Bakens, W (1997) International trends in research and technology development. Building Research & Information, 25(06), 335–7.
Bowen, P, Akintoye, A, Pearl, R and Edwards, P J (2007) Ethical behaviour in the South African construction industry. Construction Management and Economics, 25(06), 631–48.
Bubshait, A A and Tahir, B M (1997) Effect of silica fume on the concrete-steel bond. Building Research & Information, 25(06), 365–9.
Chan, C T W (2007) Fuzzy procurement selection model for construction projects. Construction Management and Economics, 25(06), 611–8.
Delgado-Hernandez, D J, Bampton, K E and Aspinwall, E (2007) Quality function deployment in construction. Construction Management and Economics, 25(06), 597–609.
Egbu, C O (1997) Refurbishment management: challenges and opportunities. Building Research & Information, 25(06), 338–47.
Enshassi, A (1997) Construction safety issues in Gaza Strip. Building Research & Information, 25(06), 370–3.
Galbraith, G H, McLean, R C and Kelly, D (1997) Moisture permeability measurements under varying barometric pressure. Building Research & Information, 25(06), 348–53.
Goodier, C and Gibb, A (2007) Future opportunities for offsite in the UK. Construction Management and Economics, 25(06), 585–95.
Green, S D and Liu, A M M (2007) Theory and practice in value management: a reply to Ellis et al. (2005). Construction Management and Economics, 25(06), 649–59.
Holt, G D (1997) Classifying construction contractors. Building Research & Information, 25(06), 374–82.
Hu, X and Liu, C (2018) Measuring efficiency, effectiveness and overall performance in the Chinese construction industry. Engineering, Construction and Architectural Management, 25(06), 780–97.
Imriyas, K, Pheng, L S and Teo, E A-L (2007) A framework for computing workers' compensation insurance premiums in construction. Construction Management and Economics, 25(06), 563–84.
Malmberg, F (2007) Introduction of a new form of quote evaluation: a case study in southern Sweden. Construction Management and Economics, 25(06), 661–9.
- Type: Journal Article
- Keywords: Procurement; quote evaluation; case study; southern Sweden; renovation
- ISBN/ISSN: 0144-6193
- URL: http://www.informaworld.com/openurl?genre=article&issn=0144-6193&volume=25&issue=6&spage=661
- Abstract:
The effects of changing from traditional tendering methods to an alternative form of quote evaluation were tested in a case study within the southern Swedish construction market. The project studied replacing the outer surface of the roof of a multiple-dwelling building 2000m2 in area. Procurement was carried out in two steps. The first step consisted of traditional tendering methods in which quotations were obtained by asking different contractors to bid. In the second step, formal tender documents were sent by mail to the same contractors. These documents included an alternative form of quote evaluation requiring that references to be provided for similar work, as well as for issues of environmental control, working environment, quality control and the material's life cycle. This second step was found to create additional value for the client and to improve competition. It was also observed that although there was a communication threshold to overcome, this segment of the construction market appeared ready to accept alternative methods for evaluating quotes. It was regarded as important to make the criteria readily understandable and measurable and strive towards a standardized template form of quote evaluation to reflect the goals of both the project and the clients.
Modak, J P, Sohoni, V V and Aware, H V (1997) Manually powered manufacture of keyed bricks. Building Research & Information, 25(06), 354–64.
Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2018) Developing a safety climate factor model in construction research and practice. Engineering, Construction and Architectural Management, 25(06), 738–57.
Oke, A E (2018) Bonding capability of Nigerian contracting firms. Engineering, Construction and Architectural Management, 25(06), 707–20.
Skitmore, M and Smyth, H (2007) Pricing construction work: a marketing viewpoint. Construction Management and Economics, 25(06), 619–30.
Tripathi, K K and Jha, K N (2018) Application of fuzzy preference relation for evaluating success factors of construction organisations. Engineering, Construction and Architectural Management, 25(06), 758–79.
Umeokafor, N (2018) An investigation into public and private clients’ attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(06), 798–815.
Yan, X and Kim, Y (2018) A conceptual framework of ITSMCA for a building collapse accident. Engineering, Construction and Architectural Management, 25(06), 721–37.
Yang, R J, Jayasuriya, S, Gunarathna, C, Arashpour, M, Xue, X and Zhang, G (2018) The evolution of stakeholder management practices in Australian mega construction projects. Engineering, Construction and Architectural Management, 25(06), 690–706.