Aaron, M A, Mohan, M K and Gangadhar, M (2011) Building relationally integrated value networks (RIVANS). Engineering, Construction and Architectural Management, 18(01), 102–20.
Abdullahi, B, Ibrahim, Y M, Ibrahim, A and Bala, K (2019) Development of e-tendering evaluation system for Nigerian public sector. Journal of Engineering, Design and Technology , 18(01), 122–49.
Abuzeinab, A, Arif, M, Qadri, M A and Kulonda, D (2018) Green business models in the construction sector: An analysis of outcomes and benefits. Construction Innovation, 18(01), 20-42.
Acheamfour, V K, Kissi, E, Adjei-Kumi, T and Adinyira, E (2019) Review of empirical arguments on contractor pre-qualification criteria. Journal of Engineering, Design and Technology , 18(01), 70–83.
Adamtey, S A (2022) An Empirical Study to Assist Owners in Selecting the Right Procurement Method for Design-Build Projects. International Journal of Construction Education and Research, 18(01), 67–84.
Adu, E T and Opawole, A (2019) Assessment of performance of teamwork in construction projects delivery in South-Southern Nigeria. Journal of Engineering, Design and Technology , 18(01), 230–50.
Afolabi, A, O, Oluwatayo, A, Oyeyipo, O, Ojelabi, R and Fagbenle, O (2018) Assessment of Designers’ Perception of Post Conflict Housing Schemes for Internally Displaced Persons. Construction Economics and Building, 18(01), 27-47.
Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(01), 77-89.
Al Hattab, M, Zankoul, E, Barakat, M and Hamzeh, F (2018) Crane overlap and operational flexibility: Balancing utilization, duration, and safety. Construction Innovation, 18(01), 43-63.
Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(01), 15-27.
Ariyachandra, M, Jayasena, H and Perera, B (2022) Competencies Expected from an Information Manager Working in BIM Based Projects. International Journal of Construction Education and Research, 18(01), 49–66.
Belniak, S, Lesniak, A, Plebankiewicz, E and Zima, K (2013) The influence of the building shape on the costs of its construction. Journal of Financial Management of Property and Construction, 18(01), 90-102.
Caetano, L F, de Souza, H A and Gomes, A P (2022) Effect of the exposed steel structure on the thermal performance of buildings. Architectural Engineering and Design Management, 18(01), 38–55.
Christos, V, John, E T and James, S (2011) The logistics of construction supply chains: the builders' merchant perspective. Engineering, Construction and Architectural Management, 18(01), 66–81.
Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(01), 91-100.
Dadzie, J, Runeson, G and Ding, G (2019) Assessing determinants of sustainable upgrade of existing buildings. Journal of Engineering, Design and Technology , 18(01), 270–92.
Dosumu, O, S (2018) Perceived Effects of Prevalent Errors in Contract Documents on Construction Projects . Construction Economics and Building, 18(01), 1-26.
Edwards, D J, Holt, G D and Harris, F C (2000) A model for predicting plant maintenance costs. Construction Management and Economics, 18(01), 65-75.
Fielden, S L, Davidson, M J, Gale, A W and Davey, C L (2000) Women in construction: the untapped resource. Construction Management and Economics, 18(01), 113-21.
Fraser, C (2000) The influence of personal characteristics on effectiveness of construction site managers. Construction Management and Economics, 18(01), 29-36.
Friedrich, D (2022) Consumer and expert behaviour towards biobased wood-polymer building products: a comparative multi-factorial study according to theory of planned behaviour. Architectural Engineering and Design Management, 18(01), 73–92.
Garnett, N and Pickrell, S (2000) Benchmarking for construction: theory and practice. Construction Management and Economics, 18(01), 55-63.
Hadiwattege, C, Senaratne, S, Sandanayake, Y and Fernando, N (2022) Merging Academic Research and Industry Requirements for Innovative Construction Management Practices in Sri Lanka: A Study on Critical Success Factors. International Journal of Construction Education and Research, 18(01), 32–48.
Helen, L, Ron, W and Patrick, C (2011) The development and testing of a hierarchical measure of project OHS performance. Engineering, Construction and Architectural Management, 18(01), 30–49.
