ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 34 results ...
Al-Fadhali, N (2024) An AMOS-SEM approach to evaluating stakeholders' influence on construction project delivery performance. Engineering, Construction and Architectural Management, 31(02), 638-61.
Arbulu, R J, Tommelein, I D, Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(02), 161–71.
Azman, M A, Abdul-Samad, Z, Lee, B L, Skitmore, M, Rajendra, D and Chuweni, N N (2024) How technological, environmental and managerial performance contribute to the productivity change of Malaysian construction firms. Engineering, Construction and Architectural Management, 31(02), 618-37.
Bai, L, Kang, S, Zhang, K, Zhang, B and Pan, T (2024) Modeling for external stakeholder risk assessment of project portfolios. Engineering, Construction and Architectural Management, 31(02), 737-66.
Ballard, G (2003) Lean project management. Building Research & Information, 31(02), 119–33.
Barlow, J, Childerhouse, P, Gann, D, Hong-Minh, S, Naim, M and Ozaki, R (2003) Choice and delivery in housebuilding: lessons from Japan for UK housebuilders. Building Research & Information, 31(02), 134–45.
Bygballe, L E, Håkansson, H and Jahre, M (2013) A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(02), 104-18.
Chang, C-Y (2013) A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(02), 99-103.
Courtney, R and Winch, G M (2003) Re-engineering construction: the role of research and implementation. Building Research & Information, 31(02), 172–8.
Danel, T, Lafhaj, Z, Puppala, A, BuHamdan, S, Lienard, S and Richard, P (2024) Identifying tower crane activities with data: the case of the concrete pouring. Engineering, Construction and Architectural Management, 31(02), 939-56.
Deep, S, Gajendran, T, Jefferies, M, Uggina, V S and Patil, S (2024) Influence of subcontractors' “strategic capabilities” on “power”, “dependence” and “collaboration”: an empirical analysis in the context of procurement decisions. Engineering, Construction and Architectural Management, 31(02), 571-92.
Gerth, R, Boqvist, A, Bjelkemyr, M and Lindberg, B (2013) Design for construction: utilizing production experiences in development. Construction Management and Economics, 31(02), 135-50.
Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: client expectations and drivers. Building Research & Information, 31(02), 146–60.
Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: partnering in-between systems of production, values and interests. Construction Management and Economics, 31(02), 119-34.
Green, S D and May, S (2003) Re-engineering construction: going against the grain. Building Research & Information, 31(02), 97–106.
Kim, S, Makhmalbaf, A and Shahandashti, M (2024) Diagnosing and quantifying post-COVID-19 fluctuations in the architecture billings indices. Engineering, Construction and Architectural Management, 31(02), 681-95.
Kwok, T W, Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for Hong Kong's high-rise residential buildings: a multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(02), 526-43.
Leung, M Y, Ahmed, K and Famakin, I O (2024) Impact of mindfulness-based stress reduction intervention on the performance of construction professionals. Engineering, Construction and Architectural Management, 31(02), 662-80.
Li, C, Zhao, Y and Chen, W F (2024) Effects of commitment-based governance on the relationship between formal control and PPP projects performance: mediating and moderating. Engineering, Construction and Architectural Management, 31(02), 696-715.
Liao, L and Wu, Z (2024) Untangling the relationship between work pressure and emotions in social media: a quantitative empirical study of construction industry. Engineering, Construction and Architectural Management, 31(02), 767-88.
Liu, J, Wang, Z, Tang, J and Song, J (2024) The impact of the institutional environment of the host country on the perception of compliance risk of the international engineering contractor: the moderating effect of absorptive capacity. Engineering, Construction and Architectural Management, 31(02), 716-36.
Ma, T and Liu, Y (2024) Multiple paths to enhancing the resilience of project-based organizations from the perspective of CSR configuration: evidence from the Chinese construction industry. Engineering, Construction and Architectural Management, 31(02), 835-65.
Menches, C L and Chen, J (2013) Using ecological momentary assessment to understand a construction worker's daily disruptions and decisions. Construction Management and Economics, 31(02), 180-94.
Murphy, R (2013) Strategic planning in construction professional service firms: a study of Irish QS practices. Construction Management and Economics, 31(02), 151-66.
