Acheamfour, V K, Kissi, E and Adjei-Kumi, T (2019) Ascertaining the impact of contractors pre-qualification criteria on project success criteria. Engineering, Construction and Architectural Management, 26(04), 618–32.
Aksorn, T and Hadikusumo, B H W (2008) Measuring effectiveness of safety programmes in the Thai construction industry. Construction Management and Economics, 26(04), 21.
Cheung, F K T, Wong, M and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(04), 349–62.
Forsythe, P J and Sepasgozar, S M (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(04), 578–98.
Jayasinghe, R S, Rameezdeen, R and Chileshe, N (2019) Exploring sustainable post-end-of-life of building operations. Engineering, Construction and Architectural Management, 26(04), 689–722.
Jha, K N and Devaya, M N (2008) Modelling the risks faced by Indian construction companies assessing international projects. Construction Management and Economics, 26(04), 337–48.
Kumaraswamy, M M and Dissanayaka, S M (1998) Linking procurement systems to project priorities. Building Research & Information, 26(04), 223–38.
Kyrö, R, Peltokorpi, A and Luoma-Halkola, L (2019) Connecting adaptability strategies to building system lifecycles in hospital retrofits. Engineering, Construction and Architectural Management, 26(04), 633–47.
Lingard, H, Warmerdam, A and Shooshtarian, S (2019) Getting the balance right. Engineering, Construction and Architectural Management, 26(04), 599–617.
Littlefair, P J (1998) Predicting lighting energy use under daylight linked lighting controls. Building Research & Information, 26(04), 208–22.
Luu, T-V, Kim, S-Y, Cao, H-L and Park, Y-M (2008) Performance measurement of construction firms in developing countries. Construction Management and Economics, 26(04), 373–86.
Mallasi, Z (2019) Designing with pixels: parametric thinking for patterning dynamic building facades. Engineering, Construction and Architectural Management, 26(04), 668–88.
Mejlænder-Larsen, & (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(04), 648–67.
Naderpajouh, N and Afshar, A (2008) A case-based reasoning approach to application of value engineering methodology in the construction industry. Construction Management and Economics, 26(04), 363–72.
- Type: Journal Article
- Keywords: Value engineering; expert system; case-based reasoning; decision support system; fuzzy sets
- ISBN/ISSN: 0144-6193
- URL: https://doi.org/10.1080/01446190801905398
- Abstract:
A key point in value engineering (VE) methodology is to acquire and apply knowledge of the assorted fields. An appropriate definition of VE expert knowledge flow could, therefore, yield more productive VE workshops. A conceptual expert case-based reasoning (CBR) framework is introduced in this paper to form a coherent basis for the provision of practically suitable VE expert models. The proposed framework outlines knowledge entities and their relations in the VE workshop. The model benefits from a fuzzy approach to handle uncertainties in the evaluation phase of the methodology. In addition, a computer program is devised, based on the proposed framework, using Borland Delphi 7.0. It comprises an interface representing several phases of the VE job plan. The model is employed in a tunnelling project to demonstrate feasibility of the model in a practical workshop. Owing to its expert nature, the developed model contributes to efficiency of the methodology through providing VE teams with canalized expert knowledge of diverse domains. The propounded model may avail researchers in promoting expert models for pre-construction and specifically VE studies in major construction projects.
Toor, S-U-R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(04), 395–408.
Wang, D, Fang, S and Li, K (2019) Dynamic changes of governance mechanisms in mega construction projects in China. Engineering, Construction and Architectural Management, 26(04), 723–35.
Zou, Y and Lee, S-H (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26(04), 387–93.