ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 86 results ...
Abdullahi Ahmed, U, Noor Amila Wan Abdullah, Z and Abdul-Rashid, A-A (2021) Malaysian regulators' ranking of PPP contract governance skills. Built Environment Project and Asset Management, 11(01), 88-102.
Abunyewah, M, Gajendran, T, Maund, K and Okyere, S A (2019) Linking information provision to behavioural intentions. International Journal of Disaster Resilience in the Built Environment, 11(01), 100–18.
Al-Sakkaf, A, Zayed, T, Bagchi, A, Mahmoud, S and Pickup, D (2022) Development of a sustainability rating tool for heritage buildings: future implications. Smart and Sustainable Built Environment, 11(01), 93-109.
Almarri, K and Boussabaine, H (2021) Re-evaluating the risk costing agenda in PPP projects. Built Environment Project and Asset Management, 11(01), 22-37.
Alnaser, N W and Alnaser, W E (2022) Modelling the yield of 8.64 kW PV panels installed on a rooftop of a building in the Kingdom of Bahrain. Smart and Sustainable Built Environment, 11(01), 162-74.
Aryal, A and Wilkinson, S (2019) The role of social capital in the recovery of cultural built heritage. International Journal of Disaster Resilience in the Built Environment, 11(01), 44–57.
Asadi, M and Karami, J (2019) Modeling of the city evacuation plan in case of earthquake with particle swarm optimization (PSO) and imperialist competition algorithm (ICA). International Journal of Disaster Resilience in the Built Environment, 11(01), 134–51.
Assad, M, Hosny, O, Elhakeem, A and El Haggar, S (2015) Green building design in Egypt from cost and energy perspectives. Architectural Engineering and Design Management, 11(01), 21-40.
Assad, M, Hosny, O, Elhakeem, A and El Haggar, S (2015) Green building design in Egypt from cost and energy perspectives. Architectural Engineering and Design Management, 11(01), 21–40.
Babatunde, S O, Ekundayo, D, Udeaja, C and Abubakar, U O (2022) An investigation into the sustainability practices in PPP infrastructure projects: a case of Nigeria. Smart and Sustainable Built Environment, 11(01), 110-25.
Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(01), 1-18.
Bennett, J (1993) Japan's building industry: the new model. Construction Management and Economics, 11(01), 3-17.
Betts, M and Ofori, G (1993) Competitive advantage in construction: reply. Construction Management and Economics, 11(01), 73-4.
Bilbo, D, Bigelow, B, Escamilla, E and Lockwood, C (2015) Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(01), 40-53.
Chileshe, N and Kavishe, N (2021) Readiness assessment of public-private partnerships adoption in developing countries: the case of Tanzania. Built Environment Project and Asset Management, 11(01), 71-87.
Cho, C-S, Mazze, C E, Dika, S L and Gehrig, G B (2015) Enhancing construction education: Implementing habitat for humanity projects as service-learning for construction materials. International Journal of Construction Education and Research, 11(01), 4-20.
Dainty, A R J, Raiden, A B and Neale, R H (2004) Psychological contract expectations of construction project managers. Engineering, Construction and Architectural Management, 11(01), 33–44.
Delaney, F T and Wamuziri, S C (2004) The impact of mergers and acquisitions on shareholder wealth in the UK construction industry. Engineering, Construction and Architectural Management, 11(01), 65–73.
Dev, M and Biswas, A (2022) Studying the institutional framework for the public transport system in Jaipur, India. Smart and Sustainable Built Environment, 11(01), 79-92.
Dobgegah, R Owusu-Manu, D-G and Omoteso, K (2011) A principal component analysis of project management construction industry competencies for the Ghanaian. Construction Economics and Building, 11(01), 26-40.
Dolla, T, Devkar, G and Boeing, L (2021) Procurement governance and information asymmetry in waste management of India. Built Environment Project and Asset Management, 11(01), 38-51.
Duksh, Y S, Kaushik, B K, Sarkar, S and Singh, R (2013) Analysis of propagation delay and power with variation in driver size and number of shells in multi walled carbon nanotube interconnects. Journal of Engineering, Design and Technology, 11(01), 19-33.