Nguyen, M V (2024) Corporate social responsibility performance and its effects on climate for innovation and opportunism: evidence from Vietnamese architectural design firms. Engineering, Construction and Architectural Management, 31(02), 812-34.
Nguyen, T T N, Do, S T, Nguyen, V T and Nguyen, T A (2024) Interrelationships among enabling factors for BIM adoption in construction enterprises. Engineering, Construction and Architectural Management, 31(02), 891-918.
Nor Azazi, N A, Shaed, M M, Samsurijan, M S and Ebekozien, A (2024) The influence of higher learning institutions in developing the experience economy from the perspective of the urban community. Engineering, Construction and Architectural Management, 31(02), 509-25.
Phua, F T T (2013) Construction management research at the individual level of analysis: current status, gaps and future directions. Construction Management and Economics, 31(02), 167-79.
Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(02), 544-70.
Su, L, Cao, Y, Li, H and Zhang, C (2024) Water environment treatment PPP projects optimal payment mechanism based on multi-stage dynamic programming model. Engineering, Construction and Architectural Management, 31(02), 866-90.
- Type: Journal Article
- Keywords: incentive contract; multi-objective optimization; payment mechanism; PPPs; pricing
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-04-2022-0291
- Abstract:
Purpose: The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of projects. This study is aimed at constructing an effective payment model for the whole life period of projects to achieve win-win among all stakeholders, so as to provide a theoretical reference and managerial implications for the public sector in the whole operation and maintenance period. Design/methodology/approach: In the whole operation and maintenance period of water environment treatment PPP projects, this article investigates how the public sector optimizes the payment in the whole operation and maintenance period of projects. Firstly, the projects' whole operation and maintenance period is divided into several stages according to the performance appraisal period. And then, the multi-stage dynamic programming model is constructed to design the payment construct model for the public sector in each performance appraisal stage. The payment from the public sector is the decision variable, and the deduction from the private sector is a random variable. Findings: The optimal payment model showed that the relatively less objective weight of public sector leaded to its relatively more total payment and vice versa. Therefore, the sustainable development of the projects can only be ensured when the objective weights both of them should be balanced. Additionally, the deduction from the performance appraisal of private sector plays an important role in the model construction. The larger deduction the private sector undertakes, the smaller profits private sector has. Since the deduction at each stage is a random variable, the deduction varies with the different probability distributions obeyed by the practical deduction in each stage. Research limitations/implications: The findings from this study have provided theoretical and application references, and some managerial implications are also given. First, the improvement of the pricing system of public sector should be accelerated. Second, the reasonable profit of the private sector must be guaranteed. While pursuing the maximization of social benefits, the public sector should make full use of the price sharing mechanism in the market and supervise the real income situation of the private sector. Third is increasing the public to participate in pricing. Additionally, it is a limitation that the deduction is assumed to conform to a uniform distribution in this study. Other probability distributions on deduction can be essentially further sought, so as to be more line with the actual situation of the projects. Originality/value: The optimal payment in whole operation and maintenance period of the projects has become an important issue, which is a key to project success. This study constructs a multi-stage dynamic programming model to optimize payment in the whole period of projects. Additionally, this study adds its value through deeply developing the new theories of optimal payment to more suitable for the practical problems, so that to optimize the design of payment mechanism. Meanwhile, a valuable reference for public and private sectors is provided to ensure the sustainable development of the projects. © 2022, Emerald Publishing Limited.
Winch, G M (2003) Integrated life-cycle analysis. Building Research & Information, 31(02), 107–18.
Zandee, D, Zutshi, A, Creed, A and Nijhof, A (2024) Aiming for bullseye: a novel gameplan for circular economy in the construction industry. Engineering, Construction and Architectural Management, 31(02), 593-617.
Zhang, N, Hwang, B G, Deng, X and Tay, F (2024) Exploring critical success factors for collaborative contracting implementation in the Singapore construction industry. Engineering, Construction and Architectural Management, 31(02), 919-38.
Zhu, J, Shi, Q, Zhang, C, Yuan, J, Li, Q and Wang, X (2024) Investigating cooperative strategies in low-carbon public–private partnership projects through evolutionary game. Engineering, Construction and Architectural Management, 31(02), 789-811.