Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 34 results ...

Akin, S, Ergun, O, Surer, E and Gursel Dino, I (2021) An immersive performative architectural design tool with daylighting simulations: a building information modeling-based approach. Engineering, Construction and Architectural Management, 28(04), 1319-44.

Aldossari, K M, Lines, B C, Smithwick, J B, Hurtado, K C and Sullivan, K T (2021) Best practices of organizational change for adopting alternative project delivery methods in the AEC industry. Engineering, Construction and Architectural Management, 28(04), 1060-82.

Azman, M A, Hon, C K H, Xia, B, Lee, B L and Skitmore, M (2021) Product diversification and large construction firm productivity: the effect of institutional environments in Malaysia. Engineering, Construction and Architectural Management, 28(04), 994-1013.

Cattell, D W, Bowen, P A and Kaka, A P (2010) The risks of unbalanced bidding. Construction Management and Economics, 28(04), 333–44.

Chen, Q, Hall, D M, Adey, B T and Haas, C T (2021) Identifying enablers for coordination across construction supply chain processes: a systematic literature review. Engineering, Construction and Architectural Management, 28(04), 1083-113.

Crosthwaite, D (2000) The international performance of British construction companies 1990-1996. Building Research & Information, 28(04), 280–90.

Cui, Q, Hastak, M and Halpin, D (2010) Systems analysis of project cash flow management strategies. Construction Management and Economics, 28(04), 361–76.

Dainty, A R J, Bagilhole, B M and Neale, R H (2000) Computer aided analysis of qualitative data in construction management research. Building Research & Information, 28(04), 226–33.

Dulaimi, M F, Alhashemi, M, Ling, F Y Y and Kumaraswamy, M (2010) The execution of public-private partnership projects in the UAE. Construction Management and Economics, 28(04), 393–402.

Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(04), 1241-60.

Elghaish, F, Abrishami, S, Hosseini, M R and Abu-Samra, S (2021) Revolutionising cost structure for integrated project delivery: a BIM-based solution. Engineering, Construction and Architectural Management, 28(04), 1214-40.

Gage, S A and Graham, J M R (2000) Static split duct roof ventilators. Building Research & Information, 28(04), 234–44.

Galbraith, G H, Guo, J S and McLean, R C (2000) The effect of temperature on the moisture permeability of building materials. Building Research & Information, 28(04), 245–59.

Hallowell, M (2010) Safety risk perception in construction companies in the Pacific Northwest of the USA. Construction Management and Economics, 28(04), 403–13.

Hammond, S F, Gajendran, T, Savage, D A and Maund, K (2021) Unpacking the problems behind the limited green construction adoption: towards a theoretical model. Engineering, Construction and Architectural Management, 28(04), 833-44.

Kalach, M, Abdul-Malak, M A and Srour, I (2021) Design information release under alternative design-construction modes. Engineering, Construction and Architectural Management, 28(04), 969-93.

Kern, A P, Postay, R, Schneck, E R, Mancio, M, González, M A S and Guerra, G (2021) Cost and environmental impacts reduction through building compactness. Engineering, Construction and Architectural Management, 28(04), 1176-95.

Kim, S Y, Nguyen, M V and Dao, T T N (2021) Prioritizing complexity using fuzzy DANP: case study of international development projects. Engineering, Construction and Architectural Management, 28(04), 1114-33.

Kumar, R, Iyer, K C and Singh, S P (2021) Understanding relationship between risks and claims for assessing risks with project data. Engineering, Construction and Architectural Management, 28(04), 1014-37.

Lai, I K W and Lam, F K S (2010) Perception of various performance criteria by stakeholders in the construction sector in Hong Kong. Construction Management and Economics, 28(04), 377–91.

Lai, J H K (2010) Operation and maintenance budgeting for commercial buildings in Hong Kong. Construction Management and Economics, 28(04), 415–27.

