Ajmal, M M, Khan, M, Gunasekaran, A and Helo, P T (2022) Managing project scope creep in construction industry. Engineering, Construction and Architectural Management, 29(07), 2786-809.

Alemayehu, S, Nejat, A, Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(07), 2635-64.

Ambekar, S, Roy, D, Hiray, A, Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: a case of construction, real estate, infrastructure and project (CRIP) sectors. Engineering, Construction and Architectural Management, 29(07), 2878-902.

Beh, H J, Rashidi, A, Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(07), 2854-77.

Carrillo, P, Harding, J and Choudhary, A (2011) Knowledge discovery from post-project reviews. Construction Management and Economics, 29(07), 713–23.

  • Type: Journal Article
  • Keywords: knowledge discovery; text mining; project reviews; knowledge
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2011.588953
  • Abstract:
    Many construction companies conduct reviews on project completion to enhance learning and to fulfil quality management procedures. Often these reports are filed away never to be seen again. This means that potentially important knowledge that may assist other project teams is not exploited. In order to ascertain whether useful knowledge can be gleaned from such reports, Knowledge Discovery from Text (KDT) and text mining (TM) are applied. Text mining avoids the need for a manual search through a vast number of reports, potentially of different formats and foci, to seek trends that may be useful for current and future projects. Pilot tests were used to analyse 48 post-project review reports. The reports were first reviewed manually to identify key themes. They were then analysed using text mining software to investigate whether text mining could identify trends and uncover useful knowledge from the reports. Pilot tests succeeded in finding common occurrences across different projects that were previously unknown. Text mining could provide a potential solution and would aid project teams to learn from previous projects. However, a lot of work is currently required before the text mining tests are conducted and the results need to be examined carefully by those with domain knowledge to validate the results obtained.

Chen, G, Chen, J, Tang, Y, Ning, Y and Li, Q (2022) Collaboration strategy selection in BIM-enabled construction projects: a perspective through typical collaboration profiles. Engineering, Construction and Architectural Management, 29(07), 2689-713.

Choy, C F (2011) Revisiting the ‘Bon curve’. Construction Management and Economics, 29(07), 695–712.

Elbeltagi, E, Hosny, O A, Elhakeem, A, Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(07), 659–70.

Fatayer, F A, Issa, A Z, Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(07), 2577-98.

Gong, J, Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction projects. Construction Management and Economics, 29(07), 737–51.

Laloui, H, Abdul Majid, N H and Sanusi, A N Z (2022) The impacts of introducing voids combinations on indoor ventilation performance in high-rise residential buildings. Engineering, Construction and Architectural Management, 29(07), 2736-59.

Lee, J G, Lee, H S, Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(07), 2599-614.

Levander, E, Engström, S, Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(07), 753–64.

Meharie, M G, Mengesha, W J, Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(07), 2836-53.

Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(07), 2810-35.

Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(07), 2665-88.

Squicciarini, M and Asikainen, A-L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(07), 671–93.

Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(07), 725–35.

Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: new methodology and old problems. Construction Management and Economics, 29(07), 653–8.

Zhang, Z, Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(07), 2615-34.