Al-Fadhali, N (2024) An AMOS-SEM approach to evaluating stakeholders' influence on construction project delivery performance. Engineering, Construction and Architectural Management, 31(02), 638-61.

Arbulu, R J, Tommelein, I D, Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(02), 161–71.

Azman, M A, Abdul-Samad, Z, Lee, B L, Skitmore, M, Rajendra, D and Chuweni, N N (2024) How technological, environmental and managerial performance contribute to the productivity change of Malaysian construction firms. Engineering, Construction and Architectural Management, 31(02), 618-37.

Bai, L, Kang, S, Zhang, K, Zhang, B and Pan, T (2024) Modeling for external stakeholder risk assessment of project portfolios. Engineering, Construction and Architectural Management, 31(02), 737-66.

Ballard, G (2003) Lean project management. Building Research & Information, 31(02), 119–33.

Barlow, J, Childerhouse, P, Gann, D, Hong-Minh, S, Naim, M and Ozaki, R (2003) Choice and delivery in housebuilding: lessons from Japan for UK housebuilders. Building Research & Information, 31(02), 134–45.

Bygballe, L E, Håkansson, H and Jahre, M (2013) A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(02), 104-18.

Chang, C-Y (2013) A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(02), 99-103.

Courtney, R and Winch, G M (2003) Re-engineering construction: the role of research and implementation. Building Research & Information, 31(02), 172–8.

Danel, T, Lafhaj, Z, Puppala, A, BuHamdan, S, Lienard, S and Richard, P (2024) Identifying tower crane activities with data: the case of the concrete pouring. Engineering, Construction and Architectural Management, 31(02), 939-56.

Deep, S, Gajendran, T, Jefferies, M, Uggina, V S and Patil, S (2024) Influence of subcontractors' “strategic capabilities” on “power”, “dependence” and “collaboration”: an empirical analysis in the context of procurement decisions. Engineering, Construction and Architectural Management, 31(02), 571-92.

Gerth, R, Boqvist, A, Bjelkemyr, M and Lindberg, B (2013) Design for construction: utilizing production experiences in development. Construction Management and Economics, 31(02), 135-50.

Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: client expectations and drivers. Building Research & Information, 31(02), 146–60.

Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: partnering in-between systems of production, values and interests. Construction Management and Economics, 31(02), 119-34.

Green, S D and May, S (2003) Re-engineering construction: going against the grain. Building Research & Information, 31(02), 97–106.

Kim, S, Makhmalbaf, A and Shahandashti, M (2024) Diagnosing and quantifying post-COVID-19 fluctuations in the architecture billings indices. Engineering, Construction and Architectural Management, 31(02), 681-95.

Kwok, T W, Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for Hong Kong's high-rise residential buildings: a multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(02), 526-43.

  • Type: Journal Article
  • Keywords: curtain wall; high-rise residential building; influential factor; multi-stakeholder; prefabrication
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-04-2022-0359
  • Abstract:
    Purpose: The unitized curtain wall system (UCWS), one of the prefabricated technologies, is increasingly attracting attention in the Hong Kong construction industry. However, this innovative technology still lacks on-site implementation in high-rise residential buildings. To promote its development, this study aims at identifying the influential factors of UCWS adoption in Hong Kong's high-rise residential buildings from a multi-stakeholder perspective. Design/methodology/approach: Factors were first selected through an in-depth literature review and a semi-structured interview. Then the factors were validated through a questionnaire survey using Cronbach's Alpha Reliability Test. Next, the factors were ranked regarding their importance using mean-score ranking and standard deviation. Meanwhile, different stakeholders were clustered using an experimental factor analysis (EFA) model to find the shared preferences (namely common factors). Findings: The result shows that reduction of construction time (B1) and insufficient site storage area (C1) are the most important factors. The six stakeholder groups were clustered into two segments. B1 and improved quality control are the shared interests. While C1 and the need of specification change are the common concerns. Originality/value: There are two major breakthroughs in this study. First is the novelty of research objects. UCWS, particularly its application preference in high-rise residential buildings, has rarely been studied, yet it is urgently required. Second is the novel research perspective. The influential factors were studied from a multi-stakeholder perspective. Not only the significant factors for six specific stakeholders but also the shared preference for stakeholder groups was identified. The findings contribute to promoting UCWS more targeted, efficient and comprehensive, as well as demonstrating the collaborative possibilities of multi-stakeholders. © 2022, Emerald Publishing Limited.

