Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 17 results ...
Doukari, O, Kassem, M, Scoditti, E, Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: the case of three demonstration sites in different European countries. Construction Innovation, 24(01), 365-83.
Faraji, A, Homayoon Arya, S, Ghasemi, E, Rashidi, M, Perera, S, Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(01), 384-406.
- Type: Journal Article
- Keywords: blockchain technology (bct); building information modeling (BIM); construction project; integrated project delivery (IPD); project dispute management (pdm); smart contract
- ISBN/ISSN:
- URL: https://doi.org/10.1108/CI-01-2023-0008
- Abstract:
Purpose: In the construction industry, various parties are involved in a project. Consequently, claims and disputes are inevitable in this industry. This paper aims to develop Integrated project delivery (IPD) practices including early involvement of stakeholders and multiparty contracts which its combination with advanced technologies such as blockchain can lead to better dispute management and improve the whole construction process. Design/methodology/approach: Based on literature review, the alternative dispute resolution (ADR) for IPD contacts were identified, and three formats of IPD contracts were selected, and the dispute resolution process of them has been analyzed. Then, based on blockchain review, a conceptual blockchain-based dispute management (BDM) model was generated for ADR in IPD. Model validation was done by an interview. Experts were asked to compare the BDM model with the traditional system regarding the ADR duration. Findings: Analyses of the collected data from the experts demonstrated that the BDM model has better function in terms of time and cost for ADR process when the project is facing serious and considerable number of disputes. The relation between blockchain technology (BCT) and building information modeling (BIM) has been examined through a framework, and the ability of the proposed model for administrating dispute resolution process has been verified using four different scenarios of construction claims that show the system can run successfully. Originality: The current study proposes a truthful model, reliable framework to address the problem of project dispute management in IPD contracts. The system combines the ability to being unchangeable and the reliability characteristics of BCT with informative and automation aspects of BIM together to improve dispute resolution issue in the IPD system. © 2023, Emerald Publishing Limited.
Garip, S B, Güzelci, O Z, Garip, E and Kocabay, S (2024) A genetic algorithm-based design model to provide reduced risk areas for housing interiors. Construction Innovation, 24(01), 49-66.
Gledson, B, Zulu, S L, Saad, A M and Ponton, H (2024) Digital leadership framework to support firm-level digital transformations for Construction 4.0. Construction Innovation, 24(01), 341-64.
Jowett, B, Edwards, D J and Kassem, M (2024) Field BIM and mobile BIM technologies: a requirements taxonomy and its interactions with construction management functions. Construction Innovation, 24(01), 134-63.
Likita, A J, Jelodar, M B, Vishnupriya, V and Rotimi, J O B (2024) Lean and BIM integration benefits construction management practices in New Zealand. Construction Innovation, 24(01), 106-33.
Lisco, M and Aulin, R (2024) Taxonomy supporting design strategies for reuse of building parts in timber-based construction. Construction Innovation, 24(01), 221-41.
Mahamedi, E, Wonders, M, Gerami Seresht, N, Woo, W L and Kassem, M (2024) A reinforcing transfer learning approach to predict buildings energy performance. Construction Innovation, 24(01), 242-55.
Matoseiro Dinis, F, Rodrigues, R and Pedro da Silva Poças Martins, J (2024) Development and validation of natural user interfaces for semantic enrichment of BIM models using open formats. Construction Innovation, 24(01), 196-220.
Parisi, F, Sangiorgio, V, Parisi, N, Mangini, A M, Fanti, M P and Adam, J M (2024) A new concept for large additive manufacturing in construction: tower crane-based 3D printing controlled by deep reinforcement learning. Construction Innovation, 24(01), 8-32.
Philip, B and AlJassmi, H (2024) Time-series forecasting of road distress parameters using dynamic Bayesian belief networks. Construction Innovation, 24(01), 317-40.
Rampini, L and Re Cecconi, F (2024) Synthetic images generation for semantic understanding in facility management. Construction Innovation, 24(01), 33-48.
Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(01), 164-95.
Sati, A and Al-Tabtabai, H (2024) A paradigm shift toward the application of blockchain in enhancing quality information management. Construction Innovation, 24(01), 407-24.
Singh, A, Kumar, V, Mittal, A and Verma, P (2024) Identifying critical challenges to lean construction adoption. Construction Innovation, 24(01), 67-105.
Yu, J, Zhong, H and Bolpagni, M (2024) Integrating blockchain with building information modelling (BIM): a systematic review based on a sociotechnical system perspective. Construction Innovation, 24(01), 280-316.
Zani, A, Speroni, A, Mainini, A G, Zinzi, M, Caldas, L and Poli, T (2024) Customized shading solutions for complex building façades: the potential of an innovative cement-textile composite material through a performance-based generative design. Construction Innovation, 24(01), 256-79.