Al-Fadhali, N (2024) An AMOS-SEM approach to evaluating stakeholders' influence on construction project delivery performance. Engineering, Construction and Architectural Management, 31(02), 638-61.
Arbulu, R J, Tommelein, I D, Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(02), 161–71.
Azman, M A, Abdul-Samad, Z, Lee, B L, Skitmore, M, Rajendra, D and Chuweni, N N (2024) How technological, environmental and managerial performance contribute to the productivity change of Malaysian construction firms. Engineering, Construction and Architectural Management, 31(02), 618-37.
Bai, L, Kang, S, Zhang, K, Zhang, B and Pan, T (2024) Modeling for external stakeholder risk assessment of project portfolios. Engineering, Construction and Architectural Management, 31(02), 737-66.
Ballard, G (2003) Lean project management. Building Research & Information, 31(02), 119–33.
Barlow, J, Childerhouse, P, Gann, D, Hong-Minh, S, Naim, M and Ozaki, R (2003) Choice and delivery in housebuilding: lessons from Japan for UK housebuilders. Building Research & Information, 31(02), 134–45.
Bygballe, L E, Håkansson, H and Jahre, M (2013) A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(02), 104-18.
Chang, C-Y (2013) A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(02), 99-103.
Courtney, R and Winch, G M (2003) Re-engineering construction: the role of research and implementation. Building Research & Information, 31(02), 172–8.
Danel, T, Lafhaj, Z, Puppala, A, BuHamdan, S, Lienard, S and Richard, P (2024) Identifying tower crane activities with data: the case of the concrete pouring. Engineering, Construction and Architectural Management, 31(02), 939-56.
Deep, S, Gajendran, T, Jefferies, M, Uggina, V S and Patil, S (2024) Influence of subcontractors' “strategic capabilities” on “power”, “dependence” and “collaboration”: an empirical analysis in the context of procurement decisions. Engineering, Construction and Architectural Management, 31(02), 571-92.
Gerth, R, Boqvist, A, Bjelkemyr, M and Lindberg, B (2013) Design for construction: utilizing production experiences in development. Construction Management and Economics, 31(02), 135-50.
Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: client expectations and drivers. Building Research & Information, 31(02), 146–60.
Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: partnering in-between systems of production, values and interests. Construction Management and Economics, 31(02), 119-34.
Green, S D and May, S (2003) Re-engineering construction: going against the grain. Building Research & Information, 31(02), 97–106.
Kim, S, Makhmalbaf, A and Shahandashti, M (2024) Diagnosing and quantifying post-COVID-19 fluctuations in the architecture billings indices. Engineering, Construction and Architectural Management, 31(02), 681-95.
Kwok, T W, Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for Hong Kong's high-rise residential buildings: a multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(02), 526-43.
Leung, M Y, Ahmed, K and Famakin, I O (2024) Impact of mindfulness-based stress reduction intervention on the performance of construction professionals. Engineering, Construction and Architectural Management, 31(02), 662-80.
Li, C, Zhao, Y and Chen, W F (2024) Effects of commitment-based governance on the relationship between formal control and PPP projects performance: mediating and moderating. Engineering, Construction and Architectural Management, 31(02), 696-715.
Liao, L and Wu, Z (2024) Untangling the relationship between work pressure and emotions in social media: a quantitative empirical study of construction industry. Engineering, Construction and Architectural Management, 31(02), 767-88.
Liu, J, Wang, Z, Tang, J and Song, J (2024) The impact of the institutional environment of the host country on the perception of compliance risk of the international engineering contractor: the moderating effect of absorptive capacity. Engineering, Construction and Architectural Management, 31(02), 716-36.
Ma, T and Liu, Y (2024) Multiple paths to enhancing the resilience of project-based organizations from the perspective of CSR configuration: evidence from the Chinese construction industry. Engineering, Construction and Architectural Management, 31(02), 835-65.
Menches, C L and Chen, J (2013) Using ecological momentary assessment to understand a construction worker's daily disruptions and decisions. Construction Management and Economics, 31(02), 180-94.
Murphy, R (2013) Strategic planning in construction professional service firms: a study of Irish QS practices. Construction Management and Economics, 31(02), 151-66.
Nguyen, M V (2024) Corporate social responsibility performance and its effects on climate for innovation and opportunism: evidence from Vietnamese architectural design firms. Engineering, Construction and Architectural Management, 31(02), 812-34.
Nguyen, T T N, Do, S T, Nguyen, V T and Nguyen, T A (2024) Interrelationships among enabling factors for BIM adoption in construction enterprises. Engineering, Construction and Architectural Management, 31(02), 891-918.
Nor Azazi, N A, Shaed, M M, Samsurijan, M S and Ebekozien, A (2024) The influence of higher learning institutions in developing the experience economy from the perspective of the urban community. Engineering, Construction and Architectural Management, 31(02), 509-25.
Phua, F T T (2013) Construction management research at the individual level of analysis: current status, gaps and future directions. Construction Management and Economics, 31(02), 167-79.
Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(02), 544-70.
Su, L, Cao, Y, Li, H and Zhang, C (2024) Water environment treatment PPP projects optimal payment mechanism based on multi-stage dynamic programming model. Engineering, Construction and Architectural Management, 31(02), 866-90.
Winch, G M (2003) Integrated life-cycle analysis. Building Research & Information, 31(02), 107–18.
Zandee, D, Zutshi, A, Creed, A and Nijhof, A (2024) Aiming for bullseye: a novel gameplan for circular economy in the construction industry. Engineering, Construction and Architectural Management, 31(02), 593-617.
Zhang, N, Hwang, B G, Deng, X and Tay, F (2024) Exploring critical success factors for collaborative contracting implementation in the Singapore construction industry. Engineering, Construction and Architectural Management, 31(02), 919-38.
Zhu, J, Shi, Q, Zhang, C, Yuan, J, Li, Q and Wang, X (2024) Investigating cooperative strategies in low-carbon public–private partnership projects through evolutionary game. Engineering, Construction and Architectural Management, 31(02), 789-811.