Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 22 results ...
Bakens, W (1997) International trends in research and technology development. Building Research & Information, 25(06), 335–7.
Bowen, P, Akintoye, A, Pearl, R and Edwards, P J (2007) Ethical behaviour in the South African construction industry. Construction Management and Economics, 25(06), 631–48.
Bubshait, A A and Tahir, B M (1997) Effect of silica fume on the concrete-steel bond. Building Research & Information, 25(06), 365–9.
Chan, C T W (2007) Fuzzy procurement selection model for construction projects. Construction Management and Economics, 25(06), 611–8.
Delgado-Hernandez, D J, Bampton, K E and Aspinwall, E (2007) Quality function deployment in construction. Construction Management and Economics, 25(06), 597–609.
Egbu, C O (1997) Refurbishment management: challenges and opportunities. Building Research & Information, 25(06), 338–47.
Enshassi, A (1997) Construction safety issues in Gaza Strip. Building Research & Information, 25(06), 370–3.
Galbraith, G H, McLean, R C and Kelly, D (1997) Moisture permeability measurements under varying barometric pressure. Building Research & Information, 25(06), 348–53.
Goodier, C and Gibb, A (2007) Future opportunities for offsite in the UK. Construction Management and Economics, 25(06), 585–95.
Green, S D and Liu, A M M (2007) Theory and practice in value management: a reply to Ellis et al. (2005). Construction Management and Economics, 25(06), 649–59.
Holt, G D (1997) Classifying construction contractors. Building Research & Information, 25(06), 374–82.
Hu, X and Liu, C (2018) Measuring efficiency, effectiveness and overall performance in the Chinese construction industry. Engineering, Construction and Architectural Management, 25(06), 780–97.
Imriyas, K, Pheng, L S and Teo, E A-L (2007) A framework for computing workers' compensation insurance premiums in construction. Construction Management and Economics, 25(06), 563–84.
Malmberg, F (2007) Introduction of a new form of quote evaluation: a case study in southern Sweden. Construction Management and Economics, 25(06), 661–9.
Modak, J P, Sohoni, V V and Aware, H V (1997) Manually powered manufacture of keyed bricks. Building Research & Information, 25(06), 354–64.
Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2018) Developing a safety climate factor model in construction research and practice. Engineering, Construction and Architectural Management, 25(06), 738–57.
Oke, A E (2018) Bonding capability of Nigerian contracting firms. Engineering, Construction and Architectural Management, 25(06), 707–20.
Skitmore, M and Smyth, H (2007) Pricing construction work: a marketing viewpoint. Construction Management and Economics, 25(06), 619–30.
- Type: Journal Article
- Keywords: Marketing; marketing mix; pricing policies; relationship marketing
- ISBN/ISSN: 0144-6193
- URL: http://www.informaworld.com/openurl?genre=article&issn=0144-6193&volume=25&issue=6&spage=619
- Abstract:
Recent work on pricing has shown that neoclassical microeconomic theory (NCMT) is preferred to tendering theory and that implied by absorption, or full-cost, pricing of construction work because of its explicit treatment of market conditions, competitor behaviour and firm capacity levels. Applying NCMT in practice, however, requires the consideration of pricing from a marketing perspective. This paper examines the challenges involved in terms of the two prevalent marketing paradigms - marketing mix and relationship marketing - to pricing construction work generally, and the traditional contracting (TC), design and construction (D&C) and speculative building (SB) procurement systems in particular. In general, the marketing mix (MM) approach, having the closest fit with NCMT, is most aligned to current practice. However, conceptual and practical limitations are identified. Relationship marketing (RM) is theoretically more applicable, yet has been largely overlooked in practice due to the transaction costs and investment involved. Nevertheless, some RM tools are increasingly being adopted in response to demand criteria and clients' needs for continuous improvement, offering a challenge to NCMT-related pricing. In terms of specific procurement arrangements, SB would seem most suited to the MM approach over the long term as it is closest to consumer good markets. D&C on the other hand is considered to be the most price sensitive to demand factors, with SB the least because of its ability to control resources, specifically land and financial packages, while TC is most suited to developing RM practices.
Tripathi, K K and Jha, K N (2018) Application of fuzzy preference relation for evaluating success factors of construction organisations. Engineering, Construction and Architectural Management, 25(06), 758–79.
Umeokafor, N (2018) An investigation into public and private clients’ attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(06), 798–815.
Yan, X and Kim, Y (2018) A conceptual framework of ITSMCA for a building collapse accident. Engineering, Construction and Architectural Management, 25(06), 721–37.
Yang, R J, Jayasuriya, S, Gunarathna, C, Arashpour, M, Xue, X and Zhang, G (2018) The evolution of stakeholder management practices in Australian mega construction projects. Engineering, Construction and Architectural Management, 25(06), 690–706.