Dunlop, P and Smith, S D (2004) Planning, estimation and productivity in the lean concrete pour. Engineering, Construction and Architectural Management, 11(01), 55–64.
Edwards, D J and Holt, G D (2006) Hand-arm vibration controls: a perspective based on performance and cost dimensions. Journal of Financial Management of Property and Construction, 11(01), 21–32.
Elias, I, Felix, H, David, P and David, O (2011) Improving construction health and safety: Application of cost-benefit analysis (CBA) for accident prevention. International Journal of Construction Management, 11(01), 19-35.
ElShafei, R (2022) Managers' risk perception and the adoption of sustainable consumption strategies in the hospitality sector: the moderating role of stakeholder salience attributes. Smart and Sustainable Built Environment, 11(01), 1-18.
Fellows, R F (1993) Competitive advantage in construction: comment. Construction Management and Economics, 11(01), 71-2.
Forsythe, P (2011) Drivers of housing demolition decision making and the impact on timber waste management. Construction Economics and Building, 11(01), 1-14.
Franco, M and Rodrigues, M (2022) Indicators to measure the performance of sustainable urban entrepreneurship: an empirical case study applied to Portuguese cities and towns. Smart and Sustainable Built Environment, 11(01), 19-38.
Ghansah, F A, Owusu-Manu, D G, Ayarkwa, J, Darko, A and Edwards, D J (2022) Underlying indicators for measuring smartness of buildings in the construction industry. Smart and Sustainable Built Environment, 11(01), 126-42.
Gohil, U, Carrillo, P, Ruikar, K and Anumba, C (2011) Value-enhanced collaborative working: case study of a small management advisory firm. Construction Innovation, 11(01), 43–60.
Gudem, M, Steinert, M, Welo, T and Leifer, L (2013) Redefining customer value in lean product development design projects. Journal of Engineering, Design and Technology, 11(01), 71-89.
Hao, J L, Tam, V W Y, Yuan, H P and Wang, J Y (2011) Construction waste challenges in Hong Kong and Pearl River Delta region. International Journal of Construction Management, 11(01), 37-47.
Hejducki, Z (2004) Sequencing problems in methods of organising construction processes. Engineering, Construction and Architectural Management, 11(01), 20–32.
Hp, T, C, R and Md, D (2022) Developing a building performance score model for assessing the sustainability of buildings. Smart and Sustainable Built Environment, 11(01), 143-61.
Jahangiri, K, Borgheipour, H, Gendeshmin, S B, Matin, A and Monazami Tehrani, G (2019) Site selection criteria for temporary sheltering in urban environment. International Journal of Disaster Resilience in the Built Environment, 11(01), 58–70.
Jang, H, Kim, K, Kim, J and Kim, J (2011) Labour productivity model for reinforced concrete construction projects. Construction Innovation, 11(01), 92–113.
Júnior, J D R L and Alencar, C T D (2006) The office buildings market in São Paulo: time cycles to absorb vacant space and to recover investment attractiveness. Journal of Financial Management of Property and Construction, 11(01), 59–71.
Kapliński, O (1993) Diminishing non-uniformity of construction processes. Construction Management and Economics, 11(01), 53-61.
- Type: Journal Article
- Keywords: organization; non-uniformity; site operation
- ISBN/ISSN: 0144-6193
- URL: https://doi.org/10.1080/01446199300000064
- Abstract:
Reasons for the occurrence of the non-uniformity of production processes in construction and an outline of a formal approach that makes use of the theory of stochastic processes and statistics have been given. Attention has been drawn to the necessary and satisfactory conditions for balancing these processes. The distinction between the distribution of work time and the distribution of production volume (characterized by opposite skewness) has been introduced. A few cases of diminishing the non-uniformity have been given; the existence of mutual relations between the intensity of processes, concentration (superposition) of the processes and their non-uniformity have been used for that purpose. Examples of a superposition of processes (as a case of concentration of production) have been taken from the production and deliveries of concrete mixture. Attention have been drawn to savings resulting from such actions. These savings often require only simple technical or organizational operations.
Kumar, V, Syan, A S and Kaur, K (2022) A structural equation modeling analysis of factors driving customer purchase intention towards solar water heater. Smart and Sustainable Built Environment, 11(01), 65-78.
