ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 74 results ...

Afolabi, A, Ibem, E, Aduwo, E, Tunji-Olayeni, P, Oluwunmi, O and Ayo-Vaughan, E (2022) Gauging parameters for e-procurement acquisition in construction businesses in Nigeria. International Journal of Construction Management, 22(03), 426-35.

Afshar, M R, Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(03), 357-65.

Albattah, M A, Goodrum, P M, Littlejohn, R and Taylor, T R B (2022) A comparative analysis of the utilization of multiskilling among us Hispanic and non-Hispanic construction craft workers. International Journal of Construction Management, 22(03), 331-41.

Amadi, A I and Higham, A (2017) Latent geotechnical pathogens inducing cost overruns in highway projects. Journal of Financial Management of Property and Construction, 22(03), 269-85.

Annunen, P and Haapasalo, H (2022) Production capability creation (PCC) for collaborative construction projects: A qualitative study from Finland. Construction Economics and Building, 22(03), 1-20.

Anzagira, L F, Duah, D, Badu, E, Simpeh, E K and Marful, A B (2024) Stimulation strategies to promote green building uptake in developing countries: the case of Ghana. Journal of Engineering, Design and Technology, 22(03), 1012-29.

Ayat, M, Ullah, A and Kang, C (2024) The unsolicited proposal and performance of private participation infrastructure projects in developing countries. Journal of Engineering, Design and Technology, 22(03), 901-25.

Ball, Z, Cagan, J and Kotovsky, K (2024) Supporting management of new product development via a novel conceptual model: an interview driven approach. Journal of Engineering, Design and Technology, 22(03), 991-1011.

Bamgbade, J A, Nawi, M N M, Kamaruddeen, A M, Adeleke, A Q and Salimon, M G (2022) Building sustainability in the construction industry through firm capabilities, technology and business innovativeness: Empirical evidence from Malaysia. International Journal of Construction Management, 22(03), 473-88.

Bevan, E A M and Yung, P (2015) Implementation of corporate social responsibility in Australian construction SMEs. Engineering, Construction and Architectural Management, 22(03), 295-311.

Boadu, E F, Sunindijo, R Y, Wang, C C and Frimpong, S Y (2022) Health and safety integration into the procurement stages of public construction projects in developing countries: A case of Ghana. Construction Economics and Building, 22(03), 43-64.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

Costantino, N and Pietroforte, R (2004) Note - Production arrangements by US building and non-building contractors: an update. Construction Management and Economics, 22(03), 231-5.

Dang, C N, Le-Hoai, L and Peansupap, V (2022) Linking knowledge enabling factors to organizational performance: Empirical study of project-based firms. International Journal of Construction Management, 22(03), 527-40.

Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(03), 489-500.

Elghaish, F, Matarneh, S T and Alhusban, M (2022) The application of “deep learning” in construction site management: scientometric, thematic and critical analysis. Construction Innovation, 22(03), 580-603.

  • Type: Journal Article
  • Keywords: automated health and safety warning; deep learning; internet of things (iot); monitoring equipment; object detection; progress monitoring
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-10-2021-0195
  • Abstract:

    Purpose: The digital construction transformation requires using emerging digital technology such as deep learning to automate implementing tasks. Therefore, this paper aims to evaluate the current state of using deep learning in the construction management tasks to enable researchers to determine the capabilities of current solutions, as well as finding research gaps to carry out more research to bridge revealed knowledge and practice gaps. Design/methodology/approach: The scientometric analysis is conducted for 181 articles to assess the density of publications in different topics of deep learning-based construction management applications. After that, a thematic and gap analysis are conducted to analyze contributions and limitations of key published articles in each area of application. Findings: The scientometric analysis indicates that there are four main applications of deep learning in construction management, namely, automating progress monitoring, automating safety warning for workers, managing construction equipment, integrating Internet of things with deep learning to automatically collect data from the site. The thematic and gap analysis refers to many successful cases of using deep learning in automating site management tasks; however, more validations are recommended to test developed solutions, as well as additional research is required to consider practitioners and workers perspectives to implement existing applications in their daily tasks. Practical implications: This paper enables researchers to directly find the research gaps in the existing solutions and develop more workable applications to bridge revealed gaps. Accordingly, this will be reflected on speeding the digital construction transformation, which is a strategy over the world. Originality/value: To the best of the authors’ knowledge, this paper is the first of its kind to adopt a structured technique to assess deep learning-based construction site management applications to enable researcher/practitioners to either adopting these applications in their projects or conducting further research to extend existing solutions and bridging revealed knowledge gaps.

Elghaish, F, Matarneh, S T, Edwards, D J, Pour Rahimian, F, El-Gohary, H and Ejohwomu, O (2022) Applications of Industry 4.0 digital technologies towards a construction circular economy: gap analysis and conceptual framework. Construction Innovation, 22(03), 647-70.