Hellas, M S, Chaib, R and Verzea, I (2019) Artificial intelligence treating the problem of uncertainty in quantitative risk analysis (QRA). Journal of Engineering, Design and Technology , 18(01), 40–54.
Higgins, D M (2013) The black swan effect and the impact on Australian property forecasting. Journal of Financial Management of Property and Construction, 18(01), 76-89.
Hosseini, M R, Bosch-Sijtsema, P, Arashpour, M, Chileshe, N and Merschbrock, C (2018) A qualitative investigation of perceived impacts of virtuality on effectiveness of hybrid construction project teams. Construction Innovation, 18(01), 109-31.
Hughes, W, Hillebrandt, P and Murdoch, J (2000) The impact of contract duration on the cost of cash retention. Construction Management and Economics, 18(01), 11-4.
Hulio, Z H and Jiang, W (2019) An assessment of effects of non-stationary operational conditions on wind turbine under different wind scenario. Journal of Engineering, Design and Technology , 18(01), 102–21.
Ibn Majdoub Hassani, Z, El Barkany, A, Jabri, A, El Abbassi, I and Darcherif, A M (2019) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology , 18(01), 172–89.
James, M W W, Albert, P C C and Chiang, Y H (2011) Construction manpower demand forecasting: A comparative study of univariate time series, multiple regression and econometric modelling techniques. Engineering, Construction and Architectural Management, 18(01), 7–29.
Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(01), 53-75.
Ke, Y, Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(01), 6-25.
Khanzadi, M, Nasirzadeh, F, Mir, M and Nojedehi, P (2018) Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach. Construction Innovation, 18(01), 2-19.
Kim, J-C, Kim, D-H, Kim, J-J, Ye, J-S and Lee, H-S (2000) Segmenting the Korean housing market using multiple discriminant analysis. Construction Management and Economics, 18(01), 45-54.
Kissi, E, Adjei-Kumi, T, Amoah, P and Gyimah, J (2018) Forecasting Construction Tender Price Index in Ghana using Autoregressive Integrated Moving Average with Exogenous Variables Model . Construction Economics and Building, 18(01), 70-82.
Kurkela, M, Maksimainen, M, Julin, A, Virtanen, J, Männistö, I, Vaaja, M T and Hyyppä, H (2022) Applying photogrammetry to reconstruct 3D luminance point clouds of indoor environments. Architectural Engineering and Design Management, 18(01), 56–72.
Lines, B C, Kakarapalli, R and Nguyen, P H (2022) Does Best Value Procurement Cost More than Low-Bid? A Total Project Cost Perspective. International Journal of Construction Education and Research, 18(01), 85–100.
Luo, Z, Chen, Y, Cen, K, Pan, H, Zhong, M and He, J (2019) Research on comprehensive environmental impact assessment of shale gas development. Journal of Engineering, Design and Technology , 18(01), 1–20.
Ma, L and Liu, C (2018) Decomposition of temporal changes in construction labour productivity. International Journal of Construction Management, 18(01), 65-77.
Macieira, M, Mendonça, P, Miranda Guedes, J and Tereso, A (2022) Evaluating the efficiency of membrane’s refurbishment solutions to perform vertical extensions in old buildings using a multicriteria decision-support model. Architectural Engineering and Design Management, 18(01), 1–25.
Martin, H, Koylass, J and Welch, F (2018) An exploration of the consistency limits of the analytical hierarchy process and its impact on contractor selection. International Journal of Construction Management, 18(01), 14-25.
Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(01), 90-108.
Mengistu, D G and Mahesh, G (2019) Dimensions for improvement of construction management practice in Ethiopian construction industry. Journal of Engineering, Design and Technology , 18(01), 21–39.
Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(01), 26-33.
Neshat, N, Hadian, H and Rahimi Alangi, S (2019) Technological learning modelling towards sustainable energy planning. Journal of Engineering, Design and Technology , 18(01), 84–101.
Ogbu, C P (2018) Survival practices of indigenous construction firms in Nigeria. International Journal of Construction Management, 18(01), 78-91.
