ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 33 results ...

Agyekum, B, Kissi, E, Yamoah Agyemang, D and Badu, E (2018) Examining barriers for the utilization of non-traditional cost estimating models in developing countries. Journal of Engineering, Design and Technology, 16(06), 814–27.

  • Type: Journal Article
  • Keywords: Barriers; Cost model; Utilization; Non-traditional; Ghanaian;
  • ISBN/ISSN: 1726-0531
  • URL: https://doi.org/10.1108/JEDT-02-2018-0021
  • Abstract:
    Cost estimation model serves as a framework for forecasting the probable cost of proposed construction projects. It can be classified either as traditional or non-traditional depending on the cost variables formulation. However, in the building industry, quantity surveyors traditionally estimate the initial cost of building projects using the traditional models, which have been criticized overtime for its inaccuracies. This paper therefore aims to examine barriers for the utilization of non-traditional cost estimating models. Design/methodology/approach By using a questionnaire survey, respondents were invited to rate their level of agreement on 23 barriers identified from literature and interview (expert’s opinion). Findings Based on factor analysis inefficient techniques, perceptions of model techniques, unavailability of cost data and lack of understanding and unstable economic conditions were identified as barriers to the utilization of non-traditional cost estimating models. Practical/implications Findings demonstrate that there is need for quantity surveyors to get adapted to utilization of non-traditional cost models which offers better accuracies than the traditional approaches in their quest to improve their professional practices. Originality/value This study demonstrates that there are barriers to the utilization of non-traditional cost estimating models in the Ghanaian construction industry, as evident of this will help in policy formulation for the improvement cost estimating practices.

Aouad, R and Amara, I (2018) Influence of the cutting condition on the wear and the surface roughness in the steel AISI 4140 with mixed ceramic and diamond tool. Journal of Engineering, Design and Technology, 16(06), 828–36.

Chen, J J (1998) The characteristics and current status of China's construction industry. Construction Management and Economics, 16(06), 711-9.

Chen, Y and Yang, Z (2018) Validity and reliability of rating scales for subjective breathing resistance of wearing respirators. Journal of Engineering, Design and Technology, 16(06), 837–49.

De Silva, N, Rathnayake, U and Kulasekera, K (2018) Under-reporting of construction accidents in Sri Lanka. Journal of Engineering, Design and Technology, 16(06), 850–68.

Eriksson, P E, Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(06), 598–611.

Etemadi, R, Hon, C K H, Murphy, G and Manley, K (2020) The use of social media for work-related knowledge sharing by construction professionals. Architectural Engineering and Design Management, 16(06), 426-40.

Griffith, A and Headley, J D (1998) Effective client management control of small works and minor maintenance. Construction Management and Economics, 16(06), 703-9.

Idris, M M (1998) Assessment of the factors influencing the maintenance programme of large university buildings in Riyadh. Construction Management and Economics, 16(06), 673-9.

Jaffal, I, Inard, C, Ghaddar, N and Ghali, K (2020) A metamodel for long-term thermal comfort in non-air-conditioned buildings. Architectural Engineering and Design Management, 16(06), 441-72.

Jennings, P and Holt, G D (1998) Pre-qualification and multi-criteria selection: a measure of UK contractors' opinions. Construction Management and Economics, 16(06), 651-60.

Kulkarni, S, Edwards, D J, Parn, E A, Chapman, C, Aigbavboa, C O and Cornish, R (2018) Evaluation of vehicle lightweighting to reduce greenhouse gas emissions with focus on magnesium substitution. Journal of Engineering, Design and Technology, 16(06), 869–88.

Laryea, S and Hughes, W (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(06), 558–72.

Li, H and Love, P E D (1998) Developing a theory of construction problem solving. Construction Management and Economics, 16(06), 721-7.

Loosemore, M (1998) The influence of communication structure upon crisis management efficiency. Construction Management and Economics, 16(06), 661-71.

Lopes, J (1998) The construction industry and macroeconomy in Sub-Saharan Africa post 1970. Construction Management and Economics, 16(06), 637-49.

Low, S P and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: case study of a private condominium project. Construction Management and Economics, 16(06), 621-35.

Mak, S W, Wong, J and Picken, D (1998) Note - The effect on contingency allowances of using risk analysis in capital cost estimating: a Hong Kong case study. Construction Management and Economics, 16(06), 615-9.

Meldrum, A, Hare, B and Cameron, I (2009) Road testing a health and safety worker engagement tool-kit in the construction industry. Engineering, Construction and Architectural Management, 16(06), 612–32.

Nawfal, S and Ali, F (2018) The acceleration of 3D graphics transformations based on CUDA. Journal of Engineering, Design and Technology, 16(06), 925–37.

Ndokwana, A and Fore, S (2018) Economic assessment of bioethanol production from maize in South Africa. Journal of Engineering, Design and Technology, 16(06), 973–94.

Obi, L, Arif, M and Goulding, J (2020) Low-cost housing: a cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(06), 411-25.

Ochieng, E G and Price, A D (2009) Framework for managing multicultural project teams. Engineering, Construction and Architectural Management, 16(06), 527–43.

Owusu-Manu, D, Edwards, D J, Kukah, A, Parn, E A, El-Gohary, H and Hosseini, M R (2018) An empirical examination of moral hazards and adverse selection on PPP projects. Journal of Engineering, Design and Technology, 16(06), 910–24.

Pellicer, T M, Pellicer, E and Eaton, D (2009) A macroeconomic regression analysis of the European construction industry. Engineering, Construction and Architectural Management, 16(06), 573–97.

Pewdum, W, Rujirayanyong, T and Sooksatra, V (2009) Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Management, 16(06), 544–57.

Poh, P S H and Chen, J (1998) The Singapore buildable design appraisal system: a preliminary review of the relationship between buildability, site productivity and costs. Construction Management and Economics, 16(06), 681-92.

Raftery, J, Pasadilla, B, Chiang, Y H, Hui, E C M and Tang, B-S (1998) Globalization, comparative advantage and industrial policy: implications of recent developments in the construction sector in Asia. Construction Management and Economics, 16(06), 729-37.

Romanello, G (2018) Stability analysis of mobile cranes and determination of outriggers loading. Journal of Engineering, Design and Technology, 16(06), 938–58.

Senaratne, S, Mirza, O, Lambrousis, G and Fernandez-Soncini, A (2018) Structural applicability of steel fibre-recycled aggregate concrete in construction. Journal of Engineering, Design and Technology, 16(06), 959–72.

Shen, Q, Lo, K-K and Wang, Q (1998) Priority setting in maintenance management of public buildings: a modified multi-attribute approach using AHP. Construction Management and Economics, 16(06), 693-702.

Teshnehdel, S, Soflaei, F and Shokouhian, M (2020) Assessment of solar shading performance of courtyard houses in desert climate of Kashan, Iran. Architectural Engineering and Design Management, 16(06), 473-92.

Witmer, A (2018) Contextual engineering assessment using an influence-identification tool. Journal of Engineering, Design and Technology, 16(06), 889–909.