Adesi, M, Owusu-Manu, D and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(03), 458–74.
Ahmadi Esfahani, N and Shahandashti, M (2020) Post-hazard labor wage fluctuations: a comparative empirical analysis among different sub-sectors of the U.S. construction sector. Journal of Financial Management of Property and Construction , 25(03), 313–30.
Akinradewo, O I, Aigbavboa, C O and Oke, A E (2020) Improving accuracy of road projects’ estimates in the Ghanaian construction industry. Journal of Financial Management of Property and Construction , 25(03), 407–21.
Bon, R (1997) The future of international construction. Building Research & Information, 25(03), 137–41.
Bordass, B and Leaman, A (1997) Design for manageability. Building Research & Information, 25(03), 148–57.
Deng, X, Low, S P, Zhao, X and Chang, T (2018) Identifying micro variables contributing to political risks in international construction projects. Engineering, Construction and Architectural Management, 25(03), 317–34.
Fo, S and Hietanen, x (2007) Interorganizational use of building information models: potential for automational, informational and transformational effects. Construction Management and Economics, 25(03), 289–96.
Gupta, P K and Verma, H (2020) Risk perception in PPP infrastructure project financing in India. Journal of Financial Management of Property and Construction , 25(03), 347–69.
Hassim, S, Muniandy, R, Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia. Engineering, Construction and Architectural Management, 25(03), 443–57.
Holt, G D (2018) Let’s change tack, not wind direction: a response to Kog and Yaman (2016). Engineering, Construction and Architectural Management, 25(03), 335–41.
Jin, X-H, Doloi, H and Gao, S-Y (2007) Relationship-based determinants of building project performance in China. Construction Management and Economics, 25(03), 297–304.
K'Akumu, O A (2007) Construction statistics review for Kenya. Construction Management and Economics, 25(03), 315–26.
Kappia, J G, Dainty, A R J and Price, A D F (2007) Prioritising career development in relation to recruitment and retention: a trade and craft perspective. Construction Management and Economics, 25(03), 239–53.
Ling, F Y Y and Hui, D (2007) Enablers for Singapore contractors to internationalize construction services. Construction Management and Economics, 25(03), 267–75.
Meintjes, I, Bowen, P and Root, D (2007) HIV/AIDS in the South African construction industry: understanding the HIV/AIDS discourse for a sector-specific response. Construction Management and Economics, 25(03), 255–66.
Ngowi, A B (1997) A hybrid approach to house construction: a case study in Botswana. Building Research & Information, 25(03), 142–7.
Obeng, K, Ocran, K A G and Anaba, D (1997) Palm kernel shell as fuel for burning bricks. Building Research & Information, 25(03), 131–6.
Olander, S (2007) Stakeholder impact analysis in construction project management. Construction Management and Economics, 25(03), 277–87.
Onubi, H O, Yusof, N and Hassan, A S (2020) Effects of green construction on project’s economic performance. Journal of Financial Management of Property and Construction , 25(03), 331–46.
Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(03), 342–57.
Pheng, L S and May, C F (1997) Quality management systems: a study of authority and empowerment. Building Research & Information, 25(03), 158–69.
Praticò, F G (2007) Quality and timeliness in highway construction contracts: a new acceptance model based on both mechanical and surface performance of flexible pavements. Construction Management and Economics, 25(03), 305–13.
Proverbs, D G, Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(03), 176–84.
Rowlinson, S (2007) The temporal nature of forces acting on innovative IT in major construction projects. Construction Management and Economics, 25(03), 227–38.
Shurrab, M, Abbasi, G and Al Khazaleh, R (2018) Evaluating the effect of motivational dimensions on the construction project managers in Jordan. Engineering, Construction and Architectural Management, 25(03), 412–24.
Sundquist, V, Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(03), 358–73.
W., F A (2020) Impacts of capital structure: profitability of construction companies in Ethiopia. Journal of Financial Management of Property and Construction , 25(03), 371–86.
Wang, Q, Guo, Z, Mei, T, Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies’ installation. Engineering, Construction and Architectural Management, 25(03), 374–411.
- Type: Journal Article
- Keywords: Construction; Project management; Building information modelling; Approach;
- ISBN/ISSN: 0969-9988
- URL: https://doi.org/10.1108/ECAM-09-2016-0210
- Abstract:
Construction industrialization is emerging in the construction industry, as a result, buildings with prefabricated assemblies are gaining more and more ground. In most situations, the prefabricated building assemblies are installed by labor crews manually. If some assemblies are ill-designed, clashes between labor crews’ workspaces and them may occur, which will have bad effect on workers’ productivity and even incur hazard. The purpose of this paper is to provide a 4D building information modeling (BIM) based approach to find potential workspace conflicts during the installation process of prefabricated building assemblies in the detailed design process so as to eliminate them in advance.Design/methodology/approach First, a workspace modeling method is provided; second, three kinds of workspace conflicts are analyzed; third, a 4D-BIM-based approach is established; fourth, a prototype tool based on the approach is developed; and finally, a case study is conducted to test the tool.Findings The result shows that the proposed tool can detect or precaution workspace conflicts and visualize them in a series of views; in doing so, valuable information can be obtained for improving the design quality of prefabricated assemblies.Research limitations/implications The proposed approach and tool only concern the congestions caused by ill-designed prefabricated components; the tool needed to be further optimized for speed; the tests on the tool are limited to a single case study; and more tests are needed to verify its effectiveness.Originality/value This research provides a 4D-BIM-based approach and a prototype tool for installation workspace analysis. It can be used to provide support for design optimization of prefabricated building assemblies.
Wild, S, Gailius, A, Hansen, H, Pederson, L and Szwabowski, J (1997) Pozzolanic properties of a variety of European clay bricks. Building Research & Information, 25(03), 170–5.
Williams, C and Kosta, B (2020) Explaining the cash-in-hand consumer culture in the European home repairs and renovations sector. Journal of Financial Management of Property and Construction , 25(03), 387–405.
Windapo, A O, Olugboyega, O and Odediran, S (2020) Impacts of procurement strategies on construction SMEs’ growth. Journal of Financial Management of Property and Construction , 25(03), 423–46.
Zhang, R P, Pirzadeh, P, Lingard, H and Nevin, S (2018) Safety climate as a relative concept. Engineering, Construction and Architectural Management, 25(03), 298–316.
Zuo, J, Zhao, X, Nguyen, Q B M, Ma, T and Gao, S (2018) Soft skills of construction project management professionals and project success factors. Engineering, Construction and Architectural Management, 25(03), 425–42.