Leung, M Y, Ahmed, K and Famakin, I O (2024) Impact of mindfulness-based stress reduction intervention on the performance of construction professionals. Engineering, Construction and Architectural Management, 31(02), 662-80.

Li, C, Zhao, Y and Chen, W F (2024) Effects of commitment-based governance on the relationship between formal control and PPP projects performance: mediating and moderating. Engineering, Construction and Architectural Management, 31(02), 696-715.

Liao, L and Wu, Z (2024) Untangling the relationship between work pressure and emotions in social media: a quantitative empirical study of construction industry. Engineering, Construction and Architectural Management, 31(02), 767-88.

Liu, J, Wang, Z, Tang, J and Song, J (2024) The impact of the institutional environment of the host country on the perception of compliance risk of the international engineering contractor: the moderating effect of absorptive capacity. Engineering, Construction and Architectural Management, 31(02), 716-36.

Ma, T and Liu, Y (2024) Multiple paths to enhancing the resilience of project-based organizations from the perspective of CSR configuration: evidence from the Chinese construction industry. Engineering, Construction and Architectural Management, 31(02), 835-65.

Menches, C L and Chen, J (2013) Using ecological momentary assessment to understand a construction worker's daily disruptions and decisions. Construction Management and Economics, 31(02), 180-94.

Murphy, R (2013) Strategic planning in construction professional service firms: a study of Irish QS practices. Construction Management and Economics, 31(02), 151-66.

Nguyen, M V (2024) Corporate social responsibility performance and its effects on climate for innovation and opportunism: evidence from Vietnamese architectural design firms. Engineering, Construction and Architectural Management, 31(02), 812-34.

Nguyen, T T N, Do, S T, Nguyen, V T and Nguyen, T A (2024) Interrelationships among enabling factors for BIM adoption in construction enterprises. Engineering, Construction and Architectural Management, 31(02), 891-918.

Nor Azazi, N A, Shaed, M M, Samsurijan, M S and Ebekozien, A (2024) The influence of higher learning institutions in developing the experience economy from the perspective of the urban community. Engineering, Construction and Architectural Management, 31(02), 509-25.

Phua, F T T (2013) Construction management research at the individual level of analysis: current status, gaps and future directions. Construction Management and Economics, 31(02), 167-79.

Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(02), 544-70.

Su, L, Cao, Y, Li, H and Zhang, C (2024) Water environment treatment PPP projects optimal payment mechanism based on multi-stage dynamic programming model. Engineering, Construction and Architectural Management, 31(02), 866-90.

Winch, G M (2003) Integrated life-cycle analysis. Building Research & Information, 31(02), 107–18.

Zandee, D, Zutshi, A, Creed, A and Nijhof, A (2024) Aiming for bullseye: a novel gameplan for circular economy in the construction industry. Engineering, Construction and Architectural Management, 31(02), 593-617.

Zhang, N, Hwang, B G, Deng, X and Tay, F (2024) Exploring critical success factors for collaborative contracting implementation in the Singapore construction industry. Engineering, Construction and Architectural Management, 31(02), 919-38.

Zhu, J, Shi, Q, Zhang, C, Yuan, J, Li, Q and Wang, X (2024) Investigating cooperative strategies in low-carbon public–private partnership projects through evolutionary game. Engineering, Construction and Architectural Management, 31(02), 789-811.