Elghaish, F, Matarneh, S T, Talebi, S, Abu-Samra, S, Salimi, G and Rausch, C (2022) Deep learning for detecting distresses in buildings and pavements: a critical gap analysis. Construction Innovation, 22(03), 554-79.

Faris, H, Gaterell, M and Hutchinson, D (2022) Investigating underlying factors of collaboration for construction projects in emerging economies using exploratory factor analysis. International Journal of Construction Management, 22(03), 514-26.

Getuli, V, Capone, P, Bruttini, A and Sorbi, T (2022) A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 22(03), 504-30.

Ghodki, M K (2024) A new solar powered robotic arm guided master–slave electric motors of biomass conveyor. Journal of Engineering, Design and Technology, 22(03), 739-62.

Giritli, H and Oraz, G T (2004) Leadership styles: some evidence from the Turkish construction industry. Construction Management and Economics, 22(03), 253-62.

Goodrum, P M and Gangwar, M (2004) The relationship between changes in equipment technology and wages in the US construction industry. Construction Management and Economics, 22(03), 291-301.

Griffiths, R, Lord, W and Coggins, J (2017) Project bank accounts: the second wave of security of payment?. Journal of Financial Management of Property and Construction, 22(03), 322-38.

Hajirasouli, A, Banihashemi, S, Drogemuller, R, Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: thematic analysis and conceptual frameworks. Construction Innovation, 22(03), 412-43.

Hamza, M, Shahid, S, Bin Hainin, M R and Nashwan, M S (2022) Construction labour productivity: Review of factors identified. International Journal of Construction Management, 22(03), 413-25.

Hwang, B-G, Zhao, X and Tan, L L G (2015) Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(03), 327-46.

Ibrahim, F S, Esa, M and Kamal, E M (2022) Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia. Construction Economics and Building, 22(03), 21-42.

Jacobsen, E L, Solberg, A, Golovina, O and Teizer, J (2022) Active personalized construction safety training using run-time data collection in physical and virtual reality work environments. Construction Innovation, 22(03), 531-53.

Jain, P, Tambuskar, D P and Narwane, V (2024) Identification of critical factors for big data analytics implementation in sustainable supply chain in emerging economies. Journal of Engineering, Design and Technology, 22(03), 926-68.

Jayalath, C and Perera, B A K S (2022) Exploring a shared comprehension between judicial approaches and scholar views pertaining to concurrent delays. International Journal of Construction Management, 22(03), 400-12.

Karthik, D and Kameswara Rao, C B (2022) Identifying the significant factors affecting the masonry labour productivity in building construction projects in India. International Journal of Construction Management, 22(03), 464-72.

Khan, A, Khan, M W A, Sorooshian, S, Ullah, M and Rana, F (2022) The mediating role of benefit management for sustaining the performance of infrastructure projects. Construction Economics and Building, 22(03), 124-43.

Kissi, E, Adjei-Kumi, T, Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(03), 252-68.

Kissi, E, Adjei-Kumi, T, Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(03), 252-68.

Kissi, E, Agyekum, K, Baiden, B K, Reuben Agyei, T, Badu Eshun, B T and Badu, E (2022) Factors influencing tender pricing strategies of construction SMEs in Ghana. International Journal of Construction Management, 22(03), 387-99.

Kukah, A S K, Owusu-Manu, D G, Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(03), 854-78.

Kuoribo, E, Amoah, P, Kissi, E, Edwards, D J, Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(03), 969-90.

Lü, X, Liu, Z, Lü, X and Wang, X (2024) Design and study on the leveling mechanism of the tractor body in hilly and mountainous areas. Journal of Engineering, Design and Technology, 22(03), 679-89.

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(03), 237-51.

Lee, Y S, Rashidi, A, Talei, A, Arashpour, M and Pour Rahimian, F (2022) Integration of deep learning and extended reality technologies in construction engineering and management: a mixed review method. Construction Innovation, 22(03), 671-701.

Leung, M-Y, Ng, S T and Cheung, S-O (2004) Measuring construction project participant satisfaction. Construction Management and Economics, 22(03), 319-31.

Li, H, Xu, C, Cao, Y and Zhang, C (2024) What are the influencing factors of government’s trust decision-making on private sector in PPP projects: evidence from China?. Journal of Engineering, Design and Technology, 22(03), 813-35.

Lingard, H, Turner, M and Charlesworth, S (2015) Growing pains: Work-life impacts in small-to-medium sized construction firms. Engineering, Construction and Architectural Management, 22(03), 312-26.

Low, S P and Hongbin, J (2004) Estimation of international construction performance: analysis at the country level. Construction Management and Economics, 22(03), 277-89.

Lowies, B, Viljoen, C and McGreal, S (2017) Investor perspectives on property crowdfunding: evidence from Australia. Journal of Financial Management of Property and Construction, 22(03), 303-21.

Mahdi, I M, Khalil, A H, Mahdi, H A and Mansour, D M M (2022) Decision support system for optimal bridge' maintenance. International Journal of Construction Management, 22(03), 342-56.

Metham, M, Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(03), 501-13.

