Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 33 results ...

Alashwal, N and Alashwal, A (2023) Rural access programs in Yemen: delay of international funded road projects. Engineering, Construction and Architectural Management, 30(04), 1746-67.

Alsulami, H, Serbaya, S H, Rizwan, A, Saleem, M, Maleh, Y and Alamgir, Z (2023) Impact of emotional intelligence on the stress and safety of construction workers' in Saudi Arabia. Engineering, Construction and Architectural Management, 30(04), 1365-78.

Amiri, R, Majrouhi Sardroud, J and Momenaei Kermani, V (2023) Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model. Engineering, Construction and Architectural Management, 30(04), 1444-62.

Andersen, M (2002) Light distribution through advanced fenestration systems. Building Research & Information, 30(04), 264–81.

Cheraghi, E, Zohrehvandi, S, Vanhoucke, M and Mohamadpour Tosarkani, B (2023) A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management, 30(04), 1578-600.

Du, H, Han, Q, Sun, J and Wang, C C (2023) Adoptions of prefabrication in residential sector in China: agent-based policy option exploration. Engineering, Construction and Architectural Management, 30(04), 1697-725.

Du, J, Xue, Y, Sugumaran, V, Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(04), 1601-35.

Dulaimi, M F, Ling, F Y Y, Ofori, G and Silva, N D (2002) Enhancing integration and innovation in construction. Building Research & Information, 30(04), 237–47.

Ebekozien, A, Aigbavboa, C O, Aigbedion, M, Ogbaini, I F and Aginah, I L (2023) Integrated project delivery in the Nigerian construction sector: an unexplored approach from the stakeholders’ perspective. Engineering, Construction and Architectural Management, 30(04), 1519-35.

Fuller, R J and Luther, M B (2002) Thermal simulation of an Australian university building. Building Research & Information, 30(04), 255–63.

Greenwood, D and Wu, S (2012) Establishing the association between collaborative working and construction project performance based on client and contractor perceptions. Construction Management and Economics, 30(04), 299-308.

Guo, H and Lu, W (2023) Measuring competitiveness with data-driven principal component analysis: a case study of Chinese international construction companies. Engineering, Construction and Architectural Management, 30(04), 1558-77.

Hatamleh, M T, Moynihan, G P, Batson, R G, Alzarrad, A and Ogunrinde, O (2023) Risk assessment and ranking in the developing countries’ construction industry: the case of Jordan. Engineering, Construction and Architectural Management, 30(04), 1344-64.

Hu, H, Deng, X and Mahmoudi, A (2023) A cognitive model for understanding fraudulent behavior in construction industry. Engineering, Construction and Architectural Management, 30(04), 1423-43.

Huang, C-F and Lien, H-C (2012) An empirical analysis of the influences of corporate social responsibility on organizational performance of Taiwan's construction industry: using corporate image as a mediator. Construction Management and Economics, 30(04), 263-75.

Ibrahimkhil, M H and Hadidi, L (2023) Is the construction site a safer place under the USACE or local government guidelines? The case of Afghanistan. Engineering, Construction and Architectural Management, 30(04), 1379-400.

Kohler, N and Hassler, U (2002) The building stock as a research object. Building Research & Information, 30(04), 226–36.

Laar, M and Grimme, F W (2002) German developments in guidance systems: an overview daylight. Building Research & Information, 30(04), 282–301.

Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(04), 1679-96.

Li, J, Zhou, G, Li, D, Zhang, M and Zhao, X (2023) Recognizing workers' construction activities on a reinforcement processing area through the position relationship of objects detected by faster R-CNN. Engineering, Construction and Architectural Management, 30(04), 1657-78.

Liu, J, Wang, Y and Wang, Z (2023) Multidimensional drivers: exploring contractor rule violations in the construction industry. Engineering, Construction and Architectural Management, 30(04), 1496-518.

Mahdavian, S, Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(04), 1401-22.

MarchwiƄski, J and Kurtz-Orecka, K (2023) Effect of photovoltaic installation power and façade glazing ratio on the energy performance of a nursery building. Engineering, Construction and Architectural Management, 30(04), 1463-80.

Mirzaee, A M, Hosseini, M R, Martek, I, Rahnamayiezekavat, P and Arashpour, M (2023) Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: case studies from Iran. Engineering, Construction and Architectural Management, 30(04), 1481-95.

Rose, T M and Manley, K (2012) Adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 30(04), 277-98.

Scala, N M, Liu, M, Alves, T C L, Schiavone, V and Hawkins, D (2023) The gold standard: developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(04), 1636-56.

Shojaei, R S, Oti-Sarpong, K and Burgess, G (2023) Enablers for the adoption and use of BIM in main contractor companies in the UK. Engineering, Construction and Architectural Management, 30(04), 1726-45.

Stehn, L (2002) Environmental labelling of timber-framed dwellings and their building components. Building Research & Information, 30(04), 248–54.

Thomson, D, Kaka, A, Pronk, L and Alalouch, C (2012) The use of freelisting to elicit stakeholder understanding of the benefits sought from healthcare buildings. Construction Management and Economics, 30(04), 309-23.

Tu, B, Zuo, J, Chang, R D, Webber, R J, Xiong, F and Dong, N (2023) A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study. Engineering, Construction and Architectural Management, 30(04), 1321-43.

Xue, J, Shen, G Q, Deng, X, Ogungbile, A J and Chu, X (2023) Evolution modeling of stakeholder performance on relationship management in the dynamic and complex environments of megaprojects. Engineering, Construction and Architectural Management, 30(04), 1536-57.

Zhou, Q, Chen, S, Deng, X and Mahmoudi, A (2023) Knowledge transfer among members within cross-cultural teams of international construction projects. Engineering, Construction and Architectural Management, 30(04), 1787-808.

Zhou, S, Qin, L, Zhang, J and Cao, X (2023) Research on the influencing factors of knowledge transfer among construction workers based on social cognitive theory. Engineering, Construction and Architectural Management, 30(04), 1768-86.