technology , 17(06), 1161–73.
- Type: Journal Article
- Keywords: Competencies; Human resources management; Training; Quadrant analysis; Gap analysis; Quantity surveyor; Skills;
- ISBN/ISSN: 1726-0531
- URL: https://doi.org/10.1108/JEDT-01-2019-0029
- Abstract:
In their delivery of service, quantity surveyors are not in any way protected against threats and changes in their operating environment as a result of globalisation and continuous change in demand of clients. This research therefore examined the current and important areas of competencies of Nigerian quantity surveyors in their quest to continue to provide value for money for their clients.Design/methodology/approach Primary data were collected through administration of questionnaires on quantity surveyors that are members of the Nigerian Institute of Quantity Surveyors (NIQS). Mean item score (MIS) was used to rank required and exhibited competencies while gap and quadrant analyses were employed to evaluate their importance and proficiency level.Findings Core competencies required of quantity surveyors are costing of construction works; valuation; estimating and tendering; and procurement management while valuation; estimating and tendering; and costing of construction works are top three competencies currently exhibited. There is significant difference in the level of importance of the competencies areas compared to their exhibition by quantity surveyors.Originality/value It was noted that some important areas of competencies are not currently exhibited by quantity surveyors in the study area, there is therefore the need for personal and collective continuous development through workshops, conferences and seminars that will enhance the identified competencies areas. Training of undergraduates and retraining of practicing quantity surveyors is also essential to inculcate competencies that are not currently exhibited. This will benefit quantity surveyors and bodies concerned with the regulation of the profession in their quest for better service delivery.
Othman, A A E and Hafez, M G (2019) A framework integrating corporate social responsibility for marketing architectural design firms in developing countries. Journal of Engineering, Design and Technology , 17(06), 1174–91.
Owusu-Manu, D, Edwards, D J, Mohammed, A, Thwala, W D and Birch, T (2019) Short run causal relationship between foreign direct investment (FDI) and infrastructure development. Journal of Engineering, Design and Technology , 17(06), 1202–21.
Rajabion, L, Sataei Mokhtari, A, Khordehbinan, M W, Zare, M and Hassani, A (2019) The role of knowledge sharing in supply chain success. Journal of Engineering, Design and Technology , 17(06), 1222–49.
Srivastava, A, Srivastava, D K and Misra, A K (2019) Spatial variability modeling and reliability analysis of flexible pavement through mechanistic–empirical model. Journal of Engineering, Design and Technology , 17(06), 1129–45.
Tengan, C, Aigbavboa, C O, Guribie, F and Annor-Asubonteng, J (2019) Analysis of the outcome features of effective monitoring and evaluation in construction project delivery. Journal of Engineering, Design and Technology , 17(06), 1192–201.
Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology , 17(06), 1323–39.