Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Abdel-Wahab, M and Vogl, B (2011) Trends of productivity growth in the construction industry across Europe, US and Japan. Construction Management and Economics, 29(06), 635–44.

Bajjou, M S and Chafi, A (2022) Exploring the critical waste factors affecting construction projects. Engineering, Construction and Architectural Management, 29(06), 2268-99.

Camilleri, M, Jaques, R and Isaacs, N (2001) Impacts of climate change on building performance in New Zealand. Building Research & Information, 29(06), 430–50.

Chi, C S F and Nicole Javernick‐Will, A (2011) Institutional effects on project arrangement: high‐speed rail projects in China and Taiwan. Construction Management and Economics, 29(06), 595–611.

Edwards, D J (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(06), 417–27.

Ekanayake, E M A C, Shen, G, Kumaraswamy, M and Owusu, E K (2022) A fuzzy synthetic evaluation of vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 29(06), 2358-81.

Gambatese, J A and Hallowell, M (2011) Enabling and measuring innovation in the construction industry. Construction Management and Economics, 29(06), 553–67.

Gidigah, B K, Agyekum, K and Baiden, B K (2022) Defining social value in the public procurement process for works. Engineering, Construction and Architectural Management, 29(06), 2245-67.

Gundes, S (2011) Input structure of the construction industry: a cross‐country analysis, 1968–90. Construction Management and Economics, 29(06), 613–21.

Hartono, B and Yap, C M (2011) Understanding risky bidding: a prospect‐contingent perspective. Construction Management and Economics, 29(06), 579–93.

Mohamed, E, Jafari, P and Hammad, A (2022) Mixed qualitative–quantitative approach for bidding decisions in construction. Engineering, Construction and Architectural Management, 29(06), 2328-57.

Murray, B and Smyth, H (2011) Franchising in the US remodelling market: growth opportunities and barriers faced by general contractors. Construction Management and Economics, 29(06), 623–34.

Musarat, M A, Alaloul, W S and Liew, M S (2022) Inflation rate and labours’ wages in construction projects: economic relation investigation. Engineering, Construction and Architectural Management, 29(06), 2461-94.

Navandar, Y V, Bari, C and Gaikwad, P G (2022) Failure factors–a comparative study of private and government construction firms. Engineering, Construction and Architectural Management, 29(06), 2495-513.

Rezakhani, P (2022) Project scheduling and performance prediction: a fuzzy-Bayesian network approach. Engineering, Construction and Architectural Management, 29(06), 2233-44.

Scheublin, F J M (2001) Project alliance contract in The Netherlands. Building Research & Information, 29(06), 451–5.

Shouman, B, Othman, A A E and Marzouk, M (2022) Enhancing users involvement in architectural design using mobile augmented reality. Engineering, Construction and Architectural Management, 29(06), 2514-34.

  • Type: Journal Article
  • Keywords: facilities design; interactive design projects; mobile augmented reality; user involvement
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-02-2021-0124
  • Abstract:

    Purpose: Mobile augmented reality (MAR) is one of the advanced three-dimensional (3D) representation tools that has been recently utilized in the construction industry. This paper aims to assess a user’s involvement levels through MAR application that has been experimented against traditional involvement techniques through an existing facility, plan re-designing scenario. Design/methodology/approach: Through reviewing related literature studies in the MAR field, an application has been developed that can superimpose real design alternatives on paper-based markers, allowing for flexible wall positioning, interior and exterior wall material application. As such, an enhanced user involvement experience is created. To measure user involvement levels, the application is experimented with 33 participants having the British University in Egypt’s library building as a case study, followed by survey questionnaires to gather and evaluate user responses. Findings: The results of the analyzed data using SPSS indicated that MAR showed a positive impact on enhancing user involvement and better understanding of design projects. It also allowed users to produce different design alternatives in comparison to the traditional involvement approaches where users showed low design interaction and understanding. Originality/value: The interactive features of the proposed application facilitate implementing ideas in design of construction projects that require user involvement.

Taher, A, Vahdatikhaki, F and Hammad, A (2022) Formalizing knowledge representation in earthwork operations through development of domain ontology. Engineering, Construction and Architectural Management, 29(06), 2382-414.

van Manen, M, olde Scholtenhuis, L and Voordijk, H (2022) Empirically validating five propositions regarding 3D visualizations for subsurface utility projects. Engineering, Construction and Architectural Management, 29(06), 2535-53.

Wang, K, Ke, Y, Liu, T and Sankaran, S (2022) Social sustainability in Public–Private Partnership projects: case study of the Northern Beaches Hospital in Sydney. Engineering, Construction and Architectural Management, 29(06), 2437-60.

Wang, Z, Xie, W and Liu, J (2022) Regional differences and driving factors of construction and demolition waste generation in China. Engineering, Construction and Architectural Management, 29(06), 2300-27.

Westberg, K, Noren, J and Kus, H (2001) On using available environmental data in service life estimates. Building Research & Information, 29(06), 428–39.

Yap, J B H, Skitmore, M, Lim, Y W, Loo, S C and Gray, J (2022) Assessing the expected current and future competencies of quantity surveyors in the Malaysian built environment. Engineering, Construction and Architectural Management, 29(06), 2415-36.

Zhang, H, Xing, F and Liu, J (2011) Rehabilitation decision-making for buildings in the Wenchuan area. Construction Management and Economics, 29(06), 569–78.