ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 34 results ...

Al-Fadhali, N (2024) An AMOS-SEM approach to evaluating stakeholders' influence on construction project delivery performance. Engineering, Construction and Architectural Management, 31(02), 638-61.

Arbulu, R J, Tommelein, I D, Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(02), 161–71.

Azman, M A, Abdul-Samad, Z, Lee, B L, Skitmore, M, Rajendra, D and Chuweni, N N (2024) How technological, environmental and managerial performance contribute to the productivity change of Malaysian construction firms. Engineering, Construction and Architectural Management, 31(02), 618-37.

Bai, L, Kang, S, Zhang, K, Zhang, B and Pan, T (2024) Modeling for external stakeholder risk assessment of project portfolios. Engineering, Construction and Architectural Management, 31(02), 737-66.

Ballard, G (2003) Lean project management. Building Research & Information, 31(02), 119–33.

Barlow, J, Childerhouse, P, Gann, D, Hong-Minh, S, Naim, M and Ozaki, R (2003) Choice and delivery in housebuilding: lessons from Japan for UK housebuilders. Building Research & Information, 31(02), 134–45.

Bygballe, L E, Håkansson, H and Jahre, M (2013) A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(02), 104-18.

Chang, C-Y (2013) A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(02), 99-103.

Courtney, R and Winch, G M (2003) Re-engineering construction: the role of research and implementation. Building Research & Information, 31(02), 172–8.

Danel, T, Lafhaj, Z, Puppala, A, BuHamdan, S, Lienard, S and Richard, P (2024) Identifying tower crane activities with data: the case of the concrete pouring. Engineering, Construction and Architectural Management, 31(02), 939-56.

Deep, S, Gajendran, T, Jefferies, M, Uggina, V S and Patil, S (2024) Influence of subcontractors' “strategic capabilities” on “power”, “dependence” and “collaboration”: an empirical analysis in the context of procurement decisions. Engineering, Construction and Architectural Management, 31(02), 571-92.

Gerth, R, Boqvist, A, Bjelkemyr, M and Lindberg, B (2013) Design for construction: utilizing production experiences in development. Construction Management and Economics, 31(02), 135-50.

Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: client expectations and drivers. Building Research & Information, 31(02), 146–60.

  • Type: Journal Article
  • Keywords: business process re-engineering; clients; clients; pre-assembly; re-engineering construction; system building
  • ISBN/ISSN: 0961-3218
  • URL: http://taylorandfrancis.metapress.com/link.asp?id=kyf1wc0q3cqa6rtg
  • Abstract:
    Pre-assembly is an important facet of the strategy to re-engineer construction. It can be recognized as : modular building, volumetric pre-assembly, non-volumetric pre-assembly and component manufacture/subassembly. This paper presents the results of an interview survey of major construction clients about their expectations fro and drivers for pre-assembly on their projects. In particular, time, cost, quality and productivity benefits through minimization of on-site operations and duration, less congestion on site, improved health and safety along with greater and more predictable quality are identified. To get the best out of pre-assembly, clients acknowledge that they must be able to freeze the design early, provide reasonable lead times and provide time for presite prototyping. Clients' past experience has been mixed, with some citing tangible benefits, but others experiencing poor-quality products and a limited and disjointed supply chain - these mitigate against efforts to increase pre-assembly as part of the re-engineering mantra. Typically, clients accepted that suppliers should be involved early, but in practice many do not re-engineer the process and leave key decisions too late in the process to maximize benefits. More than half wanted to see an increase in the use of pre-assembly on their projects, but the supply chain must refocus to consider the client's perspective and capitalize on this opportunity. Whilst pre-assembly is not new and many have published on the subject, the perspective of clients has not been adequately covered. Pre-assembly may be well understood by manufacturers, contractors and even some designers, but unless the client decision makers understand its benefits and limitations, then their misunderstandings and prejudices will continue to be a barrier to further development.

Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: partnering in-between systems of production, values and interests. Construction Management and Economics, 31(02), 119-34.

Green, S D and May, S (2003) Re-engineering construction: going against the grain. Building Research & Information, 31(02), 97–106.

Kim, S, Makhmalbaf, A and Shahandashti, M (2024) Diagnosing and quantifying post-COVID-19 fluctuations in the architecture billings indices. Engineering, Construction and Architectural Management, 31(02), 681-95.

Kwok, T W, Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for Hong Kong's high-rise residential buildings: a multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(02), 526-43.

Leung, M Y, Ahmed, K and Famakin, I O (2024) Impact of mindfulness-based stress reduction intervention on the performance of construction professionals. Engineering, Construction and Architectural Management, 31(02), 662-80.

Li, C, Zhao, Y and Chen, W F (2024) Effects of commitment-based governance on the relationship between formal control and PPP projects performance: mediating and moderating. Engineering, Construction and Architectural Management, 31(02), 696-715.

Liao, L and Wu, Z (2024) Untangling the relationship between work pressure and emotions in social media: a quantitative empirical study of construction industry. Engineering, Construction and Architectural Management, 31(02), 767-88.

Liu, J, Wang, Z, Tang, J and Song, J (2024) The impact of the institutional environment of the host country on the perception of compliance risk of the international engineering contractor: the moderating effect of absorptive capacity. Engineering, Construction and Architectural Management, 31(02), 716-36.

Ma, T and Liu, Y (2024) Multiple paths to enhancing the resilience of project-based organizations from the perspective of CSR configuration: evidence from the Chinese construction industry. Engineering, Construction and Architectural Management, 31(02), 835-65.

Menches, C L and Chen, J (2013) Using ecological momentary assessment to understand a construction worker's daily disruptions and decisions. Construction Management and Economics, 31(02), 180-94.

Murphy, R (2013) Strategic planning in construction professional service firms: a study of Irish QS practices. Construction Management and Economics, 31(02), 151-66.

Nguyen, M V (2024) Corporate social responsibility performance and its effects on climate for innovation and opportunism: evidence from Vietnamese architectural design firms. Engineering, Construction and Architectural Management, 31(02), 812-34.

Nguyen, T T N, Do, S T, Nguyen, V T and Nguyen, T A (2024) Interrelationships among enabling factors for BIM adoption in construction enterprises. Engineering, Construction and Architectural Management, 31(02), 891-918.

Nor Azazi, N A, Shaed, M M, Samsurijan, M S and Ebekozien, A (2024) The influence of higher learning institutions in developing the experience economy from the perspective of the urban community. Engineering, Construction and Architectural Management, 31(02), 509-25.

Phua, F T T (2013) Construction management research at the individual level of analysis: current status, gaps and future directions. Construction Management and Economics, 31(02), 167-79.

Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(02), 544-70.

Su, L, Cao, Y, Li, H and Zhang, C (2024) Water environment treatment PPP projects optimal payment mechanism based on multi-stage dynamic programming model. Engineering, Construction and Architectural Management, 31(02), 866-90.

Winch, G M (2003) Integrated life-cycle analysis. Building Research & Information, 31(02), 107–18.

Zandee, D, Zutshi, A, Creed, A and Nijhof, A (2024) Aiming for bullseye: a novel gameplan for circular economy in the construction industry. Engineering, Construction and Architectural Management, 31(02), 593-617.

Zhang, N, Hwang, B G, Deng, X and Tay, F (2024) Exploring critical success factors for collaborative contracting implementation in the Singapore construction industry. Engineering, Construction and Architectural Management, 31(02), 919-38.

Zhu, J, Shi, Q, Zhang, C, Yuan, J, Li, Q and Wang, X (2024) Investigating cooperative strategies in low-carbon public–private partnership projects through evolutionary game. Engineering, Construction and Architectural Management, 31(02), 789-811.