Laryea, S and Watermeyer, R (2021) Structuring architectural competitions as a competitive procurement process. Engineering, Construction and Architectural Management, 28(04), 886-907.

Li, C Q (2000) A method for reliability-based economic design of building structures. Building Research & Information, 28(04), 260–7.

Liu, F, Wang, Y, Li, H and Zhou, X (2021) Influence of cooperative period of municipal PPPs on transaction cost – a case study. Engineering, Construction and Architectural Management, 28(04), 1261-77.

Lyu, S, Hon, C K H, Chan, A P C, Javed, A A, Zhang, R P and Wong, F K W (2021) An exploratory study of safety communication networks of ethnic minority crews in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 28(04), 1156-75.

Newaz, M T, Jefferies, M, Davis, P R and Pillay, M (2021) Managerial implications for construction practices as a consequence of using a psychological contract of safety. Engineering, Construction and Architectural Management, 28(04), 1134-55.

Nicholas, J, Holt, G D and Harris, P T (2000) Suppliers' debt collection and contractor creditworthiness evaluation. Building Research & Information, 28(04), 268–79.

Ofori-Boadu, A N, Owusu-Manu, D G, Edwards, D J and Asiseh, F (2021) A conceptual model of subcontractor development practices for LEED projects. Engineering, Construction and Architectural Management, 28(04), 1196-213.

Raisbeck, P, Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(04), 345–59.

Suresh, S, Renukappa, S, Abdul-Aziz, A R, Paloo, Y and Jallow, H (2021) Developments in the UK road transport from a smart cities perspective. Engineering, Construction and Architectural Management, 28(04), 845-62.

Udawatta, N, Zuo, J, Chiveralls, K and Zillante, G (2021) From green buildings to living buildings? Rating schemes and waste management practices in Australian educational buildings. Engineering, Construction and Architectural Management, 28(04), 1278-94.

  • Type: Journal Article
  • Keywords: Australia; building rating tools; green buildings; waste generation; waste management
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-03-2019-0177
  • Abstract:

    Purpose: There is an increasing level of recognition of the pressing issues associated with climate change and resource depletion. As a result, it is well recognised that higher education institutions bear responsibilities to promote “sustainable development”. Many universities have adopted green building practices in the construction of their building infrastructure. A variety of Green Building Rating Tools (GBRTs) have been designed to facilitate green building developments. Thus, the aim of this research is to identify mechanisms to improve current GBRTs in terms of waste management (WM) practices by using green star accredited educational buildings in Australia. Design/methodology/approach: A qualitative approach was adopted in this study to achieve the research aim by conducting three case studies of educational buildings in South Australia. Thirty three interviews were carried out in a face-to-face, semi-structured manner and project documentations were reviewed. The participants were asked to provide their expert opinions on the GS initiative and its ability to minimise waste generation, the impact of the GS initiative on solid WM practices and problems associated with the implementation process of the GS initiative. Data was analysed using code-based content analysis using the NVivo software package. Tables and figures were used as the visualization technique to present an expedient understanding in a holistic manner. Findings: Findings showed that the Green Star (GS) initiative drives change in the way current practices are performed in the Australian construction industry. However, this study revealed that WM targets outlined in the GS initiative are not challenging enough. Thus, suggestions are provided in this research to improve the WM aspects of GS initiatives by looking beyond a focus on “sustainability” and “waste minimisation” towards a focus on regenerative environments. Originality/value: These findings are valuable for practitioners and policymakers seeking to improve WM practices and to address issues associated with climate change and resource depletion.

Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(04), 1295-318.

Wang, D, Wang, X, Liu, M, Liu, H and Liu, B (2021) Managing public–private partnerships: a transmission pattern of underlying dynamics determining project performance. Engineering, Construction and Architectural Management, 28(04), 1038-59.

Zhan, W, Pan, W and Chen, L (2021) Construction project productivity evaluation framework with expanded system boundaries. Engineering, Construction and Architectural Management, 28(04), 863-85.