ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 53 results ...

Abdelhadi, Y, Dulaimi, M F and Bajracharya, A (2019) Factors influencing the selection of delay analysis methods in construction projects in UAE. International Journal of Construction Management, 19(04), 329-40.

Aliu, J, Aghimien, D, Aigbavboa, C, Oke, A, Ebekozien, A and Temidayo, O (2023) Empirical Investigation of Discipline-Specific Skills Required for the Employability of Built Environment Graduates. International Journal of Construction Education and Research, 19(04), 460–79.

Almazrouei, M, Khalizani, K and Davidson, R (2021) Safety climate of UAE petroleum industry: a cross-validation using confirmatory factor analytic approach. Journal of Engineering, Design and Technology, 19(04), 943-65.

Amin, F, Ghazi, M, Sotoodeh, A F and Nikian, M (2021) Economic optimization of heat exchanger networks based on geometric parameters using hybrid genetic-particle swarm algorithm technique. Journal of Engineering, Design and Technology, 19(04), 989-1015.

Anike, E E, Saidani, M, Ganjian, E, Tyrer, M and Olubanwo, A O (2019) The potency of recycled aggregate in new concrete: a review. Construction Innovation , 19(04), 594–613.

Ayed Eid, A (2021) Effect of the transversal-spacing of stirrup-legs on the behavior and strength of shallow concealed RC beams. Journal of Engineering, Design and Technology, 19(04), 932-42.

Bemelmans, J, Voordijk, H and Vos, B (2012) Supplier-contractor collaboration in the construction industry: A taxonomic approach to the literature of the 2000-2009 decade. Engineering, Construction and Architectural Management, 19(04), 342-68.

Chan, S L (2001) Empirical tests to discern linkages between construction and other economic sectors in Singapore. Construction Management and Economics, 19(04), 355-63.

Cheung, S-O, Lam, T, Lueng, M and Wan, Y (2001) An analytical hierarchy process based procurement selection method. Construction Management and Economics, 19(04), 427-37.

Chong, H-Y and Zin, R M (2012) Selection of dispute resolution methods: factor analysis approach. Engineering, Construction and Architectural Management, 19(04), 428-43.

Costantino, N, Pietroforte, R and Harnill, P (2001) Subcontracting in commercial and residential construction: an emperical investigation. Construction Management and Economics, 19(04), 439-47.

Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(04), 444-68.

El Hawary, M and Marzouk, M (2023) Predicting buildings life cycle sustainability behaviour using system dynamics. Architectural Engineering and Design Management, 19(04), 323–39.

El-Dabaa, R and Abdelmohsen, S (2023) Integrating performance indicators in the production rules of shape-shifting grammars for architectural adaptive façade systems. Architectural Engineering and Design Management, 19(04), 419–37.

Elias, R, Issa, R R A and Wu, W (2023) Progress on Building Information Modeling Education and Talent Acquisition. International Journal of Construction Education and Research, 19(04), 363–82.

Fisher, T and Ranasinghe, M (2001) Culture and foreign companies' choice of entry mode: the case of the Singapore building and construction industry. Construction Management and Economics, 19(04), 343-53.

H. P., T, C., R and M. D., D (2023) Assessing the life cycle performance of green building projects: a building performance score (BPS) model approach. Architectural Engineering and Design Management, 19(04), 378–93.

Hamza, H and Alshibani, A (2021) A multi-criteria decision-making model for selecting curtain wall systems in office buildings. Journal of Engineering, Design and Technology, 19(04), 904-31.

Hilal, M, Maqsood, T and Abdekhodaee, A (2019) A hybrid conceptual model for BIM in FM. Construction Innovation , 19(04), 531–49.

Ibrahim, M N, Thorpe, D and Mahmood, M N (2019) Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia. Construction Innovation , 19(04), 550–69.

Ikediashi, D and Aigbavboa, C (2019) Outsourcing as a strategy for facilities management provision in Nigerian universities. International Journal of Construction Management, 19(04), 281-90.

Isidore, L J, Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(04), 417-26.

Ismaeel, W S E, Alamoudy, F O and Sameh, R (2023) How renovation activities may jeopardise indoor air quality: accounting for short and long-term symptoms of sick building syndrome in educational buildings. Architectural Engineering and Design Management, 19(04), 360–77.

Jacob, J C, Pandit, D and Sen, J (2023) An explorative study on transient cooling pattern and energy efficiency while using micro-zonal occupant-centric control. Architectural Engineering and Design Management, 19(04), 340–59.

Kavishe, N, Jefferson, I and Chileshe, N (2019) Evaluating issues and outcomes associated with public-private partnership housing project delivery: Tanzanian practitioners' preliminary observations. International Journal of Construction Management, 19(04), 354-69.

Kumar, S and Bansal, V K (2019) Use of GIS in locating TFs safely on a construction site in hilly regions. International Journal of Construction Management, 19(04), 341-53.

