Asiedu, R O, Adaku, E and Owusu-Manu, D-G (2017) Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projects. Construction Innovation, 17(03), 363-80.

  • Type: Journal Article
  • Keywords: construction industry,cost overruns,factor analysis,focus group,mitigating measures,time overruns
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-01-2016-0003
  • Abstract:
    An analysis of the critical failure factors of cost and time overruns in construction projects reveals that several short to medium term key strategies and mitigating measures are recommended to avert the occurrence of the overruns.

Aziz, Z, Qasim, R M and Wajdi, S (2017) Improving productivity of road surfacing operations using value stream mapping and discrete event simulation. Construction Innovation, 17(03), 294-323.

Babatunde, S O and Ekundayo, D (2019) Barriers to the incorporation of BIM into quantity surveying undergraduate curriculum in the Nigerian universities. Journal of Engineering, Design and Technology, 17(03), 629–48.

Badu, E, Edwards, D J, Owusu-Manu, D and Brown, D M (2012) Barriers to the implementation of innovative financing (IF) of infrastructure. Journal of Financial Management of Property and Construction, 17(03), 253-73.

Bellifa, S and Boumechra, N (2019) Effects of calcium leaching on the physical and mechanical properties of aerial lime-cement mortars. Journal of Engineering, Design and Technology , 17(03), 649–66.

Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(03), 351-62.

Cheung, E, Chan, A P C and Kajewski, S (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(03), 292–308.

Dabous, S A and Alkass, S (2010) A multi-attribute ranking method for bridge management. Engineering, Construction and Architectural Management, 17(03), 282–91.

Dang, C N and Le-Hoai, L (2019) Relating knowledge creation factors to construction organizations’ effectiveness. Journal of Engineering, Design and Technology, 17(03), 515–36.

Dithebe, K, Aigbavboa, C O, Thwala, W D and Oke, A E (2019) Analysis on the perceived occurrence of challenges delaying the delivery of water infrastructure assets in South Africa. Journal of Engineering, Design and Technology , 17(03), 554–71.

Farrow, C B and Leathem, T (2021) The Syllabus as a Tool to Enhance Teaching & Learning in Construction Education. International Journal of Construction Education and Research, 17(03), 201–21.

Gaafar, H K and Perry, J G (1999) Strategies for insuring sub-contracted works. Construction Management and Economics, 17(03), 383-91.

García de Soto, B, Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(03), 165-96.

Golizadeh, H, Banihashemi, S, Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(03), 197-209.

Green, S D (1999) A participative research strategy for propagating soft methodologies in value management practice. Construction Management and Economics, 17(03), 329-40.

Henderson, J R and Ruikar, K (2010) Technology implementation strategies for construction organisations. Engineering, Construction and Architectural Management, 17(03), 309–27.

Hietajärvi, A-M, Aaltonen, K and Haapasalo, H (2017) Opportunity management in large projects: A case study of an infrastructure alliance project. Construction Innovation, 17(03), 340-62.

Ibem, E O, Aduwo, E B, Afolabi, A O, Oluwunmi, A O, Tunji-Olayeni, P F, Ayo-Vaughan, E A and Uwakonye, U O (2021) Electronic (e-) Procurement Adoption and Users’ Experience in the Nigerian Construction Sector. International Journal of Construction Education and Research, 17(03), 258–76.

Irurah, D K and Holm, D (1999) Energy impact analysis of building construction as applied to South Africa. Construction Management and Economics, 17(03), 363-74.

Jepson, J, M, Kirytopoulos, K and London, K (2017) Exploring project managers’ perception of stress when working in increasingly complex construction projects . Construction Economics and Building, 17(03), 47-67.

Jonsson, H and Rudberg, M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Construction Innovation, 17(03), 381-403.

Kenley, R (1999) Cash farming in building and construction: a stochastic analysis. Construction Management and Economics, 17(03), 393-401.

Kereri, J O and Adamtey, S (2019) RFID use in residential/commercial construction industry. Journal of Engineering, Design and Technology , 17(03), 591–612.

Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(03), 305-14.

Liang, L, Hu, X, Tivendale, L and Liu, C (2017) The log mean divisia index based carbon productivity in the Australian construction industry . Construction Economics and Building, 17(03), 68-84.

Liao, L, Teo, E, A, L and Low, S, P (2017) A project management framework for enhanced productivity performance using building information modelling . Construction Economics and Building, 17(03), 1-26.

Masu, S, Gichunge, H and K'Akumu, O A (2012) Component ratios of new building costs in Nairobi: a contractors' perspective. Journal of Financial Management of Property and Construction, 17(03), 222-34.

Mayouf, M, Gerges, M and Cox, S (2019) 5D BIM: an investigation into the integration of quantity surveyors within the BIM process. Journal of Engineering, Design and Technology , 17(03), 537–53.