Minami, K (2004) Whole life appraisal of the repair and improvement work costs of Post Office buildings in Japan. Construction Management and Economics, 22(03), 311-8.

Mitropoulos, P and Tajima, V (2022) Constructability opportunities in the engineering design of marine pier structures: A case study. International Journal of Construction Management, 22(03), 366-78.

Moshood, T D, Rotimi, F E and Rotimi, J O B (2022) An integrated paradigm for managing efficient knowledge transfer: Towards a more comprehensive philosophy of transferring knowledge in the construction industry. Construction Economics and Building, 22(03), 65-98.

Mustaffa, N K, Isa, C M M, Ekundayo, D and Joseph, V R A (2022) Barriers and strategies for improving carbon emissions management approaches in Malaysian construction. Construction Economics and Building, 22(03), 99-123.

Nguyen, D C, Nguyen, T Q, Jin, R, Jeon, C H and Shim, C S (2022) BIM-based mixed-reality application for bridge inspection and maintenance. Construction Innovation, 22(03), 487-503.

Osuizugbo, I C, Okolie, K C and Oshodi, O S (2024) Factors supporting the implementation of buildability assessment as a tool for buildability improvement. Journal of Engineering, Design and Technology, 22(03), 879-900.

Oyegoke, A S and Al Kiyumi, N (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(03), 286-302.

Quaigrain, R A, Owusu-Manu, D G, Edwards, D J, Hammond, M, Hammond, M and Martek, I (2024) Occupational health and safety orientation in the oil and gas industry of Ghana: analysis of knowledge and attitudinal influences on compliance. Journal of Engineering, Design and Technology, 22(03), 795-812.

Reyes Veras, P, Renukappa, S and Suresh, S (2022) Awareness of Big Data concept in the Dominican Republic construction industry: an empirical study. Construction Innovation, 22(03), 465-86.

S, E K and M.K, P (2024) Adaptive deep learning for deep COVID-19 diagnosis. Journal of Engineering, Design and Technology, 22(03), 763-94.

Sadeghineko, F and Kumar, B (2022) Application of semantic Web ontologies for the improvement of information exchange in existing buildings. Construction Innovation, 22(03), 444-64.

Sandanayake, M, Zhang, G and Setunge, S (2022) Impediments affecting a comprehensive emission assessment at the construction stage of a building. International Journal of Construction Management, 22(03), 453-63.

Shayan, S, Pyung Kim, K and Tam, V W Y (2022) Critical success factor analysis for effective risk management at the execution stage of a construction project. International Journal of Construction Management, 22(03), 379-86.

Sobuz, M H R, Meraz, M M, Saha, A, Akid, A S M, Hasan, N M S, Rahman, M and Safayet, M A (2024) Performance assessment of various seismic resistant systems for a multistory structure in different seismic zones of Bangladesh. Journal of Engineering, Design and Technology, 22(03), 718-38.

Sulaimon, I A, Alaka, H, Olu-Ajayi, R, Ahmad, M, Ajayi, S and Hye, A (2024) Effect of traffic data set on various machine-learning algorithms when forecasting air quality. Journal of Engineering, Design and Technology, 22(03), 1030-56.

Talebi, S, Wu, S, Al-Adhami, M, Shelbourn, M and Serugga, J (2022) The development of a digitally enhanced visual inspection framework for masonry bridges in the UK. Construction Innovation, 22(03), 624-46.

Tang, S L, Aoieong, R T and Ahmed, S M (2004) The use of process cost model (PCM) for measuring quality costs of construction projects: model testing. Construction Management and Economics, 22(03), 263-75.

Taniguchi, K, Kubota, S and Yasumuro, Y (2022) Quantitative visualization of physical barriers for vulnerable pedestrians based on photogrammetry. Construction Innovation, 22(03), 604-23.

Thakare, P and V, R S (2024) Advanced pest detection strategy using hybrid optimization tuned deep convolutional neural network. Journal of Engineering, Design and Technology, 22(03), 645-78.

Wang, S Q, Dulaimi, M F and Aguria, M Y (2004) Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(03), 237-52.

Wild, A (2004) Re-interpreting the Building Industry Communications Research Project. Construction Management and Economics, 22(03), 303-10.

Yap, J B H and Shavarebi, K (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: Competency development. International Journal of Construction Management, 22(03), 436-52.

Zamani, S H, Rahman, R A, Fauzi, M A and Mohamed Yusof, L (2024) Government pandemic response strategies for AEC enterprises: lessons from COVID-19. Journal of Engineering, Design and Technology, 22(03), 690-717.

Zhao, X, Hwang, B-G and Low, S P (2015) Enterprise risk management in international construction firms: Drivers and hindrances. Engineering, Construction and Architectural Management, 22(03), 347-66.

Zulu, E, Zulu, S L, Chabala, M, Kavishe, N, Chifunda, C and Musonda, I (2024) Infrastructure design stage considerations for environmental sustainability in Zambia. Journal of Engineering, Design and Technology, 22(03), 836-53.