Lau, E and Rowlinson, S (2005) The value base of trust for the construction industry. Journal of Construction Procurement, 11(01).
Lavy, S, Kiss, C W and Fernandez-Solis, J L (2015) Linking design and energy performance in U.S. military hospitals. Architectural Engineering and Design Management, 11(01), 41-64.
Lavy, S, Kiss, C W and Fernandez-Solis, J L (2015) Linking design and energy performance in U.S. military hospitals. Architectural Engineering and Design Management, 11(01), 41–64.
Lewis, T M (2005) Public procurement and corruption in Trinidad and Tobago. Journal of Construction Procurement, 11(01).
Li, Y and Liu, C (2011) Construction capital productivity measurement using a data envelopment analysis. International Journal of Construction Management, 11(01), 49-61.
Lindén, S and Josephson, P-E (2013) In-housing or out-sourcing on-site materials handling in housing?. Journal of Engineering, Design and Technology, 11(01), 90-106.
Lines, B C, Sullivan, K T, Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(01), 21-39.
Ling, F Y Y and Kumaraswamy, M M (2005) The role of trust in team integration: a survey of contractors, consultants and clients in Singapore. Journal of Construction Procurement, 11(01).
Ling, F Y Y, Kumaraswamy, M M, Dulaimi, M F and Khalfan, M (2011) Public private partnerships: Overcoming pre-contract problems faced by public clients and private providers in infrastructure projects in Singapore. International Journal of Construction Management, 11(01), 63-77.
Liu, T, Mostafa, S, Sherif, M and Tuan Son, N (2021) Emerging themes of public-private partnership application in developing smart city projects: a conceptual framework. Built Environment Project and Asset Management, 11(01), 138-56.
Mamphweli, N S and Meyer, E L (2013) Performance monitoring system for a biomass gasifier. Journal of Engineering, Design and Technology, 11(01), 7-18.
Mangu, S, Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: a case study of highway projects in India. Built Environment Project and Asset Management, 11(01), 103-20.
McCoy, A, Thabet, W and Badinelli, R (2011) Defining a commercialization model for residential construction innovation: industry case studies. Construction Innovation, 11(01), 114–33.
Meeampol, S and Ogunlana, S O (2006) Factors affecting cost and time performance on highway construction projects: evidence from Thailand. Journal of Financial Management of Property and Construction, 11(01), 3–20.
Mendes, J M, Tavares, A O and Santos, P P (2019) Social vulnerability and local level assessments: a new approach for planning. International Journal of Disaster Resilience in the Built Environment, 11(01), 15–43.
Miller, J P (2019) Post-disaster recovery through the evolution of the lakou, a traditional settlement pattern. International Journal of Disaster Resilience in the Built Environment, 11(01), 3–14.
Moselhi, O and Deb, B (1993) Project selection considering risk. Construction Management and Economics, 11(01), 45-52.
Muthukumaran, V, kumar, M S and Selladurai, V (2013) Improvement of surface properties of AISI 316L SS by oxygen and helium ion implantation. Journal of Engineering, Design and Technology, 11(01), 34-43.
Naghipour, M, Gholampour, A A and Nematzadeh, M (2013) Analytical and experimental study on damping ratio of GRP-reinforced glulam beams. Journal of Engineering, Design and Technology, 11(01), 44-58.
Navon, R and Arkin, H (1993) Economic comparison of an air-conditioner and a desert cooler for residences in arid areas. Construction Management and Economics, 11(01), 62-70.
Ngowi, A B, Pienaar, E, Akindele, D O and Iwisi, D S (2006) Globalization of the construction industry: a review of infrastructure financing. Journal of Financial Management of Property and Construction, 11(01), 45–58.
Nguyen, N, Almarri, K and Boussabaine, H (2021) A risk-adjusted decoupled-net-present-value model to determine the optimal concession period of BOT projects. Built Environment Project and Asset Management, 11(01), 4-21.
Nimesha Sahani, J, Chan, D W M and Kumaraswamy, M (2021) A systematic literature review and analysis towards developing PPP models for delivering smart infrastructure. Built Environment Project and Asset Management, 11(01), 121-37.
