ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 20 results ...

Ajmal, M M, Khan, M, Gunasekaran, A and Helo, P T (2022) Managing project scope creep in construction industry. Engineering, Construction and Architectural Management, 29(07), 2786-809.

Alemayehu, S, Nejat, A, Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(07), 2635-64.

Ambekar, S, Roy, D, Hiray, A, Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: a case of construction, real estate, infrastructure and project (CRIP) sectors. Engineering, Construction and Architectural Management, 29(07), 2878-902.

Beh, H J, Rashidi, A, Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(07), 2854-77.

Carrillo, P, Harding, J and Choudhary, A (2011) Knowledge discovery from post-project reviews. Construction Management and Economics, 29(07), 713–23.

Chen, G, Chen, J, Tang, Y, Ning, Y and Li, Q (2022) Collaboration strategy selection in BIM-enabled construction projects: a perspective through typical collaboration profiles. Engineering, Construction and Architectural Management, 29(07), 2689-713.

  • Type: Journal Article
  • Keywords: BIM-enabled construction projects (becps); collaboration profiles; collaboration strategies; latent profile analysis (lpa); project-based collaboration
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-01-2021-0004
  • Abstract:

    Purpose: Collaboration is essential to BIM-enabled construction projects (BECPs). To facilitate collaboration, various strategies have been proposed. Usually, project team adopts single collaboration strategy for convenience. However, BIM-based collaboration is rather dynamic and exposed to a lot of barriers and risks, which easily changes collaboration conditions among partners. Therefore, better understanding of collaboration conditions in BECPs is crucial to develop flexible and suitable strategies. To fill in the gap, this study intends to identify typical collaboration profiles in BECPs and develop a profile-oriented strategy selection framework. Design/methodology/approach: This study establishes a six-dimensional collaborative behavior matric based on a comprehensive literature review to profile collaboration. Then a questionnaire survey is conducted to collect the collaboration data from 162 BECPs in China. Finally, latent profile analysis (LPA) is utilized to identify the typical collaboration profiles in BECPs. Findings: Through LPA, four profiles are identified, including restricted collaboration profile, smarmy collaboration profile, intuitive collaboration profile, and modest collaboration profile. A profile-oriented strategy selection framework is also established to match strategies with collaboration profiles. Two major categories of strategies are proposed to promote these collaboration profiles including trust building and elevating strategies and collaborative behaviors facilitating strategies. Research limitations/implications: These identified profiles can provide an insightful understanding on the diversified collaboration conditions in BECPs. Practical implications: The profile-oriented strategy selection framework will help managers develop strategies flexibly to promote collaboration in BECPs. Originality/value: This study validates four typical collaboration profiles in BECPs. Moreover, a profile-oriented strategy selection framework is also established for collaboration facilitation in BECPs.

Choy, C F (2011) Revisiting the ‘Bon curve’. Construction Management and Economics, 29(07), 695–712.

Elbeltagi, E, Hosny, O A, Elhakeem, A, Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(07), 659–70.

Fatayer, F A, Issa, A Z, Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(07), 2577-98.

Gong, J, Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction projects. Construction Management and Economics, 29(07), 737–51.

Laloui, H, Abdul Majid, N H and Sanusi, A N Z (2022) The impacts of introducing voids combinations on indoor ventilation performance in high-rise residential buildings. Engineering, Construction and Architectural Management, 29(07), 2736-59.

Lee, J G, Lee, H S, Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(07), 2599-614.

Levander, E, Engström, S, Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(07), 753–64.

Meharie, M G, Mengesha, W J, Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(07), 2836-53.

Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(07), 2810-35.

Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(07), 2665-88.

Squicciarini, M and Asikainen, A-L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(07), 671–93.

Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(07), 725–35.

Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: new methodology and old problems. Construction Management and Economics, 29(07), 653–8.

Zhang, Z, Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(07), 2615-34.