Ajmal, M M, Khan, M, Gunasekaran, A and Helo, P T (2022) Managing project scope creep in construction industry. Engineering, Construction and Architectural Management, 29(07), 2786-809.

Alemayehu, S, Nejat, A, Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(07), 2635-64.

Ambekar, S, Roy, D, Hiray, A, Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: a case of construction, real estate, infrastructure and project (CRIP) sectors. Engineering, Construction and Architectural Management, 29(07), 2878-902.

Beh, H J, Rashidi, A, Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(07), 2854-77.

Carrillo, P, Harding, J and Choudhary, A (2011) Knowledge discovery from post-project reviews. Construction Management and Economics, 29(07), 713–23.

Chen, G, Chen, J, Tang, Y, Ning, Y and Li, Q (2022) Collaboration strategy selection in BIM-enabled construction projects: a perspective through typical collaboration profiles. Engineering, Construction and Architectural Management, 29(07), 2689-713.

Choy, C F (2011) Revisiting the ‘Bon curve’. Construction Management and Economics, 29(07), 695–712.

Elbeltagi, E, Hosny, O A, Elhakeem, A, Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(07), 659–70.

Fatayer, F A, Issa, A Z, Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(07), 2577-98.

  • Type: Journal Article
  • Keywords: construction management; contract requirements; contractor failure; questionnaire survey
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-01-2021-0083
  • Abstract:

    Purpose: Construction contractors in Palestine, as in many other developing countries, suffer from many problems. One of their main problems is their inability to meet contractual requirements, such as completing projects within time, at the agreed cost and to the desired quality. Therefore, this paper aims to investigate the causes of the non-fulfillment of contractual requirements in three different types of projects: building, road and electro-mechanical projects. Design/methodology/approach: Two methods were adopted to collect the data – qualitative and quantitative. In total, 65 causes were identified from the literature and qualitative semi-structured interviews with professional experts. These causes were classified into five categories: managerial, financial, contractor capabilities, regulations and laws and political. In the quantitative approach, a questionnaire was developed and then distributed to 50 professional experts: 20 building experts, 15 road experts and 15 experts in electro-mechanical projects. A five-point Likert scale was used to assess the importance, from the perspective of the subject matter experts, of the causes that had been identified. About 35 responses, which represent a combined response rate of 70%, were received. The quantitative data were analyzed using descriptive statistics, with the mean, standard deviation and degree of importance for each of the identified causes being determined, and the SPSS software platform used to rank them. Findings: The results reveal that the most important reasons why contractors did not fulfill their contractual requirements in building projects were that contracts were awarded to the contractor offering the lowest price, and the profit margin was low because of intense competition among contractors. In road projects, the most important causes were the poor estimation of the equipment required and a lack of standardized conditions in the construction sector, while in electro-mechanical projects, the most important causes were the inability of the contractor to estimate the cost of the project accurately because of unclear bid documents and a lack of contractor capital. Originality/value: The results of this study will be useful to stakeholders and Palestinian contractor unions. They can be disseminated to give guidance so that contractors can avoid these problems in future construction projects and enhance their compliance with contractual requirements. Moreover, knowing about these causes may lead to the reduction of conflicts and disputes between contractual parties (owners and contractors), which in turn will be reflected in the work quality and reputation of contractors.

Gong, J, Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction projects. Construction Management and Economics, 29(07), 737–51.

Laloui, H, Abdul Majid, N H and Sanusi, A N Z (2022) The impacts of introducing voids combinations on indoor ventilation performance in high-rise residential buildings. Engineering, Construction and Architectural Management, 29(07), 2736-59.

Lee, J G, Lee, H S, Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(07), 2599-614.

Levander, E, Engström, S, Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(07), 753–64.

Meharie, M G, Mengesha, W J, Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(07), 2836-53.

Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(07), 2810-35.

Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(07), 2665-88.

Squicciarini, M and Asikainen, A-L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(07), 671–93.

Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(07), 725–35.

Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: new methodology and old problems. Construction Management and Economics, 29(07), 653–8.

Zhang, Z, Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(07), 2615-34.