Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Abdel-Wahab, M and Vogl, B (2011) Trends of productivity growth in the construction industry across Europe, US and Japan. Construction Management and Economics, 29(06), 635–44.

Bajjou, M S and Chafi, A (2022) Exploring the critical waste factors affecting construction projects. Engineering, Construction and Architectural Management, 29(06), 2268-99.

Camilleri, M, Jaques, R and Isaacs, N (2001) Impacts of climate change on building performance in New Zealand. Building Research & Information, 29(06), 430–50.

Chi, C S F and Nicole Javernick‐Will, A (2011) Institutional effects on project arrangement: high‐speed rail projects in China and Taiwan. Construction Management and Economics, 29(06), 595–611.

Edwards, D J (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(06), 417–27.

Ekanayake, E M A C, Shen, G, Kumaraswamy, M and Owusu, E K (2022) A fuzzy synthetic evaluation of vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 29(06), 2358-81.

Gambatese, J A and Hallowell, M (2011) Enabling and measuring innovation in the construction industry. Construction Management and Economics, 29(06), 553–67.

Gidigah, B K, Agyekum, K and Baiden, B K (2022) Defining social value in the public procurement process for works. Engineering, Construction and Architectural Management, 29(06), 2245-67.

Gundes, S (2011) Input structure of the construction industry: a cross‐country analysis, 1968–90. Construction Management and Economics, 29(06), 613–21.

Hartono, B and Yap, C M (2011) Understanding risky bidding: a prospect‐contingent perspective. Construction Management and Economics, 29(06), 579–93.

Mohamed, E, Jafari, P and Hammad, A (2022) Mixed qualitative–quantitative approach for bidding decisions in construction. Engineering, Construction and Architectural Management, 29(06), 2328-57.

Murray, B and Smyth, H (2011) Franchising in the US remodelling market: growth opportunities and barriers faced by general contractors. Construction Management and Economics, 29(06), 623–34.

Musarat, M A, Alaloul, W S and Liew, M S (2022) Inflation rate and labours’ wages in construction projects: economic relation investigation. Engineering, Construction and Architectural Management, 29(06), 2461-94.

  • Type: Journal Article
  • Keywords: construction industry; economy; gdp; inflation rate; labour wages; spearman correlation
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-07-2020-0478
  • Abstract:

    Purpose: Labours are one of the key resources of construction projects having a significant impact on economic development. With time, the construction industry is getting a boom due to numerous construction projects in which labours’ contribution is significant. Project betterment is associated with the project productivity which relates to the labours. Wages play a vital role in retaining labours in the construction industry. Design/methodology/approach: This study focuses on investigating the increasing and decreasing behaviour of labour wages in the construction industry and observing the impact of the inflation rate in deviating labour wages. Initially, the percentage deviation was calculated to observe the changing behaviour of the data and then the Spearman correlation test was used to find the relationship between the inflation rate and the labour wages. Findings: It is evident that even with a good economy and a stable construction sector, still, the labour wages faced a decline over time, which is a matter of concern. Also, based on the correlation coefficient, it was revealed that several labour wages categories are moderately and strongly correlated with the inflation rate and can impact project cost if the inflation rate is not considered while finalizing the budget. Besides that, the changing behaviour of labour wages due to the inflation rate impacts significantly on gross domestic product (GDP); therefore, it requires vital attention. Originality/value: Changes in labour wages are not considered in budget estimation which drag the project towards cost overrun. This study brings the attention of the stakeholders on the issue with experimental justification. Also, how the inflation rate is affecting the labour wages has also been addressed.

Navandar, Y V, Bari, C and Gaikwad, P G (2022) Failure factors–a comparative study of private and government construction firms. Engineering, Construction and Architectural Management, 29(06), 2495-513.

Rezakhani, P (2022) Project scheduling and performance prediction: a fuzzy-Bayesian network approach. Engineering, Construction and Architectural Management, 29(06), 2233-44.

Scheublin, F J M (2001) Project alliance contract in The Netherlands. Building Research & Information, 29(06), 451–5.

Shouman, B, Othman, A A E and Marzouk, M (2022) Enhancing users involvement in architectural design using mobile augmented reality. Engineering, Construction and Architectural Management, 29(06), 2514-34.

Taher, A, Vahdatikhaki, F and Hammad, A (2022) Formalizing knowledge representation in earthwork operations through development of domain ontology. Engineering, Construction and Architectural Management, 29(06), 2382-414.

van Manen, M, olde Scholtenhuis, L and Voordijk, H (2022) Empirically validating five propositions regarding 3D visualizations for subsurface utility projects. Engineering, Construction and Architectural Management, 29(06), 2535-53.

Wang, K, Ke, Y, Liu, T and Sankaran, S (2022) Social sustainability in Public–Private Partnership projects: case study of the Northern Beaches Hospital in Sydney. Engineering, Construction and Architectural Management, 29(06), 2437-60.

Wang, Z, Xie, W and Liu, J (2022) Regional differences and driving factors of construction and demolition waste generation in China. Engineering, Construction and Architectural Management, 29(06), 2300-27.

Westberg, K, Noren, J and Kus, H (2001) On using available environmental data in service life estimates. Building Research & Information, 29(06), 428–39.

Yap, J B H, Skitmore, M, Lim, Y W, Loo, S C and Gray, J (2022) Assessing the expected current and future competencies of quantity surveyors in the Malaysian built environment. Engineering, Construction and Architectural Management, 29(06), 2415-36.

Zhang, H, Xing, F and Liu, J (2011) Rehabilitation decision-making for buildings in the Wenchuan area. Construction Management and Economics, 29(06), 569–78.