Ajmal, M M, Khan, M, Gunasekaran, A and Helo, P T (2022) Managing project scope creep in construction industry. Engineering, Construction and Architectural Management, 29(07), 2786-809.
Alemayehu, S, Nejat, A, Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(07), 2635-64.
Ambekar, S, Roy, D, Hiray, A, Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: a case of construction, real estate, infrastructure and project (CRIP) sectors. Engineering, Construction and Architectural Management, 29(07), 2878-902.
Beh, H J, Rashidi, A, Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(07), 2854-77.
Carrillo, P, Harding, J and Choudhary, A (2011) Knowledge discovery from post-project reviews. Construction Management and Economics, 29(07), 713–23.
Chen, G, Chen, J, Tang, Y, Ning, Y and Li, Q (2022) Collaboration strategy selection in BIM-enabled construction projects: a perspective through typical collaboration profiles. Engineering, Construction and Architectural Management, 29(07), 2689-713.
Choy, C F (2011) Revisiting the ‘Bon curve’. Construction Management and Economics, 29(07), 695–712.
Elbeltagi, E, Hosny, O A, Elhakeem, A, Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(07), 659–70.
Fatayer, F A, Issa, A Z, Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(07), 2577-98.
Gong, J, Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction projects. Construction Management and Economics, 29(07), 737–51.
Laloui, H, Abdul Majid, N H and Sanusi, A N Z (2022) The impacts of introducing voids combinations on indoor ventilation performance in high-rise residential buildings. Engineering, Construction and Architectural Management, 29(07), 2736-59.
Lee, J G, Lee, H S, Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(07), 2599-614.
Levander, E, Engström, S, Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(07), 753–64.
Meharie, M G, Mengesha, W J, Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(07), 2836-53.
Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(07), 2810-35.
- Type: Journal Article
- Keywords: model; optimization; results-based-finance; sanitation; uml; work packages
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-10-2019-0556
- Abstract:
Purpose: In many developing countries, the sanitation sector constitutes a major part of their strategic plans of reform. Yet with the very limited budget of the public treasury, countries opt to major lending institutions for funds. “Results-Based-Finance” is a new funding mechanism that has proven its efficiency in achieving the necessary reform in sanitation sectors. Due to the complexity of the funding tool, it is crucial to be able to decompose the project into smaller packages to be able to effectively control the project. The objective of this paper is to reach an optimum packaging scheme that enables the project to be successfully managed through better planning and cost control practices. Design/methodology/approach: With the aid of Unified Modelling Language (UML), an algorithm is developed to map the logic behind the model suggested with detailed illustrations of its different modules. Object-oriented processes and operations are modeled using different diagrams of the language, which automatically generate the optimum packaging combination. The packaging model is then implemented via a number of computer-aided programs. The Microsoft Excel 2019 is used for calculation purposes. Visual Basic for Applications (VBA) programming language is used to make the model user-friendly for non-engineering stakeholders. The Palisade’s Decision Tools Suite is used for the optimization process Findings: The model is validated through a case study of a mega sanitation project located in Egypt. The model output is not only the content of the packages but also a complete managing plan which demonstrates many useful information to the decision-makers and government officials. Originality/value: The research aim is to provide the construction industry with a tool that makes the packaging process of mega projects funded through the “Results-Based-Finance” mechanism, done in an automated manner. Moreover, the packages are selected in a way to optimize the project cashflow. Having the optimum package size shall ensure better planning and a more accurate cost control. Yet it is a challenging task; especially, when the project cash flow is very sensitive and intolerant to delays like in the “Results-Based-Finance” mechanism.
Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(07), 2665-88.
Squicciarini, M and Asikainen, A-L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(07), 671–93.
Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(07), 725–35.
Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: new methodology and old problems. Construction Management and Economics, 29(07), 653–8.
Zhang, Z, Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(07), 2615-34.