Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 26 results ...
Abdolahi, M J, Barmayehvar, B, Marjani, T and Esmaeilabadi, R (2023) Investigating the relationship between human resource development and quality in building projects. Journal of Financial Management of Property and Construction, 28(02), 260-71.
Abrishami, S, Goulding, J and Rahimian, F (2021) Generative BIM workspace for AEC conceptual design automation: prototype development. Engineering, Construction and Architectural Management, 28(02), 482-509.
Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(02), 61.
Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(02), 75.
Aziz, Z, Alzaabi, E and Syazli Fathi, M (2023) Prioritisation of resilience criteria and performance indicators for road emergencies crisis response: an analytic hierarchy process (AHP) approach. Journal of Financial Management of Property and Construction, 28(02), 178-205.
Bologna, R and Nord, R D (2000) Effects of the law reforming public works contracts on the Italian building process. Building Research & Information, 28(02), 109–18.
Bremer, W and Kok, K (2000) The Dutch construction industry: a combination of competition and corporatism. Building Research & Information, 28(02), 98–108.
Campagnac, E (2000) The contracting system in the French construction industry: actors and institutions. Building Research & Information, 28(02), 131–40.
Charlton, J, Kelly, K, Greenwood, D and Moreton, L (2021) The complexities of managing historic buildings with BIM. Engineering, Construction and Architectural Management, 28(02), 570-83.
Dasandara, M, Ingirige, B, Kulatunga, U and Fernando, T (2023) Climate financing barriers and strategies: the case of Sri Lanka. Journal of Financial Management of Property and Construction, 28(02), 242-59.
Elghaish, F and Abrishami, S (2021) A centralised cost management system: exploiting EVM and ABC within IPD. Engineering, Construction and Architectural Management, 28(02), 549-69.
Getuli, V, Capone, P and Bruttini, A (2021) Planning, management and administration of HS contents with BIM and VR in construction: an implementation protocol. Engineering, Construction and Architectural Management, 28(02), 603-23.
Kamunda, A, Renukappa, S, Suresh, S and Jallow, H (2021) BIM in the water industry: addressing challenges to improve the project delivery process. Engineering, Construction and Architectural Management, 28(02), 510-29.
Keskin, B, Salman, B and Ozorhon, B (2021) Airport project delivery within BIM-centric construction technology ecosystems. Engineering, Construction and Architectural Management, 28(02), 530-48.
Loosemore, M, Phua, F, Dunn, K and Ozguc, U (2010) Operatives’ experiences of cultural diversity on Australian construction sites. Construction Management and Economics, 28(02), 88.
Lu, S-L and Sexton, M (2010) Career journeys and turning points of senior female managers in small construction firms. Construction Management and Economics, 28(02), 39.
Madhumitha, B and Onkar, P (2023) The economic domino effect on housing and construction sector – a case of India. Journal of Financial Management of Property and Construction, 28(02), 206-19.
McGuffin, A A and Obonyo, E (2010) Enhancing performance: a case study of the effects of employee coaching in construction practice. Construction Management and Economics, 28(02), 9.
Ökmen, Ö and Öztaş, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(02), 12.
Qian, X and Papadonikolaki, E (2021) Shifting trust in construction supply chains through blockchain technology. Engineering, Construction and Architectural Management, 28(02), 584-602.
Syben, G (2000) Contractors take command: from a demand-based towards a producer oriented model in German construction. Building Research & Information, 28(02), 119–30.
Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(02), 202.
Wanigarathna, N, Jones, K, Pascale, F, Morga, M and Meslem, A (2023) Cost–benefit analysis to appraise technical mitigation options for earthquake-induced liquefaction disaster events. Journal of Financial Management of Property and Construction, 28(02), 220-41.
Winch, G M (2000) Institutional reform in British construction: partnering and private finance. Building Research & Information, 28(02), 141–55.
Ye, K, Shen, L and Tan, Y (2010) Response strategies to the competition in the Chinese construction market. Construction Management and Economics, 28(02), 24.
Yuliastuti, N, Okta, E V, Haryanti, V G and Afif, F (2023) Dimension of community capability and its effect on the social vulnerability at Semarang coastal area. Journal of Financial Management of Property and Construction, 28(02), 164-77.