Othman, A A E and Khalil, M H (2019) Divergent heritage sustainability: a threefold approach through lean talent management. Journal of Engineering, Design and Technology , 18(01), 150–71.
Patel, T D, Haupt, T C and Bhatt, T (2019) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology , 18(01), 251–69.
Peter, L, David, E and Elliot, W (2011) Loosening the Gordian knot: the role of emotional intelligence in construction. Engineering, Construction and Architectural Management, 18(01), 50–65.
Porter, D and Glick, S (2022) Spatial Visualization in Construction Management Education: A Review and Validation of the Literature Using Professionals and Related Practitioners. International Journal of Construction Education and Research, 18(01), 17–31.
Roghanian, E, Alipour, M and Rezaei, M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(01), 1-13.
Sánchez Vivas, L, Costello, K, Mobley, S, Mihelcic, J R and Mullins, G (2022) Determination of safety factors for structural bamboo design applications. Architectural Engineering and Design Management, 18(01), 26–37.
Safa, M, Reinsma, S, Haas, C T, Goodrum, P M and Caldas, C H (2018) A decision-making method for choosing concrete forming systems. International Journal of Construction Management, 18(01), 53-64.
Sahin, O, Miller, D and Mohamed, S (2018) Value-based modelling: An Australian case of off-site manufactured buildings. International Journal of Construction Management, 18(01), 34-52.
Saini, M, Arif, M and Kulonda, D J (2018) Critical factors for transferring and sharing tacit knowledge within lean and agile construction processes. Construction Innovation, 18(01), 64-89.
Soltani, M, Aouag, H and Mouss, M D (2019) An integrated framework using VSM, AHP and TOPSIS for simplifying the sustainability improvement process in a complex manufacturing process. Journal of Engineering, Design and Technology , 18(01), 211–29.
Sundaraj, G and Eaton, D (2013) Quantifying robustness in PFIs. Journal of Financial Management of Property and Construction, 18(01), 26-52.
Syed Abu Bakar, S P, Jaafar, M and Muhibudin, M (2019) Intensifying business success of Malaysian housing development firms through entrepreneurial learning. Journal of Engineering, Design and Technology , 18(01), 190–210.
Teräväinen, V, J, Junnonen, J-M, Ali-Löytty, S (2018) Organizational Culture: Case of the Finnish Construction Industry . Construction Economics and Building, 18(01), 48-69.
Treloar, G J, Love, P E D, Faniran, O O and Iyer-Raniga, U (2000) A hybrid life cycle assessment method for construction. Construction Management and Economics, 18(01), 5-9.
Wafaa, N and Goulding, J S (2011) Offsite production: a model for building
Wagner, H E and Kulwiec, A (2022) Expanding Pre-apprenticeship Training Programs as a Model to Improve Recruitment and Retention of Building Construction Tradeswomen. International Journal of Construction Education and Research, 18(01), 3–16.
Walker, A and Newcombe, R (2000) The positive use of power on a major construction project. Construction Management and Economics, 18(01), 37-44.
Yap, J B H and Toh, H M (2019) Investigating the principal factors impacting knowledge management implementation in construction organisations. Journal of Engineering, Design and Technology , 18(01), 55–69.
Zarkada-Fraser, A and Skitmore, M R (2000) Decisions with moral content: collusion. Construction Management and Economics, 18(01), -11.
- Type: Journal Article
- Keywords: Australia; collusion; ethics; moral decision-making; tendering
- ISBN/ISSN: 0144-6193
- URL: https://doi.org/10.1080/014461900370997
- Abstract:
Morality is fast becoming an integral part of the mandate for business through both societal and regulatory pressures. Collusive tendering is one of the moral choices facing decision-makers in the construction industry. This paper describes an empirical investigation of the attitudes and behavioural intent towards collusive tendering of key individuals in the tendering process. It also explores the factors that determine these attitudes. The results of the empirical investigation indicate that there is a minority of decision-makers that admit they would consider participating in some form of collusive tendering agreement under certain circumstances. These people form a distinct group in their demographic as well as decision-making profile.