Akin, S, Ergun, O, Surer, E and Gursel Dino, I (2021) An immersive performative architectural design tool with daylighting simulations: a building information modeling-based approach. Engineering, Construction and Architectural Management, 28(04), 1319-44.
Aldossari, K M, Lines, B C, Smithwick, J B, Hurtado, K C and Sullivan, K T (2021) Best practices of organizational change for adopting alternative project delivery methods in the AEC industry. Engineering, Construction and Architectural Management, 28(04), 1060-82.
Azman, M A, Hon, C K H, Xia, B, Lee, B L and Skitmore, M (2021) Product diversification and large construction firm productivity: the effect of institutional environments in Malaysia. Engineering, Construction and Architectural Management, 28(04), 994-1013.
Cattell, D W, Bowen, P A and Kaka, A P (2010) The risks of unbalanced bidding. Construction Management and Economics, 28(04), 333–44.
Chen, Q, Hall, D M, Adey, B T and Haas, C T (2021) Identifying enablers for coordination across construction supply chain processes: a systematic literature review. Engineering, Construction and Architectural Management, 28(04), 1083-113.
Crosthwaite, D (2000) The international performance of British construction companies 1990-1996. Building Research & Information, 28(04), 280–90.
Cui, Q, Hastak, M and Halpin, D (2010) Systems analysis of project cash flow management strategies. Construction Management and Economics, 28(04), 361–76.
Dainty, A R J, Bagilhole, B M and Neale, R H (2000) Computer aided analysis of qualitative data in construction management research. Building Research & Information, 28(04), 226–33.
Dulaimi, M F, Alhashemi, M, Ling, F Y Y and Kumaraswamy, M (2010) The execution of public-private partnership projects in the UAE. Construction Management and Economics, 28(04), 393–402.
Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(04), 1241-60.
Elghaish, F, Abrishami, S, Hosseini, M R and Abu-Samra, S (2021) Revolutionising cost structure for integrated project delivery: a BIM-based solution. Engineering, Construction and Architectural Management, 28(04), 1214-40.
Gage, S A and Graham, J M R (2000) Static split duct roof ventilators. Building Research & Information, 28(04), 234–44.
Galbraith, G H, Guo, J S and McLean, R C (2000) The effect of temperature on the moisture permeability of building materials. Building Research & Information, 28(04), 245–59.
Hallowell, M (2010) Safety risk perception in construction companies in the Pacific Northwest of the USA. Construction Management and Economics, 28(04), 403–13.
Hammond, S F, Gajendran, T, Savage, D A and Maund, K (2021) Unpacking the problems behind the limited green construction adoption: towards a theoretical model. Engineering, Construction and Architectural Management, 28(04), 833-44.
Kalach, M, Abdul-Malak, M A and Srour, I (2021) Design information release under alternative design-construction modes. Engineering, Construction and Architectural Management, 28(04), 969-93.
Kern, A P, Postay, R, Schneck, E R, Mancio, M, González, M A S and Guerra, G (2021) Cost and environmental impacts reduction through building compactness. Engineering, Construction and Architectural Management, 28(04), 1176-95.
Kim, S Y, Nguyen, M V and Dao, T T N (2021) Prioritizing complexity using fuzzy DANP: case study of international development projects. Engineering, Construction and Architectural Management, 28(04), 1114-33.
- Type: Journal Article
- Keywords: complexity; danp; fuzzy logic; international development project; research framework
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-04-2020-0265
- Abstract:
Purpose: This paper aims to propose a comprehensive framework for prioritizing complexity criteria. The framework was validated by applying in infrastructure international development (ID) project as a case study. Design/methodology/approach: A literature review highlighted the limitations of existing complexity prioritization methods. Then, a combination of the fuzzy decision-making trial and evaluation laboratory (DEMATEL) and fuzzy analytic network process (ANP) was employed as a foundation to develop a three-stage complexity prioritization framework. Focus group discussion and questionnaire surveys were used to practically test the framework in the infrastructure ID projects. Findings: The three-stage complexity prioritization framework was validated to be reliable and feasible. The findings showed ability of consultants, scope uncertainties, site compensation and clearance, communication between stakeholders, administrative procedure and project duration were the most significant complexity criteria of ID projects in the Vietnamese context. Practical implications: The framework is a robust tool that enables the researchers to grasp the interaction of complexity criteria for complexity prioritization. Later studies can apply the proposed framework, with some minor revisions, to assess the interaction of criteria in other research topics in, and beyond, project complexity. Results of the case study suggest project stakeholders focusing on complex interactions among criteria to reduce project complexity. Originality/value: This study contributes to the body of knowledge by providing a comprehensive complexity prioritization framework that grasps the interrelationship of complexity criteria. For stakeholders of ID projects, the findings provide insightful perspectives to understand complexity, which can help to enhance project performance.
Kumar, R, Iyer, K C and Singh, S P (2021) Understanding relationship between risks and claims for assessing risks with project data. Engineering, Construction and Architectural Management, 28(04), 1014-37.
Lai, I K W and Lam, F K S (2010) Perception of various performance criteria by stakeholders in the construction sector in Hong Kong. Construction Management and Economics, 28(04), 377–91.
Lai, J H K (2010) Operation and maintenance budgeting for commercial buildings in Hong Kong. Construction Management and Economics, 28(04), 415–27.
Laryea, S and Watermeyer, R (2021) Structuring architectural competitions as a competitive procurement process. Engineering, Construction and Architectural Management, 28(04), 886-907.
Li, C Q (2000) A method for reliability-based economic design of building structures. Building Research & Information, 28(04), 260–7.
Liu, F, Wang, Y, Li, H and Zhou, X (2021) Influence of cooperative period of municipal PPPs on transaction cost – a case study. Engineering, Construction and Architectural Management, 28(04), 1261-77.
Lyu, S, Hon, C K H, Chan, A P C, Javed, A A, Zhang, R P and Wong, F K W (2021) An exploratory study of safety communication networks of ethnic minority crews in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 28(04), 1156-75.
Newaz, M T, Jefferies, M, Davis, P R and Pillay, M (2021) Managerial implications for construction practices as a consequence of using a psychological contract of safety. Engineering, Construction and Architectural Management, 28(04), 1134-55.
Nicholas, J, Holt, G D and Harris, P T (2000) Suppliers' debt collection and contractor creditworthiness evaluation. Building Research & Information, 28(04), 268–79.
Ofori-Boadu, A N, Owusu-Manu, D G, Edwards, D J and Asiseh, F (2021) A conceptual model of subcontractor development practices for LEED projects. Engineering, Construction and Architectural Management, 28(04), 1196-213.
Raisbeck, P, Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(04), 345–59.
Suresh, S, Renukappa, S, Abdul-Aziz, A R, Paloo, Y and Jallow, H (2021) Developments in the UK road transport from a smart cities perspective. Engineering, Construction and Architectural Management, 28(04), 845-62.
Udawatta, N, Zuo, J, Chiveralls, K and Zillante, G (2021) From green buildings to living buildings? Rating schemes and waste management practices in Australian educational buildings. Engineering, Construction and Architectural Management, 28(04), 1278-94.
Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(04), 1295-318.
Wang, D, Wang, X, Liu, M, Liu, H and Liu, B (2021) Managing public–private partnerships: a transmission pattern of underlying dynamics determining project performance. Engineering, Construction and Architectural Management, 28(04), 1038-59.
Zhan, W, Pan, W and Chen, L (2021) Construction project productivity evaluation framework with expanded system boundaries. Engineering, Construction and Architectural Management, 28(04), 863-85.