Nitithamyong, P and Skibniewski, M J (2011) Success factors for the implementation of web-based construction project management systems: A cross-case analysis. Construction Innovation, 11(01), 14–42.
O'Brien, M J and Pantouvakis, J P (1993) A new approach to the development of computer-aided estimating systems for the construction industry. Construction Management and Economics, 11(01), 30-44.
Ogunsemi, D R and Aje, I O (2006) A model for contractors’ selection in Nigeria. Journal of Financial Management of Property and Construction, 11(01), 33–44.
Okunola, O H (2019) Residents vulnerability analysis and explanation of development-induced disasters in a Sub-Saharan African city. International Journal of Disaster Resilience in the Built Environment, 11(01), 71–84.
Phua, F T T and Rowlinson, S (2004) How important is cooperation to construction project success? A grounded empirical quantification. Engineering, Construction and Architectural Management, 11(01), 45–54.
Piroozfar, P ( E and Farr, E R (2015) Visual perception and the choice of systemised building façades. Architectural Engineering and Design Management, 11(01), 65–81.
Piroozfar, P and Farr, E R P (2015) Visual perception and the choice of systemised building façades. Architectural Engineering and Design Management, 11(01), 65-81.
Rahayu, H P, Haigh, R, Amaratunga, D, Kombaitan, B, Khoirunnisa, D and Pradana, V (2019) A micro scale study of climate change adaptation and disaster risk reduction in coastal urban strategic planning for the Jakarta. International Journal of Disaster Resilience in the Built Environment, 11(01), 119–33.
Ren, Z, Carter, C D, Hassan, T M and Anumba, C J (2005) Trust building for SMEs through an e-engineering hub. Journal of Construction Procurement, 11(01).
Rosenfeld, Y and Warszawski, A (1993) Forecasting methodology of national demand for construction labour. Construction Management and Economics, 11(01), 18-29.
Ross, A (2011) Supply chain management in an uncertain economic climate: a UK perspective. Construction Innovation, 11(01), 5–13.
Sandberg, E and Bildsten, L (2011) Coordination and waste in industrialised housing. Construction Innovation, 11(01), 77–91.
Sarvari, H, Chan, D W M, Banaitiene, N, Norhazilan Md, N and Beer, M (2021) Barriers to development of private sector investment in water and sewage industry. Built Environment Project and Asset Management, 11(01), 52-70.
Senaratne, S and Gunawardane, S (2015) Application of team role theory to construction design teams. Architectural Engineering and Design Management, 11(01), 1-20.
Senaratne, S and Gunawardane, S (2015) Application of team role theory to construction design teams. Architectural Engineering and Design Management, 11(01), 1–19.
Shen, Q and Liu, G (2004) Applications of value management in the construction industry in China. Engineering, Construction and Architectural Management, 11(01), 9–19.
Sourani, A and Sohail, M (2015) The Delphi method: Review and use in construction management research. International Journal of Construction Education and Research, 11(01), 54-76.
Suleiman, M Z, Talib, R and Ramli, M (2013) Durability and flexibility characteristics of latex modified ferrocement in structural development applications. Journal of Engineering, Design and Technology, 11(01), 59-70.
Swan, W, McDermott, P, Khalfan, M M A, Cooper, R, Rees, C and Wood, G (2005) The Development of Trust Inventory. Journal of Construction Procurement, 11(01).
Tam, V, Zhang, X, Lee, W and Shen L Y (2011) Applications of extensive green-roof systems in contributing to sustainable development in densely populated cities: a Hong Kong study. Construction Economics and Building, 11(01), 15-25.
Tavakoli Taba, S, Mojtahedi, M and Newton, S (2019) Disaster risk management approaches in construction and built environment. International Journal of Disaster Resilience in the Built Environment, 11(01), 85–99.
Tran, V D and Tookey, J (2011) Labour productivity in the New Zealand construction industry: a thorough investigation. Construction Economics and Building, 11(01), 41-60.
Wong, A K D, Wong, F K W and Nadeem, A (2011) Government roles in implementing building information modelling systems: Comparison between Hong Kong and the United States. Construction Innovation, 11(01), 61–76.