Langar, S, Mosier, R and Adhikari, S (2023) Perceptions and Pedagogical Responses of Construction Educators During COVID-19. International Journal of Construction Education and Research, 19(04), 405–25.

Le-Hoai, L, Dang, C N, Lee, S B and Lee, Y D (2019) Benchmarking claim causes against contractors in emerging markets: Empirical case study. International Journal of Construction Management, 19(04), 307-16.

Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(04), 406-27.

Lundberg, M, Engström, S and Lidelöw, H (2019) Diffusion of innovation in a contractor company. Construction Innovation , 19(04), 629–52.

Magoda, C M, Gryzagoridis, J and Kant, K (2021) Effective heat conductivity of Honeycomb (porous) composite panel. Journal of Engineering, Design and Technology, 19(04), 876-87.

Manavazhi, M R and Xunzhi, Z (2001) Productivity oriented analysis of design revisions. Construction Management and Economics, 19(04), 379-91.

Marasini, R, Dawood, N and Hobbs, B (2001) Stockyard layout planning in precast concrete products industry: a case study and proposed framework. Construction Management and Economics, 19(04), 365-77.

Martinez, E, Reid, C K and Tommelein, I D (2019) Lean construction for affordable housing: a case study in Latin America. Construction Innovation , 19(04), 570–93.

Marzouk, M and Hassouna, M (2019) Quality analysis using three-dimensional modelling and image processing techniques. Construction Innovation , 19(04), 614–28.

Mochtar, K and Arditi, D (2001) Pricing strategy in the US construction industry. Construction Management and Economics, 19(04), 405-15.

Mock, B and O'Connor, J T (2019) High-value, low-effort industrial plant commissioning solution strategies. Construction Innovation , 19(04), 653–71.

Moniri, M R, Akbar Alem, T, Ayough, A and Zandieh, M (2021) Turnaround project risk assessment using hybrid fuzzy SWARA and EDAS method: case of upstream oil process industries in Iran. Journal of Engineering, Design and Technology, 19(04), 966-88.

Muleya, F, Mulenga, B, Sambo Lyson, Z, Nwaubani, S, Chipozya Kosta, T and Mushota, H (2021) Investigating the suitability and cost-benefit of copper tailings as partial replacement of sand in concrete in Zambia: an exploratory study. Journal of Engineering, Design and Technology, 19(04), 828-49.

Noorzai, E, Bakmohammadi, P and Garmaroudi, M A (2023) Optimizing daylight, energy and occupant comfort performance of classrooms with photovoltaic integrated vertical shading devices. Architectural Engineering and Design Management, 19(04), 394–418.

Oluwatayo, A and Amole, D (2012) Characteristics of global architectural firms. Engineering, Construction and Architectural Management, 19(04), 393-405.

Palmer, S and Udawatta, N (2019) Characterising “Green Building” as a topic in Twitter. Construction Innovation , 19(04), 513–30.

Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(04), 291-306.

Pieters, W D and Tzoneva, R (2021) Investigation of an IEC 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers. Journal of Engineering, Design and Technology, 19(04), 850-75.

Shojaei, R S, Oti-Sarpong, K and Burgess, G (2023) Leading UK Construction Companies’ Strategies to Tackle BIM Training and Skills Challenges. International Journal of Construction Education and Research, 19(04), 383–404.

Silva, N D and Wimalaratne, P L I (2012) OSH management framework for workers at construction sites in Sri Lanka. Engineering, Construction and Architectural Management, 19(04), 369-92.

Sparkling, A E and Sengupta, R (2023) Mapping Student’s Perspective of a Redesigned Curriculum in Construction Management Using Self-Determination Theory. International Journal of Construction Education and Research, 19(04), 443–59.

Tam, C M, Fung, I W H and Chan, A P C (2001) Study of attitude changes in people after the implementation of a new safety management system: the supervision plan. Construction Management and Economics, 19(04), 393-403.

Teräväinen, V J and Junnonen, J (2019) The promoters and the barriers for organizational culture change in a Finnish construction company. Construction Innovation , 19(04), 672–88.

Titus, E K, Aigbavboa, C O and Wellington Didibhuku, T (2021) Clusters of key barriers to life cycle assessment adoption in the South African construction industry: perspectives of stakeholders. Journal of Engineering, Design and Technology, 19(04), 888-903.

Torres, A (2023) Using Large Peer-Teaching Groups to Learn Construction Management Software Packages. International Journal of Construction Education and Research, 19(04), 426–42.

Umar, M, Michael Ikpi, O, Auwal Sani, A and Abubakar Garba, S (2021) Modelling of mechanical properties of Pa6 based reinforced graphite and graphite nano platelets composites using different aspect ratio. Journal of Engineering, Design and Technology, 19(04), 809-27.

Xiao, Y, Liu, J and Pang, Y (2019) Development of a competency model for real-estate project managers: Case study of China. International Journal of Construction Management, 19(04), 317-28.