Ajmal, M M, Khan, M, Gunasekaran, A and Helo, P T (2022) Managing project scope creep in construction industry. Engineering, Construction and Architectural Management, 29(07), 2786-809.
Alemayehu, S, Nejat, A, Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(07), 2635-64.
Ambekar, S, Roy, D, Hiray, A, Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: a case of construction, real estate, infrastructure and project (CRIP) sectors. Engineering, Construction and Architectural Management, 29(07), 2878-902.
Beh, H J, Rashidi, A, Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(07), 2854-77.
Carrillo, P, Harding, J and Choudhary, A (2011) Knowledge discovery from post-project reviews. Construction Management and Economics, 29(07), 713–23.
Chen, G, Chen, J, Tang, Y, Ning, Y and Li, Q (2022) Collaboration strategy selection in BIM-enabled construction projects: a perspective through typical collaboration profiles. Engineering, Construction and Architectural Management, 29(07), 2689-713.
Choy, C F (2011) Revisiting the ‘Bon curve’. Construction Management and Economics, 29(07), 695–712.
Elbeltagi, E, Hosny, O A, Elhakeem, A, Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(07), 659–70.
- Type: Journal Article
- Keywords: fuzzy logic; horizontal formwork selection; knowledge base
- ISBN/ISSN: 0144-6193
- URL: https://doi.org/10.1080/01446193.2011.590144
- Abstract:
Formwork plays an important role in building construction. The selection of an appropriate formwork system can reduce project cost, improve quality and speed up the construction process. Although the selection of an appropriate formwork system requires years of experience in formwork design, few experienced personnel may be available, especially in small/medium size contracting companies. With the lack of such experts, the costly outsourcing option becomes essential otherwise the selection of a particular formwork system might not be appropriate. A structured approach is developed to help decision makers in small/medium Egyptian construction companies to select the appropriate horizontal formwork system(s) for their projects. This can be achieved by recognizing the project governing factors affecting the selection process. Based on these factors, a knowledge base is developed to facilitate the process. A fuzzy logic system is used to automate the process and overcome ambiguity and uncertainty in the selection process. The system is shown to be useful and accurate in its application to a real-life case. A survey of formwork experts reveals its ease of use. Further research will expand the system to consider vertical formwork selection to ensure full compatibility.
Fatayer, F A, Issa, A Z, Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(07), 2577-98.
Gong, J, Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction projects. Construction Management and Economics, 29(07), 737–51.
Laloui, H, Abdul Majid, N H and Sanusi, A N Z (2022) The impacts of introducing voids combinations on indoor ventilation performance in high-rise residential buildings. Engineering, Construction and Architectural Management, 29(07), 2736-59.
Lee, J G, Lee, H S, Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(07), 2599-614.
Levander, E, Engström, S, Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(07), 753–64.
Meharie, M G, Mengesha, W J, Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(07), 2836-53.
Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(07), 2810-35.
Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(07), 2665-88.
Squicciarini, M and Asikainen, A-L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(07), 671–93.
Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(07), 725–35.
Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: new methodology and old problems. Construction Management and Economics, 29(07), 653–8.
Zhang, Z, Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(07), 2615-34.