Ajmal, M M, Khan, M, Gunasekaran, A and Helo, P T (2022) Managing project scope creep in construction industry. Engineering, Construction and Architectural Management, 29(07), 2786-809.

Alemayehu, S, Nejat, A, Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(07), 2635-64.

Ambekar, S, Roy, D, Hiray, A, Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: a case of construction, real estate, infrastructure and project (CRIP) sectors. Engineering, Construction and Architectural Management, 29(07), 2878-902.

Beh, H J, Rashidi, A, Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(07), 2854-77.

Carrillo, P, Harding, J and Choudhary, A (2011) Knowledge discovery from post-project reviews. Construction Management and Economics, 29(07), 713–23.

Chen, G, Chen, J, Tang, Y, Ning, Y and Li, Q (2022) Collaboration strategy selection in BIM-enabled construction projects: a perspective through typical collaboration profiles. Engineering, Construction and Architectural Management, 29(07), 2689-713.

Choy, C F (2011) Revisiting the ‘Bon curve’. Construction Management and Economics, 29(07), 695–712.

Elbeltagi, E, Hosny, O A, Elhakeem, A, Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(07), 659–70.

Fatayer, F A, Issa, A Z, Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(07), 2577-98.

Gong, J, Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction projects. Construction Management and Economics, 29(07), 737–51.

Laloui, H, Abdul Majid, N H and Sanusi, A N Z (2022) The impacts of introducing voids combinations on indoor ventilation performance in high-rise residential buildings. Engineering, Construction and Architectural Management, 29(07), 2736-59.

Lee, J G, Lee, H S, Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(07), 2599-614.

Levander, E, Engström, S, Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(07), 753–64.

Meharie, M G, Mengesha, W J, Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(07), 2836-53.

Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(07), 2810-35.

Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(07), 2665-88.

Squicciarini, M and Asikainen, A-L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(07), 671–93.

Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(07), 725–35.

Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: new methodology and old problems. Construction Management and Economics, 29(07), 653–8.

Zhang, Z, Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(07), 2615-34.

  • Type: Journal Article
  • Keywords: construction planning; high-rise modular building; modular integrated construction; multicriteria decision-making; tower crane layout planning
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-03-2021-0192
  • Abstract:

    Purpose: Modular integrated construction (MiC) is the most advanced off-site construction technology. However, the application of MiC for high-rise buildings is still limited and challenging. One critical issue is tower crane layout planning (TCLP) to guarantee safe and efficient multiple crane-lifts for module installation, which, however, has been insufficiently explored. For filling this knowledge gap, this paper aims to systematically explore the critical considerations on TCLP for high-rise MiC to support contractors in determining the optimal crane layout plan. Design/methodology/approach: This study employed a multimethod strategy. First, previous studies on TCLP and critical features of MiC were reviewed to develop a conceptual model of TCLP considerations. Second, expert interviews with 15 construction planners were conducted to identify the critical TCLP considerations for high-rise MiC. Third, a multicase study with three high-rise MiC projects was undertaken to demonstrate and verify the identified considerations. Findings: The paper characterises critical considerations on TCLP as performance criteria and influencing factors and identifies 7 critical performance criteria and 25 influencing factors for high-rise MiC. Specifically, the features of MiC (e.g. various modularised layout design, heavyweight and large size of modules) were found to significantly affect the crane layout performance (i.e. technical feasibility, safety and economic efficiency). Originality/value: The paper is the first-of-its-kind study on crane layout planning for high-rise modular buildings, which contributes a two-stage multicriteria decision-making framework integrated with systematic TCLP considerations. The findings should help contractors determine safe and efficient tower crane layout plans for high-rise MiC projects.