ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 20 results ...

Ajmal, M M, Khan, M, Gunasekaran, A and Helo, P T (2022) Managing project scope creep in construction industry. Engineering, Construction and Architectural Management, 29(07), 2786-809.

Alemayehu, S, Nejat, A, Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(07), 2635-64.

Ambekar, S, Roy, D, Hiray, A, Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: a case of construction, real estate, infrastructure and project (CRIP) sectors. Engineering, Construction and Architectural Management, 29(07), 2878-902.

  • Type: Journal Article
  • Keywords: barriers; crip sectors; interpretive structural modelling; micmac analysis; reverse logistics
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-02-2021-0112
  • Abstract:

    Purpose: This study attempts to identify and analyse the barriers to implementing a reverse logistics (RL) system in Indian Construction, Real estate, Infrastructure and Project (CRIP) sectors and present a structured model to identify interdependencies among them. Design/methodology/approach: The barriers to implementing RL in CRIP sectors in India were identified using a Delphi study. The interdependencies were identified using Interpretive Structural Modeling (ISM). Further, using the Matriced’ Impacts Croisés Multiplication Appliquée à un Classement (MICMAC) analysis, the barriers were classified on the basis of their driving power and interdependencies. Findings: The study has identified ten barriers that can hamper the application of an RL system in CRIP sectors. The finding of the ISM model shows that macro level barriers such as lack of awareness of reverse logistics, insufficient government policies and unavailability of standard codes stimulate each other and also drive all other barriers. The organization-specific barriers operating at the strategic/tactical level, namely, company’s rigid mechanism, lack of awareness of economic profits, inadequate company’s organizational policies and lack of training, reluctance from stakeholders, scarcity of resources and finance from company are found at the intermediate level of hierarchy and they can be influenced by the barriers at the lower level and influence the barriers on the and higher levels. The operational level barrier namely “Inadequate Information Technology system” is at the top of the hierarchy and can be driven by all the barriers at the lower level. Research limitations/implications: The present findings are based on the opinions of experts only from Indian CRIP sectors so the results may require to be validated in other contexts. Practical implications: The structural model presenting the interdependencies will be a guide for the CRIP supply chain professionals in understanding and ranking the barriers they may face while implementing the RL system. Originality/value: The study contributes to the existing literature by providing a set of barriers and their interdependencies faced during the implementation of an RL system implementation in CRIP sectors. It is one of the first studies which identifies barriers applicable to the CRIP firms in India and models their inter-dependencies. Additionally Consequently, these firms can make a move forward towards a circular economy by overcoming these interlinked barriers.

Beh, H J, Rashidi, A, Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(07), 2854-77.

Carrillo, P, Harding, J and Choudhary, A (2011) Knowledge discovery from post-project reviews. Construction Management and Economics, 29(07), 713–23.

Chen, G, Chen, J, Tang, Y, Ning, Y and Li, Q (2022) Collaboration strategy selection in BIM-enabled construction projects: a perspective through typical collaboration profiles. Engineering, Construction and Architectural Management, 29(07), 2689-713.

Choy, C F (2011) Revisiting the ‘Bon curve’. Construction Management and Economics, 29(07), 695–712.

Elbeltagi, E, Hosny, O A, Elhakeem, A, Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(07), 659–70.

Fatayer, F A, Issa, A Z, Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(07), 2577-98.

Gong, J, Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction projects. Construction Management and Economics, 29(07), 737–51.

Laloui, H, Abdul Majid, N H and Sanusi, A N Z (2022) The impacts of introducing voids combinations on indoor ventilation performance in high-rise residential buildings. Engineering, Construction and Architectural Management, 29(07), 2736-59.

Lee, J G, Lee, H S, Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(07), 2599-614.

Levander, E, Engström, S, Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(07), 753–64.

Meharie, M G, Mengesha, W J, Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(07), 2836-53.

Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(07), 2810-35.

Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(07), 2665-88.

Squicciarini, M and Asikainen, A-L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(07), 671–93.

Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(07), 725–35.

Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: new methodology and old problems. Construction Management and Economics, 29(07), 653–8.

Zhang, Z, Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(07), 2615-34.