McCluskey, W, Davis, P, Haran, M, McCord, M and McIlhatton, D (2012) The potential of artificial neural networks in mass appraisal: the case revisited. Journal of Financial Management of Property and Construction, 17(03), 274-92.

Mekid, S and Bashmal, S (2019) Engineering manipulation at nanoscale: further functional specifications. Journal of Engineering, Design and Technology, 17(03), 572–90.

Mok, K Y, Shen, G Q and Yang, R J (2017) A network theory-based analysis of stakeholder issues and their interrelationships in large construction projects: A case study. International Journal of Construction Management, 17(03), 210-27.

Mostafaeipour, A, Goudarzi, H, Sedaghat, A, Jahangiri, M, Hadian, H, Rezaei, M, Golmohammadi, A and Karimi, P (2019) Energy efficiency for cooling buildings in hot and dry regions using sol-air temperature and ground temperature effects. Journal of Engineering, Design and Technology, 17(03), 613–28.

Odeyinka, H, Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(03), 203-21.

Okoroh, M I and Torrance, V B (1999) A model for sub-contractor selection in refurbishment projects. Construction Management and Economics, 17(03), 315-27.

Park, J and Tucker, R (2017) Overcoming barriers to the reuse of construction waste material in Australia: A review of the literature. International Journal of Construction Management, 17(03), 228-37.

Pietroforte, R and Bon, R (1999) The Italian residential construction sector: an input-output historical analysis. Construction Management and Economics, 17(03), 297-303.

Rosa, J, E, Hon,C, K, H, Xia, B and Lamari, F (2017) Challenges, success factors and strategies for women’s career development in the Australian construction industry . Construction Economics and Building, 17(03), 27-46.

Rose, T and Manley, K (2010) Client recommendations for financial incentives on construction projects. Engineering, Construction and Architectural Management, 17(03), 252–67.

Runeson, G and Skitmore, M R (1999) Tendering theory revisited. Construction Management and Economics, 17(03), 285-96.

Sackey, E and Akotia, J (2017) Spanning the multilevel boundaries of construction organisations: Towards the delivery of BIM-compliant projects. Construction Innovation, 17(03), 273-93.

Scott, S and Assadi, S (1999) A survey of the site records kept by construction supervisors. Construction Management and Economics, 17(03), 375-82.

Sha'ar, K Z, Assaf, S A, Bambang, T, Babsail, M and Fattah, A M A E (2017) Design–construction interface problems in large building construction projects. International Journal of Construction Management, 17(03), 238-50.

Shalwani, A and Lines, B C (2021) An Empirical Analysis of the Causes of Cost and Schedule Growth for Small Healthcare and Educational Construction Projects. International Journal of Construction Education and Research, 17(03), 277–96.

Silva, N D, Ranasinghe, M and Silva, C R D (2012) Risk factors affecting building maintenance under tropical conditions. Journal of Financial Management of Property and Construction, 17(03), 235-52.

Slaughter, E S (1999) Assessment of construction processes and innovations through simulation. Construction Management and Economics, 17(03), 341-50.

Somiah, M K, Aigbavboa, C and Thwala, W D (2021) Rethinking the Attributes for Competitive Advantage of Indigenous Construction Firms in Developing Countries: A Ghana Study. International Journal of Construction Education and Research, 17(03), 242–57.

Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(03), 251-67.

Sun, H, Fan, Z, Zhou, Y and Shi, Y (2010) Empirical research on competitiveness factors: Analysis of real estate industry of Beijing and Tianjin. Engineering, Construction and Architectural Management, 17(03), 240–51.

Thakur, N, Awasthi, Y, Hooda, M and Siddiqui, A S (2019) Adaptive whale optimization for intelligent multi-constraints power quality improvement under deregulated environment. Journal of Engineering, Design and Technology, 17(03), 490–514.

van Rensburg, R, Mellado, B and Augusto Marin Tobon, C (2019) Wireless mesh network data communications and reliability analysis for anti-theft application deployment in educational institutions. Journal of Engineering, Design and Technology, 17(03), 474–89.

Vaz-Serra, P and Mitcheltree, H (2021) Understanding the Key Master of Construction Project Management Graduate Competencies Required to Meet Industry Needs in Australia. International Journal of Construction Education and Research, 17(03), 222–41.

Vermande, H M and Mulligen, P-H v (1999) Construction costs in The Netherlands in an international context. Construction Management and Economics, 17(03), 269-83.

Worrall, L, Harris, K, Stewart, R, Thomas, A and McDermott, P (2010) Barriers to women in the UK construction industry. Engineering, Construction and Architectural Management, 17(03), 268–81.

Zaeri, F, Rotimi, J O B, Hosseini, M R and Cox, J (2017) Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry. Construction Innovation, 17(03), 324-39.